SucceeMaker Implementation Goals

Document Sample
SucceeMaker Implementation Goals Powered By Docstoc
					                                                                                        2011-2012


                            Madera Unified School District
                                    SuccessMaker
                       2011-12 Implementation Goals Schedule

        Monthly Student Use Goals                   SuccessMaker Progress Goals
September 2011                                 September 1: Students begin daily
 Students should have logged 3 hours in        sessions of SME
  each content area                            Septemebr 20th Students complete IPM
October 2011                                              Grade Level Targets
 Students should have an accumulated log-       Recommended to reach CST   Proficient Level
  in time of 8 hours in each content area               Beginning of Year        End of Year
                                              Grade     Reading     Math     Reading      Math
                                              Grade 1   n/a       n/a        2.3        1.8
                                              Grade 2   2.3       1.8        3.9        3.2
                                              Grade 3   3.9       3.2        5.4        4.1
                                              Grade 4   5.4       4.1        5.8        5.0
                                              Grade 5   5.8       5.0        6.7        5.9
                                              Grade 6   6.7       5.9                   6.9

November 2011
 Students should have an accumulated log-    Individual Growth Targets:
   in time of 11 hours in each content area
December 2011                                 a. Establish a goal for each student based
 Students should have an accumulated log-       on grade level information listed above.
   in time of 14 hours in each content area   b. Use the IPM baseline data as a starting
January 2011                                     point to determine yearly growth.
 Students should have an accumulated log-    c. Two hours of time on SM with acceptable
   in time of 16 hours in each content area      performance (AP) equals approximately 1
February 2012                                    month’s growth.
 Students should have an accumulated log-    d. Determine the needed growth and
   in time of 19 hours in each content area      establish a realistic, attainable goal for
                                                 each child.
March 2012
 Students should have an accumulated log-
                                              Reasonable, attainable goal = 15 months
   in time of 23 hours in each content area
                                              growth over period of one school year.
April 2012
 Students should have an accumulated log-    Recomended Reports:
   in time of 28 hours in each content area     Daily: Last Session Report
May 2012                                        Weekly: Cumulative Performance
 Students should have an accumulated log-               Report
   in time of 31 hours in each content area     Every 2-3 months: Prescriptive
June 2012                                                          Scheduling Report
 Students should have an accumulated log-
   in time of 32 hours in each content area




                        Every Child, Every Day, Whatever it Takes!

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:4
posted:10/5/2012
language:Unknown
pages:1