113

W
Shared by: xuyuzhu
Categories
Tags
-
Stats
views:
0
posted:
11/16/2012
language:
Unknown
pages:
12
Document Sample
scope of work template
							EXPLORATION & DEVELOPMENT

          AND

         MINING



 THE NEW PARADIGM


  David J. Hall

     FINEX '08
NO MINE EXISTS WITHOUT THE PROCESS

OF EXPLORATION & DEVELOPMENT (E&D)


E&D IS THE LIFEBLOOD OF THE MINING

INDUSTRY & CURRENTLY NEW BLOOD IN

SHORT SUPPLY



                              FINEX '08
Drilling Dominican Republic   Engaging natives in Kenya




  5000 metres a.s.l. Peru                Drilling in Turkey
                                                          FINEX '08
  THE EXPLORATION-MINING VALUE CURVE
VALUE

   The E & D                         The Mining
   Business                        Business


                 POSITIVE
                 FEASIBILITY                             LONG TERM VALUE ADDED



  GREATEST
  VALUE
  ADDED
  THROUGH                         FINANCING &          START-UP
  E&D                             CONSTRUCTION         PROBLEMS




                                                                                   TIME

  Discovery                    Development                            Production
  “Excitement”                 “Investment Analysis”                  “Real Results”

                                                                                FINEX '08
Risk = Probability of Success By Financial Exposure

                   1. First phase drill program

                        1                            2. Second phase after
                               2                       initial encouragement
            High


        REWARD                        3                3. Pre-Feasibility
                                                               Stage
                                          4
            Low                                       4. Feasibility Stage




        Project          Low                  High
                                   RISK

                   RISK REWARD DIAGRAM
                                                                    FINEX '08
HOW MANAGE AND INCREASE PROBABILITY OF SUCCESS.

1. QUALITY OF PEOPLE.

   Good people are rare because all competitors don’t have them.
   They are valuable because they affect the bottom line.
   They are inimitable because they cannot be copied or substituted.

2. QUALITY OF TECHNICAL TEAM.

   Teams can ensure that different viewpoints and perspectives are taken
   into account early on, thus make better decisions.

3. LEADERSHIP.

   Leadership is different to management.

4. RISK MANAGEMENT.

   The evaluation and controlling of risks that face exploration companies
   will ensure that opportunities are not missed, and competitive
   advantage is enhanced


                                                                FINEX '08
THE RESOURCE SECTOR IS CURRENTLY BOOMING AND

 EXPERIENCING EXCELLENT FINANCIAL PERFORMANCES


MINING COMPANIES MUST REPLACE THEIR PRODUCTION TO

 SUSTAIN THEMSELVES


YET WE ARE SEEING A DECLINING DISCOVERY RATE IN E&D


E&D MORE IMPORTANT THAN EVER




                                                 FINEX '08
THE DRUG DEVELOPMENT PROCESS: WHAT HAPPENS and WHEN


             Early Research/                                                   FDA Review Process
             preclinical testing      Phase        Phase         Phase         Approval             On Market   Phase
                                      I            II            III                                            IV


YEARS        6.5                      1.5          2             3.5           1.5                  15 years
                                                                                                    to get here
Test         Test tube and            20-80        100-300       1000-                                          Patients
Population   animal studies           healthy      patients      3000
                                      volunteers                 patients


Purpose      Look for                 Determine    Evaluate      Confirm                                        Post
             safety,                  safety and   effectiveness effectiveness                              marketing
             desired activity         dosage for   look for      Look for side effects                     surveillance
                                      next phase   potential     from long term use                        of the patients
                                                   toxic side effects                                      to look for
                                                                                                        potential problems
SUCCESS      5000                     5                                        1
RATE         evaluated                compounds enter clinical trials          compound approved


Source: Pharmaceutical Research & Manufacturing Association                                            FINEX '08
Research & Development                   =         Exploration & Development


The R&D Process                          The E&D Process
Long-Range Research                      Grass-roots exploration
General scientific/technology research   General exploration of country or region;
unrelated to any specific product        target generation exploration

Advanced Product Engineering             Advanced Exploration
Research and development focusing        Exploration and discovery focusing on
on product lines                         quality economic orebodies incorporating
                                         geology, mine engineering, metallurgy and
                                         economics focusing on the product

Product Engineering                      Mine Engineering, Mineral processing
                                         and Geological Modelling
Adapting the product concepts for        Preparing the product – reserves for
use in products                          mining and the market


                                                                         FINEX '08
TODAY                                            VISION FOR THE FUTURE

Commercial mining makes the difference           Mining companies can focus on their
between success and failure of a mining          priorities for success.
company.
                                                 Mining companies are free to select the right
                                                 projects for their portfolio, from the right
E&D is an expensive, risky process that          E&D group, at the right time.
cannot be relied upon to support the mining
companies portfolio.                             Mining companies maintain links with
                                                 development.

Mining and E&D have traditionally struggled      Exploration risk is spread across a number of
to work together in mining companies due to      focused E&D groups.
clashes in culture, objectives and priorities.
                                                 A clearly defined ‘business’ relationship is
                                                 defined between commercial mining and
The ‘not found here’ mentality may result in     E&D.
exploration groups within a mining company
encouraging internal projects over external      E&D is free to sell innovations to the ‘best’
projects.                                        customer.




          The Relationship of Mining and E&D                                             FINEX '08
Mining companies will need to balance risk in their
portfolios by sourcing multiple projects from multiple
E&D partners to ensure their ability to select the best
projects at the right time. In order to establish this new
paradigm, commercial mining will form clearly defined
“business” relationships with E&D organizations providing
a framework to manage their inherent differences.

The mining companies of the future will have to make
better decisions endowing it the ability to select the best
projects sooner and hence reduce late stage costly
attrition. Deals that are often struck too late in a project
development are unlikely to generate maximum value for
the mining company.




                                                          FINEX '08
THANK YOU




            FINEX '08

						
Related docs
Other docs by xuyuzhu
like - ms-campbell
Views: 164  |  Downloads: 0
AVI TWIN - Albuz
Views: 209  |  Downloads: 0
APUNTATE Y PARTICIPA - Uceda
Views: 0  |  Downloads: 0
Ethics.doc - Toledo Estate Planning Council
Views: 114  |  Downloads: 0
Ethics Quiz
Views: 150  |  Downloads: 0
a bean
Views: 157  |  Downloads: 0
Avertisement in English - Doordarshan News
Views: 147  |  Downloads: 0
liga LIMENOR CATEGORíA Preparatorio
Views: 0  |  Downloads: 0