Ministry of Energy and Mines

Document Sample
Ministry of Energy and Mines Powered By Docstoc
					                                    Ministry of Energy, Mines                                                Mineral & Coal
                                    and Petroleum Resources             Annual Summary of Work for Exploration Activities
                                    Mining and Minerals Division                Pursuant to Part 9.2.1(3) of the H.S.R. Code



Date: _________________________________                                               Mine No.: ________________________
Permit Number: _____________________
Name of Property/Project: ____________________________________________________________________
Annual Work Approval Number:_______________________________________________________________
Permittee
Name: ___________________________________________________________________________________
Address: _________________________________________________________________________________
City: ___________________________________________________________ Province: ________________
Postal Code: ______________ Bus. Phone: ______________________    Fax: ____________________
Duration of Exploration Program for reported year.
Start date (Year/Month/Day)                                             Finish date (Year/Month/Day)
             Attach a map at a scale of 1:10,000 or better showing as built: trails, roads, drill sites, trenches, test
                                 pits, core storage, other developments and reclaimed sites.
Surface Exploration Work Completed on Property
Exploration Surveys
     Type                        Total Length (km)                                  Type                Total Length (km)
Line Cutting                                                            VLF
IP                                                                      Max-Min
EM                                                                      Mag
Other
Geochem.
     Type                              # Samples                                  Type                       # Samples
Grid Soil                                                               Detailed Silt
Contour Soil                                                            Other
Mechanized Work
                                              # Sites     Total Length (m)         Width (m)             Disturbance (ha)
                                                                               (includes sidecast)
Trenching
Test Pits
Access
        Excavated Trail
        Excavated Road
                                                  Core Size   # Sites     # Holes     Metres (m)       Total Disturbance (ha)
Diamond Drilling
Percussion Drilling
Other Drilling
Bulk Sample                                                              Tonnes
Core Location (NAD 83)
                                              Lat/Long                                     º                   º    ZONE
                                              UTM


Annual Summary of Exploration Activities (ASEA)
                                                                                                                                1
                                        Ministry of Energy, Mines                                                            Mineral & Coal
                                        and Petroleum Resources                         Annual Summary of Work for Exploration Activities
                                        Mining and Minerals Division                            Pursuant to Part 9.2.1(3) of the H.S.R. Code



Underground Exploration Work Completed on Property This Year
                                      # Holes          Total Metres Drilled                          New Development                                             (m)
Diamond Drilling                                                                                     Drifts
Percussion Drilling                                                                                  Raises
                                                                                                     Declines & Ramps
Bulk Sample                                     m3                      Tonnes                       Rehab Workings                                              (m)
    Ore Mined                                                                                        Drifts
    Waste Mined                                                                                      Raises
Totals                                                                                               Declines & Ramps
       Are underground openings closed in compliance with Section 10.6.5 of the Code?                                                                 □ Yes □ No
Surface Disturbances and Reclamation Completed on Property This Year
                                                                         Surface Disturbance (ha)                                  Reclamation Completed (ha)
                                                                                    1ha = 10,000m2                                               1ha = 10,000m2
Cut grids, camps, helicopter pads
Mechanical trenches/test pit
Surface drill sites/settling ponds/sumps
Excavated Trail construction/modification
Excavated Road construction/modification
Bulk sample overburden/waste dumps
Portal sites, ore/waste dumps
Other: __________________________
Totals

Reclamation Summary
Area of new surface disturbance this year:                                                                                          _____________________ ha
Add disturbance from previous years:                                                                                              + ____________________ ha
Subtract disturbance reclaimed this year:                                                                                         - _____________________ ha
Balance of unreclaimed surface disturbance:                                                                                       = ____________________ ha

CONFIDENTIAL                                            (Information not for routine release)
Deposit Type:                                                                                    Exploration Expenditure:

Estimated total person/days worked
Do you expect to be working on this property within one year?                                                                        □ Yes □ No
Do you wish to close this permit and have the reclamation security returned?                                                         □ Yes □ No
If yes, submit Notice of Mine Closure (Part 10.6 of the Code)



Manager Signature                                                                                              Date
The Mines Act of British Columbia authorizes the collection of the requested information on this form. The completed from is routinely available to the public, except as noted, and
is covered by the Freedom of Information and Protection of Privacy Act.



Annual Summary of Exploration Activities (ASEA)
                                                                                                                                                                                  2

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:1/30/2013
language:Unknown
pages:2