Appendices

W
Shared by: HC121105202044
Categories
Tags
-
Stats
views:
4
posted:
11/5/2012
language:
Latin
pages:
28
Document Sample
scope of work template
							                            AECOM International Development
                            Stability in Key Areas-West (SIKA-West)
                            Bagh-e-Azadi Street
                            District 5, Near Tabiban Clinic
                            Herat, Afghanistan


To:              Offerors

From:            Stability in Key Areas-West (SIKA-West)

Date:            September 23, 2012

Subject:         Request for Proposal (RFP) Number SIKA-West-HT-12-09-02

Subproject
Name and No: SIKA-West-HT-12-09-02: SIKA-West Custom Database Design, Implementation &
             Training

Reference:       USAID/AECOM Contract No. AID-306-C-12-00004, Stability in Key-Areas (SIKA-
                 West)

Dear Offerors:

Enclosed is a Request for Proposal (RFP) for “SIKA-West Custom Database Design, Implementation
& Training” in Afghanistan. SIKA-West invites Offerors to submit a best-price proposal for the work
funded by the U.S. Agency for International Development (USAID) under Contract No. AID-306-C-
12-00004, Stability in Key Areas-West (SIKA-West).

  I.    Type of Subcontract – A Firm Fixed Price Subcontract is contemplated with an anticipated
        duration of two (2) months.

 II.    Submission of Questions – The SIKA-West Subcontracts Unit is ready to answer questions
        and provide assistance in understanding the requirements of this RFP. SIKA-West will not
        provide technical guidance on preparation of your proposal regarding exact information to
        provide cost or pricing, or any other technical requirement. Questions may be submitted no
        later than 2 October 2012 (4:00 pm. Herat, Afghanistan local time) to the Subcontracts Unit
        via email at grants.subcontracts@sikawest.com. No questions will be answered over the
        phone or in person; all questions must be submitted in writing. Offerors must insert in the
        subject line of their email the full RFP Number and Project Name (e.g. SIKA-West-HT-12-
        09-02, SIKA-West Custom Database Design, Implementation & Training.

III.    Submission of Proposals – Both Technical and Price Proposals must be in English and
        comprised of one (1) original hard-copy and one digital copy (on CD-ROM). Proposals must
        be delivered to the address below no later than 8 October 2012 (2:00 pm Herat, Afghanistan
        local time) to:

                               Stability in Key Areas-West Office
                               Nikbakht Brothers Compound
                               Bagh-e-Azadi Street
                               District 5, Near Tabiban Clinic
                               Herat, Afghanistan
                               Attention: Subcontracts Unit




                                            Page 1 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


       Both the hard and soft copy (on CD-ROM) of the Technical and Price proposal shall be
       placed in a sealed envelope clearly marked “Proposal for RFP SIKA-West-HT-12-09-02” and
       “TO BE OPENED ONLY BY A SUBCONTRACTS INDIVIDUAL WHO IS NOT A
       MEMBER OF THE EVALUATION COMMITTEE AND A WITNESS.” The CD-ROM
       version does not need to include signed and stamped versions of the documents so long as the
       required signed and stamped documents are included in the hard copy version. SIKA-West
       reserves the right not to evaluate a non- responsive proposal. Please note that no drawings or
       photos should be submitted as part of the proposal. The proposal must be submitted in two
       parts under separate, sealed envelopes and clearly labeled: (1) Technical Proposal and (2)
       Price Proposal.

       Electronic submittals meeting the standards listed above are acceptable. Electronic submittals
       are date stamped with the time received into SIKA-West servers. This time may be later than
       when sent by the Offeror.

       Electronic submissions must be addressed to grants.subcontracts@sikawest.com and received
       no later than the proposal deadline. The subject line of the proposal email must be “SIKA-
       West-HT-12-09-02”.

       Submission of the proposal to any other email account or copied to any other email account
       will be considered a non-responsive bid.

IV.    Offeror’s Agreement with Terms and Conditions – The completion of all RFP
       requirements in accordance with the instructions in this RFP and submission to SIKA-West of
       the technical and price proposals will constitute an offer and indicate the Offeror’s agreement
       to the terms and conditions in this RFP and any attachments hereto. SIKA-West reserves the
       right to award a subcontract without discussion and/or negotiation; however, SIKA-West also
       reserves the right to conduct discussions and/or negotiations, which among other things may
       require an Offeror(s) to revise its proposal (technical and/or price). Issuance of this RFP in no
       way obligates SIKA-West to award a subcontract, nor does it commit SIKA-West to pay any
       costs incurred by the Offeror in preparing and submitting the proposal.

 V.    Compliance with RFP Instructions – Offerors are required to fully review all instructions
       and specifications contained in this RFP. Failure to do so will be at the Offeror’s risk.

VI.    Confirmation of Receipt of RFP – Please confirm receipt of this RFP by email within 72
       hours. Failure to confirm receipt may disqualify a recipient from consideration of award under
       this RFP.

VII.   Index of RFP – This RFP is comprised in its entirety of the following sections and
       appendices:

       Sections of RFP
       Section 1       Statement of Work
       Section 2       Proposal Submission Documents
       Section 3       Technical Proposal Components
       Section 4       Price Proposal Components
       Section 5       Inspections and Acceptance
       Section 6       Subcontract Requirements
       Section 7       Evaluation Criteria
       Appendices
       Appendix A      Proposal Cover Letter
       Appendix B      Proposal Checklist
       Appendix C      Summary of Relevant Work Experience


                                             Page 2 of 28
 Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


         Appendix D      Past Performance References
         Appendix E      Implementation Plan, Timeline (Excel Format) & Coordination Plan
         Appendix F      Staffing Plan
         Appendix G      Management Capability Information
         Appendix H      Price Proposal Cover Letter
         Appendix I      Priced Deliverables and Payment Schedule
         Appendix J      Detailed Cost Breakdown (Excel Format)
         Appendix K      Afghanistan NGO Registration Certificate/ Copy of AISA Business License
         Appendix L      Tax Exemption Certificate (issued by MOE)
         Appendix M      Organizational Resources & Financial Capability
         Appendix N      Marking Plan

VIII.    Composition of Proposal – The proposal is comprised of Technical (Section 3), and Price
         (Section 4) for the activities described in the Statement of Work (Section 1). The proposal
         will consist of Appendix A through N (see above).

 Sections of RFP
 (1 through 7)
 Section 1 – Statement of Work

 1.1      Introduction
 USAID has contracted AECOM to implement the Stability in Key Areas-West Project in Western
 Afghanistan. AECOM will support Afghan citizens and the Government of the Islamic Republic of
 Afghanistan (GIRoA) sub-national offices in Farah, Herat, Badghis and Ghor Provinces. This will be
 accomplished by building GIRoA capacity at the provincial and district level and working with
 District Entities (DEs).

 Stabilization programming will prepare the sub-national entities for the transition from stabilization to
 traditional development. The ultimate goal of the stabilization programming is to eliminate sources of
 instability while at the same time supporting and promoting good governance and sustainable
 development that are Afghan owned, Afghan led and sustained by existing Afghan institutions. SIKA-
 West is a project of USAID/Afghanistan in collaboration with SIKA-East, North and South.

 1.2     Background and Statement of Problem
 SIKA-West is requesting proposals from qualified database developers to develop a custom database,
 implement the database, and train the SIKA-West M&E Database Officer on its use and maintenance.
 Currently the SIKA-West database, tracking 36 separate indicators, is on numerous Excel
 spreadsheets, and SIKA-West intends for all existing databases to be incorporated into one Access-
 based system, that will be maintained from the SIKA-West HQ in Herat.

 Based on the project work plan, it has become essential that SIKA-West implement a technological
 platform that provides for more efficient database and reporting systems to be utilized by SIKA-West
 staff and management. The first step in this process is to consolidate all Excel spreadsheets onto an
 Access database.

 1.3     Objectives
 The purpose of this RFP is to solicit proposals for an Access database, consolidating SIKA-West’s
 existing Excel database, and all existing reporting templates for 36 separate indicators, and
 photographs.

 An important requirement of this proposal will also be to build the capacity of SIKA-West’s Database
 Officer to be able to maintain and update the Access database. The contractor must be able to supply
 general onsite support services for this database at the SIKA-West offices in Herat for an agreed upon

                                               Page 3 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


number of hours per week. The rest of the time the contractor can work on the design and
modifications of the database from a remote location.

1.4    Estimated Project Duration
The proposed project duration is approximately two (2) months, including project start-up, closedown
and any necessary modifications. The project is expected to start on 22 October 2012 and end on 19
December 2012.

1.5       Expected Outcomes
         Design Access-based database incorporating all SIKA-West existing Excel databases,
          reporting templates for 36 separate indicators and program photographs.
         Implement database following feedback from SIKA-West M&E Manager and Database
          Officer.
         Train one (1) Database Officer on the maintenance and updating of database. This may
          involve allowing the Database Officer to shadow the database developers.

1.6       Activities
As follows, please find a description of activities or tasks the selected subcontractor will implement
during the different phases of the database development. The below is not meant as a comprehensive
list, but rather overall guidelines as relates to important phases of the database development.

Specifically, the subcontractor will perform the following activities:

A.        Database Design
          During the preparation and start-up of the training activity, the subcontractor must complete
          the following tasks. Several tasks may run concurrently.
          1. Conduct a needs assessment based on SIKA-West contractual requirements to USAID
              and the SIKA-West PMP, to ensure that the database meets program requirements.
          2. Work with the M&E Manager and Database Officer to modify the existing data collection
              template.
          3. Work with the M&E Manager and Database Officer to design Versions 1.0 of the
              database.
          4. Incorporate weekly, monthly and quarterly reporting requirements into the database.
          5. Modify database following SIKA-West feedback. Feedback may be received multiple
              times as issues arise and SIKA-West staff beta-test the database.

B.        Database Implementation
          1. Install the database on a terminal in the SIKA-West Herat office
          2. Install the database on SIKA-West’s online data storage site, OneSource, enabling the
             Database Officer to regular upload a backup copy of the database to OneSource
          3. Set up a system allowing Provincial Satellite Offices to send data to Herat HQ office on
             Excel spreadsheets, and then be uploaded by the Database Officer
          4. Set up system to allow Database Officer to generate monthly reports from the database
             according to the requirements of SIKA-West’s Performance Monitoring Plan (PMP)

C.       Training
      1. Train the SIKA-West Database Officer to be able to maintain and update database.
      2. These training sessions may involve allowing the Database Officer to shadow the database
         designer and be involved at every level of the database design.
      3. A key component of this training will be a practical test of the Database Designer to ensure
         he/she is able to maintain the database, generate reports and solve any minor issues.

Throughout each phase of the process, the selected subcontractor will work in consultation with the
SIKA-West Point of Contact (POC), Clint Lambert, M&E Manager.


                                              Page 4 of 28
    Request for Proposal (RFP) Number SIKA-West-HT-12-09-02




    1.7 Staffing
    Prior to administration of the database development, the subcontractor, if necessary, will provide
    training to its database development team and share its training materials with SIKA-West. A staffing
    plan must be included in the technical proposal that demonstrates adequate expertise, training, and
    supervision for a database of the intended scale and complexity.

    1.8 Administration
    Prior to implementation the subcontractor will submit a detailed timeline so that the SIKA-West POC
    will be able to identify exactly when and where each sampling point identified by SIKA-West will be
    surveyed. As the database is developed, the subcontractor will provide ongoing, weekly reports of
    database development activities, challenges encountered and recommended solutions.

    1.9      Deliverables & Due Dates
    Upon award of a subcontract, the deliverables detailed in below table will be submitted to SIKA-West
    according to deadlines established by the selected subcontractor. The deliverables are intended as
    evidence or confirmation that the activities have been successfully completed. The Offeror should
    detail proposed costs per deliverable in Appendix H Priced Deliverable and Payment Schedule.

    All of the deliverables must be submitted to and approved by SIKA-West before payment will be
    processed.

No.     Deliverable Description                                           Due Date
1         Deliverable 1: Database Data Collection Templates               Due 7 days after subcontract
          In conjunction with SIKA-West refine existing data collection   award – 29 October 2012
          templates to meet data collection requirements for all 36
          indicators.
2       Deliverable 2: SIKA-West Database Version 1.0                     Due 21 days after subcontract
        In conjunction with the SIKA-West Database Officer, design a      award – 12 November 2012
        draft version of the SIKA-West Database that will enable staff
        to field test it and provide feedback.
3       Deliverable 3: SIKA-West Database Version 2.0                     Due 28 days after subcontract
        In conjunction with the SIKA-West Database Officer, design a      award- 19 November 2012
        Version 2.0 of the SIKA-West Database, based on feedback
        provided by staff. The database designer must also provide
        explanations on why some comments or requirements could not
        be incorporated into the Database 2.0.
4       Deliverable 4: SIKA-West Database Version 2.1                     Due one month after Version 2.0
        Following the end of the project the Database Designer will be    is completed -19 December 2012
        available to make any additional modifications to the database
        for a period of one month, allowing staff to use and report any
        glitches in the system. The M&E Database Officer will be
        responsible for making changes, and the Database Designer
        will provide support.
5       Deliverable 5: Trained SIKA-West Database Officer                 Due 28 days after subcontract
        At the end of the project the Database Designer will administer   award- 19 November 2012
        a test of the SIKA-West Database Officer, to ensure he/she has
        the capacity to modify the database, manipulate data and
        provide necessary reports. The M&E Manager will also be


                                                Page 5 of 28
         Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


     No.     Deliverable Description                                          Due Date
             administering an independent test as well to monitor the
             performance of the Database Officer. Recommendations for
             additional training can be made at this point.
     5        Deliverable 5: Final Report                                     Due at the same time as the final
              The Subcontractor will submit a final report in the English     2.1 version of the database - 19
              language containing lessons learned, challenges encountered,    December 2012
              and the methods used to overcome them. The final report is
              expected to be roughly 5-10 pages. The report will be made
              available only to the SIKA-West program. The report will be
              e-mailed to the SIKA-West M&E Manager and a copy
              emailed to the subcontracts manager.

Section 2 – Proposal Submission Documents

Appendix A: Proposal Cover Letter – The Offeror shall complete, sign and submit the cover letter
found in Appendix A.

Appendix B: Proposal Checklist – The proposal must contain a completed copy of the template
shown in Appendix B.

Section 3 – Technical Proposal Components

Note: Appendices C through G shall comprise the Technical Proposal.

Appendix C: Summary of Relevant Work Experience – Offerors must submit evidence of previous
experience in implementing a vocational training program and documentation of successful
completion. Offerors must use Appendix C to provide the requested information.

Appendix D: Past Performance References – Within Appendix D of the proposal, Offerors must
include copies of letters from past or current clients as documentation of successful performance.
Appendix E: Implementation Plan, Timeline & Coordination Plan– Offerors will provide a draft
work plan (matching activities to the timeline and persons responsible for activities) that lays out all
activities to match the allotted timeframe.

Required sample documents shall be submitted in accordance with the Statement of Work. The work
plan/strategy shall be submitted as Appendix E and must include the following items:

a.          Appendix E.1: Draft Implementation Plan (matching activities to the ongoing work, timeline
            and persons responsible for activities) – The draft implementation plan should include steps of
            assessment and survey planning, rounds of implementation, analysis and reporting.

b.          Appendix E.2: Implementation Timeline – Using the Excel format provided in Appendix E

c.          Appendix E.3: Coordination Plan – This plan should demonstrate how the project will be linked
            to other programs or other SIKA-West components, as well as the local government, and key
            local partners.

Appendix F: Staffing Plan – Within Appendix F of the Technical Proposal, Offerors must describe
the technical and managerial team proposed for the project and attach copies of the resumes for the
proposed senior positions (e.g., Project Manager). If one individual fills more than one of these roles,
please state this in the proposal.


                                                    Page 6 of 28
     Request for Proposal (RFP) Number SIKA-West-HT-12-09-02



Appendix G: Management Capability Information – Offerors shall provide the following information
as Appendix G. Offerors must discuss the following:
1. How long the organization has been in existence
2. The organization’s mission and objectives
3. How the organization’s mission relates to the proposed activities in the Statement of Work

a.      Appendix G.1 Audited Financial Statements - The Offeror must submit audited financial
        statements for the last three years certified by an independent public accountant. If the Offeror
        does not have audited financial statements, internal financial reports should be submitted.

b.      Appendix G.2: Within Appendix G.2, the Offeror should submit a copy of the Organization
        Chart, and a description of the management structure and oversight procedures.

Section 4 – Price Proposal

The Price Proposal must be under separate, sealed envelope and clearly labeled as such.

Appendix H: Price Proposal Cover Letter The Offeror should complete, sign and submit the Price
Cover Letter found in Appendix H.

Appendix I: Priced Deliverables and Payment Schedule – Offerors must enter their prices on
Appendix I for all specified Deliverables. Price shall include all labor, other direct costs (materials, etc.)
and overhead.

Appendix J: Detailed Cost Breakdown – A cost breakdown of summary prices provided in Appendix I
must be included in Appendix J, which outlines costs per deliverable by labor (by person and daily rate),
materials, security, training, production costs, overhead and other costs. This must be submitted in Excel.
The Offeror may not include a separate line for tax. This must be factored into the overall cost.

Appendix K: Afghanistan NGO Registration or AISA Certificate – The Offeror should submit a
copy of their registration certificate documenting the NGO’s authorization from the Government of
Afghanistan to conduct work in-country. All for-profit firms must submit a copy of their AISA
registration in order to have its proposal evaluated and be considered for award.

Appendix L: Tax Exemption Certificate- If the Offeror is a NGO and exempt from tax withholding,
then a copy of the Tax Exemption Certificate issued by the Ministry of Economy must be attached as
Appendix L.

Appendix M: Organizational Resources & Financial Capability Questionnaire Offerors shall
provide the following information as Appendix M. Offerors must discuss the following:

1. The resources (financial, material, human etc.) that the organization will utilize in support of the
   proposed activities.
2. Appendix M.1: Audited Financial Statements: Offerors must provide audited financial statements
   for the last three years and certified by an independent public accountant. If the Offeror does not
   have audited financial statements, internal financial reports must be submitted.
3. Appendix M.2: Financial Capability Questionnaire. The Offeror must complete and submit the
   questionnaire included as Appendix M2.




                                                  Page 7 of 28
   Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


Section 5 – Inspection & Acceptance

The SIKA-West Project Manager will inspect from time to time the services being performed to
determine whether the activities are being performed in a satisfactory manner, and that all equipment or
supplies are of acceptable quality and standards. The subcontractor shall be responsible for any
countermeasures or corrective action, within the scope of this RFP, which may be required by the SIKA-
West Project Manager, SIKA-West Chief of Party and/or USAID representative as a result of such
inspection.

Section 6 – Subcontract Requirements

6.1        Executive Order on Terrorism Financing – The Offeror is reminded that U.S. Executive
Orders and U.S. law prohibits transactions with, and the provision of resources and support to,
individuals and organizations associated with terrorism. It is the legal responsibility of the contractor to
ensure compliance with these Executive Orders and laws. This provision must be included in all purchase
orders/sub-awards issued under the Prime Contract. In addition to conducting a background check for
any new personnel, the Offeror agrees to conduct a search for the prospective employees name on the
following site: http://www.treasury.gov/offices/enforcement/ofac/sdn/index.html

6.2        Communications with USAID and Other Agencies – All of the Offeror’s written or oral
communications with or to USAID including the FPO (Field Program Officer) or Development Advisor,
the Provincial Reconstruction Team, or ministries relative to the proposed activities must be through or
with the authorization of SIKA-West, which can be requested by contacting the SIKA-West
Subcontracts, Grants, and Compliance Manager for this RFP.

6.3        English Language Requirement – All work plans, reports and other deliverables shall be
provided in English. The Offeror shall have a minimum of one English speaking representative at all
times when work is in progress.

6.4         Government of Afghanistan Tax Withholding – Pursuant to Article 72 of the Afghanistan
Tax Law dated March 2009, SIKA-West is required to withhold income taxes from the gross amounts
payable to all Afghan for-profit subcontractors/vendors and transfer this to the Ministry of Finance Tax
Division (MOF). In accordance with this requirement, SIKA-West shall withhold two percent (2%) tax
from the gross amount of each invoice received from for-profit Afghan subcontractors/vendors with
active current AISA license. If Offeror is a for-profit firm, a copy of the organization’s AISA license
must be submitted with the proposal. If selected for award, your firm’s Tax Identification Number (TIN)
must be submitted to SIKA-West prior to issuance of the Subcontract. This withholding tax applies to all
for-profit vendors/subcontractors who provide supplies, materials, construction and services. This tax is
not applicable to non-profit organizations.

6.5        Branding Implementation Plan and Marking Plan - Markings under this subcontract shall
comply with the USAID “Graphic Standards Manual" available at www.usaid.gov/branding or any
successor branding policy. In accordance with ADS 320 “Branding and Marking,” this subcontract
incorporates USAID’s policy directives and required procedures on branding and marking of USAID-
funded programs, projects, activities, public communications, and commodities with the USAID identity.
The Branding Implementation Plan and Marking Plan are included as an appendix to the awarded
subcontract.

Section 7 – Evaluation Criteria

7. 1       Technical and Financial/Management Capability - The Offeror’s proposals shall be
evaluated to determine overall technical capability to effectively implement the project. The sub factors
used to determine this will be:



                                                 Page 8 of 28
   Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


   a. Number of completed projects (5 points) – This score relates to the number of projects the
      organization has implemented.

   b. Demonstrated geographic experience (10 points) – The Offeror will receive maximum points
      if it has implemented activities within the Districts and Provinces described in Section A.2. of the
      Statement of Work.

   c. Relevancy of projects (ongoing and completed) (10 points) – This relates to the type of
      activities the Offeror has implemented (e.g. training, surveys, communications).

   d. Implementation Plan & Timeline (15 points) – Does the Offeror understand the activities to be
      undertaken, the order in which they should occur and timeline by which they should be
      completed?

   e. Coordination Plan (10 points) – This is based on the Offeror’s proposed plan for coordinating
      with relevant GIRoA Ministries, other SIKA-West activities and local partners.

   f.   Afghan NGO/Firm (5 points) – Is the Offeror registered with the appropriate GIRoA Ministry?

   g. Discussion of Past Performance (15 points) – This is dependent upon all information presented
      by the Offeror in Appendix D.

   h. Staffing Plan (20) – Do the proposed technical and managerial staff have the skills, education
      and experience necessary to implement the activity?

   i.   Financial and Management Capacity (10 points) – Does the Offeror have the financial and
        management capacity to complete the activity. Appendix G will be reviewed and evaluated.

7.2        Selection by Means of Best Value Determination

SIKA-WEST shall select for award by making a best value determination. A best value determination
means that, in SIKA-West’s estimation, the selected offer will provide the greatest overall benefit to the
SIKA-West project in response to the requirements stated in this RFP. SIKA-West will use the trade-off
process to make a best value determination, which means that it may be in the interest of SIKA-West to
consider award to other than the lowest priced Offeror or other than the highest technically rated Offeror.
The evaluation factors and allocated points are presented in Section 7.1 of this RFP. In total, the technical
evaluation factors, when combined, are significantly more important than the total offered price. This
process permits trade-offs among price and non-cost factors and allows SIKA-West to accept other than
the lowest price proposal. The perceived benefits of a higher price proposal shall merit the additional
cost. However, even though technical factors are significantly more important than price, cost data will
be evaluated on the basis of cost reasonableness, allowability and realism based on the following
considerations:

   ·       Are proposed costs realistic for the work to be performed under the award?
   ·       Do the costs reflect a clear understanding of the work requirements?
   ·       Are the costs consistent with the various elements of the Offeror’s technical proposal?




                                                  Page 9 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


                                     Appendices of RFP
                                       (A through N)


APPENDIX A – PROPOSAL COVER LETTER-Technical


                                                                        Herat, Afghanistan
                                                                        <Insert Date>

TO:                SIKA-West



Ladies and Gentlemen:

We, the undersigned, offer to undertake the RFP No. SIKA-West-HT-12-09-02, “SIKA-West Custom
Database Design, Implementation and Training”, in accordance with your Request for Proposal dated
24 September 2012 and our Proposal (Technical and Price).


Our proposal shall be binding upon us, including mutually agreed upon modifications resulting from
subcontract negotiations, up to [insert _Month & Day_ year], at which time the validity of our
proposal will expire.

We understand that SIKA-West is not required to accept and/or evaluate proposals that do not
conform to the instructions of this RFP, and additionally, SIKA-West may reject all proposals and not
award a subcontract for this RFP.


Sincerely yours,


Authorized Signature:

Name and Title of Signatory:

Name of Firm:

Address:




                                            Page 10 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02



APPENDIX B - PROPOSAL CHECKLIST
(Please check all that apply and include this page in the sealed envelope with the proposal)


Offeror: __________________________________________________________________________


Have you?

        Submitted your technical and financial proposal to SIKA-West into different sealed
        envelopes, each containing one (1) hard copy and one electronic copy (CD-ROM) or email
        submission by the required deadline?

Does your proposal include the following?

        Cover Letters (use template in Appendices A and H)

        Summary of Relevant Work Experience (use form in Appendix C)

        Past Performance References (Letters from clients submitted as Appendix D)

        Implementation Plan, Timeline & Coordination Plan (to be submitted as Appendix E)

        Staffing Plan (use template in Appendix F and submit resumes/CVs for proposed staff))

        Management Capability Information (to be submitted as Appendix G)

        Priced Deliverable and Payment Schedule (use template in Appendix I)

        Detailed Cost Breakdown (use Excel template in Appendix J)

        NGO Registration Certificate/ AISA Business License (to be submitted as Appendix K)

        Tax Exemption Certificate (if applicable, to be submitted as Appendix L)

        Organizational Resources & Financial Capability Information (to be submitted as Appendix
        M)




                                             Page 11 of 28
        Request for Proposal (RFP) Number SIKA-West-HT-12-09-02

        APPENDIX C - SUMMARY OF RELEVANT WORK EXPERIENCE

        Include projects that best illustrate your work experience relevant to this RFP, sorted by decreasing order of completion date.

        Projects should have been undertaken in the past three years. Projects undertaken in the past six years may be taken into consideration at the discretion of the
        evaluation panel.

# Project Title                Description of Activities   Location            Client              Cost in AFN    Start-End    Completed     Completion          Type of
                                                           Province/District   Name/Tel No                        Dates        on            Letter Received?    Agreement –
                                                                                                                               schedule      (Yes/No)            Subcontract,
                                                                                                                                (Yes/No)                         Grant, PO (fixed
                                                                                                                                                                 price, cost
                                                                                                                                                                 reimbursable)

1

2

3

4

5

6

7

8




                                                                                   Page 12 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


APPENDICES D - F:

APPENDIX D - PAST PERFORMANCE REFERENCES

Offerors must include copies of letters from past or current clients as documentation of successful
performance and include it as Appendix D of the technical proposal.

APPENDIX E - IMPLEMENTATION PLAN, TIMELINE & COORDINATION PLAN

Offerors should develop and submit a proposal that complies with instructions detailed in Section 3
Technical Proposal Components as Appendix E.

Appendix E.2 Implementation Timeline should be completed in the Excel format shown below.




                                            Page 13 of 28
           Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


Stability in Key Areas-West (SIKA-West)
USAID Contract No. AID-306-C-12-0004


Annex E.2 Implementation Timeline

Instructions for completion: The first 3 tasks are included as an EXAMPLE and should be deleted by the applicant and replaced with activities specific to the RFP. Key
activities should be listed under Description of Activity and an X should be marked in the columns/weeks in which the activity will take place and be completed. The applicant
may modify the number of tasks and weeks included as needed to include a complete timeline.


                                                                    Week Week Week Week Week Week Week Week Week Week Week Week                                 Week Week
No.    Description of Activity/Task                                  1    2    3    4    5    6    7    8    9    10   11   12                                   13   14
  1    Meet with Govt. Ministry to Coordinate Workplan                X
  2    Finalize and submit workplan To SIKA-West                              X
  3    Select Trainees, obtain letters of commitment                                 X
  4
  5
  6
  7
  8
  9
  10
  11
  12
  13
  14
  15
  16
  17
  18
  19
  20
  21
  22
  23
  24
  25




                                                                                   Page 14 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02




APPENDIX F - STAFFING PLAN

Offerors must complete the below table and submit resumes/CVs of proposed staff.

  POSITION            NAME                        TITLE AND TASK OF TEAM MEMBER

  Overall
  Management
  Position (e.g.,
  Project Manager)




  Top Technical
  Position




                                            Page 15 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


APPENDIX G – MANAGEMENT CAPABILITY INFORMATION

Appendix G.1 Audited Financial Statements - The Offeror must submit its audited financial
statements for the last three years certified by an independent public accountant. If the Offeror does
not have audited financial statements, internal financial reports should be submitted.

Appendix G.2 Organization Chart - The Offeror must submit an organization chart, description of
management structure and oversight procedures.

Appendix G.3 Accounting System & Financial Capability Questionnaire - The following
questionnaire should be completed and submitted as Appendix G.3.

The main purpose of this questionnaire is to understand the systems adopted by your institution for
financial oversight and accounting of funds, especially those provided through the U.S. Federal
Government.

The questionnaire should be completed by the financial officer of your institution.

SECTION A: General Information

Please complete this section which provides general information on your institution.

Name of Institution:

Name and Title of Financial Contact Person:

Name of Person Filling out Questionnaire:

Address:

Telephone, Email

Enter the beginning and ending dates of your institution's fiscal year:

        From: (Month, Day) ______To: (Month, Day) ________


SECTION B: Internal Controls

Internal controls are procedures which ensure that: 1) financial transactions are approved by an authorized
individual and are consistent with U.S. laws, regulations and your institution's policies; 2) assets are
maintained safely and controlled; and 3) accounting records are complete, accurate and maintained on a
consistent basis. Please complete the following questions concerning your institution's internal controls.

1. Does your institution maintain a record of how much time employees spend on different projects or
activities?              Yes:            No:

2. If yes, how?




                                                Page 16 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


3. Do you maintain inventory records for your institution's equipment?    Yes:       No:    (if no, explain)




4. How often do you check actual inventory against inventory records?




5. Are all financial transactions approved by an appropriate official?       Yes:             No:

6. Does your institution use a payment voucher system or some other procedure for the documentation of
approval by an appropriate official?             Yes:            No:

7. Does your institution require supporting documentation (such as original receipts) prior to payment for
expenditures?     Yes:                    No:

8. Does your institution require that such documentation be maintained over a period of time?
                   Yes:                     No:

If yes, how long are such records kept?

9. Are different individuals within your institution responsible for approving, disbursing, and accounting
of transactions? Yes:                      No:

10. Are the functions of checking the accuracy of your accounts and the timely recording of accounting
data performed by different individuals?         Yes:            No:

SECTION C: Fund Control and Accounting Systems

Fund Control essentially means that access to bank accounts and/or other cash assets is limited to
authorized individuals. Bank balances should be reconciled periodically to the accounting records. If cash
cannot be maintained in a bank, It is very important to have strict controls over its maintenance and
disbursement.

An Accounting System accurately records all financial transactions, and ensures that these transactions
are supported by documentation. Some institutions may have computerized accounting systems while
others use a manual system to record each transaction in a ledger. In all cases, the expenditure of funds
provided by AECOM must be properly authorized, used for the intended purpose, and recorded in an
organized and consistent manner.

1. Does your institution maintain separate accounting of funds for different projects by?

Separate bank accounts:                             A fund accounting system:

2. Will any cash from the subcontracts be maintained outside a bank (in petty cash funds, etc.)?
          Yes:                   No:




                                               Page 17 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


If yes, please explain the amount of funds to be maintained, the purpose and person responsible for
safeguarding these funds.




3. If your institution doesn't have a bank account, how do you ensure that cash is maintained safely?




4. Does your institution have written accounting policies and procedures? Yes:                No:

5. Are your financial reports prepared on a:       Cash basis:               Accrual basis:

6. Is your institution's accounting system capable of recording transactions, including date, amount, and
description?        Yes:                   No:

7. Is your institution's accounting system designed to detect errors in a timely manner?   Yes:     No:

8. Are reconciliations between bank statements and accounting records performed monthly and reviewed
by an appropriate individual?    Yes:            No:




                                               Page 18 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


APPENDIX H – PRICE PROPOSAL COVER LETTER


                                                                        Herat, Afghanistan
                                                                        <Insert Date>

TO:                SIKA-West



Ladies and Gentlemen:

We, the undersigned, offer to undertake the RFP-SIKA-West-HT-12-09-02, “SIKA-West Custom
Database Design, Implementation and Training”, in accordance with your Request for Proposal dated
24 September 2012 and our Price Proposal.

Our attached Proposal is for the sum of: Amount in Words and figures (00000.00 must be in
Afghani).

Our proposal shall be binding upon us, including mutually agreed upon modifications resulting from
subcontract negotiations, up to [insert _Month & Day_ year], at which time the validity of our
proposal will expire.

We understand that SIKA-West is not required to accept and/or evaluate proposals that do not
conform to the instructions of this RFP, and additionally, SIKA-West may reject all proposals and not
award a subcontract for this RFP.


Sincerely yours,


Authorized Signature:

Name and Title of Signatory:

Name of Firm:

Address:




                                            Page 19 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


APPENDIX I - PRICED DELIVERABLES AND PAYMENT SCHEDULE

Offerors shall enter proposed prices in the Bid Amount Column. Deliverables are defined in
Section 1, Subsection 1.7, Deliverables and Deliverable Due Dates. Note that in addition to
providing proposed prices for deliverables, the Offeror should provide a detailed breakdown of
costs in Appendix I.

YOU DO NOT NEED TO AGAIN DESCRIBE THE DELIVERABLES, PLEASE FILL IN
APPROPRIATE LOCAL CURRENCY AMOUNTS ACCORDING TO YOUR SUGGESTED
COST PROPOSAL

               No.        Deliverable              Amount           Percentage of
                                                                        Total
                                                    in AFN

              1      Deliverable No. 1
                                                                         10%

              2      Deliverable No. 2
                                                                         15%

              3      Deliverable No. 3                                   35%

              4      Deliverable No. 4
                                                                         40%

                          Total                                          100%




APPENDIX J - DETAILED COST BREAKDOWN

The Offeror must submit a detailed cost breakdown in the Excel format shown below.




                                          Page 20 of 28
                   Request for Proposal (RFP) Number SIKA-West-HT-12-09-02

Appendix J - Detailed Cost Breakdown

Instructions: Offerors must submit a detailed cost breakdown of all costs to be incurred during implementation of the activity. Illustrative categories are listed
below. The Offeror may add or delete rows as necessary. The Offeror may directly bill a portion of headquarters office costs to the activity. But, in the Comment
column there must be an explanation of how this cost is justified.
RFP Name & No.                                                                                                                 Duration of Activity (in months):

                                                                               Unit Description
                                                                    No. of                         Unit Cost  Total Cost
  Category                                                                    (e.g. month/ day/                                      Comments/Explanations
                                                                    Units                        (in dollars) (in dollars)
                                                                                trip/ item etc.)
1 Personnel
  Title, Name                                                                                                         $0
  Title, Name                                                                                                         $0
  Title, Name                                                                                                         $0
  Subtotal Personnel                                                                                                  $0

2 Fringe Benefits
  Health insurance                                                                                                    $0
  Subtotal Fringe                                                                                                     $0

3 Other Direct Costs
  Office rent                                                                                                         $0
  Internet charges                                                                                                    $0
  Communications (cell phone)                                                                                         $0
  Expendable Office supplies (paper, pens, staples, clips, etc.)                                                      $0
  Utilities (electricity, water)                                                                                      $0
  Generator fuel                                                                                                      $0
  Security                                                                                                            $0
  Subtotal Other Direct Costs                                                                                         $0

4 Travel and Transportation
  Vehicle rental                                                                                                      $0
  Domestic airfare                                                                                                    $0
  Transportation allowance for participants                                                                           $0
  Per diem (only authorized for trips in excess of 12 hours)                                                          $0
  Subtotal Travel and Transportation                                                                                  $0

5 Material and Equipment
  Toolkits                                                                                                            $0

  Subtotal Materials and Equipment                                                                                    $0

6 Headquarters Charges
  Director                                                                                                            $0
  Accountant                                                                                                          $0
  Office Rent                                                                                                         $0
  Subtotal Headquarters Charges                                                                                       $0

7 Fee                                                                                                                 $0

  TOTAL                                                                                                               $0




                                                                          Page 21 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02




APPENDIX K – Afghanistan NGO REGISTRATION CERTIFICATE/ Copy of AISA Business
License

The Offeror must submit a copy of the registration obtained from the relevant GIRoA Ministry.

APPENDIX L - TAX EXEMPTION CERTIFICATE- If the Offeror is a NGO and exempt from
tax withholding, then a copy of the Tax Exemption Certificate issued by the Ministry of Economy
must be attached as Appendix K.




                                           Page 22 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


APPENDIX M – ORGANIZATIONAL RESOURCES & FINANCIAL CAPABILITY

Appendix M.1 Audited Financial Statements - The Offeror must submit audited financial statements
for the last three years certified by an independent public accountant. If the Offeror does not have
audited financial statements, internal financial reports should be submitted.

Appendix M.2 Accounting System & Financial Capability Questionnaire - The following
questionnaire should be completed and submitted as Appendix M.2.

The main purpose of this questionnaire is to understand the systems adopted by your institution for
financial oversight and accounting of funds, especially those provided through the U.S. Federal
Government.

The questionnaire should be completed by the financial officer of your institution.

SECTION A: Internal Controls

Internal controls are procedures which ensure that: 1) financial transactions are approved by an authorized
individual and are consistent with U.S. laws, regulations and your institution's policies; 2) assets are
maintained safely and controlled; and 3) accounting records are complete, accurate and maintained on a
consistent basis. Please complete the following questions concerning your institution's internal controls.

1. Does your institution maintain a record of how much time employees spend on different projects or
activities?              Yes:            No:

2. If yes, how?




3. Do you maintain inventory records for your institution's equipment?    Yes:        No:   (if no, explain)




4. How often do you check actual inventory against inventory records?




5. Are all financial transactions approved by an appropriate official?       Yes:             No:

6. Does your institution use a payment voucher system or some other procedure for the documentation of
approval by an appropriate official?             Yes:            No:

7. Does your institution require supporting documentation (such as original receipts) prior to payment for
expenditures?     Yes:                    No:

8. Does your institution require that such documentation be maintained over a period of time?

                                               Page 23 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


                  Yes:                  No:
If yes, how long are such records kept?

9. Are different individuals within your institution responsible for approving, disbursing, and accounting
of transactions? Yes:                      No:

10. Are the functions of checking the accuracy of your accounts and the timely recording of accounting
data performed by different individuals?         Yes:            No:

SECTION B: Fund Control and Accounting Systems

Fund Control essentially means that access to bank accounts and/or other cash assets is limited to
authorized individuals. Bank balances should be reconciled periodically to the accounting records. If cash
cannot be maintained in a bank, It is very important to have strict controls over its maintenance and
disbursement.

An Accounting System accurately records all financial transactions, and ensures that these transactions
are supported by documentation. Some institutions may have computerized accounting systems while
others use a manual system to record each transaction in a ledger. In all cases, the expenditure of funds
provided by AECOM must be properly authorized, used for the intended purpose, and recorded in an
organized and consistent manner.

1. Does your institution maintain separate accounting of funds for different projects by:

Separate bank accounts:                            A fund accounting system:

2. Will any cash from the subcontracts be maintained outside a bank (in petty cash funds, etc.)?
          Yes:                   No:

If yes, please explain the amount of funds to be maintained, the purpose and person responsible for
safeguarding these funds.




3. If your institution doesn't have a bank account, how do you ensure that cash is maintained safely?




4. Does your institution have written accounting policies and procedures? Yes:                No:


                                               Page 24 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


5. Are your financial reports prepared on a:       Cash basis:               Accrual basis:

6. Is your institution's accounting system capable of recording transactions, including date, amount, and
description?        Yes:                   No:

7. Is your institution's accounting system designed to detect errors in a timely manner?   Yes:   No:

8. Are reconciliations between bank statements and accounting records performed monthly and reviewed
by an appropriate individual?    Yes:            No:




                                               Page 25 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02



APPENDIX N
SAMPLE MARKING PLAN-
Note: This is not required as part of the proposal. It is included as information for the Offeror.
Upon subcontract award, this will be the first deliverable due.

Sub Project Number and Name: _____________________________________________________
Name of Implementing Partner: _____________________________________________________
Name and Title of Partner’s Agent: __________________________________________________
Name and Title of SIKA-West Project Manager:
_________________________________________

Instructions: This form has been created to provide implementing partners (subcontractors and
grantees) and SIKA-West Project Managers with a summary of marking requirements found in the
SIKA-West Branding Implementation Plan (BIP). This form must be completed by the SIKA-West
Project Manager in conjunction with the agent of the implementing partner. For guidance on specific
branding formats, please communicate with the SIKA-West M&E Department.

Subproject Activities:

1. Provide a short summary of the activities to be completed including the project location. For
   example, what materials or equipment will be purchased? What events will take place?


Include 2-3 sentence summary here:




2. Please place an “X” below for each activity that will take place as part of this Sub project. The
   implementing partner will be responsible for ensuring the Marking noted in the table below is
   implemented according to standards and templates provided by the SIKA-West M&E
   Department.


 Mark
          Activity Description               Required Marking
 “X”
 Infrastructure
          Rehabilitation of building
          Bridge construction
          Well rehab or digging              1. An interim sign will be posted at the project site
                                             during construction and,
          Canal rehab or digging             2. A permanent durable and visible plaque is posted
          Road works                         when the project is completed.

          New construction
          Other (please describe)




                                           Page 26 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02


 Non Infrastructure
          Billboards                           USAID graphic logo must be posted on the billboard.

          Training/Workshop/Conference         Banners must be on display at the event site.
          Commodity procurement                Stickers with USAID graphic logo must be placed on
                                               all items procured with USAID funds.

          Radio or TV programs                 Public communications financed by USAID that are
                                               audio visual or electronic must permanently display
                                               the USAID graphic logo. Please note that audio
                                               products must disseminate the message orally.

          Other (please describe)

 Closing ceremony
          Closing or      ground     breaking Banners must be on display at the event site.
          ceremony

 Documents
          Reports                              Graphic logos must be included on the documents.

          Certificates (training or other)
          Invitations

          Other (please describe)

3. Co- Branding and Co-Marking:


   a) Co-branding with GIRoA: SIKA-West and the implementing partner will always seek to
      acknowledge, empower and legitimize GIRoA by including their logos alongside the USAID
      logo. The SIKA-West Project Manager will determine when co-branding is appropriate for
      the activity.

   b) Co-Branding with Grantee: Grantees (but not subcontractors) may display their logo on
      branding activities financed by USAID. The SIKA-West Project Manager will determine
      when co-branding is appropriate for the activity

   c) Co-Branding with Subcontractor: Subcontractors are not allowed to co-brand USAID
      funded activities, materials or commodities with their logo.

   d) AECOM logo must not appear on any USAID funded programmatic material.


4. Requests for Exceptions or Waivers of Marking Requirements – If you do not feel it is
   possible to mark one or more of the items or events listed above, please describe below (1) what
   marking you want to be exempt from (2) how the activity or item meets the requirement for an
   exception or waiver. Note that any exception or waiver requires USAID approval. This request
   should be submitted to the SIKA-West Project Manager for review.

                                             Page 27 of 28
Request for Proposal (RFP) Number SIKA-West-HT-12-09-02



 Include full detailed justification here:




                                             Page 28 of 28

						