The Containers arrive 22nd April 2010 - Site Cabin Hire

Shared by: HC121006094134
Categories
Tags
-
Stats
views:
0
posted:
10/6/2012
language:
English
pages:
11
Document Sample
scope of work template
							                 The Containers arrive
                    22nd April 2010




Wow! It’s big!
            The Containers arrive
               22nd April 2010




Lift off!
                           The Containers arrive
                              22nd April 2010




How’s he going to get it
  in the right place?
                        The Containers arrive
                           22nd April 2010




It’s swinging about a
         bit!
         The Containers arrive
            22nd April 2010




Final lining up.
       The Containers arrive
          22nd April 2010




And it’s in position.
  The Containers arrive
     22nd April 2010




So that’s what it looks
      like inside
        The Containers arrive
           22nd April 2010




And now the second
one. It’s a tight fit.
                         The Containers arrive
                            22nd April 2010




It’s swung into place.
                           The Containers arrive
                              22nd April 2010




Lining it up – hope it’s
 the right way round!
                     The Containers arrive
                        22nd April 2010




And it’s in place.

						
Related docs
Other docs by HC121006094134
NCLA MEMBERSHIP APPLICATION
Views: 0  |  Downloads: 0
Business Case RCM2 Intro
Views: 0  |  Downloads: 0
Ideas for UUCM Ingathering Water Ceremony
Views: 0  |  Downloads: 0
MAINTENANCE SKILLS TEST
Views: 15  |  Downloads: 0
Hop database - PPI home
Views: 0  |  Downloads: 0
NDA sample 1
Views: 20  |  Downloads: 0
hemswell cliff
Views: 5  |  Downloads: 0
Data Form
Views: 1  |  Downloads: 0
Josiah Lewis
Views: 2  |  Downloads: 0