Presentation - Level Crossing 2012

Document Sample
Presentation - Level Crossing 2012 Powered By Docstoc
					      More Countermeasures
to prevent level crossing accidents


         Nobuaki SHIMADA
    Transport Safety Department
    East Japan Railway Company
  Contents

1. Outline of JR East

2. Past countermeasures in Five-Year Safety
 Plan

3. More countermeasures of the last two
  years
・Countermeasures of low grade level crossings
・Eliminating high risk level crossing
4. Conclusions
  Outline of JR East

            JR Group Map
                                                 JR Hokkaido




                JR West                          JR East
                                        Tokyo
JR Kyushu          Osaka

                           JR Central           JR Freight
            JR Shikoku
   Outline of JR East
( As of April 1, 2012 )
Employees                59,130
Working line-kilometers 7,512.6 km
                                             Shin-Aomori
Stations                 1,689
                                                             Hachinohe
Passengers carried       About 16 million/day
Trains operated          12,757/day               Akita       Series E3

Units of rolling stock   13,157                      Morioka
Number of level crossings 7,073
                                              Shinjo
                               Niigata
                                                              Series E5*


                     Nagano                    Sendai
Series E2

Series E4
                                                                 The Shinkansen
                                                  Shinkansen lines
                              Tokyo               (      Under construction )
                                                  Conventional lines
   The Shinkansen
 Contents


1. Outline of JR East

2. Past countermeasures in Five-Year Safety
 Plan

3. More countermeasures of the last two
  years
・Countermeasures of low grade level crossings
・Eliminating high risk level crossing
4. Conclusions
  5th Five-Year Safety Plan “2013 Safety Vision”

                              1987     Establishment of JR East

                       1989          Safety Priority Investment Plan

                1994            Safety Basic Plan

           1999           Safety Plan 21

     2004            Safety Plan 2008

 2009           2013 Safety Vision

Ultimate Safety
5th Five-Year Safety Plan “Safety Vision 2013”
  5th Five-Year Safety Plan “Safety Vision 2013”

Related terms of 4 pillars for level crossing accidents
・Promoting active installation of safety facilities
・Taking sure steps to reduce risks


 High risks at level crossings
    ・A collision with a car stranded in the level crossing
    ・Derailment

   Countermeasures
    (1) Installing level crossing obstruction detectors
    (2) Installing guards to prevent deviation
Level crossing obstruction detectors

3D laser radar system



                                Laser beams



                                                              Laser scanning, both
                                                              length and width




  Laser radar head

                                                                                     Obstruction
                                          Monitored area
                                                                                     warning signal.
                                                              Crossing tools box



                     On the basis of 3-dimensional data measured by laser beams,
                     obstructions are detected in a pre-determined monitoring area and the
                     obstruction warning signal displays a stop signal to the train.

                             Installed detectors amount to 2754
  Secondary damage
  at level crossing deviation


                                2. Collision with other train
1. A train derailed by
                                running on the opposite
   level crossing accident
                                track
Installing guards to prevent deviation


Principles for their installation locations

1. Four-track lines
   ・Tokyo Metropolitan area
   ・Automobiles can cross
 2. Double-track lines
    ・Trains run at high speed
    ・Large vehicles can cross



      Installed 41 guards from 2009 to 2011
      Trend in the number of
      level crossing accidents

300                                                                                  5000
                                            Number of level
       247                                  crossing obstruction                     4500
250                                         detectors
                                                                                     4000
                                            Number of level                          3500
200                                         crossing accidents
                                                                      2754           3000

150                                                                                  2500

                                                                                     2000
100
                                                                                     1500

       235                                                                 36        1000
 50
                                                                                     500

  0                                                                                  0
      87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11
                                                                       Fiscal year
 Contents


1. Outline of JR East

2. Past countermeasures in Five-Year Safety
 Plan

3. More countermeasures of the last two
  years
・Countermeasures of low grade level crossings
・Eliminating high risk level crossing
4. Conclusions
 Countermeasures of low grade level crossings


level crossing, Class 1
 ・Crossing gates are lowered to close road traffic for all
 passing trains.
level crossing, Class 2
 ・Crossing gates are lowered to close road traffic for trains
  passing through during a certain period of time.
                                                                Class 1
  (At present, this class does not exist in Japan)


level crossing, Class 3
 ・An alarm is installed to signal the approach of trains.


level crossing, Class 4
 ・A crossing other than above classes.                          Class 4
 Countermeasures of low grade level crossings

 1. Proposing the elimination of level crossings

  Class 4 level
                                     ・Elimination
   crossings          Proposing
                                  ・Limiting passage
      528


Decided to        Decided to            The other
Eliminate       Limit passage             continuing
   25                 12                 consultation
 Countermeasures of low grade level crossings
  2. Upgrading level crossing for greater
  3. Restriction barriers to prevent entry
We decided the type of countermeasures by a history of accidents
    Countermeasures for class 4 level crossing classified by type of accidents
  Type of accidents                      Limitation level of passage
 Involving   occurred    Only           Allowed small   Not allowed       No limitation
 fatality    by cars     pedestrians    cars and        only large cars
                         and bicycles   bikes)
   Yes         Yes
   Yes          No
    No         Yes
    No          No
 No Accidents occurred

    Installing restriction barriers               Upgrading to Class 1
  Countermeasures of low grade level crossings




           Class 4                                        Class 1

                     38 level crossing will upgrade
                      ( 13 were already finished※)
          ※Including one case of upgrading from class 3 level crossing

※Along with conversion to Class 1 crossings, consultations will also
 continue toward combining and/or eliminating certain existing
 crossings.
   Countermeasures of low grade level crossings




Barriers will continue to be installed to prevent entry of automobiles
 and to encourage pedestrians and bicycle riders to stop before entry.
Countermeasures of low grade level crossings

4. Signboards to alert pedestrians
                                         LED lightings
                                         with solar cells




        Installed all class 4 level crossings
Countermeasures of low grade level crossings
5. Accident-prevention campaigns
We will work on the police, road administrators and school for
cooperation and assistance. And we visited 410 schools as a
level crossing accident-prevention campaign
 Contents


1. Outline of JR East

2. Past countermeasures in Five-Year Safety
 Plan

3. More countermeasures of the last two
  years
・Countermeasures of low grade level crossings
・Eliminating high risk level crossing
4. Conclusions
Eliminating high risk level crossing




        In the case of “Soujiji” level crossing
Location of Soujiji level crossing

                              Soujiji
                          level crossing




                              22 km south far from Tokyo St.




    Tokyo
     Outline of Soujiji level crossing (1)

                                                                                In 2007




    Number of                       Number of passage                  State in 2007
                  Maximum closing
trains which pass
       over
                       time                                 ・Limited passage for large cars
     per day
                      per hour      Cars      Pedestrians   ・A guard placed
                     (minutes)                              ・Overpass for pedestrians installed
                                                            (Elevators were not installed)
   1,257               59           559          980
Outline of Soujiji level crossing (2)




                                      11 Lines crossing

                      17
                      18
                       20
                        23
                           28
                            31
                            32
                             37
     Soujiji                          80
                                                 121

               0                 50        100         150
                      Number of level crossing events
                   (In Tokyo Metropolitan Area, FY2007)
Hidden risk of this level crossing




         Located at the end of a sharp curve
  To Eliminate this level crossing

For vehicles
 ・To lead to the large overpass which is 800 meters north
For bike riders and bicycles
 ・To install slopes
 ・To install large elevators which can carry bikes
For pedestrians
 ・To install elevators gets to be more useful.


After several difficult consultations since 2005
 ・The expense was approved in 2007
 ・The expense was shared by half between the city of Yokohama
 and JR East
Installation of elevators and slopes (1)




      Installed elevators which can carry bikes
      (The installation finished in March 2010)
 Installation of elevators and slopes (2)




                        Installed slopes in 2010
Before installation
 Limiting passage(1)
After consultations with police, road administrators and local
 residents since Sep 2009
 ・Limiting passage during 6:00-10:00 and 16:00-21:00 was
 approved in Feb 2010
 ・That started in Apr 2010




                     Movable barriers
                 (A guard was also placed)
 Limiting passage(2) and elimination

After limiting passage, no major isuues had come up
We expand the limiting time to 6:00-21:00 after discussion
 ・Limiting passage during 6:00-21:00 started in Apr 2011


The discussion for elimination the level crossing started in June
 2011
・It takes time to explain to local residents.
・Some improvements requested by residents were made.
In Jan 2012, we had to get the agreement of elimination.


  The Soujiji level crossing was closed on 1 Apr 2012
Eliminating high risk level crossing

                          <Notice>
        The Soujiji level crossing was eliminated
        on 1 April 2012 JR East
 Contents


1. Outline of JR East

2. Past countermeasures in Five-Year Safety
 plan

3. More countermeasures of the last two
  years
・Countermeasures of low grade level crossings
・Eliminating high risk level crossing
4. Conclusions
  Conclusion


・ There is no end for safety.
・ The countermeasures for hidden risks are becoming
significant.
・ We will take countermeasures against level crossing
  accidents based on our risk evaluation in the future.

・ Furthermore, we will continue to do our level best to
attain
             Ultimate Safety
Conclusion




   Thank you for your attention !

				