									E T H E K W I N I      I R P T N

            National Treasury Meeting
                     23 February 2011
1. Design Philosophy
Current Planning and Implementation Initiative - IRPTN
                                       Philosophy and Approach


           Efficent City               • The users (travellers, operators,
                                         and the city) are the focus of the
          Right mode for                 plan and the system.
              the job                  • The IRPTN apart from moving
                                         people is about making the city
                                         more efficient by reducing trip
                                         lengths and cost of travel.
             System                    • Consequently, planning for the
              Users                      IRPTN is about using the right
                                         mode for the job and developing
                                         a truly integrated transport
                                         network that embraces the range
            Integration                  of modes and technologies
                                         available to enhance accessibility
                                         to opportunity in a cost effective
                                         way.
                                       • The system is to be technically
                                         and financially sustainable.
                  2. System Development




ETHEKWINI IRPTN                           3
                        2.1. Network Structure
                        2.1.1. Demand
                         Trend Modal Split (AM Peak Period)                                                       Policy Modal Split (AM Peak Period)
                       1600                                                                                     1600
                                  Total PT Trend                                                                           Total PT Policy
                       1400                                                                                     1400
                                  Total Car Trend                                                                          Total Car Policy
Person Trips (x1000)




                       1200




                                                                                         Person Trips (x1000)
                                                                                                                1200
                       1000                                                                                     1000
                        800                                                                                      800
                        600                                                                                      600
                        400                                                                                      400
                        200                                                                                      200
                          0                                                                                        0
                           2007          2010        2015       2020      2025                                      2007            2010      2015     2020   2025




                                                            2007       2010      2015                              2020               2025      MS %
                                   Total PT Trend           607.2      606.0     603.6                             601.1              599.0      40%
                                   Total PT Policy          607.2      606.0     611.8                             649.1              709.4      49%
                                                                               Tongaat


2.1. Network Structure
2.1.1. Demand                                                                    DTP
                                                Daily Person Trips (x 1000)`




    Employment

                                                         PINK          Umhlanga
    Residential
                         Hillcrest
    Mixed
             Mpumalanga              Pinetown
                                             Westville
                                                                           Durban
Based on the demand
analysis, existing and
planned key RPT                                                       SDB
                                       Chatsworth
movement corridors
were identified                                                                  Indian
                                              Umlazi                             Ocean
                                                        Project Progress




                                                                                                          I R P T N
                                                                                                          E T H E K W I N I
                                   ACTIVITY                                  COMPLETION PROGRESS
   ETHEKWINI IRPTN                                                            2011/05/17            60%
   A. PROJECT MANAGEMENT                                                      2011/05/17            70%
   B. Demand Analysis                                                         2010/05/12           100%
   C. Rail Serv ice and System Capacity                                       2010/05/19           100%
   D. Zero Subsidy Public Transport Serv ice                                  2010/05/05            65%
   E. Dev elopment and Costing of IRPTN and PT Restructuring Alternativ es    2010/11/22            80%
   F. Support System Plan                                                     2010/11/22            60%
   G. Comparativ e Analysis                                                   2011/02/14            50%
   H. Preliminary Design                                                      2011/05/03            35%
   I. Marketing                                                               2011/02/24             5%
   J. Reporting                                                               2011/05/10            50%
   K. CONSULTATION AND COMMUNICATION                                          2010/11/08            60%
                                                                                                                6
   L. CLIENT PARTICIPATION                                                    2011/05/13            70%




2011/02/24                         1T4643 - ETHEKWINI IRPTN
                                            Project Progress




                                                                                     I R P T N
                      IMPLEMENTATION OF IRPTN PHASE 0
                 (RESTRUCTURING OF DURBAN TRANSPORT)
 Gross based, contract document for IRPTN Phase 0 Operations have been
                                                                                 




                                                                                     E T H E K W I N I
  prepared with award planned for 01 July 2011. The contract duration is three
  years.

 The gross contract will be support by a fare revenue management contract.
  This contract will be award simultaneously with the Gross Contracts.           
 The Contract is structured to ensure compulsory participation by the minibus
  taxi and small bus operator industry.
                                                                                 
 Negotiations with the Minibus Taxi Industry has commenced                      
 The service provider (ALMEX) of the ticketing system ALMEX OPTIMA has
                                                                                 
                                                                                           7
  been appointed for IRPTN Phase 0. The business rules for the system has been
  defined.

 124 New Bus Fleet of which 34 will be BRT buses. The first buses will arrive
  during the 1st quarter of 2012
                                                                                 
 IRPTN Phase 0 Depots are in the process of being upgraded
2011/02/24              1T4643 - ETHEKWINI IRPTN
                                                                                 
     E-Ticketing High Level Plan




                                                                                        I R P T N
                                                    Task                    Due
              1 Finalise Business Rules                                   28-Feb-11




                                                                                        E T H E K W I N I
              2 Design system Architecture                                15-Feb-11
              3 Finalise RFP for Change Management and Marketing          14-Feb-11
              4 Appoint Change Management and Marketing vendor            31-May-11
              5 Installation and set-up of infrastructure                 31-May-11
              6 Installation of new ETicketing equipment on buses          30-Jun-11
                  ·People Mover                                             31-Jul-11
                  ·Rossburgh                                              31-Aug-11
                  ·Umlazi                                                 30-Sep-11
                  ·Ntuzuma                                                31-Dec-11
              7 Software development and testing                          31-Dec-11
                                                                                              8
              8 EMV Certification                                         31-Dec-11
              9 Implementation of full-blown Smart Card solution
                  ·Pilot (People Mover)                                   15-Feb-12
                  ·Phased roll-out to all operators                       15-Apr-12
             10 Post go-live                                              15-Sep-11
                  ·Benefits tracking and realisation
                  ·Embedding change and encouraging commuter transition
2011/02/24               1T4643 - ETHEKWINI IRPTN
                                            Project Progress




                                                                              I R P T N
THOUGH SIGNIFICANT PROGRESS HAS BEEN MADE ON NUMEROUS FRONTS,
   EFFORTS IN THE FOLLOWING AREAS WILL BE PLACED OVER THE COMING




                                                                              E T H E K W I N I
   MONTHS:
    More intense engagement with the minibus taxi industry specifically in
     terms Phase 0

    Completion of the Phase 1 Business Plan

    Incorporated provincial bus operators into the implementation

    More engagement with PRASA to get better alignment with the rail
     modernisation strategy.
                                                                                    9
    Funding applications and confirmations for Phase 1




2011/02/24              1T4643 - ETHEKWINI IRPTN
        Stakeholder Engagement


10




     E T H E K W I N I           I R P T N
             Stakeholder Engagement




                                                                                       I R P T N
    Numerous stakeholder’s have been consulted. These stakeholders included:




                                                                                       E T H E K W I N I
            eThekwini Line Departments (Architecture, Planning, Environmental, etc)
            PRASA
            SANRAL
            KZNDoT
            The Minibus Taxi Industry
            Bus Operators
            Durban Chamber of Commerce
            Passenger Forums
                                                                                          11




2011/02/24                 1T4643 - ETHEKWINI IRPTN
      eThekwini IRPTN

12




     E T H E K W I N I   I R P T N
                                           eThekwini IRPTN




                                                                                 I R P T N
The stakeholder engagement process has been largely positive and taking on




                                                                                 E T H E K W I N I
board the needs of the stakeholders and alignment of plans between the various
“Transport Agencies” (KZNDoT, SANRAL, PRASA), phasing options have been
considered.




                                                                                    13




2011/02/24           1T4643 - ETHEKWINI IRPTN
                                                                                 Modes




                                                                                                    I R P T N
                                                                                                    E T H E K W I N I
Rail                        Intensive BRT              BRT                   Quality Bus Corridor
•                                                                            (QBC)
       Highest              •     Reliable             •     Reliable
       reliability of all                                                    •    Reliable
       modes                •     ROW A for            •     ROW B for
                                  most of route              most of route   •    ROW C for
•      Universal                                                                  most of route
       Accessibility        •     Safe                 •     Safe
                            •                                                •    Safe
•      Safe                       Secure               •     Secure
                            •                                                •    Secure
•      Secure                     Integrated           •     Integrated
                                  ticketing                  ticketing       •    Integrated           14
•      Integrated                                                                 ticketing
       ticketing            •     Highest              •     Moderate
                                  capacity road              capacity road   •    Urban Design
•      ROW A                      based mode                 based mode           Treatment
                                                       •     Urban Design
                                                             Treatment

2011/02/24                  1T4643 - ETHEKWINI IRPTN
                                IRPTN Trunk Routes




                                                                                                                            I R P T N
                                                                                                                Tongaat



     Total Annual Ridership (All trips excluding Feeders)
               C1      C2      C3        C4        C5      C6          C7       C8          C9
                                                                                                                  Airport
               BRT    RAIL    BRT       BRT     BRT/LRT    BRT        BRT       BRT         BRT




                                                                                                                            E T H E K W I N I
     2015      26.7   77.4    25.6      21.0      23.1     22.8       29.3      15.0        14.1                     C8

     2025      28.8   93.6    27.2      22.9      26.4     29.0       33.8      17.9       15.8
                                                                                       Bridge City         C9


                                                                                                                 Umhlanga
                                                                                                                C8
                                               Hillcrest                               C3
                                                           C7                                      C1


                                 Mpumalanga
                                                                                                                Warwick
                                                                     Pinetown                                                  15
                                                                                               C4                 CBD
      The IRPTN Trunk Corridors were
       developed and assessed                                   C7
      Further work has been undertaken                                                                  Rossburgh
       to refine the trunk network and                                                 Merebank
                                                                                                    C2
       develop:                                                                        C5
                                                                      Chatsworth
        Complementary routes
        Feeder Routes                                                           Umlazi            Prospecton
2011/02/24                   1T4643 - ETHEKWINI IRPTN
                                                                                  I R P T N
                                           Municipal Population 3,600,000




                                                                                  E T H E K W I N I
                                           Percentage of Municipal
                                            Population within 800m of Trunk 28%

                                           Percentage of population within
                                            800m access of the IRPTN 85%

                                           Percentage of PT trips served by
                                            complementary routes 40%

                                           Percentage served by trunk routes        16
                                            60%




2011/02/24   1T4643 - ETHEKWINI IRPTN
             Complementary Routes




                                                                                                       I R P T N
                                                                    KSIA




                                                                                                       E T H E K W I N I
                                                        Phoenix
                                                                  Umhlanga
                        Hillcrest
                                                          N2       Rocks
                                                                Durban
              Mpumalanga        N3        Pinetown               North

                                                                Durban
                                                                 CBD
                                                CTC
                                                       Rossburgh
                                            Umlazi
                                                     Isipingo
                                                                                                          17


                                                                           Legend
                                                                              Urban Development Line

                                                                              800m buffer


2011/02/24     1T4643 - ETHEKWINI IRPTN
                                 Coverage Statistics




                                                                                              I R P T N
                                                       Municipal Population 3,600,000




                                                                                              E T H E K W I N I
                                                       Percentage of Municipal
                                                        Population within 800m of Trunk 28%

                                                       Percentage of population within
                                                        800m access of the IRPTN 85%

                                                       Percentage of PT trips served by
                                                        complementary routes 40%

                                                       Percentage served by trunk routes        18
         Trunk Buffer                                   60%
         Feeder Buffer
         Complementary Buffer



2011/02/24               1T4643 - ETHEKWINI IRPTN
                                                              Effectiveness




                                                                                           I R P T N
                                                                                           E T H E K W I N I
      Phoenix, Inanda,                     Phoenix, Inanda,         Phoenix, Inanda,
      Ntazuma,                             Ntazuma,                 Ntazuma,
      Kwamashu                             Kwamashu                 Kwamashu


      Umlazi,                              Umlazi,                  Umlazi,
      Chatsworth                           Chatsworth               Chatsworth




                                                                                              19
       Population Density                     Trunk Routes       Trunk and Feeder Routes




2011/02/24                  1T4643 - ETHEKWINI IRPTN
                                        I R P T N
                                        E T H E K W I N I
                                           20




2011/02/24   1T4643 - ETHEKWINI IRPTN
                                                  Phasing Options




                                                                                 I R P T N
    There are two phasing options that            Phasing Option 1




                                                                                 E T H E K W I N I
     were developed.                                Phase 0: Durban Transport
    Both options consider different                Phase 1: C2, C5, C9
     phase 1 project packages                       Phase 2: C3, C1, C7
                                                    Phase 3: C4, C8
                                                    Phase 4: C6

                                                   Phasing Option 2
                                                    Phase 0: Durban Transport
                                                    Phase 1: C1, C3, C9
                 Approved by PSC
                                                    Phase 2: C2, C5, C7            21
                                                    Phase 3: C4, C8
                                                    Phase 4: C6




2011/02/24             1T4643 - ETHEKWINI IRPTN
                                                                          Precedent




                                                                                      I R P T N
CURITIBA, BRAZIL
 Three interlinking bus system at a time with a capacity of 300
    passengers per bus;




                                                                                      E T H E K W I N I
   Frequency around 40 seconds per bus;
   Links 83 suburbs with BRT;
   Stations approximately 800m apart;
   Key issue is paying before you get on board;
   Form of station, cylinder – timeless;
   Disable signage and lift;
   2400000 commuters per day;
   System private public partnership, private initiative, designed and
    maintained by the city who provide the fleet.



                                                                                         22




 2011/02/24                                 1T4643 - ETHEKWINI IRPTN
                                                 Precedent




                                                             I R P T N
       HANNOVER, GERMANY




                                                             E T H E K W I N I
                                                                23




2011/02/24            1T4643 - ETHEKWINI IRPTN
                                                      Precedent




                                                                  I R P T N
       PEREIRA, COLUMBIA




                                                                  E T H E K W I N I
                                                                     24




2011/02/24                 1T4643 - ETHEKWINI IRPTN
                                                                                     Precedent




                                                                                                 I R P T N
BOGOTA, COLUMBIA
   Transmileno bus system;
   Designated lanes between main transport routes;




                                                                                                 E T H E K W I N I
   Linear reserved interchange and track;
   Frequency every 30 seconds on loop’
   Capacity of 80 passengers;
   Signage clear and simple;
   Ticketing system based on credit system, when expired, card is recycles;
   Natural ventilation though system louvers;
   System of ramps allows for ease of circulation within the system, and disabled
    friendly;
 Lighting of station very important;
 Management of system by municipality.

                                                                                                    25




2011/02/24                               1T4643 - ETHEKWINI IRPTN
                                        Precedent




                                                             I R P T N
                                            Public
                                            Transport
                                            infrastructure




                                                             E T H E K W I N I
                                            facilitate the
                                            development
                                            of Quality
                                            Urban Space




                                                                26




2011/02/24   1T4643 - ETHEKWINI IRPTN
                                                                       Phase 0




                                                                                              I R P T N
                                                                     KSIA

                                                                    Umhlanga
                                                                      Rocks
                                                                   N2




                                                                                              E T H E K W I N I
                                         Kwadabeka
                                                Phoenix
                                    Hillcrest

                                                              Durban
                              N3            Pinetown
                                                               North
                         Hammersdale
                                                                  Durban
                                                                   CBD
• Restructuring of Durban Transport
• 3 year contract, gross based contract        CTC
                                                         Rossburgh
• Purchase of new fleet that will also be    Umlazi
  used for Phase 1                                     Isipingo
• ALMEX OPTIMA ticketing system                                                                  27
  (Smart Card)                                                         Legend
• The contract is structured to
  encourage participation by the                                               DT North
  minibus taxi and smaller bus operator
  industry                                                                     DT Central

• Initiator for industry negotiations                                          DT South


                 (3yr Contract)
7/2011 – 6/2014 1T4643 - ETHEKWINI IRPTN
 2011/02/24                                                                    railway line
             Preferred Phase Option




                                                                                                               I R P T N
                                                                                                   Tongaat




                                                                                                     Airport




                                                                                                               E T H E K W I N I
             Phase 1
                                                                                                        C8


                                                                            Bridge City       C9


                                                                                                    Umhlanga
                                                                                                   C8
                                        Hillcrest                           C3
                                                    C7                              C1
                                            C6
                           Mpumalanga                                        C6
                                                                                                   Warwick
                                                              Pinetown                                            28
                                                                                  C4                 CBD

                                                         C7
                                                                                            Rossburgh
                                                                            Merebank
                                                                                       C2
                                                                            C5
                                                               Chatsworth

                                                                         Umlazi      Prospecton
2011/02/24             1T4643 - ETHEKWINI IRPTN
         Preferred Phase Option




                                                                                                               I R P T N
                                                                                                   Tongaat




                                                                                                     Airport




                                                                                                               E T H E K W I N I
             Phase 1
                                                                                                        C8

             Phase 2                                                        Bridge City       C9


                                                                                                    Umhlanga
                                                                                                   C8
                                        Hillcrest                           C3
                                                    C7                              C1
                                            C6
                           Mpumalanga                                        C6
                                                                                                   Warwick
                                                              Pinetown                                            29
                                                                                  C4                 CBD

                                                         C7
                                                                                            Rossburgh
                                                                            Merebank
                                                                                       C2
                                                                            C5
                                                               Chatsworth

                                                                         Umlazi      Prospecton
2011/02/24             1T4643 - ETHEKWINI IRPTN
         Preferred Phase Option




                                                                                                               I R P T N
                                                                                                   Tongaat




                                                                                                     Airport




                                                                                                               E T H E K W I N I
             Phase 1
                                                                                                        C8

             Phase 2                                                        Bridge City       C9


             Phase 3                                                                                Umhlanga
                                                                                                   C8
                                        Hillcrest                           C3
                                                    C7                              C1
                                            C6
                           Mpumalanga                                        C6
                                                                                                   Warwick
                                                              Pinetown                                            30
                                                                                  C4                 CBD

                                                         C7
                                                                                            Rossburgh
                                                                            Merebank
                                                                                       C2
                                                                            C5
                                                               Chatsworth

                                                                         Umlazi      Prospecton
2011/02/24             1T4643 - ETHEKWINI IRPTN
             Preferred Phase Option




                                                                                                               I R P T N
                                                                                                   Tongaat




                                                                                                     Airport




                                                                                                               E T H E K W I N I
             Phase 1
                                                                                                        C8

             Phase 2                                                        Bridge City       C9


             Phase 3                                                                                Umhlanga
                                                                                                   C8
                                        Hillcrest                           C3
                                                    C7                              C1
             Phase 4
                                            C6
                           Mpumalanga                                        C6
                                                                                                   Warwick
                                                              Pinetown                                            31
                                                                                  C4                 CBD

                                                         C7
                                                                                            Rossburgh
                                                                            Merebank
                                                                                       C2
                                                                            C5
                                                               Chatsworth

                                                                         Umlazi      Prospecton
2011/02/24             1T4643 - ETHEKWINI IRPTN
        Implementation Plan


32




     E T H E K W I N I        I R P T N
                    Implementation Plan




                                                I R P T N
Factors to Consider




                                                E T H E K W I N I
 Stakeholder engagement
 Contract duration of IRPTN Phase 0
 Negotiations with the minibus taxi
   industry
 PRASA’s planning processes
 Buildability and industry capacity
 Key decisions and decision making
   processes
 Cash Flow

                                                   33




2011/02/24           1T4643 - ETHEKWINI IRPTN
                             Implementation Plan




                                                                                                                     I R P T N
2010            2011                          2012                          2013                  2014
 Q4 Q1         Q2 Q3         Q4     Q1       Q2 Q3          Q4      Q1     Q2 Q3          Q4   Q1 Q2 Q3
                          Tender Award




                                                                                                                     E T H E K W I N I
    Phase 0 Contract
              Period
             Decision on Phasing of the IRPTN
               C2 Implementation Plan
             Agreement on Phase 1 with MBT Leadership
               Detail Financial Modelling & Analysis
                    Business Plan Preparation
                                         Basic Planning
                       Confirmation of Funding Provision
                                                          Minibus Taxi industry Negotiations
       Appoint Operator and Operator Mobilisation                                                                       34
                                      Procure Detail Design Service Provider
                                                                      Detail Design
                                                                    Procure Contractor
                                         Phase 1Construction
                                                                                      Commence Operations
                                                                                                 ETA Restructuring

2011/02/24                    1T4643 - ETHEKWINI IRPTN
                    Implementation Plan




                                                                               I R P T N
Key Highlights




                                                                               E T H E K W I N I
 Durban Transport Implementation and contract durations July 2011-July 2014
 Commence Basic Planning for Phase 1 February 2011 – January 2012
 Detail Design January 2012 – December 2012
 Confirmation of Funding June 2011
 Negotiations with the minibus taxi industry November 2010-July 2012
 Construction November 2012 – July 2014
 ETA Restructuring February 2011 – October 2013
 Commence Operations July 2014


                                                                                  35