BP_roof

Shared by: huanglianjiang1
Categories
Tags
-
Stats
views:
0
posted:
12/18/2012
language:
Unknown
pages:
1
Document Sample
scope of work template
							                                                         Village of Sugar Grove – Building Division
                                                                     601 Heartland Drive
                                                                    Sugar Grove, IL 60554
             Roofing/Siding                                630-466-8954 phone 630-466-1083 fax
                                                          Monday – Friday 8:00 a.m. – 4:30 p.m.
                                                                 permits@sugar-grove.il.us


BUILDING PERMIT - Allow 7 (seven) to 10 (ten) working days for processing.

PLAN REVIEW
Please submit a completed building permit application with a copy of an owner accepted proposal,
contract or Authorization form.

REQUIRED CONTRACTOR INFORMATION
All private contractors that perform any installation shall be licensed with the Village of Sugar Grove. If
the contractor is not currently licensed with the Village, an application can be obtained from the
http://www.sugar-grove.il.us/Dept_CD/BP_contractor.pdf or by contacting the Building Division at 630-
466-8954. The contractor’s fee is $165 and is valid for one year from the date of application.
A CURRENT STATE OF ILLINOIS ROOFING LICENSE IS REQUIRED FOR THE
CONTRACTOR DOING THE WORK.

INSPECTIONS
A Tyvek / house wrap inspection and final may be required for siding permits.
A final inspection is required for new roof and re-roofs.

Please call 630-466-8954 ext. 35 to schedule an inspection. Be prepared to give contact name and
phone number, address, permit number, type of inspection, as well as the date and time (am or pm) of
day you would like the inspection. 24-HOUR NOTICE MUST BE GIVEN.

PERMIT FEE
  • Permit fees for roofing, re-roofing and siding are $60.00 each and are to be paid when you pick
    up the permit which can usually be issued immediately over the counter.
  • NO WORK CAN COMMENCE UNTIL THE PERMIT HAS BEEN ISSUED. WORK
    STARTED PRIOR TO ISSUANCE OF PERMIT, WILL INCUR PENALTY OF DOUBLE
    THE PERMIT FEE.

MISCELLANEOUS INFORMATION
  • Current building code requires ice and water shield to be installed and proper roof ventilation.
  • Dumpsters must be placed on private property. They are not allowed in the right-of-way
     (sidewalk) or in the streets.
  • According to Ordinance #614 the erection, demolition, alteration or repair of any building may
     only occur between the hours of 6:30 a.m. and 8:30 p.m.
  • If you reside in an area with a Homeowner’s Association, check with them to ensure compliance
     with their regulations.

						
Related docs
Other docs by huanglianjiang1
9999
Views: 497  |  Downloads: 0
99977_1_Assignment-title
Views: 349  |  Downloads: 0
97600
Views: 228  |  Downloads: 0
9711 QUIZ
Views: 573  |  Downloads: 0
91712
Views: 196  |  Downloads: 0
96132.100.01.1_8500 to 8600 Upgrade Manual
Views: 329  |  Downloads: 0
9425f2a1-8439-4e5a-98f7-8d6d853f0158
Views: 258  |  Downloads: 0
92612-SAC-Summary
Views: 183  |  Downloads: 0
9121 - Bid Tabulations
Views: 836  |  Downloads: 0
91006
Views: 165  |  Downloads: 0