					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 8/18/06 WORK PERFORMED BY : Elijah Electric Date of Report : 8/28/06 Cont. Job No.: Contract No. Cont. RPT NO. CCO NO.

DESCRIPTION OF WORK: Brake concrete and install new extensions for taxi way lights EQUIPMENT Equip No. EQUIPMENT CLASS/MAKE Code Hours/ Units Hrly/Dly Rate Delay Factor Extended Amount P.R. No. labr Gildordo Rubio labr Tino Ortiz labr Jose Aguilar #VALUE! labr Nahum Salgado labr Salvador Deanda labr Simon Ruvalcaba labr Jadiel Salgado labr David Rangel LABOR

LABORERS, FOREMANS, etc. Hours Reg O.T. 0.5 0.5 1.5 2 1.5 1.5 1 1.5 Hourly Rate Reg O.T. $56.75 $91.50 $64.18 $53.00 $71.50 $41.00 $49.76 $84.41 Extended Amount $28.38 $45.75 $96.27 $106.00 $107.25 $61.50 $49.76 $126.62

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description Units Unt Cst

#VALUE!
Labor Surcharge Total Subsistence Reg. 17%

Sub-Total
O.T. 16%

$621.52
$105.66

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (33%) Markup on Equipment (15%) $239.97 #VALUE! $727.18 #VALUE!

Material & Specialist Sub-Total

Markup on Material (15%)

Total This Report

#VALUE!

9ac52e46-a045-4ddd-b78f-e46e545d2e3a.xlsForce Account Analysis

9/12/200810:42 AM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500