Shaped by the past, creating the future - DOC

Shared by: HC121104051352
Categories
Tags
-
Stats
views:
0
posted:
11/3/2012
language:
Unknown
pages:
1
Document Sample
scope of work template
							                                                          Shaped by the past, creating the future


NAME OF COMMITTEE/SUB-COMMITTEE IN BOLD CAPITALS (e.g. EDUCATION
COMMITTEE/ADMISSIONS SUB-COMMITTEE/QUALITY AND STANDARDS SUB-
COMMITTEE/STUDENT EXPERIENCE SUB-COMMITTEE/FACULTY EDUCATION
COMMITTEE

Communication Title: Click here and type

Purpose of Communication: Click here and type (this should serve as a brief executive
summary of the paper; for example 'Departments across the University have operated peer
observation of teaching schemes for many years. A recent survey demonstrated that all but
one department had such schemes, but that there was significant variation in the approach
taken by different departments. Taking as its starting point the proposition that peer
observation is a key mechanism to support quality enchancment, this paper proposes the
establishment of University guidelines that would address the issue of variability while
retaining sufficient flexibility to allow departmental peer observation schemes to be tailored
to meet subject-specific needs and thereby ensure local ownership of these schemes')

Consultation to date: Click here and type (this should summarise any consultation carried
out prior to submission to the committee; for example 'These proposals were subject to
consultation with departments through meetings of FECs held earlier this term. Minute
extracts detailing the comments at FECs are attached as an annex to this paper, and the
detailed proposals have been amended to take account of the feedback received from
departments at FCs. The proposals were also discussed at QSSC prior to their submission
to EC, and were fully endorsed by the Sub-Committee')

Action Requested: Click here and type (this should summarise the action the committee is
being asked to take. Sometimes it will be possible to do this in detail on the paper (for
example 'EC is asked to consider whether to recommend the revised policy to Senate'); on
other occasions the detail and complexity of the requested action may be such that it is
difficult to summarise and it may be more appropriate to insert a cross reference to the main
paper (for example 'EC is asked to consider the recommendations detailed in paragraphs 9
and 10')

Deadline for action/response required: Click here and type (e.g. 'Oral responses at the
meeting meeting of EC on 1 July 2008')

Contact for further information: Click here and type (this will usually be the author(s) of the
paper)




C:\Docstoc\Working\pdf\18155e5a-24f0-45e2-ad05-7f5b4f76689a.doc

						
Related docs
Other docs by HC121104051352
ren ride pres
Views: 0  |  Downloads: 0
midronics presentation
Views: 0  |  Downloads: 0
Dean�s Office
Views: 0  |  Downloads: 0
PAYROLL SPECIALIST
Views: 0  |  Downloads: 0
Shaped by the past, creating the future - DOC
Views: 0  |  Downloads: 0
ADMINSUPPORTJUN
Views: 0  |  Downloads: 0
If you want your photo to be in the yearbook
Views: 0  |  Downloads: 0