					  Draft Nuclear Energy Series Document:
          Workforce Planning for
     New Nuclear Power Programmes




Tom MAZOUR
IAEA, Division of Nuclear Power
t.mazour@iaea.org
Workforce Planning: part of “how to”
implement the Milestones Approach
                                     Nuclear power option included
                                                                                 MILESTONE 1                                        MILESTONE 2                                   MILESTONE 3
                                                                             Ready to make a knowledgeable                                                                       Ready to commission and
                                               within the                                                                            Ready to invite bids
                                                                                      commitment                                                                                   operate the first NPP
                                       national energy strategy                                                                       for the first NPP
                                                                                to a nuclear programme




                                                                                                                                                                                                       Maintenance and continuous
                                                                                                                                                            PHASE                                       infrastructure improvement
                                                                                                                                                            3
Infrastructure development program




                                                                                                                                                     Activities to implement a
                                                                                                                                                     first NPP


                                                                                                          PHASE
                                                                                                          2
                                                                                                    Preparatory work for the
                                                                                                    construction of a NPP after a
                                                                                                    policy decision has been
                                                                                                    taken


                                                        Preparing for 1
                                                             PHASE
                                                        assuming
                                                        commitments &
                                                      Considerations before a
                                                        obligations
                                                      decision to launch a nuclear
                                                      power programme is taken




                                                        Pre project                          Project decision making                           Construction                                        Operation / decommissioning
                1st. NPP Project




                                                                                      Feasibility study                                      Bidding process                          Commissioning




                                                                                             10 – 15 years


                                                                                     INFRASTRUCTURE DEVELOPMENT PROGRAMME
           Key Infrastructure Issues

•   National position       • Stakeholder involvement
•   Nuclear safety          • Site and supporting
•   Management                  facilities
•   Funding and financing   •   Environmental protection
•   Legislative framework   •   Emergency planning
•   Safeguards              •   Security and physical
•   Regulatory framework        protection
•   Radiation protection    •   Nuclear fuel cycle
•   Electric grid           •   Radioactive waste
•   Human resource          •   Industrial involvement
    development (cross-     •   Procurement
    cutting)
Human Resource Development-Milestone 1


• Competencies needed to support a nuclear
  programme are identified by NEPIO
• Initial Workforce/Staffing Plans are
  developed
Human Resources for NEPIO (example)

                                    Responsible Minister


                                        Director of NEPIO



               Legal & regulatory                              Public information &
                     team                                    public consultation officer



 Technical, commercial &            Electric market & generation              NPP technology &
    policy consultants                 mix assessment team               fuel cycle assessment team



          Environmental assessment &                           Economic & technology
                  siting team                               localization assessment team
        WORKFORCE PLANNING

•   Definition: the systematic identification and
    analysis of what an organization/nation is
    going to need in terms of the size, type,
    and quality of workforce to achieve its
    objectives.

•   Identifies the steps that should be taken to
    get the right number of the right people in
    the right place at the right time.
IAEA Document, WORKFORCE PLANNING
      FOR NEW NP PROGRAMMES

•   The main activities to be undertaken to address
    each issue, together with an indication of the
    responsibilities of key organisations in
    completing these activities;
•   An indication of the competencies needed to
    implement these activities
•   Education/professional capabilities needed to
    support achievement of these competencies, and
•   Suggestions for the Workforce Planning needed
    to deliver these competencies within the project.
•   Final review meeting: 31 Mar-2 Apr 2009
                 Define the Objectives of the national
                      Nuclear Power programme




                Determine the HR needs of the


Workforce
             programme based on these Objectives




Planning
                 Compare HR needs to existing and
                  expected national HR resources
                          (Gap Analysis)




Process     No              Can Gaps be
                            addressed?


                                    Yes


             Determine how gaps will be addressed




                       Develop workforce plan




                  Review/Revise workforce plan as
                         phases progress
            Sample of Competencies Matrix
    Infrastructure Issue 10.                     Electrical Grid           Phase 1
   Activity        Responsibilities of            NP specific            Probable          Inputs             Comments
                   key organizations             competencies           education        regarding
                                                                         sources/        Workforce
                                                                        profession       Planning,
                                                                             s         education and
                                                                                          training

Study of grid     NEPIO:                       Knowledge of grid        Nuclear        At least one        Core competence
capability/        Take a lead role in        characteristics that     power          nuclear power       is Electrical Power
capacity re         the study                  are important re an      engineer       engineer with       Engineering, but
nuclear power     Grid Operator:               NPP                      Electrical     expert level        training in
                   Provide information        Thorough                 Power          competency          specifics of NPP
                    regarding the              understanding of         Engineer       At least one        output
                    stability and              electrical O/P           with Nuclear   power engineer      characteristics
                    reliability of the grid,   characteristics of an    Power          with expert level   would be
                    and anticipated grid       NPP and their impact     training       competency and      necessary to
                    growth/changes and         on existing              module         Nuclear Power       address grid
                    suitability for NPPs       grid/necessary                          training            capability/upgrade
                                               upgrades                                                    requirements
Study of grid     Grid Operator:               In-depth knowledge       Power          one power
interconnectio     Provide information        of principles for, and   engineer       engineer with
n possibilities     re grid                    lessons learned,                        expert level
                    characteristics and        regarding grid                          competency
                    the issues related to      interconnections                        One or more
                    their interconnection                                              with working
                                                                                       level
                                                                                       competency
                           Typical Phasing of Resources
                   1. NEPIO = 10 --> 50 (Depending on Expert Group Support) --> 0 (close to)
                   2. REG BODY = 10 --> 50+Tech Support
                                                                                      NEPIO               REG BODY                              OP ORG
                   3. OP ORG = 0 --> 20 to 30 --> 600 to 1200
                1000

                                        MS1                                MS2                                                  MS3
                800                                                                         <--Op Training-->
                       <-- Phase 1-->                                                            2-3 yrs
No. of people




                                              <-------- Phase 2-------->
                600                            Site Investigation, Bid
                                                    Preparations
                                                                            <----------------- Phase 3 ---------------->
                400                                                              Design, Construct, Comm'n




                                                                                                                     Commissioning
                                                                                                                                          M ulti Units
                200
                                                                                                                                            1Unit


                                                                                           M ulti Units
                  0                                                                1Unit
                       0    1     2       3        4     5      6      7    8       9      10     11      12    13                   14      15          16
                                                              Years (Indicative only)
Human Resource Development-Milestone 2

• Sufficient human resources are in place to be an intelligent
  customer
• Training of human resources needed for plant operation is
  initiated (Systematic Approach to Training (SAT))
• HR issues are addressed in requirements for suppliers
  (turnkey assumed)
• Workforce/Staffing Plan(s) updated
        an Intelligent Customer is:



•   An organisation (or individual) that has the
    competence to specify the scope and
    standard of a required product or service
    and subsequently assess whether the
    supplied product or service meets the
    specified requirements.
   Operations and                     Owner / Operator
Intelligent Customer


  Major Projects
                                        Contractors


  Minor Projects                        Consultants

                                        Suppliers /
    Component                         General Industry
     Supply


                   SUPPLY ‘PYRAMID’
      Human Resource Development-
              Milestone 3

• All human resources to commission and
  operate the first NPP are in place
• Education and training programmes for
  continuing flow of qualified people are in
  place
• Workforce/Staffing Plan(s)
  updated
                           Typical Phasing of Resources
                   1. NEPIO = 10 --> 50 (Depending on Expert Group Support) --> 0 (close to)
                   2. REG BODY = 10 --> 50+Tech Support
                                                                                      NEPIO               REG BODY                              OP ORG
                   3. OP ORG = 0 --> 20 to 30 --> 600 to 1200
                1000

                                        MS1                                MS2                                                  MS3
                800                                                                         <--Op Training-->
                       <-- Phase 1-->                                                            2-3 yrs
No. of people




                                              <-------- Phase 2-------->
                600                            Site Investigation, Bid
                                                    Preparations
                                                                            <----------------- Phase 3 ---------------->
                400                                                              Design, Construct, Comm'n




                                                                                                                     Commissioning
                                                                                                                                          M ulti Units
                200
                                                                                                                                            1Unit


                                                                                           M ulti Units
                  0                                                                1Unit
                       0    1     2       3        4     5      6      7    8       9      10     11      12    13                   14      15          16
                                                              Years (Indicative only)
    Summary: How to effectively consider HR from
                 the beginning?

• Use an integrated, systematic approach toward
    considering and implementing a NP
    programme (The “Milestones” Approach)
•   Develop workforce/staffing plans that are
    based upon activities in each of the 3 Phases
•   Require a Systematic Approach to Training
    (SAT) for all training programmes
•   Include SAT, and knowledge capture and
    transfer requirements in supplier contracts
•   Maintain this integrated workforce planning
    approach through the entire lifecycle of the
    facilities/programmes
                    NS


      NE
                   IAEA
                                MT

                 Education
TC              and Training          NA

                  Support
OLA               Group              SG

                 (ETSG)
           NA              NS
                    NE
IAEA




       …atoms for peace.

				