Nº/ Document Decision Stages to Adoption
Acronym
1 Minerals & Waste The timetable for Progress reported monthly and
(MWDS) Development Scheme producing all the parts reviewed at the Minerals & Waste
of the MWDF Project Board, also annually via the
AMR (see 5 below). Updated
Not required to be regularly to reflect feasibility in
formally adopted relation to resources available,
additional stages identified etc.
2 Minerals Strategy/policies for Evidence gathering, followed
(MDD) Development minerals planning in by public consultation on
(MLP) Documents, called Essex until at least various Issues & Options
the replacement 2028, plus allocations of including site options, then
Minerals Local Plan sites for development the Preferred Approach
since April 2012, and a proposals setting out ECC's preferences
which will, when map. Comprises: including sites; each stage
adopted, replace the Minerals Core document includes public
current Minerals Strategy, setting consultation, and consultation
Local Plan (approved out the long- responses inform the next
1996). term direction for stage of preparation
minerals Publication and Pre-
development Submission public
and the plan to consultation on soundness of
deliver the the document
strategy. Submission to Planning
Development Inspectorate
Management Examination by Planning
Policies for Inspector and publication of
Minerals Inspector's Report
Strategic Site Review and Adoption of the
allocations and document
safeguarding for Annual monitoring review
mineral thereafter
extraction,
transhipment
facilities and
other related
activities
Policies
(previously
Proposals) Maps
3 Joint Waste Strategy/policies for Evidence gathering, followed
(WDD) Development waste planning in Essex by public consultation on
(WLP) Documents (in and Southend until at various Issues & Options
conjunction with least 2031, plus including site options, then
Southend on Sea allocations of sites for the Preferred Approach
unitary authority), development and a setting out ECC's preferences
called the proposals including sites; each stage
replacement Joint map. Comprises: document includes public
Waste Local Plan consultation, and consultation
since April 2012, Waste Core responses inform the next
which will, when Strategy stage of preparation
adopted, replace the Development Publication and Pre-
current Essex & Management Submission public
Southend Waste Policies for consultation on soundness of
Local Plan (approved Waste the document
2001), Strategic Site Submission to Planning
allocations for Inspectorate
(see What's in a waste-related Examination by Planning
name? in Section 2 development Inspector and publication of
above) Non-Strategic Inspector's Report
Site Allocations Review and Adoption of the
for other document
preferred sites Annual monitoring review
for waste thereafter
processing plus
any associated
safeguarding
Policies
(previously
Proposals) Maps
4 Statement of Document explaining Preliminary scoping and initial
(SCI) Community how the people and public consultation
Involvement – this businesses of Essex Production of Draft SCI and
present document, can be involved both in public consultation
setting out community the preparation of the Pre-submission public
engagement in the MWDF and in consultation and submission
planning process contributing to to Secretary of State
determining planning Adoption following
applications incorporation of minor
changes by Planning
(The amended Planning Inspector
Act 2008, removes the Annual monitoring review
requirements for the First Review of SCI including
SCI to be specified in public consultation on
the MWDS and for an changes
independent Adoption by ECC Full Council
examination of the SCI) incorporating changes arising
from public consultation
5 Annual Monitoring Self-assessment of Produced annually; latest version
(AMR) Report produced progress against the can be viewed here together with a
annually within 9 MWDS timetable, the detailed AMR on the SCI.
months of the end of adequacy of MWDF
the financial year policies and the
effectiveness of public
consultation as set out
in the SCI
6 Supplementary These are not If and when produced, would be in
(SPDs) Planning compulsory, but, if accordance with Town and Country
Documents – produced, would need Planning (Local Planning)(England)
supplementary to support and be Regulation 2012, and with the
guidance to support consistent with new Planning & Compulsory Purchase
or expand new planning policy (both Act 2004 as amended by the
policies in the local and national) and Localism Act 2011.
MWDF. None are with the SCI. Not
proposed at this time. subject to public
examination.