Oberlin City School
Facilities
Major Facility Maintenance Projects
Oberlin High School
Built in 1960
Classroom addition in
1964
Classroom and
Auditorium addition in
1988
86,150 sq.ft.
High School HVAC
Four gas fired hot water
boilers, 1964, 1987 (2),
2005.
1964 unit is out of service
Cost for replacement,
$640,000.
Cost of entire heating
system replacement:
$2,030,800
High School Systems
Roofs: All roofs are over 14 years old, except for
choir room area. Expected replacement cost:
$490,200
Electrical: Transformer Replacement: $15,000
Lighting: Upgrade classroom lighting, $338,480
Masonry: $124,050
High School Door/Windows
Replacement of all
window units: $500,500
Replacement of all
exterior doors: $62,500
High School Hazardous Material
Removal of all hazardous
building materials:
$281,600
Oberlin High School
Boilers: $510,000 to $2,030,800
Roofs: $490,200
Electrical: $15,000
Lighting: $338,480
Windows and Doors: $563,000
Hazardous material: $281,600
Masonry: $124,050
Total: $2,322,250 to $3,843,050
Langston Middle School
Built in 1923
Addition in 1945
Renovation and addition
in 1982
84,240 sq. ft.
Langston HVAC
Two gas fired hot water
boilers, 1958
Cost of boiler
replacement: $340,000
Cost of entire heating
system replacement:
$2,021,760
Langston Systems
Roof: Single ply roof system installed in 1996,
out of warranty in 2011. Cost to replace:
$254,700
Electrical: transformer replacement: $15,000
Lighting: $336,960
Doors: $44,000
Langston Foundation and Masonry
Foundation sealing:
$10,000 +
Masonry repairs:
$109,175
Langston Hazardous Material
Removal of all hazardous
building material:
$130,672
Langston Middle School
Boilers: $340,000 to $2,021,760
Roofs: $254,700
Electrical: $15,000
Lighting: $336,960
Doors: $44,000
Masonry: $119,175
Hazardous material: $130,672
Total: $1,240,570 to $2,922,267
Prospect Elementary School
Built in 1960
Classroom addition in
1970
Classroom addition in
1980
45,290 sq.ft.
Prospect HVAC
Two gas fired steam
boilers and three hot
water boilers.
Cost of boiler
replacement: $510,00
Cost of heating system
replacement: $1,086,960
Prospect Systems
Roof: Many different roof surfaces, shingles and
Garland section under warranty. Cost for
replacement: $221,200
Electrical: transformer replacement: $15,000
Lighting: $181,160
Doors/windows: $303,300
Langston Foundation and Masonry
Foundation sealing:
$10,000 +
Masonry repairs:
$100,500
Prospect Hazardous Material
Removal of all hazardous
building material:
$102,200
Prospect School
Boilers: $510,000 to $1,086,960
Roofs: $221,200
Electrical: $15,000
Lighting: $181,160
Doors/windows: $303,300
Masonry: $110,500
Hazardous material: $102,200
Total: $1,443,360 to $2,020,320
Eastwood Elementary School
Built in 1955
Addition in 1960
Addition in 1960
38,660 sq.ft.
Eastwood HVAC
Two gas fired hot water
boilers, 1995
Expected replacement in
2015: $340,000.
Total cost of heating
system replacement:
$927,840.
Eastwood Systems
Roof: Built up roof system, much over 15 yrs.
old. Preschool wing 2006. Total roof
replacement: $198,425
Electrical: transformer replacement: $15,000
Doors/windows: $355,250
Masonry repairs: $54,275
Eastwood Hazardous Material
Removal of all hazardous
building material:
$113,700
Eastwood Elementary School
Boilers: $340,000 to $927,840
Roofs: $198,425
Electrical: $15,000
Doors/windows: $355,250
Masonry: $54,275
Hazardous material: $113,700
Total: $1,076,650 to $1,723,915
Oberlin City School District Totals
High School : $2,322,250 to $3,843,050
Langston: $1,240,570 to $2,922,267
Prospect: $1,443,360 to $2,020,320
Eastwood: $1,076,650 to $1,723,915
District: $6,082,830 to $10,509,552