AIM Management Organization by lz4SlQ1g

VIEWS: 0 PAGES: 26

									   New and In-Process
  Software Capabilities
Status Update to AIM FRB
Danette Likens and Jamie Stewart, AIM ISD Support



                    23-25 Aug 11
                         Overview
•   Summary of AIM I and AIM II 5.0 Functionality
    ‒   Demo of selected Functionality
•   Summary of CPM 5.0
    ‒   Demo of selected Functionality
•   Summary of LO Module 5.0 Functionality
    ‒   Demo of selected Functionality
•   Summary of in-process software capabilities
    ‒ CPM
    ‒ LO Module
    ‒ AIM I
    ‒ AIM II
•   Discussion of potential future capabilities
      Summary of AIM I/II in Rel 5.0
•   FRB Prioritized ACRs
    ‒ Supporting AIM I and AIM II
•   Include:
    ‒ AIM II Content Comparison Report/Chg Pkg
    ‒ AIM I Exercise Controller Guide support
    ‒ AIM II Associated Curriculum Documents
• Numerous Smaller Items:
    ‒ Ease of Use
• NETC specific items (mostly related to TPP)
       Note: Details of functionality in backup slides (time permitting).
     Summary of AIM I/II in Rel 5.0
                                 (contd)



•   Some other items include:
    ‒ Standardized Introduction DP’s (Establish contact, etc.)
    ‒ Enhanced COI Split/Join Unit Topic functionality
       Select EO, click “Join EO”, select another EO (even
         from another TO)
    ‒ Spell check – Course, Module, Lesson, Section




       Note: Details of functionality in backup slides (time permitting).
           Summary of CPM Rel 5.0
•   NLOS search capability
•   More ISD Considerations items support IMDP
    report
•   TPP Modification/Cancelation
•   Warn to Save before Exit
•   Select All for checkbox functionality
•   JDTA Enhancements
    ‒ Copy and link/paste (in Project tab, too)
    ‒ Search – Condition, Standard, Source
        Note: Details of functionality in backup slides (time permitting).
         OCCSTDS Support in CPM
•   How did we get here?:
    – Started with NETC N74/NAVMAC discussions
    – AIM Team Provided a CPM “sandbox” for NAVMAC
      familiarization
    – NAVMAC developed an OCCSTDS Storybook PPT to describe
      high-level functionality
    – Initial OCCSTDS tab implementation in Rel 5.0 for
      creation/management of OCCSTDS data by NAVMAC – crawl
      functionality
•   Working toward business rule definition of:
    – How OCCSTDS data pulls forward into JDTA tab
    – Life-cycle impacts of OCCSTDS revisions on JDTA-based learning
      content
     Summary of LO Module Rel 5.0
•   Spell check – Course, Module, Lesson,
    Section
•   Sub-DPs for ILT (with RIAs)
•   Before and after text for RRL links
•   Update from EDE (no data loss)
•   Copy and paste elements and resources

      Note: Details of functionality in backup slides (time permitting).
          Summary of In-Process
             Functionality
•   FEA support in CPM
•   NETC tasked and funded priorities
•   NAVSPECWARCEN funded AIM II
    enhancements
•   MT Continuum lessons learned – ACRs in
    process
      Note: Details of functionality in backup slides (time permitting).
NAVEDTRA 139 Driving Changes
      to CPM - Post 5.0
• NAVEDTRA 139 FEA Policy driving CPM
  functional requirements
  – FEA – Early screen prototypes under
    development to be screened by NETC later
    this summer
 Note: BCA support in CPM to follow.
    Upcoming Tasked/Funded Changes
•    Course Master Schedule (CMS) re-engineering per
     NETC N7/AIM FRB working group AIM Change
     Request
•    Improved semi-automated functionality for
     repurposing traditional AIM LP/TG content curricula
     into LO Module *
•    CTTL Report Capability in CPM
•    Selection of traditional CTTL (and other tiered data)
     for semi-automated pre-conference population of
     JDTA data
•    LP/TG portion marking to support classified curricula
     and supporting documents
         * Multiple DP, RIA, RRL tiered items at the same time.
    Upcoming Tasked/Funded Changes
                           (contd)



•   Center-based filtering of selections in CPM
•   CPM ‘gatekeeper’ functionality to reduce duplication
    and promote standardization
•   Interfaces with BAH Atlas Pro toolset (LMS / ROCCE /
    Assessment Engine / Survey Engine)
•   AIM II Modification TPP
•   Migration from SQL Server to Oracle as backend
    database to leverage Navy enterprise license
Discussion of Potential Functionality
•   Test Plan
    – Needs updating in AIM I and AIM II to support NAVEDTRA
      132 requirement – Have input from CPPD which is a good
      start on potential ACR
    – Not covered in CPM/LO Module*
• Sub-elements in LO Module for self-paced
  rather than just ILT
    ‒ How many levels?
    ‒ LO Module ILT supports 4 total
      * Test Plan was not part of CPM/LO Module design, the thought at
      that time was that all test work would be done in QM Perception.
Questions?
Backup Slides
Summary of AIM I/II ACRs in Rel 5.0
Summary of AIM I/II ACRs in Rel 5.0
               (contd)
Summary of AIM I/II ACRs in Rel 5.0
               (contd)
Summary of CPM/LO Module Enhancements in Rel 4.1
Summary of CPM/LO Module Enhancements in Rel 4.1
                      (contd)
Summary of CPM/LO Module Enhancements in Rel 4.1
                      (contd)
Summary of CPM/LO Module Enhancements in Rel 5.0
Summary of CPM/LO Module Enhancements in Rel 5.0
                      (contd)
Summary of CPM/LO Module Enhancements in Rel 5.0
                      (contd)
Summary of CPM/LO Module Enhancements in Rel 5.0
                      (contd)
Summary of CPM/LO Module Enhancements in Rel 5.0
                      (contd)
Summary of CPM/LO Module Enhancements in Rel 5.0
                      (contd)

								
To top