NIDHI SINGH

Document Sample
NIDHI SINGH Powered By Docstoc
					Saroj Saurabh
BSS & NOC (Network Support)
Jamshedpur, Jharkhand

Email – sarojsaurabh100@gmail.com
Mob -- +91-9873109543,9910725984

CAREER OBJECTIVE & ACHIVEMENTS
Dynamically experienced in communication with technical knowledge to assist others in positive
developmental growth over a long term basis, can see the big picture and knows how to get
things done. A proven problem solver with a strong work ethic and ability to motivate staff to
excellence.

PROFESSIONAL TRAINING:

45 days ZTE BSS (iBSC/iTC/SDR)GSM) Training at Jamshedpur

Planning (GB/ATER/APCM/SIGNALLING/Capacity),Installation,Commissioning,Integration,
Testing,Configuration,Fault Management and Performance Management of BSS GSM Nodes.

TELECOM EXPERIENCE: 2.8Years

BSS and OMCR Wireless GSM

Zephyr System Pvt Ltd(Network Support Department):

Working as BSS and OMCR engineer from 08thJune 2009 to till date on TATA GSM Project and
O&M.
PROFILE:BSS Project and Operations(OMCR,NOC,BSC,TC,BTS,SDR,PCU,DSP,GB)

PROJECTS HANDELED:

1.Performed major swap (750 city sites and 240 rural sites).

2.Tata GSM Bihar and Jharkhand (20 BSC/3 ITC/2200 BTS) and MGW Traffic Shifting.

Role and Responsibilities:

.ZTE Telecom India Pvt Ltd(Network Support Department):
Planning:
IP Pool Planning(OML/OMCB/OMP/SBCX/RPU/GB/SDR/OPC/DPC).

Voice:ABIS/ATER/APCM/SIGNALLING/Networking of BSC-ITC-MGW According to Utilization,CMP
Module Balancing.

Data:GB Utilization and Traffic Distribution with Two SGSN /SGSN Papu Load and BW Plan ,PCU
Utilization,DSP Resource Utilization Plan.

Installation,Commissioning and Up gradation(IBSC/ITC/SDR):

ZXG10 IBSC (Linux Operating system/Oracle Database/ Red Hat AS4 Server)
ITC(OS Windows2003) and ZXSDR BTS 8800/8900/8700/8200.

1.Successfully Done Installation/Commissioning/Integration/ATP/Call Test(Voice/Data) for 6
BSC 3 ITC during Project Rollout.

2.Successfully Commissioned 200 SDR Nodes during Project Rollout.
3.Successfully Integrated and ATP for 4 iBSC and 2 iTC in MGW Shifting activity from One to
Other location.
4.Successfully Done OMP/OMCB /EUIP/UPPB/GUP/SDR BTS Version Upgrade BSC and BTS.

5.Successfully Done Patch and Technical Notice upgrade for Day to day Operations Faults.

6.CISCO and ZTE Router Switch commissioning and IP configuration for OML
extension .
Configuration and Fault Management :
1.Site creation ,BSC,TC,E1 Augmentation(ATER,A link ,Signalling/OPC/DPC).
2.CRF implementation(SDCCH/PDTCH/Handovers/HOMargin/Timers etc.
3.Routien BSS Nodes health check up ,Trouble Ticket Handling, Card Replacement in P.E Widow.
4.Signalling Trace analysis for voice cracking/call mute issue(BER/PCM CKTS Mismatch).
5.GUP/TC/DSP/PCU/GB faults Analysis and Resolution.
6.BSC/ITC/SDR BTS Rehoming according to utilization.
7.TASR/SD Blocking/Tch Blocking/CSSR/GB Utilization QOS Alarm Implementation.
8.Backup Maintenance(BSC/ITC/BTS).
9.UPPB DSP Additions to decongest the PCU Utilization.
10.Cordination with NOKIA SGSN NOC when NSEI IS DOWN.
11.Cordination with HUAWEI MPLS TRANSMISSION NOC for GB Outage.
12.Performing BTS/BSC Swap Activity.
13.Troubleshooting with hardware /software problem in BSC, TC BTS.
14.Troubleshooting of N.7 Signaling, RSL, OML etc.
15.Backup of BSC/ITC/SDR/Network Plan Table etc.
16. Raising Work Orders to the Field Engineers.
KPI monitoring and optimization:
1.BBH report monitoring and optimization(TASR /TCH Blocking/SDCCH Blocking/DCR/TRX tch
assignment success rate/CSSR) .
2.TRX/SDCCH /PDTCH addition/deletion/Reshuffling(over utilized/low utilized/LAC Boundary)
3.GPRS DSP load balancing /UPPB DSP addition if PCU reject/congestion occurs.
4.Hand over checks in HOSR is poor .
5.CMP Module Load /DSP Load checks in TCH blocking/SDCCH Blocking/EDAP/PCU Congestion.
6.AMR Hr threshold check and FR to HR threshold check.
7.QOS alarm threshold check (Low CSSR/Blocking/TASR).
8.RadioUtilization/E1 Utilization/GB and PCU Utilization for DATA and ATER/APCM/SIGNALLING
for voice etc.
9.Timers and counters Check.
OMCR Responsibility:
1.Commissioned OMCR-A1353-RA (AGENT).
2.Creation of MLPP OML links between TC and Cisco Router 8800.
3.BTS Database creation as well as integration from OMC-R.
4.Performing Backup Creation for OMCR as well as BSC’s.
5.Performing routine activities on the OMCR (Configuration Management, Fault Detection, BSS.
6.Network Report Analysis, Detection and Analysis of all alarms and events from the OMC-R.).
7.Handling routine problems and database change request from the planning team.
8.Synchronization of BSC (NTP Drift) with Server through OMCR.
9.Rehoming of BTS/BSC .
PROFESSIONAL QUALIFICATION:
 Bachelor of Engineering ( Electronics & telecommunication)
R.P.C.E affiliated to R.T.M.N.U. Nagpur (Maharashtra) & AICTE

PERSONAL DETAILS:
Name                              Saroj saurabh
Father’s name                     Mr.Arunendra Prasad
Date of Birth                     June 24th, 1984
Sex                               Male
Marital Status                    Unmarried
Language Known                    Hindi, English
Phone Number                      +91-9910725984

I here by declare that above information are true to best of my knowledge.

Saroj Saurabh                                                     Delhi

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:1
posted:1/30/2013
language:Unknown
pages:2