					        ENVIRONMENTAL IMPACT ASSESSMENT
                                              For
      THE PROPOSED 4X300 MW COAL BASED THERMAL POWER PLANT
     AT BINJKOT, DARRAMURA, BADEJAMPALI AND GINDOLA VILLAGES
          IN KHARSIA TEHSIL OF RAIGARH DISTRICT, CHHATTISGARH



                    REPORT FOR PUBLIC HEARING




Sponsor :                                                                         Prepared by :




SKS POWER GENERATION (CHHATTISGARH) LIMITED             Vimta Labs Ltd., 142, IDA, Cherlapally,
(a 100% subsidiary of)                                                    Hyderabad–500 051
                                                                               www.vimta.com
SKS ISPAT AND POWER LTD.



                                       December, 2008
             Environmental Impact Assessment for the Proposed 4x300 MW Coal Based
             Thermal Power Plant at Binjkot, Darramura, Badejampali and Gindola Villages in
             Kharsia Tehsil of Raigarh District, Chhattisgarh State
                                                                           Table of Contents


                         Table of Contents
_______________________________________________________________
Chapter                   Title                         Page
_______________________________________________________________

               Table of Contents                                                TC-1
               List of Figures                                                  TC-IV
               List of Tables                                                   TC-V
       1.0     Introduction
               1.1      Purpose of the Report                                   C1-1
               1.2      Identification of Project & Project Proponent           C1-1
               1.3      Brief Description of Project                            C1-2
               1.4      Scope of the Study                                      C1-2
               1.5      Compliance to TOR Conditions                            C1-7
               1.6      Methodology of the Study                                C1-7
               1.7      Administrative and Legislative Background               C1-8
               1.8      Contents of the Report                                  C1-8
       2.0     Project Description
               2.1      Type of the Project                                     C2-1
               2.2      Need for the Project                                    C2-1
               2.3      Project Location and Layout                             C2-1
               2.4      Project Size/Magnitude of Operation Including Resources C2-2
               2.5      Utilities for the Proposed Plant Operations             C2-8
               2.6      Other Plant Facilities                                  C2-13
               2.7      Sources of Pollution                                    C2-17
               2.8      Mitigation Measures Proposed                            C2-21
       3.0     Baseline Environmental Status
               3.1      Introduction                                            C3-1
               3.2      General Geology                                         C3-1
               3.3      Meteorology                                             C3-2
               3.4      Air Quality                                             C3-14
               3.5      Water Quality                                           C3-23
               3.6      Soil Characteristics                                    C3-30
               3.7      Noise Level Survey                                      C3-34
               3.8      Flora and Fauna Studies                                 C3-39
               3.9      Landuse Studies on Census                               C3-49
               3.10     Demography and Socio-economics                          C3-55

       4.0     Impact Assessment and Mitigation Measures

               4.1      Introduction                                            C4-1
               4.2      Impacts during Construction Phase                       C4-1
               4.3      Impacts during Operational Phase                        C4-4
               4.4      Environmental Management Plan during Construction       C4-18
               4.5      Environmental Management Plan during Operation          C4-19
               4.6      Greenbelt Development                                   C4-27
               4.7      Cost Provision for Environmental Measures               C4-32


VIMTA Labs Limited, Hyderabad                                                       TC-I
             Environmental Impact Assessment for the Proposed 4x300 MW Coal Based
             Thermal Power Plant at Binjkot, Darramura, Badejampali and Gindola Villages in
             Kharsia Tehsil of Raigarh District, Chhattisgarh State
                                                                            Table of Contents


                       Table of Contents (Contd.)
_______________________________________________________________
Chapter                   Title                         Page
_______________________________________________________________

       5.0     Analysis of Alternatives for Technology and Project Site

               5.1      Analysis of Alternative Technology                        C5-1
               5.2      Analysis of Alternative Sites for Location of Power Plant C5-2

       6.0     Environmental Monitoring Program

               6.1      Introduction                                             C6-1
               6.2      Environmental Monitoring and Reporting Procedure         C6-1
               6.3      Monitoring Schedule                                      C6-1
               6.4      Monitoring Methods and Data Analysis of
                        Environmental Monitoring                                 C6-5
               6.5      Reporting Schedules of the Monitoring Data               C6-7
               6.6      Infrastructure for Monitoring of Environmental
                        Protection Measures                                      C6-7

       7.0     Risk Assessment and Disaster Management Plan

               7.1      Introduction                                             C7-1
               7.2      Approach of the Study                                    C7-1
               7.3      Hazard Identification                                    C7-1
               7.4      Hazard Assessment and Evaluation                         C7-3
               7.5      Disaster Management Plan                                 C7-14
               7.6      Off-site Emergency Preparedness Plan                     C7-24
               7.7      Occupational Health and Safety                           C7-28

       8.0     Project Benefits

               8.1      Availability of Quality Power                            C8-1
               8.2      Improvements in the Physical Infrastructure              C8-1
               8.3      Improvement in the Social Infrastructure                 C8-1
               8.4      Employment Potential                                     C8-2

       9.0     Administrative Aspects

               9.1      Institutional Arrangements for Environment Protection
                        and Conservation                                         C9-1

       10.0    Disclosure of Consultants                                         C10-1




VIMTA Labs Limited, Hyderabad                                                       TC-II
           Environmental Impact Assessment for the Proposed 4x300 MW Coal Based
           Thermal Power Plant at Binjkot, Darramura, Badejampali and Gindola Villages in
           Kharsia Tehsil of Raigarh District, Chhattisgarh State
                                                                          Table of Contents


                       Table of Contents (Contd.)
_______________________________________________________________
Chapter                   Title                         Page
_______________________________________________________________

              List of Annexures

              Annexure-I    Terms of Reference Copy and Compliance             AI-1
              Annexure-II Administrative and Legislative Background            AII-2
              Annexure-III Copy of Water Allocation and Availability Letter    AIII-1
              Annexure-IV Emission Calculations                                AIV-1
              Annexure-V Ambient Air Quality Levels                            AV-1
              Annexure-VI Methodology for Sampling and Analysis                AVI-1
              Annexure-VII Details of Flora and Fauna                          AVII-1
              Annexure-VIII Landuse Pattern                                    AVIII-1
              Annexure-IX Demographic Details                                  AIX-1
              Annexure-X R&R Plan                                              AX-1




VIMTA Labs Limited, Hyderabad                                                    TC-III

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:2
posted:12/19/2012
language:Unknown
pages:4