					   Information Sheet                                                                    www.crossrail.co.uk
                                                                                           0345 602 3813
   January 2013

Installation of testing and monitoring equipment
in Wardour Street and Noel Street
                                                                                                      Duration of work
The Crossrail tunnels are now progressing from Royal Oak to
Farringdon and the tunnel boring machines (TBM) are due to pass                                           Work starts on 21
under Noel Street and Wardour Street in Spring 2013.                                                       January 2013 to
                                                                                                           7 February 2013.
As the tunnelling operation may cause some ground settlement it is                                         Between 08.00 -
important to monitor this movement to ensure that it remains within                                        18.00 Monday to
predicted limits.                                                                                          Friday and 08.00 -
                                                                                                           13.00 on Saturdays
In order to obtain accurate and effective measurements of any
settlement, we will be installing specialist equipment to monitor the                                 What to expect
underground water utilities in Noel Street and Wardour Street.                                         Traffic and
                                                                                                        pedestrian
The work will be carried out in the areas indicated in blue on the two                                  management during
drawings overleaf and is due to start on 21 January 2013 and will and                                   the work
be completed by 7 February 2013, subject to any unforeseen
circumstances.                                                                                            Redirection of
                                                                                                           pedestrian route
There should be no disruption to your water supply and the work will
will be carried out in accordance with and subject to conditions and                                      Use of mechanical
agreements stipulated by Westminster City Council.                                                         excavating
                                                                                                           equipment

                                                                                                      What we will do

                                                                                                          Ensure that traffic
                                                                                                           management signage
                                                                                                           is in place.

                                                                                                          Monitor noise and
                                                                                                           dust and keep within
                                                                                                           permitted levels.




We apologise in advance for any inconvenience caused as a result of our works. If you have any queries, please contact the
Crossrail 24-hour public helpdesk on 0345 602 3813 or email helpdesk@crossrail.co.uk
Please contact the Crossrail helpdesk if you would like to receive works information via email in advance of the printed copy.
Alternatively you can sign up to receive email notifications about stations of interest by visiting www.crossrail.co.uk/contact
Crossrail services will commence through the central tunnelled section in late 2018
followed by a phased introduction of services along the rest of the Crossrail route.             C300-XRL-Z1-XBU-CR082_1-50006
We apologise in advance for any inconvenience caused as a result of our works. If you have any queries, please contact the
Crossrail 24-hour public helpdesk on 0345 602 3813 or email helpdesk@crossrail.co.uk
Please contact the Crossrail helpdesk if you would like to receive works information via email in advance of the printed copy.
Alternatively you can sign up to receive email notifications about stations of interest by visiting www.crossrail.co.uk/contact
Crossrail services will commence through the central tunnelled section in late 2018
followed by a phased introduction of services along the rest of the Crossrail route.             C300-XRL-Z1-XBU-CR082_1-50006
We apologise in advance for any inconvenience caused as a result of our works. If you have any queries, please contact the
Crossrail 24-hour public helpdesk on 0345 602 3813 or email helpdesk@crossrail.co.uk
Please contact the Crossrail helpdesk if you would like to receive works information via email in advance of the printed copy.
Alternatively you can sign up to receive email notifications about stations of interest by visiting www.crossrail.co.uk/contact
Crossrail services will commence through the central tunnelled section in late 2018
followed by a phased introduction of services along the rest of the Crossrail route.             C300-XRL-Z1-XBU-CR082_1-50006
 About Crossrail
 Crossrail is the new high frequency, convenient
 and accessible railway for London and the South
   March 2012
 East.

 When the service opens Crossrail trains will travel
 from Maidenhead and Heathrow in the west to
 Shenfield and Abbey Wood in the east via new
 twin tunnels under central London. It will link
 Heathrow Airport, the West End, the City of
 London and Canary Wharf.
  Travelling on Crossrail will
  dramatically reduce Journey                             With
  times.                                    Now
                                                        Crossrail

   Example journey times in minutes
  Slough – Tottenham Court Road                55           32

  Romford – Bond Street                        43           35

  Whitechapel – Abbey Wood                     49           15

  Ealing Broadway – Farringdon                 38           17

  Heathrow – Liverpool Street                  55           32

  Heathrow – Canary Wharf                      71           40

  Maidenhead – Liverpool Street                71           46

  Paddington - Canary Wharf                    30           16


Drop in to our Visitor Information Centres
West End 16-18 St Giles High Street, WC2H 8LN.
Open Tuesdays and Thursdays 11.00 to 19.00
Whitechapel Idea Store, 321 Whitechapel Road,
E1 1BU. Open Mondays and Wednesdays 11.00 to
19.00

Tottenham Court Road Community Liaison Panel
Crossrail run a quarterly meeting to keep local
community representatives informed of the works
happening in the area. For more information please
contact crossrailliaisonpanels@crossrail.co.uk

                   QR Code
                   Scan with your mobile device to be taken to
                   the ‘Near You’ section of our website




 We apologise in advance for any inconvenience caused as a result of our works. If you have any queries, please contact the
 Crossrail 24-hour public helpdesk on 0345 602 3813 or email helpdesk@crossrail.co.uk
 Please contact the Crossrail helpdesk if you would like to receive works information via email in advance of the printed copy.
 Alternatively you can sign up to receive email notifications about stations of interest by visiting www.crossrail.co.uk/contact
 Crossrail services will commence through the central tunnelled section in late 2018
 followed by a phased introduction of services along the rest of the Crossrail route.             C300-XRL-Z1-XBU-CR082_1-50006

				