SSS Final Harvesting Report

W
Shared by: HC12100423408
Categories
Tags
-
Stats
views:
0
posted:
10/4/2012
language:
English
pages:
3
Document Sample
scope of work template
							                             Small Scale Salvage Final Harvesting Report
                                           Sunshine Coast District

Legal Name of Applicant: ___________________________________________________________________________

Licence Number: ________________ Licence Expiry Date: _________________ Report Date: __________________

Location: ________________________________________________________________________________________

Prepared By: _____________________________________________________________________________________

Area                                                       Volume
Exhibit “A” Area (ha): ____________________                Cruise Volume (m³): _____________________

Harvest Area (ha): ______________________                  Harvest Volume (m³): _____________________

Harvested Volume Break Down
                                       Harvested Salvage Saw Log Volumes
 Species         Fir        Cedar      Hemlock      Balsam     Cypress         Spruce        Pine      Deciduous
     (m³)
                                        Harvested Special Forest Products
 Products       SB          SK          CA       PR        PRC        FW            LS          RB         MT
     (m³)
           Shake & Shingle Bolts Blocks & Blanks = SB Shakes = SK      Cants = CA Posts & Rails = PR
     Cedar Posts & Rails = PRC Firewood = FW Lake Salvage = LS         Root Buck = RB Mining Timbers = MT

Area Status Questions during the course of this licence: (Circle Y or N)

1.    Have all roads and landings within the Exhibit “A” area been returned to their original condition? Y or N
      Please Explain: _______________________________________________________________________________
      _____________________________________________________________________________________________
      _____________________________________________________________________________________________
      _______________________________________________________________(*attach additional pages if required*)


2.    Has there been any environmental damage to creeks, streams or riparian management areas? Y or N
      Please Explain: _______________________________________________________________________________
      _____________________________________________________________________________________________
      _____________________________________________________________________________________________
      _______________________________________________________________(*attach additional pages if required*)


3.    Have any regeneration trees in previously harvested cut blocks been damaged? Y or N
      Please Explain: _______________________________________________________________________________
      _____________________________________________________________________________________________
      _____________________________________________________________________________________________
      _______________________________________________________________(*attach additional pages if required*)
4.   Has there been any impact/damage to recreational values? Y or N
     Please Explain: _______________________________________________________________________________
     _____________________________________________________________________________________________
     _____________________________________________________________________________________________
     _______________________________________________________________(*attach additional pages if required*)


5.   Have there been any aboriginal sites identified, impacted or damaged? Y or N
     Please Explain: _______________________________________________________________________________
     _____________________________________________________________________________________________
     _____________________________________________________________________________________________
     _______________________________________________________________(*attach additional pages if required*)


6.   Have openings greater than 01 hectares been created during harvest? Y or N
     Please Explain and if answered “YES,” please attach a regeneration plan: __________________________________
     _____________________________________________________________________________________________
     _____________________________________________________________________________________________
     _______________________________________________________________(*attach additional pages if required*)


7.   Has all timber been scaled and billed prior to the expiry date of this licence? Y or N
     Please Explain: _______________________________________________________________________________
     _____________________________________________________________________________________________
     _____________________________________________________________________________________________
     _______________________________________________________________(*attach additional pages if required*)


8.   Has a waste assessment of the Exhibit “A” area been conducted? Y or N
     Please Explain: _______________________________________________________________________________
     _____________________________________________________________________________________________
     _____________________________________________________________________________________________
     _______________________________________________________________(*attach additional pages if required*)


9.   Has a notification of final logging completed/expiry notice been sent to the District Manager? Y or N
     (Via Email to fta.dsc@gov.bc.ca )
     Please Explain: _______________________________________________________________________________
     _____________________________________________________________________________________________
     _____________________________________________________________________________________________
     _______________________________________________________________(*attach additional pages if required*)


By signing this form you’ve agreed the above information is accurate and that all harvesting has been completed on the
Salvage Licence area in question and all contractual obligations have been met. The information on this form is subject to
inspection. Failure to complete this form completely within 60 days from completion of operations may impact the
processing of future Forestry Licence to Cut applications within the Sunshine Coast District.




Licensees/Professional Signature: _____________________________________Date: ___________________________
                  *** Attach Map Here ***
              If you don’t have a map, please visit
       http://webmapsgovbcca/imfx/imfjsp?site=imapbc



Map Standards

  1.   1:10,000 to 1:25,000 (area size dependent)
  2.   Map must show the following:
        roads, landings and trails
        creeks, streams and lakes
        Exhibit “A” area, and
        sites harvested within Exhibit “A” area

						
Related docs
Other docs by HC12100423408
Aide M�moire
Views: 7  |  Downloads: 0
MINISTRE FINANCES LAGARDE CCCM
Views: 0  |  Downloads: 0
FB IFSCo ordinatorjd170812fg 3
Views: 0  |  Downloads: 0
PLEASE SUBMIT IN DUPLICATE
Views: 2  |  Downloads: 0
P3222R35 Index
Views: 0  |  Downloads: 0
9647 Casual MSR
Views: 0  |  Downloads: 0
RECORD OF PROCEEDINGS
Views: 3  |  Downloads: 0