Glossary
Document Sample


OWNER: ISSUE DATE: VERSION:
DG TAXUD 24/04/2008 3.01
EXCISE COMPUTERISATION PROJECT
EXCISE SYSTEM SPECIFICATIONS (ESS), PRODUCTION,
MAINTENANCE AND SUPPORT, COORDINATION AND INFORMATION
PROGRAMME
SUBJECT:
Framework Contract TAXUD/2004/CC/077
Phasing and Scope Specification (PSS), Appendix D:
Glossary
ECP1-ESS-PSS-Ap.D
DG TAXUD – EXCISE COMPUTERISATION PROJECT REF: ECP1-ESS-PSS-Ap.D
GLOSSARY VERSION: 3.01
[This page has been left intentionally blank]
ece7493a-d645-414a-9964-ef64f38f6f64.doc Page 2
DG TAXUD – EXCISE COMPUTERISATION PROJECT REF: ECP1-ESS-PSS-Ap.D
GLOSSARY VERSION: 3.01
DOCUMENT HISTORY
Document History
Edi. Rev. Date Description (*) Action Sections
(**)
0 01 10/04/2006 Creation after SfR I All
1 00 18/04/2006 Internal review, SfA U All
1 01 28/04/2006 Implementation of DG TAXUD's comments, SfA U All
1 02 12/05/2006 Corrective Maintenance following DG TAXUD U All
comments received on 08/05/2006
1 03 06/11/2006 Updated following ECWP review meeting decisions, U All
SfR
2 00 17/11/2006 Updated following ECWP review meeting decisions, U All
SfA
2 01 22/05/2007 Updated following DG TAXUD request, SfR U All
2 10 06/06/2007 SfA U All
2 10a 07/06/2007 Re-SfA U All
2 11 17/09/2007 Incorporating PSS v2.10 Workshop Decisions (ECWP U All
31).
Submitted for review to DG TAXUD.
2 12 28/09/2007 No review comments raised. U All
Submitted for acceptance to DG TAXUD.
3 00 27/03/2008 Incorporating changes imposed by the Trigger Nb No -
#167. Action
Submitted for review to Taxation and Customs Union
DG.
3 01 24/04/2008 Incorporating review comments. No -
Submitted for acceptance to Taxation and Customs Action
Union DG.
(*) SfI = Submission for Information, SfR = Submission for Review, SfA = Submission
for Acceptance
(**) Action: I = Insert, R = Replace, U = Update, D = Delete
ece7493a-d645-414a-9964-ef64f38f6f64.doc Page 3
DG TAXUD – EXCISE COMPUTERISATION PROJECT REF: ECP1-ESS-PSS-Ap.D
GLOSSARY VERSION: 3.01
TABLE OF CONTENTS
Table of contents
1 Introduction.............................................................................................................. 5
2 Definitions................................................................................................................. 6
ece7493a-d645-414a-9964-ef64f38f6f64.doc Page 4
DG TAXUD – EXCISE COMPUTERISATION PROJECT REF: ECP1-ESS-PSS-Ap.D
GLOSSARY VERSION: 3.01
INTRODUCTION
1 Introduction
This Appendix is part of the Phasing and Scope Specification (PSS). It provides a
glossary of definitions that are used in the PSS.
ece7493a-d645-414a-9964-ef64f38f6f64.doc Page 5
DG TAXUD – EXCISE COMPUTERISATION PROJECT REF: ECP1-ESS-PSS-Ap.D
GLOSSARY VERSION: 3.01
DEFINITIONS
2 Definitions
The definitions below are sequentially ordered as used within the PSS main document
and in particular, according to the Rollout Strategy presented in section 3 “EMCS
Rollout Strategy” (see Figure 2, page 24).
(Main) Actors
MSAs and Economic Operators.
Functional Stage (FS)
A coherent set of EMCS Functionality which is to be deployed by a Member State and/or an Economic
Operator.
The following expressions related to Functional Stage are used along the document:
“FSx ready” is used to qualify an actor ready to use an application implementing Functional Stage x;
“open FSx” is used to qualify an actor starting to use an application implementing Functional Stage x;
“in FSx” is used to qualify an actor already using an application implementing Functional Stage x.
Migration Period
The duration required for the complete rollout of EMCS in a given Functional Stage for all MSAs and
their Economic Operators.
Migration Path
Succession of Migration Periods for the EMCS rollout. There is one global migration path defined at the
common level for all main actors, which enables one migration path per MSA defined at the national
level.
Milestone
Scheduled event signifying the completion of a project set of tasks. In the PSS, milestones are defined at
the beginning and at the end of each Migration Period. Main actors have to commit to reach a milestone at
a given date. Dates for these milestones are discussed and agreed commonly between the Member States
and the Commission.
Preparatory Period
1) The period common to all Member States before an EMCS Migration Period.
2) The period before one Member State can open a Functional Stage at national level, and during which
he has to fulfil a series of Preparatory Activities as defined in the Rollout Plan.
ece7493a-d645-414a-9964-ef64f38f6f64.doc Page 6
DG TAXUD – EXCISE COMPUTERISATION PROJECT REF: ECP1-ESS-PSS-Ap.D
GLOSSARY VERSION: 3.01
DEFINITIONS
Proof of Readiness
The set of proof elements that a Member State has to provide to the CPT (Central Project Team) so that
the latter can evaluate if the MS is ready to enter a given Functional Stage.
Initial Member State (IMS)
A (group of) forerunner Member State(s) having agreed to open a given Functional Stage all at the same
time. They are respectively designated as IMS1 for FS1, and IMS2 for FS2 in the PSS.
That is to say that an IMS is a Member State which:
opens FS1 at milestone ma (for IMS1);
opens FS2 at milestone mc (for IMS2).
Initial Economic Operator (IEO)
A (group of) forerunner Economic Operator(s) opening the same Functional Stage as their MS, being an
IMS.
Proof of Completion
The set of proof elements that a Member State has to provide to the CPT so that the latter can evaluate if
the MS is satisfactorily operational for a given Functional Stage.
[End of Appendix]
ece7493a-d645-414a-9964-ef64f38f6f64.doc Page 7
Get documents about "