Docstoc
EXCLUSIVE OFFER FOR DOCSTOC USERS
Try the all-new QuickBooks Online for FREE.  No credit card required.

Director Facilities Project Manager in Sacramento CA Resume Larri Avilla

Document Sample
Director Facilities Project Manager in Sacramento CA Resume Larri Avilla Powered By Docstoc
					                                                                                                     Larri Avilla
                                                                                          El Dorado Hills, CA 95762
                                                                                   916-599-9523, larriav@yahoo.com




                      Facility Management / Project Management Professional

I implement change and control chaos by creating a cost efficient and effective facility, saving money, reducing
energy use, and creating an effective “safety first” awareness.


Professional Highlights:

         Completed a 30 day schedule, start to finish, of a 65,000sqft site closure to create a $1,000,000 dollar tax
         savings and exceeded customer’s expectations by meeting the deadline one day early.

         Facilitated the removal of existing modular panel power supply to a 50,000 square foot test floor area by
         installing a new electrical and ESD ground wire system into new Wiremold channels to balance and stabilize
         power supply and stop power failures and tripped circuits during a 6 weekend schedule of 28 separate areas
         to remove downtime impacts to test floor production.


Experience:
Operations & Maintenance Site Supervisor at Agilent Technologies                                     2007-2012
Johnson Controls, Inc., Global Workplace Solutions, Building Efficiency, Facilities Management

Complete facility management of two independent building sites. Managed all customer interactions, staff of 3, all
vendors, work orders, preventive maintenance, space planning, master drawing file management, planned and
implemented all staff moves, system furniture reconfigures, all large event and conference planning, monthly financial
reports, KPI’s, MOR’s, safety reports and processes, asset management, and all government required inspections.

         Forecasted and managed annual in-scope operations budget totaling $1,500,000.
         Earned 2 annual and 6 quarterly account safety awards with over 5000 injury free hours by strictly managing
         safety requirements for site, team, and vendors.
         Increased company revenue with over $300,000 in out-of- scope projects annually.
         Created budget, project scope, TI plans, and move of 100 staff members out of one building and into
         another building by reconfiguring 100 cubicles, adding DATA/IT, remodel, install of a new transformer,
         shipping furniture from other sites, and removed all equipment to achieve the customer’s goal of a thirty day
         site closure to create a $1,000,000 dollar tax savings.
         Installed a new BAS system for control of 3 60-ton chillers and reduced energy costs.
         Upgraded PM schedules on existing equipment and created new schedules for equipment never having a
         PM process.
         VOIP implementation and MDF reconfigure of redundant power system


Project Manager; Sr Move Coordinator; Sr CAD Operator at Intel & Hewlett Packard                     2005-2007
Johnson Controls, Inc., Global Workplace Solutions, Building Efficiency

Building closures, reconfigures, remodel, move coordination, VOIP implementations, data center reconfigures, lab,
and test floor reconfigures. Space planning, AutoCad, CAFM, and master building file management.

         Planned, coordinated, and managed all aspects of reconfiguring 2500 workstations to move employees from
         two buildings being closed in 8 months.
         Fully vacated and closed over 400,000 sqft of office buildings.
         Compressed over 2000 cubicles to house increased headcount.
                                                                                                Larri Avilla
                                                                                       El Dorado Hills, CA 95762
                                                                                916-599-9523, larriav@yahoo.com




Project Manager                                                                                  2002-2004
United Corporate Furnishings, Sacramento, CA
    Managed customer purchases, schedules, sub-contractors, space planning, field verifications for sites
    installations, and reconfigures of Steelcase furniture.
         Delivery and install of 200 new workstations in downtown high-rise.
         Managed 300 cubical install of workstations in brand new building for large customer.


Project Manager                                                                                   1999-2001
D & S Movers, Sacramento, CA
    Managed customer site moves, relocations, crew, sub-contractors, installations, and reconfigures. Created and
    managed all project budgets, space planning, AutoCAD, and field verifications for projects.

        Implemented install of 650 new cubicles at a newly constructed large financial site with one day’s notice.
         Earned a 3 year site management contract due to saving the customer $60,000 and reducing business
        downtime during their tri-monthly employee rotations. Reduced process from an original 5 days down to 2.5
        days with increased head count in each project.
        Managed install of 200 new cubicles in new school district site.


Core Competencies:
   Experienced project manager                             Efficient multi-tasking professional
   Safety & compliance                                     Recordkeeping, reporting, and administrative functions
   Preventive & lifecycle maintenance                      Organization & time management
   Efficiency improvement                                  Cost Containment
   Extremely high customer service standards               Business impact awareness
   Employee relations                                      Supplier/vendor management
   Contract negotiation and maintenance, RFP’s             Haz Mat compliance
   HVAC, chillers, electrical, UPS, data centers           MAC moves
   Switchgear, transfer switches, generators               System furniture installations
   Spaceplanning, AutoCad                                  CAFM, CMMS, Maximo, Archibus
   Building/space construction, restacks, and closures     QA management of all site aspects
   Presentations to managers, directors, & VP’s            Budget forecasts and management
   OSHPD, Title 24, ISO 14000, Air Quality Regs.           Energy reduction projects


Education:
        BS in Business Administration/Project Management – Colorado Technical University – 2006
        AA in Interior Design – American River College – 2006

        Member of Project Management Institute
        Bi-lingual

				
DOCUMENT INFO
Description: Larri Avilla implements change and controls chaos by creating a cost efficient and effective facility, saving money, reducing energy use, and creating an effective “safety first” awareness.