							Oberlin City School
    Facilities
 Major Facility Maintenance Projects
            Oberlin High School
   Built in 1960
   Classroom addition in
    1964
   Classroom and
    Auditorium addition in
    1988
   86,150 sq.ft.
                High School HVAC
   Four gas fired hot water
    boilers, 1964, 1987 (2),
    2005.
       1964 unit is out of service
   Cost for replacement,
    $640,000.
   Cost of entire heating
    system replacement:
    $2,030,800
           High School Systems
   Roofs: All roofs are over 14 years old, except for
    choir room area. Expected replacement cost:
    $490,200
   Electrical: Transformer Replacement: $15,000
   Lighting: Upgrade classroom lighting, $338,480
   Masonry: $124,050
     High School Door/Windows
   Replacement of all
    window units: $500,500
   Replacement of all
    exterior doors: $62,500
High School Hazardous Material
   Removal of all hazardous
    building materials:
    $281,600
           Oberlin High School
   Boilers: $510,000 to $2,030,800
   Roofs: $490,200
   Electrical: $15,000
   Lighting: $338,480
   Windows and Doors: $563,000
   Hazardous material: $281,600
   Masonry: $124,050
   Total: $2,322,250 to $3,843,050
         Langston Middle School
   Built in 1923
   Addition in 1945
   Renovation and addition
    in 1982
   84,240 sq. ft.
               Langston HVAC
   Two gas fired hot water
    boilers, 1958
   Cost of boiler
    replacement: $340,000
   Cost of entire heating
    system replacement:
    $2,021,760
             Langston Systems
   Roof: Single ply roof system installed in 1996,
    out of warranty in 2011. Cost to replace:
    $254,700
   Electrical: transformer replacement: $15,000
   Lighting: $336,960
   Doors: $44,000
    Langston Foundation and Masonry
   Foundation sealing:
    $10,000 +
   Masonry repairs:
    $109,175
    Langston Hazardous Material
   Removal of all hazardous
    building material:
    $130,672
        Langston Middle School
   Boilers: $340,000 to $2,021,760
   Roofs: $254,700
   Electrical: $15,000
   Lighting: $336,960
   Doors: $44,000
   Masonry: $119,175
   Hazardous material: $130,672
   Total: $1,240,570 to $2,922,267
      Prospect Elementary School
   Built in 1960
   Classroom addition in
    1970
   Classroom addition in
    1980
   45,290 sq.ft.
                Prospect HVAC
   Two gas fired steam
    boilers and three hot
    water boilers.
   Cost of boiler
    replacement: $510,00
   Cost of heating system
    replacement: $1,086,960
              Prospect Systems
   Roof: Many different roof surfaces, shingles and
    Garland section under warranty. Cost for
    replacement: $221,200
   Electrical: transformer replacement: $15,000
   Lighting: $181,160
   Doors/windows: $303,300
    Langston Foundation and Masonry
   Foundation sealing:
    $10,000 +
   Masonry repairs:
    $100,500
     Prospect Hazardous Material
   Removal of all hazardous
    building material:
    $102,200
              Prospect School
   Boilers: $510,000 to $1,086,960
   Roofs: $221,200
   Electrical: $15,000
   Lighting: $181,160
   Doors/windows: $303,300
   Masonry: $110,500
   Hazardous material: $102,200
   Total: $1,443,360 to $2,020,320
     Eastwood Elementary School
   Built in 1955
   Addition in 1960
   Addition in 1960
   38,660 sq.ft.
              Eastwood HVAC
   Two gas fired hot water
    boilers, 1995
   Expected replacement in
    2015: $340,000.
   Total cost of heating
    system replacement:
    $927,840.
             Eastwood Systems
   Roof: Built up roof system, much over 15 yrs.
    old. Preschool wing 2006. Total roof
    replacement: $198,425
   Electrical: transformer replacement: $15,000
   Doors/windows: $355,250
   Masonry repairs: $54,275
    Eastwood Hazardous Material
   Removal of all hazardous
    building material:
    $113,700
     Eastwood Elementary School
   Boilers: $340,000 to $927,840
   Roofs: $198,425
   Electrical: $15,000
   Doors/windows: $355,250
   Masonry: $54,275
   Hazardous material: $113,700
   Total: $1,076,650 to $1,723,915
    Oberlin City School District Totals
   High School : $2,322,250 to $3,843,050
   Langston: $1,240,570 to $2,922,267
   Prospect: $1,443,360 to $2,020,320
   Eastwood: $1,076,650 to $1,723,915

   District: $6,082,830 to $10,509,552

						
Other docs by huanglianjiang1
9999
Views: 497  |  Downloads: 0
99977_1_Assignment-title
Views: 349  |  Downloads: 0
97600
Views: 228  |  Downloads: 0
9711 QUIZ
Views: 573  |  Downloads: 0
91712
Views: 196  |  Downloads: 0
96132.100.01.1_8500 to 8600 Upgrade Manual
Views: 329  |  Downloads: 0
9425f2a1-8439-4e5a-98f7-8d6d853f0158
Views: 258  |  Downloads: 0
92612-SAC-Summary
Views: 183  |  Downloads: 0
9121 - Bid Tabulations
Views: 836  |  Downloads: 0
91006
Views: 165  |  Downloads: 0