North Fort Myers Surface Water Master Plan Update: February, 2008 During initial field investigations, Boyle Engineering had determined that a significant amount of the available information on the drainage conveyances in this area was obsolete or insufficient. Due to rapid growth and development, the drainage structure inventory, boundary, and topography information was no longer accurate. All of this information is put into the model that is the foundation for the master plan. On October 9th, the Board of County Commissioners approved additional funding to conduct the survey work needed to proceed with this study. The South Florida Water District also contributed funding to this effort. Boyle Engineering completed the survey work in January, 2008. As each conveyance was surveyed, the information has been input into the model in preparation for running that model.