pro issueb

Document Sample
pro issueb Powered By Docstoc
					Pro-Enbis Meeting

   Eindhoven
             Day 1 Draft agenda
•   12.30 – 1.30 p.m. Buffet Lunch at Eurandom
•   1.30 a.m. Meeting Start
•   Welcomes and Introductions
•   Introduction of New Members: University of Pavia, Italy
    and Nottingham Trent University, UK
•    (Paolo Guidici & Christopher McCollin)
•   Notes of the last Meeting held in Rimini, Italy
•   Matters Arising – DJS ‘issues’
•   2.15 Coffee to be served
•   2.30 – 4.00 p.m. Work Package Groups – breakout
    discussion and demonstration of software WP1 and WP3
    (more time could be allocated here if necessary)
•   4.00 – 5.00 p.m. Feedback from Work Package Groups
            Day 2 Draft agenda
• 9.30 a.m. Meeting Start
• Summary of discussions held at Work Package Meetings
  (WP Leaders)
• Work in Progress
• 11.00 a.m. Coffee to be served
• Future Plans and Events (incl. DEINDE and ESREL)
• 12.30 – 1.30 Lunch at Eurandom
• Participation and arrangements for Barcelona Pro-ENBIS
  and ENBIS ISI Conference.
• Sixth Framework (Dave Stewardson)
• Meeting close at 3.00 p.m.
• Friday Dinner
  8.00 p.m. Bistro ‘t Elfde Gebod

The Saturday meeting will be followed by an
 ENBIS Council meeting, to be held at the
 same venue from 3.00 – 5.00 p.m. (see
 separate agenda from Tony Greenfield)
Deliverables Reporting
     The Kipling Six
         What?
        Where?
         Who?
         When?
         Why?
         How?
                Deliverables
                Protocols for papers
•Must have at least two network authors
•Practical - case studies – e.g - QERI - Statistician
•Only Journal papers count as deliverables!
•Conference papers are an ‘extra’
•You HAVE to send a copy to us before submittal!
•You MUST use the pro-Enbis statement
               Deliverables II
                 Protocols for visits
•Must have at least two network partners INVOLVED
•MUST send us a one page report –
  •Attendees – what was done/discussed?
  •What, When, Where, Who, Why, How?
  •Results – what was the outcome?
  Without this info it doesn’t count as a deliverable
  and you cannot claim the costs from the project!!
              Deliverables III
               Protocols for Seminars
•Must have at least two network partners INVOLVED
•MUST send us:
  A copy of the presentation! You MUST use the
  pro-Enbis statement on the material
  List of attendees, who, what, where, when, etc.
  Without this info it doesn’t count as a deliverable
  and you cannot claim the costs from the project!!
              Deliverables IV
              Protocols for Workshops
•Must have at least two network partners INVOLVED
•MUST send us:
  A copy of the materials! You MUST use the pro-
  Enbis statement on the material – flyers - web
  List of attendees, who, what, where, when, etc.
  Without this info it doesn’t count as a deliverable
  and you cannot claim the costs from the project!!
         Deliverables V
Aims and Objectives of Industrial Visits
•Taster sessions
•Starting Research projects
•Familiarisation Visits
•Best - Practice visits
•Starting Regional networks
•To get involved with Industry!
        Deliverables VI
Articles in Popular Press
Popular means – newspapers – magazines
engineering press – human interest –
anything not academic.
Can be National – Regional – Local
If you write a good one – we can translate
it into other languages!
  If you want to use pro-Enbis
        funding to travel
• There must be a pro-Enbis objective met by the
  meeting
  – A deliverable (industrial visit – seminar – paper)
  – A meeting to prepare a deliverable
  – A report on the meeting (Kipling six)
  – Or it will be discounted!
  So if you want to go to a conference – arrange to
    deliver something while you are there!
                 Or pay for the trip yourself
    Target Conferences

Something that may become a
Journal paper?
Engineering
Manufacturing
Hold Seminars at Conferences
Management
                   So
• Send us the meeting – visit - reports
• Copies of papers
• Copies of presentations
• We need these for our records – reports –
  and for the Commission
• We will be assessed in the Autumn
Meetings
      New Members
              Criteria
• Only from States not already
represented
  Commission now insists on this!
•Current Applications
     Slovakia
     Greece
     Macedonia

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:11/3/2012
language:English
pages:16