JOB ADVERTISEMENT by 233dKuz

VIEWS: 19 PAGES: 7

									                                           FORM CV
                                         <Herwindio>

POSITION APPLIED :

A. PERSONAL INFORMATION

   Full Name                 :   Herwindio Kunto Aji
   Place and Date of Birth   :   Jakarta 12 Augusts 1976
   Sex                       :   Male
   Marital Status            :   Married
   Religion                  :   Muslim
   Citizenship               :   Indonesia
   KTP / Passport No.        :   AK 833555
    Expiration Date           :   27 sept 2010
   Height / Weight           :   160 cm / 60 kgs.
   Blood Group               :   [v]A;         [ ] B;         [ ] AB;           [ ]O
   Current Address           :


   Permanent Address         : Jl. Caman Raya Komplek Depkes 3 No 96 Bekasi


   Telephone No.             : [R] : +622186904392 [O] :
   Cellular Phone No.        :+6281514004754
   E-mail Address            : herwindio@yahoo.co.id
   Willing to relocate       : [v] Yes.            [ ]No.
   Hobbies                   : Traveling


B. EDUCATION BACKGROUND

    School          Degree           City             Major           Year         Diploma
                                                                                   Receive
Senior High     SMA 53         Jakarta          IPA                1994
School
College
University      Trisakti       Jakarta          Mechanical         2001
                                                Engineering


C. TRAINING AND RELATED COURSES

TRAINING :
       Course                     School Name and Location                Year    Certificate
                                                                                  (Yes/No)
Computer                      Upgrade Computer,        Microsoft    1992-
                              Office, Data Base,       Operating    2005
                              Program, Primavera       Program,
                              Solid Works.



Language
    English
    French
          German
          Mandarin
          Others (if any)

Other                           1. July 20, 2004,                                     Yes
                                     Milling and ADM CNC.
                                Trisakti University, Jakarta.

                                2. November 29, 2005 –                                 Yes
                                    February 28, 2006
                                   Welding Inspector
                                   Balai Besar Barang and Bahan
                                  Teknik (B4T), Bandung.

                                3. November       16, 2009     –                       Yes
                                    November 23,2009
                                    CSWIP 3.1.
                                    The    Welding    Instituted
                                  (TWI), Jakarta.


Other Language Ability :
  Language          Reading                Writing                Speaking       Listening
English         Good                    Good                    Good           Good


(Scale : Excellent =1; Good =2, Fair=3, Basic =4)


D. CERTIFICATES

1. July 20, 2004,
   Milling and ADM CNC.      Trisakti University, Jakarta.

2. November 29, 2005 – February 28, 2006
   Welding Inspector   Balai Besar Barang and Bahan Teknik (B4T), Bandung.

3. November 16, 2009 – November 23,2009
   CSWIP 3.1.        The Welding Instituted (TWI), Jakarta.


E. WORK EXPERIENCE
(From current company to previous company)

1.       Company                 : SUCOFINDO Appraisal Utama, PT
         Position Title          : Surveyor
         Period                  : September 2003 – Mei 2004
         Dimensions              Report to  : Project Manager
         Tasks / Duties
                                 : Survey the assets belongs to the government of Pemda DKI
                                 Jakarta, like buildings, bridge for Bus way and vehicle of
                                 Pemda DKI.
                                 Checking the assets that still useful or not.
                                 Account the depreciation of assets and making the report for it.

         Reason to Leave         : End of contract
2.   Company           : PT. Ujatek Baru
     Position Title    : Auditor/Appraiser Engineer
     Period            : April, 2006 - February, 2007
     Dimensions        Report to   : Mechanical Manager

     Tasks / Duties    : Project:

                       PT. TRIPOLITA Indonesia Steel Fabricator.
                       We appraised machinery, equipment and vehicles.
                       The location in Serang, West Java.

                       PT. PERTAMINA Indonesia Oil Company.
                       We appraised machinery of rig Onshore, machinery of Tanker
                       Capacity 10.000 ton, Machinery of filling station, And vehicles.
                       The location in Batam, Palembang,Makassar and Surabaya.


                       PT. TELKOM Indonesia Telecommunication Company.
                       We appraised STO building and transmitter, machinery and
                       Vehicles.
                       The location in Sorong and Fak-Fak Papua.

                       PT. INDOSIAR VISUAL MANDIRI Television Company.
                       We appraised equipment electrical, transmitter, receiver,
                       machinery, and vehicles.
                       The location in Makassar and Jakarta.

                       PT. SURYA CITRA TELEVISION Television Company.
                       We appraised equipment electrical, transmitter, receiver, and
                       Vehicles.
                       The location in Makassar and Jakarta.

                       PT. SINAR CENTRAL SANDANG
                       We appraised machinery, equipment and vehicles.
                       The location in Jakarta.

                       PT. Q BEEF Indonesia,
                       We appraised machinery, equipment and vehicles.
                       The location in Solo and Jakarta.

                       PT. MULYA CERAMIC Tile Company.
                       We appraised machinery, equipment and vehicles.
                       The location in Bogor west java.
                       We appraised building’s equipment at BRI I and II.
                       The location in Jakarta.

                       Responsibilities:
                       Survey the asset of the company, especially machines
                       equipment.
                       Checking the lifetime assets that still useful or not.
                       Account the depreciation of assets and making the report for
                       market value.

     Reason to Leave   : Looking opportunities.
3.   Company           : Mohamad Al- Moujil Group
     Position Title    : QC Mechanical and Welding Piping
     Period            : March 2007 - 2008
     Dimensions        Report to : Qc Manager

     Tasks / Duties
                       : Project:
                       PC2 Monomer Project, Mono Ethylene Glycol (MEG) unit and
                       Propylene Oxide (PO) unit, Rabigh Site (Kingdom Saudi
                       Arabia).

                       Responsibilities:
                       Review of WPS, Welder Qualification Records with the
                       requirements of ASME Sec-IX/ API-1104.
                       Review the fabrication drawings prior to start the fabrication
                       work.
                       Monitoring and checking adequacy of joints preparation by
                       verifying the joint dimension, fit-up, weld joint cleanliness,
                       quality of individual process, placement and sequence of
                       individual weld passes, interpass cleaning and interpass
                       temperature.
                       Surveillance that welding parameter such as amperage,
                       voltage, polarity, welding technique is in compliance with
                       approved procedure.
                       Monitoring the welding consumables during the storage as well
                       as uses.
                       Finished weld appearance, weld size, weld length, dimensional
                       accuracy of weld ment. NDE if required, PWHT if required and
                       preparation of inspection reports.
                       Documentation for fit up daily and monthly progress report.
                       Ensure piping pre hydrostatic test and piping post hydrostatic
                       test.
                       Line check and prepare punch list.
                       Inspection of PSV (Pressure Safety Valve) and Breather Valve,
                       setting at Dresser Al-Rushaid Valve & Instrument Co.LTD
                       (Yanbu) City.
                       Witness of nondestructive test.
                       Operator of PMI-Positives Material Identification.
                                EQUIMENT : NITON
                                MODEL        : XLT 898W
                                SERIAL NO : 14422

                       Duties of work as Commissioning:
                       Inspection of boiler hydrostatic test, boiler chemical cleaning,
                       steam blowing for tubing & critical piping.
                       Inspection of boiler preservation.
                       Inspection of safety valve setting.
                       Inspection of runback test.
                       Inspection of bench mark test.
                       Inspection of load rejection test.
                       Inspection of performance test.
                       Inspection of reliability run test.

     Reason to Leave   : Emergency
F. AFFILLIATION / AWARDS (if any)




G. THESES / OTHER PUBLICATIONS (if any)




H. ADDITIONAL INFORMATION (if any)




I. RUMENERATION (Salary, Fringe Benefit/Allowances)
      Current      : USD$ 1100
      Expected     : USD $ 2000


J. REFERENCES :


                                                   Bekasi, 02/11/2010



                                                   Herwindio Kunto Aji ST


                                        -end-


                             Contoh experience in detail:

   1. Name Of Company : PT. KALIRAYA SARI – Balikpapan, Indonesia
      a. Owner of Project    : UNOCAL INDONESIA. LTD. – Balikpapan.
         Name Of Project     : CO2 Removal Project
         Project Description : CO2 Removal
         Position            : Project Control
         Job Description     : - Making of Daily, Weekly, and Monthly Progress

         Started From 10th October 2001 – 01 st September 2001.

       b. Owner of Project    : Goverment. – Balikpapan.
          Name Of Project     : Highway of Karingau Phase I Project
          Project Description : Making of Highway with Soil Cement Recycling, Build
                                 Box Culvert & Drainage
          Position            : Engineer
          Job Description     : - Calculation For Material
                                - Making Of Monthly Certificate
                                - Managed Material Supply
                                - Making Of Back Up Data Quatity
                                - Making Of Shop Drawing
  Started From 10th October 2001 – 07th January 2002

c. Owner of Project     : Goverment. – Balikpapan.
   Name Of Project      : Highway of Karingau Phase II Project
   Project Description : Making of Highway with Soil Cement Recycling, Build
                           Box Culvert & Drainage
   Position             : Engineer
   Job Description      : - Calculation For Material
                          - Making Of Monthly Certificate
                          - Managed Material Supply
                          - Making Of Back Up Data Quatity
                          - Making Of Shop Drawing
                     th
   Started From 08 May 2002 – 27th October 2002

d. Owner of Project    : Goverment. – Balikpapan.
   Name Of Project     : The Last Place of Trash Throw Project
   Project Description : Making of Trash Throw Place, Build Sliding
                          Reinforced With GeoTextile & Concertina Wire
   Position            : Engineer
   Job Description     : - Calculation For Material
                         - Making Of Monthly Certificate
                         - Managed Material Supply
                         - Making Of Back Up Data Quatity
                         - Making Of Shop Drawing
   Started From 12th February 2002 – 10th June 2002

e. Owner of Project       : Goverment. – Balikpapan.
   Name Of Project        :Slide Of Embankments Project
   Project Description    :  Making of Retaining Wall with Concrete K-225
   Position               :Engineer
   Job Description        : - Calculation For Material
                           - Making Of Monthly Certificate
                           - Managed Material Supply
                           - Making Of Back Up Data Quatity
                           - Making Of Shop Drawing
  Started From 27th      September 2002 – 15th December 2002

f. Owner of Project    : Goverment. – Balikpapan.
   Name Of Project     : Highway of Karingau Phase III Project
   Project Description : Making of Highway With Soil Cement Recycling,
                           Build Box Culvert & Drainage
   Position            : Engineer
   Job Description     : - Calculation For Material
                          - Making Of Monthly Certificate
                          - Managed Material Supply
                          - Making Of Back Up Data Quatity
                          - Making Of Shop Drawing
   Started From 02nd January 2003 – 10th June 2003
g. Owner of Project     : Goverment. – Balikpapan.
   Name Of Project     : Rigid Pavement Project
Project Description : Making of Highway With Concrete K-225 & Asphalt
                       Treated Base
Position            : Engineer
Job Description     :
                      - Calculation For Material
                      - Making Of Monthly Certificate
                      - Managed Material Supply
                      - Making Of Back Up Data Quatity
                      - Making Of Shop Drawing

								
To top