									State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 08/08/07 WORK PERFORMED BY : Elijah Electric Date of Report : 08/13/07 Cont. Job No.: Contract No. Cont. RPT NO. EE1673 CCO NO.

DESCRIPTION OF WORK: FINISH STANDING POLES,WALKED PARKING LOT W/CITY OF SAN JOSE EQUIPMENT Equip No. TK-08 BT-02 HYLIFT EQUIPMENT CLASS/MAKE TRUCK BUCKET TRUCK BOOM Code Hours/ Units 8 8 8 Hrly/Dly Rate $19.09 $23.63 $27.35 Delay Factor Extended Amount $152.72 $189.04 $218.80 P.R. No. ELC LUIS MONDRAGON LBR WILLY CAULDERON LABOR

LABORERS, FOREMANS, etc. Hours Reg 8 8 O.T. Hourly Rate Reg $57.27 $37.35 O.T. Extended Amount $458.16 $298.80

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description #10 WIRE FUSE HOLDERS Units 0.12 2 Unt Cst 200.26 60.99

$560.56
Labor Surcharge Total Subsistence Reg. 17%

Sub-Total
O.T. 16%

$756.96
$128.68

$24.03 $121.98

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (28%) Markup on Equipment (15%) $885.64 $560.56 $146.01 $247.98 $84.08 $21.90

Material & Specialist Sub-Total

$146.01

Markup on Material (15%)

Total This Report

$1,946.18

ebaf8327-9c3e-40e6-951b-345b620fa8f1.xlsForce Account Analysis

9/12/200810:46 AM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500

Page 2


								