					RESEARCH 2005-2010 STRATEGIC THEMES & GOALS                                                                                        RESEARCH 2010-2015 STRATEGIC THEMES & GOALS
A. ENERGY & RESOURCES THEME                                                                                                        GOAL #
STRATEGIC GOALS:                                                                                                                     1      Maximize the actual operational energy performance of buildings and facilities
A1. Provide guidance on techniques and move 30% towards net zero-energy use bldgs by 2008, 50% by 2012, and 70% by 2015
A2. Produce by 2015 new residential and light commercial bldgs that use 70% less energy based on ASHRAE 90.2-2001                    2      Progress toward Advanced Energy Design Guide (AEDG) and cost-effective net-zero-energy (NZE) buildings
A3. Develop by 2015 economically viable applications of renewable energy that reduce conventional energy usage by 25%
A4. Develop systems and components that reduce energy use in supermarkets by 30% by 2015                                             3      To reduce significantly the energy consumption for HVAC&R, water heating and lighting in existing homes.
A5. Optimize & make consistent ASHRAE standards 90, 62, AND 55 for energy efficiency & IEQ for indoor built environments
A6. Develop integrated best practices design methods that optimize energy eff., life cycle cost, IEQ, and environmental impact       4      Significantly advance our understanding of the impact of indoor environmental quality (IEQ) on work performance, health symptoms and perceived
A7. Develop methods for measured bldg.(energy, cost, emissions) & occupant (comfort, health, productivity) performance.                     environmental quality in offices, providing a basis for improvements in ASHRAE standards, guidelines, HVAC&R designs and operation practices.
A8. Establish benchmark data on energy use in industrial refrigeration
                                                                                                                                     5      Support the development of ASHRAE energy standards and reduce effort required to demonstrate compliance

B. INDOOR ENVIRONMENTAL QUALITY THEME
STRATEGIC GOALS:                                                                                                                     6      Building Information Modeling (BIM) of energy efficient, high-performing buildings
B1. Make improvements in occupant health and comfort that yield 20% increase in productivity by 2015
B2. Provide optimal indoor environment for bldgs, vehicles, & facilities with respect to comfort, productivity, health, & safety     7      Support development of tools, procedures and methods suitable for designing low energy buildings
B3. Understand better how contagious viruses are transmitted in indoor environments and develop countermeasures
B4. Develop self-diagnostic inspection methods for HVAC systems that minimize impacts on comfort, health, & productivity             8      Facilitate use of natural and low global warming potential (GWP) synthetic refrigerants and seek methods to reduce refrigerant charge


C. TOOLS AND APPLICATIONS THEME                                                                                                      9      Support the development of improved HVAC&R components ranging from residential through commercial to provide improved system efficiency ,
STRATEGIC GOALS:                                                                                                                            affordability, reliability and safety
C1. Develop more effective tools that will improve the productivity of the design process by 25% by 2015
C2. Develop dual path standards where paths are a) Prescriptive based, and b) Performance based                                      10     Significantly increase the understanding of energy efficiency , environmental quality and the design of buildings in engineering and architectural education
C3. Develop methods to allow a designer to accurately model a bldg in virtual reality in no more than 1 week by 2010
C4. Develop a measurement-based rating system to establish the environmental performance of a bldg & its systems                     11     Understand influences of HVAC&R on airborne pathogen transmission in public spaces and develop effective control strategies
C5. Develop self-calibrating & low-cost sensor systems that measure control variables (comfort, health, productivity)
C6. Establish design tools to improve the installed energy eff. of HVAC&R systems and components
C7. Provide design guidance for bldgs. and systems to address the past and expected change in climatic conditions


D. EQUIPMENT, COMPONENTS & MATERIALS THEME
STRATEGIC GOALS:
D1. Establish techniques to improve energy eff. & reliability of HVAC&R components
D2. Continue research into new alternative and natural refrigerants
D3. Improve performance and reliability and minimize the environmental impacts of working fluids and materials
D4. Advance ASHRAE's role in the safety and security of food distribution
D5. Develop reliable, durable, and self-correcting sensor technology for monitoring IEQ, pollutants, energy conservation, & FDD
D6. Move one or more non-traditional technologies to market readiness by 2010
D7. Develop techniques that reduce the installed energy use of HVAC&R system auxiliary equipment 50% by 2015


E. EDUCATION & OUTREACH THEME
STRATEGIC GOALS:
E1. Make the results of ASHRAE research available to the technical committee
E2. Ensure that ASHRAE research has an international impact
        ASHRAE RESEARCH IMPLEMENTATION PLAN                                                                                                   - FALL 2012 EDITION




                                                                                                                                                               STRATEGIC PLAN




                                                                                                                                                                                                STATEMENT DUE
                                                                                                                                                                                                TO RAC BY THIS




                                                                                                                                                                                                                  RAC APPROVAL
                                                                                                                                               EST. DURATION
                                     RESPONSIBLE




                                                                                                                                                                                                                  THIS DATE OR
                                                                                                                                                                                                                  REQUIRED BY
                                                                                                                                                                                  CO-SPONSOR




                                                                                                                                                                                                1st DRAFT OF
                                                                                                                                                               SUPPORTED
                                                                                                                                                               RESEARCH
                                                                                                                                  EST. COST




                                                                                                                                                                                                                  DROPPED
                                                                                                                                               (Months)




                                                                                                                                                                                                                  FOR BID
                                                                                                                                                               GOALS




                                                                                                                                                                                                WORK
                                     TC/TG




                                                                                                                                                                                                DATE
                                                                                                                                                                                  TCs
   #     TOPIC #      STATUS                                                      TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ ================
Solicited Research Projects That Could Potentially be Funded by fall 2012 Based on Bids Received in spring 2012 or earlier:


                                                   ACTIVE MECHANISMS FOR ENHANCING HEAT AND MASS TRANSFER IN                                                   A1, A2, B2,                     REQUIREMENT       REQUIREMENT
   1     1462        TRP-R           8.03          SORPTION FLUIDS                                                              150,000           24           C1, D3, E1         None           SATISFIED         SATISFIED

                                                   THERMAL-FLUID BEHAVIOR OF MIXED REFRIGERANTS FOR CRYOGENIC                                                  D1, D2, A4,                     REQUIREMENT       REQUIREMENT
   2     1602         TRP            10.04         APPLICATIONS                                                                 150,000           24               C6             None           SATISFIED         SATISFIED


                                                   GUIDE FOR SUSTAINABLE REFRIGERATED FACILITIES AND                                                           #1, #2, #8,       10.01         REQUIREMENT       REQUIREMENT
   3     1634         TRP            REF           REFRIGERATION SYSTEMS                                                        400,000           24              #10            10.05           SATISFIED         SATISFIED
Research Projects That Could Potentially Bid in fall 2012 or spring 2013 - Rebids, Approved, and Conditionally Approved TRPs:


                                                                                                                                                               A1, A6, A7,
                                                   SURVEY OF PARTICLE PRODUCTION RATES FROM PROCESS ACTIVITIES                                                 B2, C1, C2,                     REQUIREMENT       REQUIREMENT
   4     1399        TRP-R           9.11          IN PHARMACEUTICAL AND BIOLOGICAL CLEAN ROOMS                                 260,000           24           C6, D1, D7         None           SATISFIED         SATISFIED


                                                                                                                                                               A1, A6, B2,                     REQUIREMENT       REQUIREMENT
   5     1447         TRP            5.06          PERFORMANCE OF PRESSURIZED STAIRWELLS WITH OPEN DOORS                        125,000           18               C1            None            SATISFIED         SATISFIED

                                                   REPRESENTATIVE LAYER-BY-LAYER DESCRIPTIONS FOR FENESTRATION
                                                   SYSTEMS WITH SPECIFIED BULK PROPERTIES SUCH AS U-FACTOR AND                                                                                 REQUIREMENT       REQUIREMENT
   6     1588        TRP-C           4.07          SHGC- CONDITIONALLY ACCEPTED                                                 75,000            12           A1, A2, C1         4.05           SATISFIED         SATISFIED


                                                   METHOD TO INCREASE MAXIMUM VELOCITY OF MAKE-UP AIR FOR                                                                                      REQUIREMENT       REQUIREMENT
   7     1600        TRP-C           5.06          ATRIUM SMOKE CONTROL - CFD STUDY- CONDITIONALLY ACCEPTED                     60,000              6            #7, #9           None           SATISFIED         SATISFIED


                                                   ROLE OF HVAC SYSTEMS IN THE TRANSMISSION OF INFECTIOUS AGENTS                                               A5, A6, A7,                     REQUIREMENT       REQUIREMENT
   8     1603        TRP-R           9.03          IN BUILDINGS AND INTERMODAL TRANSPORTATION                                   500,000           24           B1, B2, B3         None           SATISFIED         SATISFIED

                                                                                                                                                                                  4.01         REQUIREMENT       REQUIREMENT
   9     1631 TRP                    5.10          COUNTERTOP COMMERCIAL APPLIANCE EMISSIONS                                    246,000           12             #1, #4         SSPC 154         SATISFIED         SATISFIED

                                                   EFFECT OF UNSATURATED FLUOROCARBON CONTAMINANTS ON THE                                                                                      REQUIREMENT       REQUIREMENT
  10     1641         TRP            3.03          RELIABILITY AND PERFORMANCE OF HVAC&R EQUIPMENT                              90,000            12             #8, #9           None           SATISFIED         SATISFIED

                                                                                                                                                                                               REQUIREMENT       REQUIREMENT
  11     1665         TRP            3.02          R-40 STABILITY WITH HVAC&R SYSTEM MATERIALS                                  95,000            10                #9            3.03           SATISFIED         SATISFIED

                                                   MEASUREMENT AND PREDICTION OF WATERSIDE FOULING
                                                   PERFORMANCE OF INTERNALLY ENHANCED TUBES IN COOLING TOWER                                                                                   REQUIREMENT       REQUIREMENT
  12     1677 TRP-C                  8.05          APPLICATIONS - CONDITIONALLY ACCEPTED                                        210,000           28                #9            None           SATISFIED         SATISFIED
                                                                                                                                               STRATEGIC PLAN




                                                                                                                                                                              STATEMENT DUE
                                                                                                                                                                              TO RAC BY THIS




                                                                                                                                                                                                RAC APPROVAL
                                                                                                                               EST. DURATION
                                   RESPONSIBLE




                                                                                                                                                                                                THIS DATE OR
                                                                                                                                                                                                REQUIRED BY
                                                                                                                                                                CO-SPONSOR




                                                                                                                                                                              1st DRAFT OF
                                                                                                                                               SUPPORTED
                                                                                                                                               RESEARCH
                                                                                                                   EST. COST




                                                                                                                                                                                                DROPPED
                                                                                                                               (Months)




                                                                                                                                                                                                FOR BID
                                                                                                                                               GOALS




                                                                                                                                                                              WORK
                                   TC/TG




                                                                                                                                                                              DATE
                                                                                                                                                                TCs
   #     TOPIC #     STATUS                                                   TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ ================

Work statements which have not been approved yet by RAC for Bid:
                                                 UPDATE OF U-FACTORS, SOLAR HEAT GAIN COEFFICIENTS AND VISIBLE
                                                 TRANSMITTANCES OF STANDARD FENESTRATION UNITS MADE FROM                                                                     REQUIREMENT       EXTENDED TO
  13     1414         WS           4.05          REPRESENTATIVE FENESTRATION                                     100,000            8            A1, A2         None           SATISFIED        FEB 1, 2013


                                                 REFRIGERATED FACILITIES DOORWAY INFILTRATION AIR ENERGY                                       A6, A8, C6,                   REQUIREMENT       EXTENDED TO
  14     1434         WS           10.05         REDUCTION                                                       250,000          24           D1, D7, E1       None           SATISFIED        JUL. 1, 2013


                                SSPC 62.2 TRANSPORT OF CONTAMINANTS FROM GARAGES ATTACHED OR                                                                                 REQUIREMENT       EXTENDED TO
  15     1450         WS          4.03    INTEGRAL TO LOW-RISE RESIDENTIAL BUILDINGS                             175,000          18             #4, #5         4.03           SATISFIED        FEB. 1, 2013


                                                 DESIGN GUIDANCE FOR OUTDOOR AIR VENTILATION OF WATER LOOP
  16     1498         WS           6.08          HEAT PUMP SYSTEM


                                                 LIQUID/VAPOR SEPARATING VELOCITIES FOR INDUSTRIAL                                                                           REQUIREMENT
  17     1513         WS           10.03         REFRIGERATION SYSTEMS                                           100,000          18             D1, D2         10.01          SATISFIED        OCT. 1, 2012


                                                 DEVELOPMENT OF A DESIGN GUIDE FOR SYSTEM INTEGRATION OF                                                                     REQUIREMENT
  18     1514         WS           10.10         THERMAL ENERGY RECOVERY IN INDUSTRIAL REFRIGERATION SYSTEMS     150,000          18           A7, D1, D2       None           SATISFIED        OCT. 1, 2012


                                                 DEMAND RESPONSE OPTIMIZATION PROTOCOL AND INTEGRATED                                                                        REQUIREMENT       EXTENDED TO
  19     1543         WS           7.05          TRAINING                                                        150,000          18             #2, #7         None           SATISFIED        APR. 1, 2013

                                                 EQUATIONS TO ESTIMATE EVAPORATION RATES FROM WETTED
                                                 SURFACES IN NATATORIUMS, COMMERCIAL AND INSTITUTIONAL                                         A1, A6, A7,      1.12         REQUIREMENT
  20     1566         WS           8.10          BUILDING AND MEAT PROCESSING PLANTS                             300,000          24           B2, C1, D1       8.12           SATISFIED        JULY 1, 2013


                                                 TES SYSTEM PERFORMANCE METRICS RELATED TO CARBON EMISSION                                                                   REQUIREMENT
  21     1576         WS           6.09          REDUCTIONS AT THE POWER GENERATION SOURCE                       100,000          18                A6          1.10           SATISFIED        FEB. 1, 2013


                                                                                                                                               B1, B2, B3,                   REQUIREMENT
  22     1579         WS           2.03          TESTING AND EVALUATION OF OZONE FILTERS FOR IMPROVING IAQ       300,000          24             A2, A5         EHC            SATISFIED       FEB. 01, 2013


                                                 IMPROVED TOOLS FOR CONTROL LOOP PERFORMANCE MEASUREMENTS                                                                    REQUIREMENT
  23     1587         WS           7.09          AND EVALUATION                                                  100,000          24           A6, A7, C4       1.04           SATISFIED        JULY 1, 2013


                                                 DESIGN AND UTILIZATION OF THERMAL ENERGY STORAGE TO INCREASE                                  A6, B2, C1,                   REQUIREMENT
  24     1607         WS           6.09          THE EFFECTIVENESS OF WIND ENERGY RESOURCES                      35,000           12             C6, D1         None           SATISFIED        OCT. 1, 2013


                                                 COMPREHENSIVE PERFORMANCE RATING (CPR) FOR LIGHT                                              A2, A7, B4,                   REQUIREMENT
  25     1608         WS           8.11          COMMERCIAL UNITARY HVAC, PHASE 1                                185,000          18             D1, D5         7.06           SATISFIED        OCT. 1, 2013


                                                 DEVELOPMENT OF A TRANSPOSITION MODEL FOR CLEAR-SKY SOLAR                                      A6, B2, C1,      4.01         REQUIREMENT
  26     1610         WS           4.02          IRRADIANCE                                                      35,000           12             C6, D1         4.05           SATISFIED        FEB. 1, 2014


                                                                                                                                                                             REQUIREMENT
  27     1614         WS           5.10          EVALUATION OF EFFECTIVENESS OF UV SYSTEMS                       231,255          12                #9          2.03           SATISFIED        OCT. 1, 2014
                                                                                                                                        STRATEGIC PLAN




                                                                                                                                                                       STATEMENT DUE
                                                                                                                                                                       TO RAC BY THIS




                                                                                                                                                                                        RAC APPROVAL
                                                                                                                      EST. DURATION
                              RESPONSIBLE




                                                                                                                                                                                        THIS DATE OR
                                                                                                                                                                                        REQUIRED BY
                                                                                                                                                         CO-SPONSOR




                                                                                                                                                                       1st DRAFT OF
                                                                                                                                        SUPPORTED
                                                                                                                                        RESEARCH
                                                                                                          EST. COST




                                                                                                                                                                                        DROPPED
                                                                                                                      (Months)




                                                                                                                                                                                        FOR BID
                                                                                                                                        GOALS




                                                                                                                                                                       WORK
                              TC/TG




                                                                                                                                                                       DATE
                                                                                                                                                         TCs
  #    TOPIC #    STATUS                                                TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ ================


                                                                                                                                                                      REQUIREMENT
 28    1615        WS         7.05          FAULT DETECTION AND DIAGNOSTIC METHODS FOR SUPERMARKETS     200,000          24               #1, #2         10.07          SATISFIED       JULY 1, 2014
                                                                                                                                                         2.03
                                                                                                                                                         2.04         REQUIREMENT
 29    1624        WS         2.01          EFFECTIVE ENERGY-EFFICIENT SCHOOL CLASSROOM VENTILATION     195,000          36              231,255         5.03           SATISFIED       OCT. 1, 2014


                                            TESTING AND MODELING ENERGY PERFORMANCE OF ACTIVE CHILLED                                 #1, #2, #5, #6,                 REQUIREMENT
 30    1629        WS         5.03          BEAM SYSTEMS                                                100,000          18                 #7           4.07           SATISFIED       OCT. 1, 2015


                                            IMPROVED COMPRESSOR PERFORMANCE MODELING METHODOLOGY                                                                      REQUIREMENT
 31    1642        WS         8.11          FOR USE IN SYSTEM SIMULATION PROGRAMS                       150,000          24               C1, D1         8.01           SATISFIED       FEB. 1, 2016


                                            DEVELOPMENT OF NEW ACCELERATED CORROSION TESTS FOR ALL-                                                                   REQUIREMENT
 32    1645        WS         8.04          ALUMINUM MICROCHANNEL AND TUBE AND FIN HEAT EXCHANGERS      180,000          36            #1, #9, #10       8.11           SATISFIED       OCT. 1, 2015

                                                                                                                                                                      REQUIREMENT
 33    1663        WS         EHC           RESIDENTIAL IAQ GUIDE                                       200,000          18                  #7          None           SATISFIED       JUL. 1, 2016
                                                                                                                                                            STRATEGIC PLAN




                                                                                                                                                                                           STATEMENT DUE
                                                                                                                                                                                           TO RAC BY THIS




                                                                                                                                                                                                            RAC APPROVAL
                                                                                                                                          EST. DURATION
                                    RESPONSIBLE




                                                                                                                                                                                                            THIS DATE OR
                                                                                                                                                                                                            REQUIRED BY
                                                                                                                                                                              CO-SPONSOR




                                                                                                                                                                                           1st DRAFT OF
                                                                                                                                                            SUPPORTED
                                                                                                                                                            RESEARCH
                                                                                                                              EST. COST




                                                                                                                                                                                                            DROPPED
                                                                                                                                          (Months)




                                                                                                                                                                                                            FOR BID
                                                                                                                                                            GOALS




                                                                                                                                                                                           WORK
                                    TC/TG




                                                                                                                                                                                           DATE
                                                                                                                                                                              TCs
   #     TOPIC #     STATUS                                                    TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ ================
Additional Research Projects that could Potentially Bid in Spring 2013 - Research Topic Acceptance Request (RTAR) approved by RAC for development into a work statement:


                                                  DETERMINATION OF SUITABLE REPLACEMENT FOR SF6 WHEN USED AS A
                                                  TRACER GAS IN ACCORDANCE WITH ANSI/ASHRAE STANDARD 110 -
  34     1573        RTAR           9.10          CONDITIONALLY ACCEPTED                                                   125,000           12               #8, #9          None         May 15, 2014     July 1, 2016
                                                  DEFINING THE CAPABILITIES,NEEDS AND CURRENT LIMITATIONS OF                                                                 GPC 20
                                                  BUILDING INFORMATION MODELING (BIM) IN OPERATION AND                                                                        1.05
  35     1609        RTAR           7.03          MAINTENANCE                                                              150,000           18               A6, C1          7.01         AUG. 15, 2013    OCT. 1, 2015


                                                  DATA CENTER GASEOUS CONTAMINATION LIMITS AND MEANS OF                                                    A1, A5, D7,
  37     1619        RTAR           9.09          MONITORING                                                               180,000           18              E1, E2          None          DEC. 15, 2012    FEB. 1, 2015


                                                  DEVELOP A METHOD FOR TESTING THE MIST REMOVAL EFFICIENCY AND
  38     1623        RTAR           5.03          AIR FLOW RESISTANCE OF OIL MIST COLLECTORS                               150,000           24               #9, A1         None          DEC. 15, 2013    FEB. 1, 2016

                                                  ACTUAL ENERGY PERFORMANCE OF SMALL OFFICE AND K-12 SCHOOL
                                                  BUILDINGS DESIGNATED IN ACCORDANCE WITH THE 30% ASHRAE
  39     1627 RTAR                  2.08          ADVANCED ENERGY DESIGN GUIDES - CONDITIONALLY ACCEPTED                   170,000           14           #1, #2, #7         None          May 15, 2014     July 1, 2016

                                                  UPDATE THE SCIENTIFIC EVIDENCE FOR SPECIFYING LOWER LIMIT
                                                  RELATIVE HUMIDITY LEVELS FOR COMFORT, HEALTH AND IEQ IN
  40     1630        RTAR           5.11          OCCUPIED SPACES - CONDITIONALLY ACCEPTED                                  60,000             9             #4, #11         None          May 15, 2014     July 1, 2016


                                                  SIMPLIFIED PROCEDURE FOR CALCULATING EXHAUST/INTAKE
  41     1635        RTAR           4.03          SEPARATION DINSTANCES                                                     50,000           12              #9, #10          None         DEC. 15, 2012    FEB. 1, 2015


                                                  COMPARATIVE LAB AND FIELD EVALUATIO OF BUILDING PRESSURE                                                #1, #2, #7, #9,
  42     1639        RTAR           1.04          CONTROL METHODS - CONDITIONALLY ACCEPTED                                 199,000           36                #11            None         MAY 15, 2013     JUL. 1, 2015


                                                  THE IMPACT OF HIGHER EFFICIENCY REPLACEMENT FILTERS ON IAQ IN
  43     1649        RTAR           2.04          LOW RISE RESIDENTIAL BUILDINGS WITH CENTRAL HVAC SYSTEMS                 250,000           18                  #4           None         MAY 15, 2013     JUL. 1, 2015


                                                  CONDITIONING OF REPLACEMENT AIR FOR COMMERCIAL KITCHEN HVAC -
  44     1664        RTAR           5.10          CONDITIONALLY ACCEPTED                                                   150,000           18           #1, #4, #5, #7      None         MAY 15, 2014     JUL. 1, 2016

                                                  EXPERIMENTAL EVALUATION OF THE THERMAL AND VENTILATION
                                                  PERFORMANCE OF STRATIFIED AIRE DISTRIBUION SYSTEMS COUPLED
  45     1666        RTAR           5.03          WITH PASSIVE CHILLED BEAMS                                               195,000           24           #1, #2, #5, #7      None         MAY 15, 2014     JUL. 1, 2016
                                                  MEASUREMENTS OF THE RESPONSE OF COOLING COILS TO
                                                  ULTRAVIOLET RADIATION FOR IMPROVED ULTRAVIOLET GERMICIDAL
  46     1669        RTAR           2.09          IRRADIATION MODELING - CONDITIONALLY ACCEPTED                            150,000           18            #1, #9, #11        None         MAY 15, 2014     JUL. 1, 2016
Additional Project Funds that could be Committed by July 2013
                                                                                                                          $7,426,255
RETURNED RESEARCH TOPIC ACCEPTANCE REQUESTS (RTARS)
(These topics are NOT on the Society's Research Implementation Plan yet, but the TCs were encouraged to resubmit.)




                                                                                                                       EST. DURATION
                           RESPONSIBLE




                                                                                                                                                          CO-SPONSOR
                                                                                                                                         PLAN GOALS
                                                                                                                                         SUPPORTED
                           TC/TG/SSPC




                                                                                                                                         STRATEGIC
                                                                                                                                         RESEARCH
                                                                                                           EST. COST




                                                                                                                       (Months)




                                                                                                                                                          TCs
  #    TOPIC #   STATUS                                                TITLE                                                                                                         SUBMISSION HISTORY

===== ======== ========== ====== ============================================================ ============ ====== ========== ======== =======================================

                                 LITERATURE SEARCH FOR CURRENT HVAC DUCT DESIGN GUIDELINES
                                 FOR JUSTICE FACILITIES AND/OR STANDARDS WORLDWIDE AS WELL AS                                                                          REC. 10.07, RET. 10.10
  1    1520      RTAR     TG9.JF AT FEDERAL, STATE, COUNTY AND LOCALS LEVELS                             50,000             6               #1?                        REC.10.12, RET.11.01

                                                                                                                                        A5, A6, B1,
                                         DEVELOPMENT OF BOUNDARY MODELS FOR PARTICULATE MATTERS                                         B2, B3, C1,                    REC. 08.10, RET. 08.10
  2    1562      RTAR       4.10         DEPOSITION AT SOLID SURFACES OF INDOOR ENVIRONMENT              200,000          24                C3                         REC. 11.10, RET 11.10


                                         ASSESSMENT OF MEASUREMENT TECHNIQUES FOR LEAK FLOW RATE
  3    1599      RTAR      3.08          (LFR) OF COMPONENTS AND SYSTEMS                                 150,000          12                #1?                        REC. 09.08 RET.09.10

                                                                                                                                                                       REC. 10.08, RET. 10.10
  4    1625      RTAR      2.03          APPLICATION OF ASHRAE 62.1 INDOOR AIR QUALITY PROCEDURES        250,000          18            A6, B2, C6                     REC. 11.10, RET. 11.11

                                                                                                                                                                       REC. 10.08, RET. 10.10
  5    1626      RTAR      2.04          ENERGY IMPLICATIONS OF AIR FILTRATION IN COMMERCIAL BUILDINGS   250,000          24            #2, #5, #7                     REC. 11.12, RET. 12.02

                                                                                                                                                                       REC. 10.12, RET. 11.01
                                         DESIGN EVALUATION OF HIGH ACCURACY RELATIVE HUMIDITY (RH)                                                                     REC. 11.12, RET. 12.01
  6    1636      RTAR      1.02          SENSORS FOR PSYCHROMETRIC TESTING                               75,000           12                C1                         REC.12.08
                                                                                                                                                                       REC. 10.12, RET. 11.01
                                         ABSORPTION REFRIGERATION CYCLE TRAINING SIMULATOR FOR                                                                         REC. 11.05, RET. 11.06
  7    1638      RTAR      8.03          SUSTAINABLE RESOURCE USE                                        75,000           15                #1                         REC. 12.08

                                         EVALUATION OF THE ABILITY OF COOLING TOWER DRIFT ELIMINATORS
  8    1643      RTAR      3.06          TO REMOVE LEGIONELLA FROM EFFUENT AIR STREAM                    120,000          18              #4, #11                      REC. 11.05, RET. 11.06



  9    1644      RTAR      5.06          SMOKE CONTROL IN LONG ATRIA                                     150,000          18               #7, #9                      REC. 11.05, RET. 11.06

                                         ECONOMIC ENVELOPE COST DATA BASE IN SUPPORT OF STANDARD                                                        SSPC
 10    1647      RTAR      7.06          90.1                                                            425,000          12                A1          90.1           REC. 11.05, RET. 11.06
                                         TRAINING REQUIREMENTS FOR SUSTAINABLE, HIGH PERFORMANCE
                                         BUILDING OPERATION TO OPTIMIZE OPERATIONS AND ACHIEVING
 11    1650      RTAR      7.03          DESIGN EXPECTATIONS                                             72,000           18                #10                        REC. 11.05, RET. 11.06

                                         COMPUTATIONAL FLUID DYNAMICS (CFD) FOR PLANNING UPPER ROOM
 12    1652      RTAR      2.03          UVGI PLACEMENT, WITH VENTILATION SYSTEMS, IN PUBLIC SETTINGS    150,000          12                #4                         REC. 11.10, RET. 11.11
                                         STUDY HVAC SYSTEM PHOTO-DEGRADATION AT THE LOW LEVEL UVC
                                         LIGHT IRRADIANCE USED FOR COIL MAINTENANCE AND AIR STREAM
 13    1653      RTAR      2.03          DISINFECTION                                                    75,000           18                 ?                         REC. 11.10, RET. 11.11

                                         EFFECTIVE VENTILATION SYSTEMS FOR AIRBORNE INFECTION                                                                          REC. 11.10, RET. 11.11
 14    1657      RTAR      EHC           ISOLATION ROOMS TO REDUCE POTENTIAL CROSS INFECTION             250,000          36                #11                        REC. 12.08

                                         DEVELOPMENT OF MODELICA MODELS FOR THE EVALUATION OF
 15    1661      RTAR      4.07          SUPERVISORY CONTROL STRATEGIES IN THE ASHRAE HANDBOOK           200,000          24               #1, #7                      REC. 11.12, RET. 12.01



 16    1662      RTAR      8.03          ABSORPTION CYCLE COMPUTER SIMULATOR                             150,000          18                #1                         REC. 11.05, RET. 11.06



 17    1670      RTAR      4.04          RESEARCH TO DETERMINE ENERGY AND MOISTURE IMPACTS OF ATTIC      225,000          36           #1, #2, #3, #7                  REC. 12.03, RET. 12.04

                                         EXPERIMENTAL BENCHMARK DATA FOR DATA CENTER NUMERICAL
 18  1675  RTAR     4.10                 MODELING                               125,000   18   #1, #5, #7                                                              REC 12.06, RET 12.07

REJECTED RTARS: Topics that were judged not suitable for the ASHRAE research program as presented.
                                         DEVELOPING MODELS TO REPRESENT EXISTING BUILDING STOCK
  1    1648      RTAR       7.06         ENERGY PERFORMANCE                                              200,000            6               #7                         REC. 11.05, REJ. 11.06


  2    1676      RTAR       4.07         DATA-DRIVEN BUILDING MODELS FOR SMART METERS                    150,000          18            #1, #2, #5                     REC. 12.06, REJ. 12.07
DROPPED TOPICS FROM RESEARCH IMPLEMENTATION PLAN
(The following topics have been dropped from the Research Implementation Plan for various reasons.)




                                                                                                                          EST. DURATION (Months)




                                                                                                                                                                                                                                                                                   RAC APPROVAL FOR
                                                                                                                                                   RESEARCH STRATEGIC




                                                                                                                                                                                                                                                                                   BID REQUIRED BY
                                                                                                                                                                                                                                                             1st DRAFT OF WORK
                                                                                                                                                                                                                                                             STATEMENT DUE TO
                                                                                                                                                                                                                                                             RAC BY THIS DATE
                                                                                                                                                                         CO-SPONSOR TCs




                                                                                                                                                                                                                                                                                   THIS DATE OR
                             RESPONSIBLE




                                                                                                                                                   PLAN GOALS
                                                                                                                                                   SUPPORTED
                             TC/TG/SSPC




                                                                                                                                                                                                                                                                                   DROPPED
                                                                                                              EST. COST
  #    TOPIC #    STATUS                                                 TITLE                                                                                                               REASON FOR DROP

===== ======== =========== ======= =============================================================== ========== ======= ======= ======== ==================== ================ ================



                                           DEVELOP LOCAL CONVECTIVE HEAT TRANSFER COEFFICIENTS FOR
  1    1368      RTAR        4.05          INDOOR AND OUTDOOR SURFACES OF FENESTRATION SYSTEMS              135,000       24                        A6, C6              None                                                                              May 15, 2009             JULY 2011


                                           CHARACTERIZATION OF INFILTRATION, VENTILATION AND IAQ IN MID-
  2    1425      RTAR        4.03          AND HIGH-RISE MULTI-FAMILY BUILDINGS                             185,000       24                        A1, B2              None                                                                              May 15, 2008             JULY 2010


                                           OCCUPANT RESPONSE TO THE NOISE OF RESIDENTIAL VENTILATION
  3    1426      RTAR        4.03          FANS                                                             100,000       18                         A5                 None                                                                              May 15, 2009             JULY 2011
                                                                                                                                                   A6, A8,
                                           REFRIGERATED FACILITIES DOORWAY INFILTRATION AIR ENERGY                                                 C6, D1,
  4    1434      RTAR       10.05          REDUCTION                                                        160,000       18                       D7, E1               None                                                                              May 15, 2008             JULY 2010

                                                                                                                                                   A6, A8,
  5    1435      RTAR       10.09          OPTIMIZING BLAST FREEZER EFFECTIVENESS                           50,000        18                       C6, D1               None
                                                                                                                                                                        EHC                                                                               May 15, 2008             JULY 2010
                                                                                                                                                                        2.05
                                           ENERGY CONSERVATION, AIR-CONDITIONING AND PRODUCTIVITY IN HOT-                                          A2, A7,              5.12                                                                             REQUIREMENT
  6    1445        WS        2.01          HUMID TROPICAL REGIONS                                           175,000       36                       B1, B2               7.06                                                                               SATISFIED               JULY 2010



  7    1446      RTAR        3.04          PHYSICAL PROPERTIES MEASUREMENTS OF CO2 / LUBRICANT MIXTURES     75,000             9                    D2, D3              None                                                                              May 15, 2008             JULY 2010

                            SSPC           TRANSPORT OF CONTAMINANTS FROM GARAGES ATTACHED OR                                                                                                                                                            REQUIREMENT
  8    1450        WS        62.2          INTEGRAL TO LOW-RISE RESIDENTIAL BUILDINGS                       175,000       30                            B2              4.03                                                                               SATISFIED               FEB. 2011

                                           THE DEVELOPMENT OF A COMPUTATIONAL FLUID DYNAMICS MODEL TO
                                           REPRESENT THE PERFORMANCE OF A ROUND FLOOR (SWIRL OR
                                                                                                                                                                                          Topic time expired from
  9    1465      RTAR        4.10          INDUCTION TYPE) OUTLET USED IN UNDERFLOOR AIR DISTRIBUTION       100,000       18                        C1, C3              None
                                                                                                                                                                                            plan due to lack of
                                                                                                                                                                                                                                                         August 15, 2008           OCT. 2010

                                           EVALUATION OF THE IMPACT OF A MONOCHLORAMINE DISINFECTION ON                                                                                           activity.
                                           LEGIONELLA COLONIZATION OF AN INSTITUTIONAL SERVICE WATER
                                           SYSTEM AND ON THE INCIDENCE OF HEALTH CARE ASSOCIATED                                                   B2, B3,
 10    1479      RTAR        3.06          LEGIONNAIRES' DISEASE (LD)                                       25,000        24                       E1, E2               None                                                                              May 15, 2009             JULY 2011



                            SSPC           STANDARD 90.1 LINKED CRITERIA SLECTION ANALYSIS BASED ON                                                A1, A5,
 11    1483      RTAR        90.1          PERFORMANCE WITH DESIGN PACKAGES                                 250,000       18                         A6                 None                                                                             August 15, 2009           OCT. 2011


                                           PROCEDURES TO GENERATE HOURLY CLIMATIC DATA FROM SPARSE                                                 A6, C1,
 12    1494      RTAR        4.02          DATA SETS                                                        75,000        12                       C6, E2               None                                                                              May 15, 2009             JULY 2011


                                           MOISTURE TRANSPORT IN CONSTRUCTION MATERIALS & ASSEMBLIES AT                                            A6, B2,
 13    1496      RTAR        4.04          LOW TEMPERATURES                                                 190,000       24                       C2                   None                                                                             August 15, 2009           OCT. 2011

                                           VENT PERFORMANCE MODEL FOR ALL CATEGORIES, MULTI-STORY AND
                                           MULTI-UNIT FOR GAS & OIL FIRED FURNANCES, BOILERS AND WATER                                             C1, C3,
 14    1497      RTAR        6.10          HEATERS                                                          150,000       18                         D1                 None                                                                             August 15, 2009           OCT. 2011
                                                                                                                                                   A1, A3,
                                                                                                                                                   A5, A6,
                                           DESIGN GUIDANCE FOR OUTDOOR AIR VENTILATION OF WATER LOOP                                               B1, C1,
 15    1498      RTAR        6.08          HEAT PUMP SYSTEMS                                                100,000       12                       E1, E2               None                                                                             DEC. 15, 2011             FEB. 2014

                                                                                                                                                   A1, A2,
                                                                                                                                                   A5, A6,
                                                                                                                                                   B2, C1,                                                                                               REQUIREMENT
 16    1500        WS        5.03          A DESIGNER'S GUIDE FOR THE SELECTION OF AIR TERMINAL UNITS       120,000       24                         C6                 None                                                                               SATISFIED              OCT. 1, 2011

                                                                                                                                                                                          Replaced by URP-1633
                                                                                                                                                   A7, B2,                                                                                               REQUIREMENT             REQUIREMENT
                                                                                                                                                                                          after no bids received
 17    1502      TRP-R       1.04          USER INTERFACE DESIGN FOR ADVANCED SYSTEM OPERATION              240,000       24                         C6                 7.09                                                                               SATISFIED               SATISFIED
                                                                                                                                                                                          Topic time expired




                                                                                                                                                                                          draft and getting it
                                                                                                                                                                                          plan due to no WS

                                                                                                                                                                                          reactivate on plan
                                                                                                                                                                                          by submitting WS


                                                                                                                                                                                           deadline noted in
                                                                                                                                                                                            from display on

                                                                                                                                                                                             draft. TC can




                                                                                                                                                                                              approved by




                                           LIQUID/VAPOR SEPARATING VELOCITIES FOR INDUSTRIAL
 18    1513      RTAR       10.03          REFRIGERATION SYSTEMS                                            100,000       18                       D1, D2               None                                                                             AUG. 15, 2010            OCT. 2012


                                           THERMAL ENERGY RECOVERY FROM INDUSTRIAL REFRIGERATION                                                   A7, D1,
 19    1514      RTAR       10.01          SYSTEMS                                                          100,000       12                         D2                 None                                                                             AUG. 15, 2010             OCT. 2012

                                                                                                                                                   A1, B2,
                                           NON-STEADY STATE OVERHEAD HEATING AND AIR CHANGE                                                        C6, C7,                                  TC Dropped Topic                                             REQUIREMENT
 20    1545        WS        5.03          EFFECTIVENESS                                                    120,000       24                         D1                 None                                                                               SATISFIED               JULY 2012
                                                                                                                                                                                                Topic time expired from display on plan due to no WS

                                                                                                                                                                                                draft and getting it approved by deadline noted in far




                                           IN-DUCT FULL-SCALE LABORATORY-EVALUATED COMPARISON OF
                                                                                                                                                                                                 draft. TC can reactivate on plan by submitting WS




                                           PHOTOCATALYTIC OXIDATION (PCO) FILTERS VERSUS DRY-SCRUBBING                                             A2, A5,
 21    1548      RTAR        2.03          MEDIA FILTERS                                                    150,000       24                       B1, B3               None                                                                              MAY 15, 2010             JULY 2012


                                           IMPACT OF DUCT LEAKAGE ON INDOOR AIR QUALITY IN RESIDENTIAL
 22    1563      RTAR        6.03          SYSTEMS                                                          175,000       18                        B2, B3              None                                                                             AUG. 15, 2010             OCT. 2012

                                                                                                                                                   C1, D2,
                                                                                                                                                                                                                      left column




                                           TUBE-TO-TUBE CONDUCTION EFFECTS IN FINNED TUBE HEAT                                                     D1, A1,
 23    1577      RTAR        8.04          EXCHANGERS                                                       200,000       24                       A6, A7               None                                                                             DEC. 15, 2010             FEB. 2013


                                           LITERATURE SEARCH AND RISK ASSESSMENT FOR ESTABLISHING A LOW
 24    1618      RTAR        9.06          LIMIT OF RELATIVE HUMIDITY LEVELS IN HEALTH CARE SPACES          50,000             6                    A1, A6              None                                                                             DEC. 15, 2010             FEB. 2013



                                                                                                                                                   #8, #9,
                                           PHYSICAL PROPERTIES MEASUREMENTS OF HFO-1234yf / LUBRICANT                                              D2, D3,
 25    1628      RTAR        3.04          MIXTURES - CONDITIONALLY ACCEPTED                                100,000       12                         D6                 None                                                                             AUG. 15, 2012            OCT. 1, 2014

				