Docstoc

Gateshead Soil Stabilisation Case Study

Document Sample
Gateshead Soil Stabilisation Case Study Powered By Docstoc
					
				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:52
posted:12/5/2012
language:Japanese
pages:1
Description: The site was a former Staithes Gas Works in Dunston, Gateshead which was being developed by Taylor Wimpey to form a residential development. As our team had worked successfully with Thompsons of Prudhoe on previous contracts in the North East, T R Stabilisation were contacted to assist with the Lime Stabilisation / Bulk Modification works.