MuCool Status and Plans

Shared by: fjzhangxiaoquan
Categories
Tags
-
Stats
views:
0
posted:
11/5/2012
language:
English
pages:
47
Document Sample
scope of work template
							Muon Collider R&D in the US
                   Muon Collider Program

 Closely coupled with R&D on the Neutrino
  Factory
     IDS-NF
 The R&D program is now encompassed in a 5
  Year Plan
     Proposal submitted to DOE in December, 2008
 Two Main Thrusts
     Support on-going international commitments
          MICE
          IDS
     Deliver a Muon Collider Design Feasibility Study
      by 2013

                  Alan Bross   UKNF Meeting Lancaster April 22, 2009   2
             Muon Complex Evolution At Fermilab




•   Starting with a high-intensity proton
    source: Project X
     •   We see a natural evolution of “muon”
         program for Fermilab
•   Project X Low-Energy NF
    (pointing to Homestake)  High-
    Energy NF  1.5 TeV MC  4 TeV
    MC

                            Alan Bross   UKNF Meeting Lancaster April 22, 2009   3
     Part I: IDS-NF




Alan Bross   UKNF Meeting Lancaster April 22, 2009   4
              IDS-NF Option: 4 GeV n-Factory

   Fermilab to DUSEL (South Dakota)
    baseline -1290km
   4 GeV muons yield appropriate L/En
   Use a magnetized totally active
    scintillator detector
        Geer, Mena, Pascoli
         Phys. ReV D 75, 093001 (2007)
        Bross, Ellis, Geer, Mena, Pascoli
         Phys. ReV D 77, 093012 (2008)




                                                    Ankenbrandt, Bogacz, Bross, Geer, Johnstone, Neuffer, Popovic
                                                    Fermilab-Pub-09-001-APC; Submitted to PRSTAB

                                 Alan Bross   UKNF Meeting Lancaster April 22, 2009                           5
The Energy Frontier via m+m-Collisions




                                 MC: One Concept
                                        4 TeV Center-of-Mass
                                             • Rapid-Cycling Synchrotron
                                               Acceleration


        Alan Bross   UKNF Meeting Lancaster April 22, 2009                 6
         Muon Collider - Motivation


Reach Multi-TeV Lepton-Lepton Collisions
           at High Luminosity

         Muon Colliders may have
 special role for precision measurements.
          Small DE beam spread –
            Precise energy scans

            Small Footprint -
  Could Fit on Existing Laboratory Site

           Alan Bross   UKNF Meeting Lancaster April 22, 2009   7
The Supersymmetric Particle Zoo

                                                Independent of actual
                                                 supersymmetric mass
                                                 scale and the reach of
                                                 the ILC, the 2004
                                                 CLIC Study conclusions
                                                 are still valid
                                                   “A Multi-TeV
                                                     machine is needed
                                                     for extended
                                                     coverage of the
                                                     mass range




    Alan Bross   UKNF Meeting Lancaster April 22, 2009                8
The Gospel According to Snowmass




    Do we really need a multi-TeV COM Lepton Collider?

      Alan Bross   UKNF Meeting Lancaster April 22, 2009   9
              But the Physics Case is Not Static



 Stephen Martin
                                                                                    Strong
hep-ph/0703097                                                                     Case for
  March, 2007                                                                    considering
                                                                                  Multi-TeV
                                                                                Lepton Collider




   A typical sample “compressed” Higgs and superpartner mass spectrum with WDMh2 = 0.11
   An unfortunate feature, quite common to this scenario for dark matter, is that no visible
   superpartners would be within reach of a linear collider with √s = 500 GeV

                           Alan Bross   UKNF Meeting Lancaster April 22, 2009                  10
U.S. Muon Acceleration R&D Community


           The Usual Suspects
                                 Organization
  We have been around a while – “You can’t tell the players without a score card”




•NFMCC (Neutrino Factory & Muon Collider Collab.)
   –National collaboration funded since 1999.
   –Pursues Neutrino Factory & Muon Collider R&D.
   –NF R&D pursued with international partners
•MCTF (Muon Collider Task Force)
   –Task Force established at Fermilab in 2006
   –Pursues Muon Collider R&D, utilizing FNAL assets and
   extends & complements the NFMCC program
•MCCC (Muon Collider Coordinating Committee)
   –Leadership of NFMCC (Bross, Kirk, Zisman) and MCTF
   (Geer, Shiltsev)
   –Co-ordinates NFMCC & MCTF plans to optimize the
   overall program … has worked well and resulted in a joint
   5 year plan for future activities.


                    Alan Bross    UKNF Meeting Lancaster April 22, 2009             12
        Muon Acceleration R&D Organization

  R&D Program carried out by two groups
       Neutrino Factory and Muon Collider Collaboration
       Fermilab Muon Collider Task Force
           MUON COLLIDER R&D CO-ORD COMMITTEE

                  NFMCC                      MCTF
                LEADERSHIP
                A. Bross, H. Kirk   +     LEADERSHIP
                                               S. Geer
                   M. Zisman                  V. Shiltsev



                  MuCool                  MTA Beam Line
NEUTRINO                                                                MUON
                   MICE                       HP RF
FACTORY                                                                 COLLIDER
                  IDS-NF                  Helical Cooling
R&D                                                                     R&D
               Low-Energy NF               High-Tc SC
PROGRAM                                                                 PROGRAM
                Design & Sim.              Design & Sim


                   Alan Bross   UKNF Meeting Lancaster April 22, 2009              13
       The Muon Collider


Addressing the Technological Challenges
           Parameters of Different MC options


                                     Low Emit. High Emit. MCTF07 MCTF08
s (TeV)                                         1.5
Av. Luminosity (1034/cm2/s) *        2.7         1           1.33-2
Av. Bending field (T)                10          6           6
Mean radius (m)                      361.4       500         500  495
No. of IPs                           4           2           2
Proton Driver Rep Rate (Hz)          65          13          40-60
Beam-beam parameter/IP               0.052       0.087       0.1
* (cm)                              0.5         1           1
Bunch length (cm)                    0.5         1           1
No. bunches / beam                   10          1           1
No. muons/bunch (10    11)           1           20          11.3
Norm. Trans. Emit. (mm)              2.1         25          12.3
Energy spread (%)                    1           0.1         0.2
Norm. long. Emit. (m)                0.35        0.07        0.14
Total RF voltage (GV) at 800MHz                  40710 c3 0.21**        0.84**  0.3†
Muon survival Nm/Nm0                             0.31        0.07         0.2      ?
m+ in collision / proton                         0.047       0.01         0.03     ?
8 GeV proton beam power              3.62*** 3.2             1.9-2.8      ?
---------------------------------------------------------------------------



                             Alan Bross    UKNF Meeting Lancaster April 22, 2009          15
  Muon Collider Facility




Alan Bross   UKNF Meeting Lancaster April 22, 2009   16
                     R&D Program Overview II

 High Power Targetry – NF & MC (MERIT Experiment)
 Initial Cooling – NF & MC (MICE (4D Cooling))
 200 (& 805) MHz RF - NF & MC (MuCool and Muon’s Inc)
          Investigate RF cavities in presence of high magnetic fields
          Obtain high accelerating gradients (~15MV/m)
          Investigate Gas-Filled RF cavities
 Intense 6D Cooling – MC
          RFOFO “Guggenheim”
          Helical Channel Cooling (MANX Proposal)
          Parametric Resonance Ionization Cooling
 Bunch Recombination - MC
 Acceleration– A cost driver for both NF & MC, but in very different
  ways
          FFAG’s – (EMMA Demonstration)
          Multi-turn RLA’s – a BIG cost reducer
          RCS for MC
 Storage Ring(s) – NF & MC
 Theoretical Studies NF & MC
          Analytic Calculations
          Lattice Designs
          Numeric Simulations

                        Alan Bross   UKNF Meeting Lancaster April 22, 2009   17
          The Experiment Reached 30TP @ 24 GeV




   Beam pulse energy = 115kJ
   B-field = 15T
   Jet Velocity = 20 m/s
   Measured Disruption Length = 28 cm
   Required “Refill” time is then 28cm/20m/s = 14ms
       Rep rate of 70Hz
 Proton beam power at that rate is 115kJ *70 = 8MW
                       Alan Bross   UKNF Meeting Lancaster April 22, 2009   18
                     The Basic Problem – B Field Effect
                                           805 MHz Studies


                                                                            Data seem to follow
                                                                             universal curve
                                                                                     Max stable gradient
                                                                                      degrades quickly with
                                                                                      B field
                                                                            Re-measured
                                                                                      Same results
Gradient in MV/m




                                                                                  



                                     >2X Reduction @ required field




                   Peak Magnetic Field in T at the Window


                                     Alan Bross     UKNF Meeting Lancaster April 22, 2009                 19
       805 MHz Imaging




Alan Bross   UKNF Meeting Lancaster April 22, 2009   20
201 MHz Cavity Running
   Summary I (B=0)


          Limited by RF
              Power




                                                    Design Gradient




    Alan Bross     UKNF Meeting Lancaster April 22, 2009              21
201 MHz Cavity Running
      Summary II (B>0)




Alan Bross   UKNF Meeting Lancaster April 22, 2009   22
              Facing the RF B Field Challenge

 Three Approaches to a Solution
     Reduce/eliminate field emission
          Process cavities utilizing SCRF techniques
          Material Studies
            – Surface coatings
            – Non-Cu bodies
     RF cavities filled with High-Pressure gas (H2)
          Utilize Paschen effect to stop breakdown
     Magnetic Insulation
          Eliminate magnetic focusing
            – Not Yet Tested


                    Alan Bross   UKNF Meeting Lancaster April 22, 2009   23
       High-Gradient RF Operation B Field

 Promising indications @ a Solution
     SCRF Processing techniques help
          Reduce dark current
            – More advanced techniques (Atomic-Layer-Deposition) may
              do more
     Cavity material properties seem to be important
          TiN helps
            – Coupled with SCRF processing may reduce FE even
              more
          Mo, Be Coatings?
     Gas-filled cavities show promise
          Operation with beam critical next test

                    Alan Bross   UKNF Meeting Lancaster April 22, 2009   24
Muon Collider Design


   Emphasis on Cooling
               Muon Collider Design Progress

 Muon Collider designs
  start with a NF front-                                                 NF
                                                                         FRONT
  end, but require a much                                                END
  more ambitious cooling
  channel (6D cooling ~
  O(106) c.f. 4D cooling
  ~ O(100).
 In the last 5 years
  concepts for a complete
  end-to-end self con-
  sistent cooling scheme
  have been developed
      Requires beyond state-of-art components: need to be developed
      Hardware development and further simulations need to proceed
       together to inform choices between alternative technologies
 Also progress on acceleration scheme & Collider ring design,
  but the cooling channel presently provides the main Muon
  Collider challenge

                    Alan Bross   UKNF Meeting Lancaster April 22, 2009       26
A Muon Collider Cooling Scenario




   Alan Bross   UKNF Meeting Lancaster April 22, 2009   27
Guggenheim RFOFO - Simulations


        liquid
        H2



             RF


         solenoid




       Pavel Snopok
                     Helical Cooling Channel

   Magnetic field is solenoid B0+ dipole + quad
   System is filled with H2 gas, includes rf
    cavities
   Cools 6-D (large E means longer path length)
   But, incorporating RF is Engineering challenge!




                            Alan Bross   UKNF Meeting Lancaster April 22, 2009   29
            HCC Magnet Design & Prototyping

 Helical solenoid (HS):
  Smaller coils than in a
  “snake” design
      Smaller peak field
      Lower cost
 Field components in HS
  determined by geometry
      Over constrained
      Coil radius is not free                Outer
       parameter                              bandage rings

 4 Coil Demonstration Model
      Validate mechanical structure                                                           Inner
       and fabrication methods
                                                                                               bobbin
      Study quench performance and
       margins, field quality, quench
       protection
      Use SSC conductor
                                                                        Superconducting coils (one
                                                                        layer, hard bend wound)

                       Alan Bross   UKNF Meeting Lancaster April 22, 2009                            30
                                  Final Cooling




 LH2 absorbers tested in MICE
 50 T Solenoids
      National Very High Field Superconducting Magnet
       Collaboration
           2 Year $4M program to study HTS conductor and cable


                     Alan Bross   UKNF Meeting Lancaster April 22, 2009   31
Acceleration
              Acceleration - Overview


 RLA: get more passes
   Ramp linac magnets, get more passes (12)
   Non-scaling FFAG arcs: get 2 passes per
     arc, maybe more
 Fast ramping synchrotron (RCS)
     Potential for many more passes
 FFAG: not studied much as yet for
  Muon Collider


              Alan Bross   UKNF Meeting Lancaster April 22, 2009   33
                         Initial Acceleration – Neutrino Factory

  244                                              0.9                           Define beamlines/lattices for all components
  MeV                        146 m                 GeV
                                                                          79 m


                                                                  0.6                      3.6                               264 m
                                                                  GeV/pas
                                                                                           GeV                                                                              12.6
                                                                  s
                                                                                                                           2                                                GeV
                                                                                                                           GeV/pass
                               Dogbone RLA - footprint                                                    Tue Jun 10 21:06:52 2008   OptiM - MAIN: - D:\IDS\Arcs\Arc1.opt




                                                                                     15




                                                                                                                                                                                          3
          5000

          4000
          3000
                                                                                     BE TA_ X&Y [m]




                                                                                                                                                                                          DISP _X&Y [m]
          2000
          1000
x [cm ]      0
              6000
          -1000      11000   16000        21000          26000   31000
          -2000
          -3000

          -4000
          -5000
                                         z [cm ]




                                                                                                                                                                                          -3
                                                                                     0




                                                                                                      0        BE TA_X      BE TA_Y      DISP_X      DISP_Y                         130




                                                             Alan Bross          UKNF Meeting Lancaster April 22, 2009                                                             34
      Acceleration -RCS




Alan Bross   UKNF Meeting Lancaster April 22, 2009   35
           The Way Forward


Joint NFMCC and Fermilab MCTF 5 Year Proposal
                   to DOE
                             The 5 Year Plan
              A Proposal Has now been submitted to DOE

 A joint US: NFMCC-MCTF Plan
      A measured program based on the solid muon accelerator
       R&D achievements of the last decade
      Sufficiently ambitious to make substantial progress before
       the next round of long-term decisions by the particle physics
       community
      Includes accelerator, physics & detector studies – we also
       have plans & estimates for physics & detector studies, but
       will be in a separate proposal)
 Meets our existing commitments (NF-RDR, MICE) and
  in addition will deliver:
      MC performance requirements based on physics
      A first end-to-end MC simulation
      Critical component development & proof-of-principle
       experiments
      A first MC cost estimate


                    Alan Bross   UKNF Meeting Lancaster April 22, 2009   37
                   “The 5 Year Plan”
       (developed by All-US Community, coordinated by MCCC)


• Goals :
  I.   establish feasibility of a Muon Collider by 2012-13
  II. deliver MC-DFS by 2013 and NF-RDR by 2012
  III. greatly narrow technology options, end-end simul’s
  IV. give cost estimates for MC and NF
• Staged approach: PD  MCTF  NF  MC
 - perfectly aligned with Fermilab’s long term plan
outlined in Steering Group Report and P5 report

                   Alan Bross   UKNF Meeting Lancaster April 22, 2009   38
            5-Year Plan of Muon Accelerator R&D
                            Progress to Date

 v1.0 presented to MUTAC in Aug’08
 1 hr briefing of D.Kovar and J.Blazey Nov’08
 Presented at the Dec’08 DoE review of Accelerator
  Science
    Elaborated coherently in presentations of 4 labs
         FNAL, LBNL, BNL and ANL

 Formally submitted to DoE in Dec’08
    Current status: “interesting… wait” (CR, ARRA,

     budget, etc)




                      Alan Bross   UKNF Meeting Lancaster April 22, 2009   39
Elements of the MC R&D Plan




  Alan Bross   UKNF Meeting Lancaster April 22, 2009   40
                                                     Resources


                          FUNDING PROFILE                                             PROPOSED EFFORT CONTRIBUTIONS

             30000                                                              120

             25000    M&S                                                       100   LBNL
                      SWF                                                             BNL




                                                                 EFFORT (FTE)
FUNDS (K$)




             20000    TOTAL                                                      80   FNAL
             15000
                                                                                      OTHER
                                                                                 60   SUM
             10000
                                                                                 40
             5000
                                                                                 20
                0
                                                                                  0
                                 YEAR
                                                                                                 YEAR


                                          X3 Increase in Effort

                 NOTE: Roll-over in years 4-5 provides an opportunity to initiate post-DFS
                 activities, should the community wish us to proceed to the next step


                                        Alan Bross    UKNF Meeting Lancaster April 22, 2009
Muon Collider Technical Foundation after 5 Years
                       From Here to There




          Alan Bross     UKNF Meeting Lancaster April 22, 2009   42
Encouraging “Words”
                  Very High Field SC Magnet
                      Collaboration




   The immediate goals (2 years):
      The immediate goal (2 years) is to understand if Bi 2212 is a

       suitable vehicle for this task.
      develop the technology to build magnets with B>30 T

      Funded for 2 years @ $2M/yr



                     Alan Bross   UKNF Meeting Lancaster April 22, 2009   44
                      April 2009 MUTAC Review
                           “Selected Excerpts”
The committee endorses the integrated NFMCC and MCTF 5-year plan with the
following goals:
 - NF RDR
 - Muon Collider feasibility report which depends on:
    MC performance requirements based on physics
    End to end MC simulation
    Critical component development and testing
    First cost estimate
The collaboration estimates a factor of 3 increase in people resources is required
and the committee agrees
  - Laboratories are not prepared to commit the full increment.
     The remainder will come from universities and SBIR initiatives
      - it is not clear to the committee that the expertise is
available [ed. Help is Welcome!]
We are impressed with the flow of new ideas, but concerned that
given limited resources, options must be reduced.

                         Alan Bross   UKNF Meeting Lancaster April 22, 2009          45
                        MICE
 Impressive progress
     MICE experimental running (parasitic)
     Civil engineering
     Instrumentation installation and testing
     Magnet design and procurement drives the early
      steps in the programme.
     Cavity
 Coordination with the ISIS schedule puts
  constraints on a complex and demanding
  programme. Moms will be increasingly
  important in ensuring reactive scheduling.
 Five Year Plan
     Six step programme matches both Neutrino and
      Muon programmes.
                Alan Bross   UKNF Meeting Lancaster April 22, 2009   46
                           MICE
 Recommendations
 To assess the performance of the 201 MHz RF
  in the magnetic field levels for MICE to verify
  the assumption of dark current levels.
 Recognising the vital contribution that a timely
  delivery of MICE step VI will make to both the
  neutrino factory IDS and a Design Feasibility
  Study (DFS) for a Muon Collider, this committee
  recommends that maximum pressure is exerted
  by the collaboration on UK funding bodies to
  make a timely decision to fund the entire
  programme to the aspirational timescale.
 Provide an assessment of the timescales and
  costs of a wedge absorber test MICE
              Alan Bross   UKNF Meeting Lancaster April 22, 2009   47

						
Related docs
Other docs by fjzhangxiaoquan
Gedichte - lettern.de - Das Lite
Views: 108  |  Downloads: 0
Protection Against Environmental
Views: 1  |  Downloads: 0
PowerPoint Presentation - PCC -
Views: 79  |  Downloads: 0
Suence de 10 heures de cours su
Views: 13  |  Downloads: 0
Water - visualcatechesis.com
Views: 17  |  Downloads: 0
Wild Harbor Yacht Club Parents G
Views: 20  |  Downloads: 0
Francis Hunter Everyday Homeopat
Views: 50  |  Downloads: 0
ASPARAGUS-HAM BAKE.doc - Zimmer
Views: 1  |  Downloads: 0
Brussels sprout and almond soup
Views: 30  |  Downloads: 0