					                                       ADDM 5000.02 TEMPLATE
                                             ITT Charter




                               Integrated Test Team Charter
                                               for
                                       Program Name
                                              Date




                                         Prepared by
                                       Program Office




DISTRIBUTION STATEMENT Click here to enter distribution letter and explanation (e.g.;
“Approved for public release; distribution is unlimited”). Distribution statement reference
http://www.dtic.mil/dtic/submit/guidance/distribstatement.html .




                                                 1
ITT Charter, v1.0
AF/TE, Template approved 12 May 2011
                                       ADDM 5000.02 TEMPLATE
                                             ITT Charter




Guidance: The Integrated Test Team (ITT) is the overarching test management team that is co-
chaired by representatives from the program office and the lead operational test organization. It
is responsible for the T&E grand strategy that supports the program’s acquisition process. If
possible, the ITT must start building the overall T&E strategy BEFORE the Mildstone (MS) A
decision, but certainly no later than immediately after the MS A decision. If these early phases
are bypassed, the ITT must come together as soon as the new program is identified so that key
T&E decisions can be made and strategies developed.


Follow the guidance in the red, italic font guidance paragraphs to enter descriptions for each
section of the ITT Charter in the blue “Click here to enter text” areas. If a section is not
applicable, label it as such and state a short rationale.


Ensure that the Systems Engineering Plan resulting from this template includes all relevant
information provided by the reference documents. Particularly the Acquisition Intelligence
Guide, Version 1.0, August 2010.


Determine whether FOUO is applicable per DoD 5200.1-R, ”Information Security Program”
(January 1997) and AFI 31-401, “Information Security Program Management” (1 November
2005 and incorporating Change 1, 19 August 2009). Mark the document accordingly.
Reference http://www.dtic.mil/whs/directives/corres/pdf/520001r.pdf and
http://www.af.mil/shared/media/epubs/AFI31-401.pdf.


Instructions: PEO-specific instructions will be inserted here.
References:
    1. AFI 99-103, Capabilities-Based Test and Evaluation, 26 February, 2008, Incorporating
       Change 2, 20 March 2009. http://www.af.mil/shared/media/epubs/AFI99-103.pdf .
    2. Air Force Test & Evaluation Guidebook, Version 2.1, April 2007.




                                                 2
ITT Charter, v1.0
AF/TE, Template approved 12 May 2011
                                                        ADDM 5000.02 TEMPLATE
                                                              ITT Charter




Contents
1.     Introduction. ............................................................................................................................ 4
     1.1.    Program(s) Covered. ........................................................................................................ 4
     1.2.    Authority. ......................................................................................................................... 4
       1.2.1.       AFI 99-103. ............................................................................................................... 4
       1.2.2.       Acquisition Decision Memorandum (or other documents directing formation). ..... 4
     1.3.    Program Description. ....................................................................................................... 4
       1.3.1.       Other Key Program Information. .............................................................................. 4
       1.3.2.       Acquisition Strategy Overview. ................................................................................ 4
2.     ITT Mission, Scope, and Overarching Goals.......................................................................... 4
3.     ITT Membership and Responsibilities. ................................................................................... 4
     3.1.    System Program Office (SPO). ........................................................................................ 4
     3.2.    Operational Test Organization. ........................................................................................ 5
     3.3.    Responsible Test Organization (RTO). ............................................................................ 5
     3.4.    Associated System Program Offices. ............................................................................... 5
     3.5.    MAJCOM Operational Test Organization(s). .................................................................. 5
     3.6.    Participating Test Organizations (PTO). .......................................................................... 5
     3.7.    Operational User(s). ......................................................................................................... 5
     3.8.    HQ USAF Offices. ........................................................................................................... 5
     3.9.    OSD Offices. .................................................................................................................... 5
4.     Formation of Sub-Groups. ...................................................................................................... 6
5.     Administrative Matters. .......................................................................................................... 6
     5.1.    Frequency of Meetings. .................................................................................................... 6
     5.2.    Attendance. ....................................................................................................................... 6
     5.3.    Meeting Minutes. ............................................................................................................. 6
     5.4.    Action Items. .................................................................................................................... 6
6.     ITT Charter Updates. .............................................................................................................. 6
7.     Coordination and Signatures. .................................................................................................. 6
8.     Conflict Resolution. ................................................................................................................ 6




                                                                        3
ITT Charter, v1.0
AF/TE, Template approved 12 May 2011
                                       ADDM 5000.02 TEMPLATE
                                             ITT Charter




1. Introduction.
1.1.      Program(s) Covered.
Click here to enter text.
Guidance: List the program(s) the Integrated Test Team (ITT) will oversee and give a brief
history of the ITT since program inception. If this is a standing ITT, list when additional
programs were added to the original ITT charter.
1.2.      Authority.
Click here to enter text.
Guidance: Cite the document(s) directing formation of the ITT and its responsibilitie. AFI 99-
103 and “Acquisition Decision Memorandum or other documents directing formation”.
1.2.1.    AFI 99-103.
Click here to enter text.
1.2.2.    Acquisition Decision Memorandum (or other documents directing formation).
Click here to enter text.
1.3.      Program Description.
Click here to enter text.
Guidance: Briefly describe the program(s) covered by the charter.
1.3.1.    Other Key Program Information.
Click here to enter text.
Guidance: Acquisition category (ACAT); on OSD T&E Oversight List; etc.
1.3.2.    Acquisition Strategy Overview.
Click here to enter text.
Guidance: Briefly describe the acquisition strategy and how the test and evaluation (T&E)
strategy supports it.
2. ITT Mission, Scope, and Overarching Goals.
Click here to enter text.
Guidance: What are the major reasons for having the ITT (reference AFI 99-103, paragraph
3.14).
3. ITT Membership and Responsibilities.
Click here to enter text.
Guidance: List the ITT member organizations and how they will support development of the T&E
strategy and other T&E matters. Build on the list of responsibilities in AFI 99-103 (but don’t
repeat them), and list those that are unique to this ITT and program.
3.1.      System Program Office (SPO).
                                                 4
ITT Charter, v1.0
AF/TE, Template approved 12 May 2011
                                       ADDM 5000.02 TEMPLATE
                                             ITT Charter


Click here to enter text.
3.2.      Operational Test Organization.
Click here to enter text.
Guidance: This is AFOTEC unless it has been determined (IAW AFI 99-103) they will not be
involved in conducting operational testing. AFOTEC will be involved with all ACAT I, ACAT II,
and OSD Oversight programs according to AFI 99-103, paragraph 4.6 and Figure 4.3
Operational testers from the other Services and relevant Air Force MAJCOMs will also attend.
3.3.      Responsible Test Organization (RTO).
Click here to enter text.
Guidance: DT&E community representatives will attend early meetings until the RTO is formally
designated. Various sources are available such as the appropriate Product or Logistics Center
Test Authority (CTA), or as designated by AFMC/A3F, or the Test Representative from the
DT&E organization most likely to conduct government DT&E.
3.4.      Associated System Program Offices.
Click here to enter text.
Guidance: List any SPOs for associated systems that must be interoperable with the chartered
system(s).
3.5.      MAJCOM Operational Test Organization(s).
Click here to enter text.
Guidance: MAJCOM attendance is required if AFOTEC is not the designated operational tester,
and are strongly encouraged to attend. If AFOTEC is the designated operational tester. As the
program progresses, a transition from AFOTEC to MAJCOM will be anticipated and planned
for.
3.6.      Participating Test Organizations (PTO).
Click here to enter text.
Guidance: Describe how JITC, AFC2ISRC, etc., will support the program’s T&E activities.
3.7.      Operational User(s).
Click here to enter text.
Guidance: Assist with clarification of JCIDS documents and the development of operating and
enabling concepts, sstrategies, and other operational plans.
3.8.      HQ USAF Offices.
Click here to enter text.
Guidance: Describe how AF/TE, AF/A3, SAF/AQ, SAF/A6, and others as required will support
the ITT’s efforts.
3.9.      OSD Offices.
Click here to enter text.

                                                 5
ITT Charter, v1.0
AF/TE, Template approved 12 May 2011
                                       ADDM 5000.02 TEMPLATE
                                             ITT Charter


Guidance: Describe how DOT&E, DASD (DT&E) and others (as required) will support the
ITT’s efforts.
4. Formation of Sub-Groups.
Click here to enter text.
Guidance: Briefly describe the ITT subgroups that will support or conduct T&E such as CTFs,
study groups, writing teams, data scoring boards, certification boards, etc. These groups will
likely draw upon the same members and organizations as the ITT, but will have distinctly
different functions and may have their own charters. Do not embed these charters within the ITT
charter.
5. Administrative Matters.
5.1.      Frequency of Meetings.
Click here to enter text.
5.2.      Attendance.
Click here to enter text.
5.3.      Meeting Minutes.
Click here to enter text.
5.4.      Action Items.
Click here to enter text.
6. ITT Charter Updates.
Click here to enter text.
Guidance: ITT charters will be reviewed for currency soon after each milestone or major
decision review, for each new increment that is started, and when additional associated systems
are added to or taken from the ITT.
7. Coordination and Signatures.
Click here to enter text.
Guidance: The level of signature on the ITT charter will generally be at the O-6 or GS-15 level.
8. Conflict Resolution.
Click here to enter text.
Guidance: Describe how conflicts will be resolved according to Figure A5.2 in the Air Force
T&E Guide Book.




                                                 6
ITT Charter, v1.0
AF/TE, Template approved 12 May 2011

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:6
posted:11/20/2012
language:Unknown
pages:6