Installation Instructions - DOC by euch4U

VIEWS: 18 PAGES: 2

									    Quality
FENCE BUILDERS, INC.


          Recommended Installation Instructions
       “Fast-Trac” Aluminum Cantilever Slide Gates


 1. Layout post locations and dig holes (minimum 36” depth, 16” diameter.)
 2. Place posts in holes and check for alignment and opening dimensions.
 3. Place concrete in holes and allow to cure for 72 hours before hanging
    gate.
 4. Mount truck brackets to posts. Be
    sure the offsets are facing each
    other as shown, and the brackets
    are level with each other.

 5. Position gate (with track against the posts) at approximately half open
    and slide trucks into track.
 6. Lift gate with trucks onto truck mounting brackets.




 (continued on page 2)
        Quality
FENCE BUILDERS, INC.



   7. Adjust truck height with nuts on truck assembly so gate is level and
      has an unobstructed path.
   8. Install bottom guides on posts.
   9. Install receiver/latch on latch post.



These are general guidelines for gate installation. Each site has unique conditions that will
affect the gate installation. Manufacturer recommends that only qualified persons
experienced with this type of gate perform installation. Manufactur er is not responsible
for damage to gate due to inexperienced installers or other circumstances beyond their
control. Consult your supplier for more information.

								
To top