Energy SPICE Project Proposal

Document Sample
Energy SPICE Project Proposal Powered By Docstoc
					Custom Project Completion Report
                Enter Date

              Submitted By
          End-User Name
                Address
               City, State

                   For

            Project Title

               Prepared By

          Project Manager Name
                   Title
              Phone Number



                   For

     Doug Swier, Conservation Engineer
           Cowlitz County PUD
             961 12th Avenue
              PO Box 3007
           Longview, WA 98632

              (360) 577-7544

          dswier@cowlitzpud.org
                    Custom Project Enter Project Name/Description

PROJECT COMMISSIONING DATE: MM/DD/YYYY

M&V COMPLETION DATE: MM/DD/YYYY

SYSTEM DESCRIPTION:
Baseline:
(Provide description of system used in accepted project proposal.)

Post-Project:
(Include detailed description of completed project including, equipment installed and
modifications to the project from the project description in the accepted proposal.)

ENERGY-SAVINGS VERIFICATION:

BASELINE POWER:
(Provide description of measurement and verification plan from accepted project proposal and
baseline data)



POST-PROJECT POWER:
(Provide post project installation data)



ENERGY SAVINGS CALCULATION:
(Provide description of energy savings calculation



PROJECT COSTS VERIFICATION:
(Provide summary of total project cost, attach invoices and complete Incentive Payment Table)
                                                                                  EXHIBIT D

                                   INCENTIVE PAYMENT TABLE

The incentive payment for this project is based on actual project costs and annual verified energy
savings resulting from the project. Verification is secured through a mutually agreed upon
verification scheme submitted as part of the Project Proposal. The amount of the incentive
payment shall be taken as the lesser of the two quantities given by the following calculation
methods:

      (a)     Annual verified Busbar energy savings (kWh/yr) multiplied by the acquisition incentive
              rate/ kWh.

      (b)     70% of the actual project cost.

      (c)     Estimated incentive amount from original Proposal.

Complete the blanks in the From Proposal column below to show the estimate of the incentive
from the project proposal stage. Complete the blanks in the From Completion Report column
after energy savings have been verified. The incentive payment is figure at the bottom of the
ACTUAL column.


Row                                       From Proposal      From Completion Report
 1           Project Cost             $ ?,???               $ ?,???
 2           Annual Site Savings      ?,??? kWh/yr          ?,??? kWh/yr
 3           Annual Busbar Savings ?,??? kWh/yr             ?,??? kWh/yr
             (line 2 * 1.09056)
  4          Incentive rate/kWh                         $0.??/kWh
 5          Incentive Payment Calculation
 5a          Savings-based Payment $ ????.??                $ ????.??
             (line 3 * line 4)
 5b          Project Cost Cap         $ ????.??             $ ????.??
             (line 1 *.7)
 5c          Final Incentive Cap      N/A                   $ ?,???.??
             (original estimated
             incentive from proposal)
  6         Lesser of lines 5a,         $ ?,???.??                 $ ?,???.??
            5b, or 5c

				