					DISTRICT‑SOUTH
  S.No. Name of         Water owing   Khasra No.             Date of
        village's No of agency                               Inspection
        Water
        Bodies/Pond's
1       Aali            BDO           Tehsildar kalkaji
                                      give the report
                                      dt12.5.10, NIL
                                      water body in said
                                      village.
2       Arkpur bagh    DDA
        mochi
3       Asola          BDO            (a)1257         (21-   26.03.2010
                                      19)




                                      (b)1437(0-2)           26.03.2010




                                      (c)1470(1-18)          26.03.2010




                                      (d) 1521 (14-9) min 26.03.2010
(e) Forest       26.03.2010




(f) Forest       26.03.2010




(g) 47(32-7)     05.06.2010




(h) 483 (1-14)
(i)1629(0-14)
1404 (1-6)       24.12.2011

1424 (19-13).    24.12.2011

1430 (22-15)     24.12.2011




1759 (4-3)       24.12.2011
4   Aya nagar       BDO       1704(16-2),1705(0- 23.04.2011
                              9), 1706(2-16)
                              Total area (19-7)




5   (B)Aya nagar    BDO       (a)1575    (21-00)   23.04.2011




6   Adhchini F/66   MCD/BDO   (a)3/2(5-0)part of
                              area(23-12)
7    Bahapur       BDO    Tehsildar kalkaji
                          give the report
                          dt12.5.10, NIL
                          water body in said
                          village.
8    (a) Bahapur   BDO    630/2 (18-9)         23.04.2011



9    (b) Bahapur   BDO    53/2 (1-12)          23.04.2011




10   (c)Bahapur    BDO    465 (27-5)           23.04.2011




11   Bhati         BDO    (a)1311(2-3)         05.06.2010




                          (b)1865 (102-9)      05.06.2010
                          2873 (15-7) total=
                          117-16 Forest




                          (c)1432 (2-3)        05.06.2010




12   Badar pur F/74 DDA   Tehsildar kalkaji
                          give the report
                          dt12.5.10, NIL
                          water body in said
                          village.
13   Begum pur F/66 MCD/BDO   Tehsildar (HK) give
                              the report dt.
                              04.12.09, NIL water
                              body in said village.

14   Ber sarai F/74   DDA     Tehsildar (HK) give
                              the report dt.
                              04.12.09, NIL water
                              body in said village.
15   Chakchilla       BDO     Tehsildar (Defence
                              colony) give the
                              report dt. 15.05.10,
                              NIL water body in
                              said village.
16   Chandan Hulla BDO        160-161




17   Chattar pur      BDO     60(78-1)                26.03.2010




                              59(7-1)                 26.03.2010
298(3-5)    26.03.2010




82(8-8)     26.03.2010




82(8-8)     23.04.2011




298 (3-5)   23.04.2011




59 (7-1)    23.04.2011




60 (78-1)   23.04.2011
18   Chirag delhi   MCD/BDO   (a)196(2-2)         24.12.2010
     F/66                        (b)780/498 (6-
                              16) acquired by
                              DDA




19   Dara Mandi     BDO       (a)444(19-13)       04.06.2008




                              (a)444(19-13)       05.06.2010




20   Devli          BDO       (a)71/26(5-16)      05.06.2010




                              Forest              05.06.2010
                           (b)45/27(18-4)     05.06.2010




                           (c)206(3-5)        05.06.2010
                           (d)40/26 (10-10)
                           (e)205(0-6)
                           (f)224/1(0-1)
                           (g)267(0-7)
21   Fatehpur beri   BDO   (a)691(6-8)        05.06.2010




                           (b)1322min (1-5)   05.06.2010




                           (c)1322min (3-12)
                           (d)1187(5-8)
                           (e)1265(4-5)
22   Gadai pur       BDO   (a)512/1   (15-13) 24.12.2010


                           (b) 359 (30-13)    24.12.2010
23   Garhi jharia     MCD/DDA
     maria F/66
24   Hari nagar       DDA
     ashram F/66
25   Hauz rani F/74   DDA
26   Humaun pur       MCD/DDA   (a) 96(4-2)
27   Humaun pur       BDO       96 (4-1).               24.12.2011




28   Hauz Khas        BDO       195 (9-1)               24.12.2011




29   Jait pur         BDO       Tehsildar kalkaji
                                give the repor tdt
                                12.5.10, NIL water
                                body in said village.
30   Jona pur         BDO       (a)122(15-12)           04.06.2008




31   Jasola F/74      DDA       Tehsildar kalkaji
                                give the report
                                dt12.5.10, NIL
                                water body in said
                                village.
32   Jia sarai F/89   DDA       Tehsildar (HK) give
                                the report dt.
                                04.12.09, NILwater
                                body in said village.

33   Joga Bai F/66 DDA
34   Kotla mahigiran DDA

35   Kalu Sarai F/66 DDA
36   Katwaria sarai   DDA   (a)265(29-3)      05.06.2010
     F/74



                            (b)151(1-4)       05.06.2010




37   Khanpur          BDO   384(7-7)          23.04.2011




38   Kharera Village BDO    0-5               24.12.2011




39   Khirki           BDO   79/1 (0-18) and   24.12.2011
                            79/2 (0-13)


                      BDO   155 (135-1).      24.12.2011




                      DDA   (a)20(7-17)       26.03.2010
                           (a)20(7-17)             05.06.2010




                           (b)208(2-3)             24.12.2010




40   Kotla mahigiran BDO   Tehsildar kalkaji
                           give the report dt
                           12.5.10, NIL water
                           body in said village.

41   (a)Kotla      BDO     43 (1-12)               23.04.2011
     Mubarakpur
42   (b)Kotla        BDO       391 (1-7)             23.04.2011
     Mubarakpur




43   Khizarbad F/66 MCD/DDA


44   Kilokari F/66   MCD/DDA


45   Ladha sarai     DDA       (a)3(8-13)            24.12.2010
     F/74                           (b) 14 min (0-
                               9)


46   Lado sarai F/89 DDA       248 min (1-2)
                                (b) 335 min (2-0)

47   Maidan grahi    BDO       (a)554/2(32-8)        26.03.2010




                                                     4.12.2010




                               (b) 3(10-6)
                               (c)778/330 (0-9)
                               (d)527(12-2)
                               (e)1004/598(1-14)
                               (f) 1006/667 (34-13)

48   (b) Maidan      BDO       1004/598 (1-14)         24.12.2011
     Garhi




49   Madangir F/74   DDA       191min(19-5)            05.06.2010




50   Masjid moth     BDO       (a) 152(0-10)           24.12.2011
                                (b) 334 (1-8)



51   Madan pur       DDA       Tehsildar kalkaji
     khaddar F/74              give the report dt
                               12.5.10, NIL water
                               body in said village.
52   Masih garh      MCD/DDA
     F/66

53   Meetha pur      BDO       Tehsildar kalkaji
                               give the report dt
                               12.5.10, NIL water
                               body in said village.
54   Mehrauli       DDA/CPWD   (a)1214   (07-18)   26.03.2010
     (kishangarh)




                                                   05.06.2010




                               (b) Neela Hauz      26.03.2010



                                                   04.12.2010



                               Sanjay Van (Near    04.12.2010
                               Neela Hauz)
(c)1220(13-3)     26.03.2010
(Baba Adhrang
Nath)




                  05.06.2010




1166(1-16),1167(3- 26.03.2010
10),1168(12-
0),109(21-
02),121(4-19)
                                   (d) 1797 (6-10),      26.03.2010
                                   Yogmaya Mandir




                                   (e) 1168(12-0)        05.06.2010




                                   (f) 1166 (1-16)      05.06.2010
                                   1167(3-10) total=(5-
                                   6)




                                   (g) 1219(4-19)        05.06.2010




                                   (h) 119
                                   (i) 2321/1224 (1-5)
55   Mehrauli (A)     ASI          1033 & 1945 (         3.9.2011
     Hauzi Samshi                  2000 sp mts)
56   Mehrauli (B)     Wakf Board                         3.9.2011
     Qutub ki Baoli

57   Mehrauli (c)     ASI          1665(2200 sq mts)     3.9.2011
     Gandhak ki
     Baoli
58   Mehrauli (D)     ASI          145 (858.36 sq mts) 3.9.2011
     Raza ki Baoli
59   Molar band       BDO          468/1(0-19)
60   Neb Sarai   BDO   (a)84(04-04)        04.06.2008




                       (b) 170/2 (01-01)   04.06.2008




                                           24.12.2010




                       (c)516 (12-09)      04.06.2008
                                                    26.03.2010




                            (d) 435 (15-5)          24.12.2010
                            Forest




61   Nangli razapur   DDA   Tehsildar (Def.
     F?89                   colony) give the
                            report dt. 15.05.10,
                            NIL water body in
                            said village.
62   Okhla F/66       DDA


63   Pul pehlad       BDO   Tehsildar kalkaji
                            give the report dt
                            12.5.10, NIL water
                            body in said village.

64   Put Sarai        DDA
65   Raipur khurd     BDO   Tehsildar kalkaji
                            give the report dt
                            12.5.10, NIL water
                            body in said village
66   Raj pur kurd     BDO   (a)38(7-16)          24.12.2010
67   Saidabad       BDO   Tehsildar (Def.
                          colony) give the
                          report dt. 15.05.10,
                          NILwater body in
                          said village.

68   Saidul ajaib   BDO   (a)200/2(1-13)         24.12.2010




69   Satbari        BDO   1049 (05-01)           04.06.2008




70   Shaupur        BDO
71   Shayoor pur    BDO   (a)92(9-1)             26.03.2010
72   Sarai shahji       BDO       43                  3.9.2011




73   Sultanpur          BDO       (a)321min
74   Sarai Juliana      MCD/DDA
     F/66
75   Sarai Kalekhan     DDA
     F/89
76   Sheikh Sarai       BDO       122 (3-9).          24.12.2011
77   (b) Sheikh Sarai   BDO       167 (2-12)          24.12.2011



78   Shah pur jat       BDO       294 (5-11)          24.12.2011


79   (b) shah pur jat BDO         468 (9-11)          24.12.2011




80   (a) Sultanpur      BDO       321 min(8-6), 322   24.12.2011
                                  min(0-18), 323(5-
                                  11), 324(2-14),
                                  325(4-10) toatal
                                  area(21-19)
81   (b) Sultanpur      BDO       402(0-3)            24.12.2011




82   (c)Sultanpur       BDO       595(0-11)           24.12.2011




83   Tigri              DDA       (a)191(5-8)
84   Tehkhand F/74 DDA        (a)1520(3-0)           05.06.2010




85   Tut Sarai      DDA       Tehsildar (HK) give
                              the report dt.
                              04.12.09, NIL water
                              body in said village

86   Tajpul         DDA
87   Tamoor nagar   MCD/DDA
     F/66
88   Tuglakabad     DDA       (a)1520(3-0)           05.06.2010
     F/74




                              (b)630(4-7)
                              (c)857(0-4)
                              (d)786(1-3)
                              (e)1586(0-11)
89   Yusuf Sarai    MCD/DDA
     F/66
90   Yaqut pur      BDO       Tehsildar kalkaji
                              give the report
                              dt12.5.10, NIL
                              water body in said
                              village
91   Zamrudpur F/66 MCD/BDO   (a)32(11-4)
                                (b)192(4-0)
Site/position/Directions/opinions




Natural water body exists. The BDO was directed
to get the demarcation done and also get the
boundary wall erected at the earliest by I&FC
Department so that these occurs no encroachment
demarcation was fixed for 7.4.2010.

Land locked by farm houses. BDO was directed to
get the demarcation done as well as to get the
access to the land by exchange of land under
Section 40 of the DLR Act, 1954 in order to
develop the water body.
Land locked by farm houses. BDO was directed to
get the demarcation done as well as to get the
access to the land by exchange of land under
Section 40 of the DLR Act, 1954 in order to
develop the water body.
As per statement of Nodal Officer, BDO (HQ), a
Court case titled Sanjeev Malhotra Versus LG is
pending in High Court of Delhi and the date is now
fixed for 21.4.2010. BDO is directed to get the
Court intimated that land is marked as water body
and the matter be decided at the earliest of the
interim protection be got vacated so that the water
body is developed as per the order of this Hob'ble
Court in the present case.
A low lying area was inspected in the forest/Asola
ridge, where water collects during rainy season as
stated by Forest Officer Shri Dharam Singh. Forest
Department was directed to preserve the natural
water body and the same shall not be destroyed in
future as it would serve ecological balance in
forest area. The said water body is not recorded in
revenue record as water body but it would be
better if the same is included in the list of water
bodies.
An area of around 20 acres was also visited where
natural water exist and serves to the needs of the
forest animals. Forest Department was directed to
preserve the natural water body and same shall
not be destroyed in future as it would serve
ecological balance in forest area. The said water
body is not record as water body but it would be
better if the same is included in the list of water
bodies.
The committee reached the spot at 9:30 AM but
SDM was not present BOD and MCD staff was
present. Encroachment exists around the water
body, hence demarcation has fixed for 15.06.2010
at 9:00 AM and report was directed to be
submitted within a period of two weeks before the
committee. Further directed to get the demarcation
done for removal of encroachment and
development of water body.


encroached by water constriction.
Waste/Garbage/Dumping Yard exists there.
Gram Sabha Land.

Drawing of this total land is required by Court
Commissioner from Tehasil Dar concerned by
29/12/2011. After that this area should be
demarcated.

This is natural water body. Clean water is there.
One side Temple with Peeple Tree is situated
there. Surrounding by trees. This situated near
ETF Camp and is known as Jat Wala Johar by
local people. It is naturally maintained water body.
The committee recorded the site at 9.00 A.M. but
no staff from MCD, Delhi Jal Board, Revenue was
present telephonic calls were made and it was
only after a gap of more then one hour that
officials arrived at site. Sewer at site still was found
flowing into the water body. MCD&DJB failed to
give satisfactory reply as to why construction of
Mandir and Samadhi is being allowed in water
body. The boundary wall is broken on two sides.
The sewer system was total failure as the entire
village sewerage still flows into the water body.
The water body has been turned into a dumping
yard. BDO, MCD, DJB and SDM were directed to
stop all the nuisance as well as the ongoing
encroachment and report to the committee by
5.5.2011 along with status report of the water body.

Boundary wall exists around the water body.
Encroachment had been done by way of
constructing a temple, shops etc. Water Body is
not developed. During the inspection, it was
noticed a part of water body was being used as a
Rasta leading to unauthorized colony. upon
querying with the BDO(S), it transpired that the
Revenue Rasta has been encroached upon and
therefore the part of same was being used by the
general public. The BDO also informed that the
same has now been stopped and broken
boundary wall has been repaired/constructed
recently thereby closing the ingress and outgress
of the general public. However other
encroachment, have not been touched by the
authorities. The Revenue authorities were directed
to carry out proper demarcation of the water body
identify the encroachment, remove the same and
hand over to the developing agency. I&FC was
directed to get the scheme prepared, submit the
same before the committee so that the water body
could be developed in a better way.
Natural water body in DDA park, opposite Katla
Mandir. DDA was directed to maintain the water
body properly.

The said khasra no. has been identified by the
Revenue and the BDO staff. Revenue Staff unable
to identify the site. They were directed to identify
the site and submit the report within two weeks so
that further cause of action could be decided.

The said khasra no. has been identified by the
Revenue and the BDO staff. Revenue Staff unable
to identify the site. They were directed to identify
the site and submit the report within two weeks so
that further cause of action could be decided.
The BDO and revenue staff failed to even locate
the water body. Is it not strange that the owners of
land are not aware as to whether their land exists!
Concerned authorities have been directed to get
demarcation done on 24.6.2010 and 25.6.2010
and submit the same to the Committee for further
direction in the matter.
Large area in the form of water body exists in frest
area. The committee was informed that some
portion is encroached by the villagers. No revenue
record was provided by the concerned authorities.
Demarcation was fixed for 24.06.2010 and
25.6.2010. Forest Department and BDO have
been directed to submit the same to the
Committee. It was made clear to the authorities
that the natural form of water body shall not be
disturbed while carrying out construction of
boundary wall, if any.
The water body could not be located bythe BDO
and the SDM staff demarcation has been directed
to be carried out on 24.6.2010 and 25.6.2010 and
to submit the report within a period of two weeks
before the Committee
This water body is situated in the middle of a
village. It is surrounded by a high wall and has a
Floor Department Office complex within it. There is
no catchment provision of bodies. The water is
absolutely dirty as it is sewage water from the local
area. Until the sewage is removed nothing can be
planned for the moment. Immediately action is
required.

An area of around 33-12 is stated tobe leased out
to Chatterpur Mandir. As per revenue record,
Gaon sabha is the recorded owner. The revenue
record indicates that the land has been given on
leas to Aadhyat Katyayni Sidh Shakti Peeth
Chattarpur Mandir, New Delhi. However, the
position at site was quite different as part of area is
vacant and part of area is encroached upon.
However no record of lease has been provided by
the BDO. BDO and SDM staff is directed to carry
out demarcation and give the exact factual
position of the site along with supporting
documents. Necessary/further directions will be
issued thereafter.

Jain Mandir exist. The entire area is encroached
upon. BDO was directed to get the encroachment
removed. As per DLR Act, the area of Pond/Johar
cannot be used for any other person except for
which is has been allotted/recorded.
Aggarwal dharamshala exist. It is strange as to
how such things could be allowed to be developed
by a private party, the land use is specific in Johar
and it cannot be used for any other purpose. The
entire area is encroached upon. BDO was directed
to get the encroachment removed and intimate the
steps taken in this regard.

Park exist. No record was available with any of the
authorities. Accordingly, with the consent of the
authorities demarcation was fixed for 5.4.2010.
Copy of demarcation be provided to the Court
Committee. The land is to be get developed in the
form of pond/water body.
Same position exists as was on the last visit dated
26.3.2010. Directions have not been followed by
any of the authorities. Soil dumping is on at the
site and has reached above 2 feet from road level.
Directions have been issued to BDO and Revenue
staff to report as to how encroachment was
allowed and what action has been taken by the
authorities for remaining the encroachment.

Dharamshala and Mandir exists over one bigha of
land. Rest of the land is in form of park. It be
ensured that no further encroachment takes place
on the rest of the area of water body.

The said khasra no.has not been identified by the
revenue and BDO staff. Revenue staff has was
unable toidentify the site. They were directed to
identify the site and submit the report within two
weeks so that further cause of action culd be
decide.
The said khasra no.has not been identified by the
revenue and BDO staff. Revenue staff has was
unable toidentify the site. They were directed to
identify the site and submit the report within two
weekis so that further cause of action culd be
decide.
Water body is not identified by DDA. The agency
sought time till Monday i.e. 03.01.2011 in order to
get the the water body identified. DDA was
directed to submit its report by 13.01.2011 in
meeting to be held in chamber of Court
Commissioner.


The water body is filled with sewerage from
neighboring habitation. No progress has been
made since we last visited the area. Merely
because unauthorized temple exists at the site is
no reason to await orders for demolition for
starting work of preservation. In fact the water
body stretches over a large area as previously a
boundary wall constructed unauthorized has been
demolished. The area provides good potential for
preservation and development. Sewerage flow
should be cleared immediately in view of High
Court orders directing preservation of all water
bodies.




The natural water body is within the forest area.
The rasta leading the water body has been
encroached upon by one Smt. Renuka Wahi as
per statement given by Halka Patwari. The Forest
Department has been directed to get the
encroachment removed with the help of the
revenue and BOD staff. The Committee feels that
water body requires maintenance only.
Well developed water body. Old Mandir exist,
however encroachment is going on under the garb
of development of Mandir. BDO has been directed
to get the same stopped immediately and remove
the new construction and to protect the water body.
The water body exist within village abadi. Malba
has been dumped into the water body. MCD has
been directed to get Malba cleared immediately so
that the water body could be developed. Status
report is to be submitted to the Court Committee
within two weeks.




The Committee reached the spot at 9.45 AM but
SDM staff was not present. Mandir exist on spot.
Boundary wall is stated to have been constructed
by I&FC Department. There is some dispute
regarding rasta. BDO staff has been directed to
get the dispute resolved and hand over the water
body to I&FC Department for proper development
of the water body within a period of two weeks.

The committee was informed that one Balraj son
of Teja has been declared as Bhumidhar of the
water body, which is against the judgment of
Hon’ble High Court as well as against the
judgment of Apex Court to the effect that use of
water body can’t be changed and Government is
obliged to protect them. The water body cannot be
allotted to any person nor can be used for other
purposes. The BDO failed to give any satisfactory
reply as to whether any appeal has been filed or
not. The BDO has been directed to provide the
details of the case and to submit as to what action
has been taken. He was also directed to get the
land retracted from the person who has been
declared bhumidhar of the water body.




MPCC building exists on the site. The developing
agency was directed to construct water harvesting
sustem at site.
Site is a open land. A Court case is stated to be
pending in Court of Financial Commissioner. The
land owning agency assured that the status of the
same would be submitted on 13.01.2011 in Court
Commissioner Meeting.
There exists a community hall built up by Delhi
Govt. and election office. Allotment papers of this
water body are required by Court Commissioner
from Revenue Department.

This is maintained by DDA Horticulture. This is full
of water Deer Park exists there. Court
Commissioner directed DDA & MCD to develop
Sewer and Rain water harvesting System. MCD
officer not present.




The water body is completely dry. However, its
size and location would make it suitable for rain
water harvesting and for which proper landscaping
and introduction of native variety of trees be
experimented. On the far side and a little away
from the water body there is a depression in which
sewage water is accumulating. Work be
undertaken so that the sewage water does not
enter the water body.
Natual water body. Some small Mandir and one
big Mandir exists at site. The same is expanding.
DDA has been directed to stop the same and
protect the water body by fencing the same.

As per statement of DDA staff, the water body
exist in village Abad and is fully built up. DDA has
been directed to submit its report within two weeks
as how the lnd use of water body has been
changed and under whose authority. Further
direction would be given thereafter.
Girls school exist on spot. The roof of the school
building is in pathetic conditin and needs
replacement. PWD was directed to replace the
roof by constructing concrete roof. Thereafter, DJB
to develop rain water harvesting system.
This is a “Be Chirag Mauja” a pond. There exists a
pond in 1908, Area 0-5 built up Khasra no. not
identified. This is un-acquired as reported by SDM
Hauz Khas. Revenue authorities were asked to
locate the exact lactation Water Bodies at site and
on map with khasra No..

Entire area of water body could not be identified at
site.


This is situated near Main Road and known as
Satpula Lake. This is owned by DDA. No source of
water hence dry.




Park exist in an area of around 2 bighas only. Rest
of the land is encroached upon. The
encroachment is required to be removed and the
land left for the purpose of developing of a water
body in the village. Steps in this regard are
required to taken. Action take report be submitted
within a month for further cause of action.
A visit to the aforesaid site was made by the
Committee on 26.3.2010. The site was found
encroached, which was required to removed.
However, to ascertain the area encroached the
committee decided to visit the site on 5.6.2010.
During the preliminary meeting held with the
officers of DDA, MCD and Revenue Department, it
was proposed/decided to first earmark the area
and thereafter further course of action would be
decided. When the committee reached the site on
5.6.2010, Execute Engineer of MCD along with his
staff; Executive Engineer of DDA along with his
staff and BDO (South) along with his staff were
present. However, only Patwari from Revenue
Department, (Hauz Khas) was present. Concerned
SDM and Tehsildar were not present despite prior
intimation. To earmark the area, demarcation was
fixed for 14.6.2010 at 9.00 AM and report was
directed to be submitted within two weeks of
demarcation before the Committee. Further
directions would be issued thereafter. It has now
transpired that Revenue Department concerned is
not cooperating jurisdiction over the water body is
disputed neither DDA nor MCD nor Revenue
Department, Government of NCT is coming
forward to own its responsibility. site. At south
Govt. School is found to exists at
west corner of school a well was found to exists.
The authorities were directed to develop the said
well and also construct water harvesting system
over the roof top so that the rain water does not go
waste and the well is recharged from the water
collected through rain. The authorities were further
directed to remove small encroachments in form of
shops to be removed so that the entire area of
water body is put to good use.




No one from revenue department reached on spot.
Hence the committee decided to return back. This
only indicates that they the authorities have no
respect for the orders/directions of the Hon'ble
High Court.
No one from revenue department reached on spot.
Hence the committee decided to return back. This
only indicates that they the authorities have no
respect for the orders/directions of the Hon'ble
High Court.




The matter is stated to be pending before the
Hon'ble High Court of Delhi. The BDO and
revenue staffs were directed to submit the status
of the said case by 13.01.2011 in Court Committee
meeting.




Water body developed. BDO is th recorded owner.
The same has been handed over by the
developing agency, I&FC to BDO, BDO was
directed to continue maintaining the same as a
water body and ensure that no encroachment is
allowed/ permitted.

Inspection was done on 26.03.2010 and report
was submitted accordingly. However, later on the
villagers represented that the encroachment still
exists over the portion of water body and the
authorities has misguided the committee. During
inspection on 24.12.2010, I&FC, the developing
agency and BDO were asked about the area of the
water body. I&FC stated that it developed that
portion which was handed over to it by BDO and
revenue staff. The BDO, I&FC as well as the
revenue staff were directed to produce the entire
records, status report and the earlier demarcation
carried out and submit the same to the committee
by 13.01.2011 at 3.30 PM in the chamber of the
Court Committee so that further directions could
be issued.
This belongs to Forest Deptt. and is known as
Gummat Wala Mandir.




Only 2-3 bighas has been developed in form of
water body. An area around 2 bighas is
encroached upon. An area around 2-3 bighas is
built up in form of community hall and Mandir. Rest
of the area is vacant. DDA has been directed to
get the encroachment removed and develop the
entire land/area with the water body. Status report
is to be submitted to the Court Committee within
two weeks.
The water body is not identified though shown in
records. Market is built up in the area.
The committee was informed by the DDA officials
that allotment has been made to GAIL for CNG
Station: however no record was provided by
officials of DDA who were present. On spot, the
site was found to be filled with Malba and is being
used for parking of vehicles. DDA was requested
to provide with the details as to how and when and
at whose instance the water body has been
allowed to be converted. DDA is directed to
restore the site as water body. The committee is
awaiting the details from DDA.

As per award no. 80E/80-81, land was acquired for
pond. Through the area acquired is large but water
body exists over 500 sq. yds. Only rest of land is
lying vacant. DDA has directed to get the area
demarcated and develop a big the water body
having good catchment. Sewerage was also found
flowing into the water body. No one on behalf of
MCD was present. The High Court has now
directed DDA to construct boundary wall around it
and also desait it. MCD has given affidavit that
sewerage water earlier flowing into it has been
stopped. DDA should now ensure that high Court
order is obeyed.
Work is in progress by PWD and is stated to be
completed by may end. Thereafter the same would
be handed over DDA.
PWD has completed the fly over and the site has
been handed over DDA. DDA was directed to get
the water body cleaned and develop the same.
Natural water body exist at site. Unfortunately
entire sewerage from vacant kunj STP is flowing
into the said water body. Dda was directed to
immediately take water body. DDA was directed to
immediately take precautionary measures so that
the sewerage is diverted and water body is
protected as the STP. DDA/DJB to inform under
whose directions this was done as statement was
made in High Court that STP would be diverted to
Vasant Kunj Malls for use.
At the site a Mandir exist over01 biswa of land.
Encroachment also exist over on area 05bigha
approx. Sh. Vijay Kumar, patwari of DDA was
asked to provide the land record, unfortunately he
was without the records and on the contrary
shifted the burden on patwari of Revenue
Department who was not present. Previous halqa
patwari of revenue department was present who
was also without record .He stated that he has
handed over the record to Kham Chand, the
present halqa patwari. On account of the aforesaid
acts and conduct of the afficials by not producing
the records, the committee was helpless. As such
the only direction was issued to DDA to get the
demarcation done with help of revenue authorities.
Thereafter steps are taken to get the
encroachment removed and develop the water
body. The committee requested DDA to inform
time to time development of the land so that
committee can fix date for the same.
Partly encroached. Dumping of malba is under
progress. DDA staff informed that land has been
allotted to two public schools. DA has been
directed to fence its area; to see that no further
Malba is dumped, encroachment is removed and
area protect. Further steps to develop the
waterbody be also taken.
The officials of DDA were not aware of the
aforesaid water bodies. Nor was there any record
brought by patwari (DDA). As such direction was
issued to DDA to get the same identified futher
development work to be done would be decided
thereafter.Thereafter steps be taken to gets the
encroachment removed and develop the water
body. The committee requested DDA to inform
time to time development if theland so that
committee can fix date for the same.
Though the area acquired is large but water body
exist over 500sq.yds. only rest of land is lying
vacant. DDA was directed to get the area
demarcated and develop a big the water body
having good catchment. Sewerage was also found
flowing into the water body. No one on behalf of
MCD was present. The High Court has now
directed DDA to construct boundary wall around it
and also desalt it. MCD has given affidavit that
sewerage water earlier flowing ioto it has been
stopped. DDA should now ensure that High Court
order is obeyed.
Natural water body partly encroached.
Encroachment is required tobe removed by DDA
and area is to be protected. Demarcation has to
be carried out by DDA, which is to be submitted to
the Committee. Water body requires boundary
wall and maintenance only. Status report is to be
submitted to the Court Committee within a period
of two weeks.
Fully encroached upon. Demarcation has to be
carried out. DDA staff has been directed to get the
demarcation done for removal of encroachment
and development of water body. Status report be
submitted before the Committee within two weeks.


Flats exist at the spot asper statement of DDA
staff. DDA has been directed to submit its report
within two weeks as how the land use of water
body has been changed and under whose
authority. Further direction would be given
thereafter.



well developed. Only maintenance required.

The water body has been converted into dumping
yard. The same be got cleaned and maintenance.

Well developed. Rain water catchment area be
developed.

well developed. Only maintenance required.
The water bodyis protected with a boundary wall.
However, the railings have been broken. Work
regarding strengthening of boundary wall should
be undertaken. There is some habitation adjoining
the one end of the waterbody. The water body
needs to be cut off from the habitation. Access of
water from outside has to be provided as the
boundary wall has cut off the inflow. Landscaping
has to be done and unwanted vegetation including
Keekar has to be removed to the extent possible.
Native trees like Peepal, Neem, Bargad, Babul,
Guhal, etc. should be planted in a planned
manner. Since the water body is already
surrounded by a boundary wall the added
vegetation would beautiful the water body. Efforts
should be made to capture more and more of
water of constructing channels.

This water body is non-existing and an open piece
of land is all that remains. It is surrounded by
shanty jhuggies/ hut dwellers and there is no
access to it as passage to the water body is
through private land occupied/in premises of hut
dwellers of jhuggies. The first and foremost thing
to be undertaken is to have an independent
approach to the water body.
Same position exists as was on last visit of the
committee dated 04.06.2008. The water body is
land locked. However a rasta was found to exists
towards west side of water body. The same shall
be got vested in Gram Sabha as that water body is
approachable and the water body is developed.
The authorities were directed to get the
demarcation done for removal of encroachment.
This water body is having plenty of water which is
relatively clean. It is situated in forest land and is
used both by villagers and by buffaloes for
bathing. It was disturbing to see that water tankers
were extracting water for further supply. The
access of such vehicles to the water body should
be blocked. Further, plantation of local variety of
trees can be undertaken on the shores and
minimal landscaping and deepening/desilting
would result in improving the quantity and quality
of water inflow. The garbage near the water body
should also be directed to be removed
immediately.
The position was same as was on the last visit. No
step has been taken by the forest Department for
getting the encroachment over an area of around
1bigha as per the statement of Shri Dharam
Singh. Forest Officer. Forest Department was
directed to get the encroachment removed by
getting the demarcation done and develop the
water body at the earliest.

The water body is fully encroached. The
authorities have been directed to carry out
demarcation on 04.01.2011 and thereafter steps
be initiated for removal of encroachment and water
body is revived. The report is to be submitted
before the Court Committee by 13.01.2011 at 3.30
p.m. as meeting is fixed for said date in chamber
of Court Commissioners.




Encroachment exists over 50% of the water body.
Construction was also going on the site. The same
was got stopped immediately at site by local police
callled by the concerned Tehsildar. The Tehsildar
further assured that demarcation of the water body
carried on 29.12.2010 and thenew construction
would be demolished on 29.12.2010 itself. After
demarcation if further encroachment is found to
exists, the same would be removed by
demolishing within a period of one month.
Encroachment was found to exists at site. The
authorities i.e. DDA & Revenue staff were directed
to carry out demarcation on 10.01.2011 and
thereafter encroachment be removed and site be
handed over to the developing agency.

The water body contains muddy water. The area
should be used for planting native variety of trees
and removal of keekar shrubs. The catchment
area is open and uninhabited. The water body can
be developed with minimal expenditure.


Both the khasra no’s are stated to have been
handed over to DDA and boundary wall has been
erected. Halqa patwari Rakesh from revenue
department was stated to be busy in Court.At the
spot, official from DDA Sh. Arvind Kumar Astt.
Engineer, was present who stated that he does not
know as to where the water body exist as the land
is plain land. DDA was directed to contact the
revenue staff and get the water body demarcated
and be developed accordingly.
The said khasra no.has not been identified by the
revenue and BDO staff. Revenue staff has was
unable toidentify the site. They were directed to
identify the site and submit the report within two
weekis so that further cause of action culd be
decide. However, no report has been submitted
before the Court Committee till date.




Could not be identified at site.
This is acquired by DDA and flats are built up
there at the site of water body.


There exists a park on Khasra No. 294 (5-11)
under DDA. No body present from DDA. No
catchment system is developed.
DDA Park exists there at Khasra No. 468 (9-11).
No body present from DDA. No catchment System
is visible. Use for plantation only. Court
Commissioner asked about the quality of water
used in this park and allotment record.
Sarvodaya School exist over the site. DJB was
directed to develop the water harvesting system
for conserving rain water.


The said khasra no. has not been identified by the
Revenue and the BDO staff. Revenue Staff was
unable to identify the site. They were directed to
identify the site and submit the report within two
weeks so that further cause of action could be
decided.
The said khasra no. has not been identified by the
Revenue and the BDO staff. Revenue Staff was
unable to identify the site. They were directed to
identify the site and submit the report within two
weeks so that further cause of action could be
decided.
The water body falls under jurisdiction of DDA.
None was present from the DDA. DDA has been
directed to survey the water body in consultation
with revenue staff so that the same could be
developed.




The water body falls under jurisdiction of DDA.
None was present from the DDA. DDA has been
directed to survey the water body in consultation
with revenue staff so that the same could be
developed.
  Committee's Observation                   Reply/Response by the
                                            concern Auithorites




The authorities should comply with the
directions issued at site and send the
copies of Action Taken Report at the
earliest so that further course of action
can be decided.
The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.
NOTE- The authorities were further
directed to submit the report of the rest of
the water bodies in the meeting on
13.01.2011 to be held in chamber of Court
Commissioner so that further course of
action could be decided in the said
meeting in respect of the water bodies.




The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.

The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.
The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.
The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.




Court commissioner desired details of
water body on map and at site as per
records.
Court Commissioner directed DDA to
report about a catchment of water and
outsourcing, why no water was found
there. Surrounding park even not
maintained. RWA is also involved in
encroachment. One side vegetables are
grown and some huts are there in the park
area. Full staff.
The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.
Court Commissioner directed DDA to
report about a catchment of water and
outsourcing, why no water was found
there. Surrounding park even not
maintained. RWA is also involved in
encroachment. One side vegetables are
grown and some huts are there in the park
area. Full staff.




The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.
The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.
Court Commissioner desired the records
of allotment as well as exact location of
above water bodies at site and on map
and allotment letter.
The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.




The authorities should comply with the
directions issued at site and send the
action taken report at the earliest so that
further course of action can be decided.
DISTRICT - WEST
S. No   Name of         Land owner   Khasra         Years &
        Village’s       ships        No/Areas       Dates of
        No. of Water                                Inspection
        Bodies/Pond's

1       Bakarwala       BDO          (a) 91/2(19-   27.03.2010
                                     02)




                                     (b) 83(09-02) 27.03.2010

                                     (c)82(04-04) 27.03.2010




                                     (d)            27.03.2010
                                     10/10/2(01-
                                     10)
                    (e)92/2(06-   27.03.2010
                    03)




                    (f) 33/25(4- (I&FC list S.
                    16)            No 462)
2   Baprola   BDO   (a) 6//17/2(0-
                    8)6//18/2(0-
                    8)6//24/2(0-
                    16)6//24/3(0-
                    8) total area
                    (2-0)

                    (b)22//5(4-
                    16)32/1(4-
                    0)total
                    area(8-16)
                    (c)23//17(4- 15.10.2011
                    16)23//24(4-
                    16)23//24(4-
                    16)23//24(4-
                    16)23//25(4-
                    14)29//4(3-8)
                    total area
                    (17-14)
                    (d)31//19/2
                    (e)55//11/2(1-
                    0)
3   Basai Darapur     DDA       (a)1530(44-   07.05.2011
                                17)




4   Budhela           DDA       (a)219(1-0)
5   Garhi peeran F/89 DDA       (a) Paschim
    @ Peeragarhi                Vihar, 14700
                                sq. mtrs. (b)
                                487
6   Hastsai(partly)   DDA/BDO   (a)48/14(3- 07.06.2010
    F/74                        16)17/1(1-
                                16) total =(5-
                                12)
6   Hastsai(partly)   DDA/BDO
    F/74



                                (b)55/13(4- 07.06.2010
                                14)14(2-
                                9)16(4-
                                10)17(6-
                                2)18(5-4)
                                total=(22-19)




7   Harsh Vihar       DDA       (a) 9996 sq.   05.06.2009
    (village                    mtrs. 2.47
    Saleempur majra             acres K
    madipur F/74)               No.206


8   Hiran Kunda       BDO       (a)534,535     10.06.2009
                                (12-13)

                                (b)56/2(10-7) 10.06.2009




                                (c)184/1 (02- 27.03.2010
                                00)
                                (d)134(11-    27.03.2010
                                16)
                           (e)82/2(03- 27.03.2010
                           06)
                           (f)415(1610) 27.03.2010



                           (g)564(16-     27.03.2010
                           05)




9    Kamruddin Nagar BDO   38/1/2min      27.03.2010
                           (10 bigha)




                                          07.05.2011




10   Keshopur F/74   DDA   (a)204(4-1)

                           (b)302(5-18)
11   Khyala F/74   DDA   (a)11/5/3 (2-
                         16)
                         (b)20/23(5-
                         16)
                         (c)24/1(2-0)

                         (d)48/27/2(3-
                         1)
12   Khyala        BDO   20/23 (5-16)
                         & 24/1 (2-0),
                         (7-16)
                         48/27/1 (3-1) 15.10.2011




                         11/5/3(2-16) 15.10.2011




13   Keshopur      BDO   35(5-18)        15.10.2011




                         6//17/2 (0-8), 15.10.2011
                         24/1(0-16),
                         24/3(0-8), (2-
                         0)
                           22//5 (4-16), 15.10.2011
                           32//1 (4-4),




                           31//19/2 (1-0) 15.10.2011




14   Madi pur F/74   DDA   1298(23-2)    27.11.2010




15   Mundka          BDO   (a)178/1(1-   09.06.2008
                           19)
(b)373/1(15- 09.06.2008
18)




373/1(15-18) 07.05.2011



(c)190/1 (16- 27.03.2010
5)




190/1 (16-5) 07.05.2011
(d)142(3-1)   27.03.2010




(e)17/27(11-8)27.03.2010




              27.03.2010
(f)370min(4-16)


(g)370min(6- 27.03.2010
0)


              27.03.2010
(h)373/1(15-18)




(i)178/1(1-19) 27.03.2010
                            (h)163(4-16) 27.03.2010




16   Nangloi Sayyed   BDO   1/291 (10-14) 15.10.2011




17   Nangloi jat      BDO   (a)126 (old   27.03.2010
                            61/14/3)

                            (b)34/17/1(1- 27.03.2010
                            10)
                                  (c)61/4/3(1-5) 09.06.2008




18   Nawada majra       BDO       (a)178(6-19) 07.06.2010
     hastsal


                                  (b)330(4-6)    07.06.2010



                                  (c)665(8-5)    07.06.2010




19   Neelwal            BDO       (a)55(14-17) 27.03.2010



                                  (b)86(08-11) 27.03.2010




20   Nilothi            BDO       39//9/2(5-8)
21   Nagli jalib F/66   MCD/DDA   (a)1 etc/70
                                  (3-9)
22   Nahar pur      BDO   184 (0-13)   02.04.2011




23   Prasad Nagar   DDA   (a) K No.    05.06.2009
                          578(2800
                          sq. mtrs.)


24   Peera Garhi    BDO   14700        02.04.2011
                          Sq.mtrs.




                          487          07.05.2011
25   Ranhola @         BDO   (a)59(13-12) 09.06.2008
     safipur ranhola




                             (b)67(11      09.06.2008
                             bighas)




                             (c)76(3-13)   09.06.2008
                             (3077
                             sq.mtrs.)
27   Swaran Jayanti    BDO   7000 sq. and 02.04.2011
     Park                    District Park
                             Rohini,
                             10000 sq.
                             mtrs.




28   Tihar             BDO   1533(92-18) 02.04.2011




                             1838(16-10) 02.04.2011




                             1824(4-18)   02.04.2011




29   Tiang pur kotla   BDO   19(9-1)      15.10.2011
30   Tikari Kalan   BDO   (a)478min    27.03.2010
                          (5-6)




                          (b)480min(10 27.03.2010
                          -7)




                          (c)225min(0- 27.03.2010
                          1),226(2-
                          0)total
                          area(2-1)



                          (d)481(04-   27.03.2010
                          01)




                          485(9-3) &   27.03.2010
                          370/1(0-3)




                          485(9-3) &   07.05.2011
                          370/1(0-3)
(f)484min(06- 27.03.2010
14-1/2)
1213(0-3)




(g)482min(19 27.03.2010
-7-1/2)




(h)487/3min( 27.03.2010
10-12)



(i)486(04-16) 27.03.2010




(j)488(2-14)   27.03.2010




(k)563(0-1)    27.03.2010
(l)772(0-1)    27.03.2010
(m)927(0-1)    27.03.2010
31   Tatar pur F/66   DDA   30/1(17-11)   07.06.2010




32   Vishnu Garden    DDA   (a) K No.
                            5/3(2-16).
Site position/Directions/opinions




Boundary wall exist Mandir exist on side the water body
area approximately (0-1) in one biswa. Only passage is
required for entering the Mandir. Newly construction
should be removed immediately. Damaged wall needs
repairing so that no further encroachment is made.




Only boundary wall is required around the water body.

Mandir exist at site. Fresh construction was going on at
side. BDO/SDM were directed to stop it immediately and
get the encroachment removed and the water body be
protected from further encroachment.




Water body developed. Maintenance is reaquired.
As per report of I&FC , the water body is land locked. As
per the inspection, drain exist which is 1 ghata wide that
goes upto the water body. However, as per the revenue
recored, the same is a Rasta to the said water body. The
BDO and SDM are directed to get the said drain closed
and develop the Rasta. Thereafter, the water body be
handed over to the developing agency for development.




Natural water body surrounded by boundary wall having
clean water exists. An area of 2 acre has been left out of
the boundary wall and road, Mandir and DJB office exists.
Authorities were directed to get the demarcation by
revenue authorities by 31.10.2011 and submit the report
to the Court Committee. However,no kreport has been
submitted before the Court Committee till date.
The DDA officials took the committee to a place where
the land was lying vacant.The residents living nearby
informed the committee that the landf in question was
once in form of water body. Other DDA officials also
reached at the site and stated to the committee that the
land in question bearing khasra No. 732, 733 & 734 are
not recorded as water body and there is another land
which bears khasra No. 1530 having area of 44-17 which
is recorded as Water Body. The committee went to the
said site and shown the are where there exist Metro
Station, Govt Boys SSS over some portion; and same
portion was encroached, DDA was directed to carry out
demarcation after co-ordinate with the BDO and Revenue
staffs were not present despite prior communication to
them.
As per affidavit filed by DDA before Hon'ble High Court,
water body existed in Sudarshan Park and over the
location shown in Sudarshan park there existed a water
body as per facts committee is of the opinion that ther
are/were two water bodies one in Sudarshan park and
other in Basaid Dara Pur in Khasra No's 732, 733 & 734




Harijan Basti heavily built up. BDO and SDM to carry out
demarcation and clear the water body of the
encroachment so that the same could be developed.
Natural water body. Malba is being dumped into water
body BDO and SDM have been directed to get the
demarcation done in a proper manner so that the site is
cleared so that the encroachment could be removed. The
water body and has a vast area and in order to project the
water body and encroachment is removed help of TSM
may be taken if required. The committee hopes needful is
done at the earliest. The water body be handed over to
I&FC for development. MCD and Delhi Jal Board has
been directed to stop the sewerage immediately.




This water body is fairly well developed and is also
surrounded by a park. However, drain which flows
through the park carries sewage water and in times of
overflow contaminates the water body. MCD be directed
to take necessary steps to prevent contamination.

Work in water body in progress by DSIDC. No pathway
required on one side. Effort should be made to tap rain
water from road side. Natural land scaping be done.
Water body is developed by I&FC. However there are no
catchments. I&FC is required to develop the catchments
area. Water harvesting from road not done properly as
inlet pipes are blocked . Stadium looks given. Natural land
escaping ignored. Departments should avoid
unnecessary construction.




Required deepening. Wall that is demaged needs repair
in order to avoid encraochment.
Sullage is flowing into the water body. MCD and Delhi Jal
Board officials were absent despite prior intimation. MCD
and Delhi Jal Board are directed to immediately stop the
sullage and divert it to drain.
Requires deepening.

Water Body developed. To be maintained only.



Work is progress. However, sullage is flowing into the
water body. MCD and Delhi Jal Board officials were
absent despite prior intimation. MCD and Delhi Jal Board
are directed to immediately stop the sullage and divert it
to drain.




Sullage was flowing into the water body. MCD and Delhi
Jal Board officials were absent despite prior intimation.
MCD and Delhi Jal Board be directed to immediately stop
the sullage and divert it to drain. Further demarcation was
fixed for 5.4.2010.




Encroachment is going over at the site. BDO and
Tehsildar Nangloi were directedto get the encroachment
removed within 2 days and report back to the committee.
MCD and DJB were also directed to divert the sewer from
the water body. I&FC were directed to develop the water
body in terms of the demarcation given by the revenue
authorities. BDO & Tehsildar confirmed that the
encroachment would be removed by 10.05.2011. BDO
place Photographs alongwith report before the Court
Committee.
Not identified by the authorities. The revenue authorities
were directed to get the water body identified and submit
report to the Committee latest by 30th October 2011.
However, no report has been submitted before the Court
Committee till date.
DDA park exists at spot.Area around 1 acre situated in
Vishnu garden is in form of dumping yard. The authorities
were directed to get the area cleaned and maintain the
same as green area and submit the report to the court
committee latest by 30 th october 2011. However, no
report has been submitted before the Court Committee till
date.

Lal market exists on spot. It was informed that the same
was allotted by DDA. DDA also informed that said khasra
no was acquired by award and was developed in form of
market. It was directed that alternate site be provided for
water body and submit the report to the Court Committee
latest by 30 th October 2011. However, no report has
been submitted before the Court Committee till date.
Natural water body having water exists between the
private fields. Demarcatin fixed on 2.11.2011 at 9.30 AM
for indicating the exact area of water body and submit
report to Court Committee. However, no report has been
submitted before the Court committee till date
Water body developed by DSIIDC. Encoachment appears
to have been made. Hence it was directed to get the
demarcation. Authorities were directed to get the
demarcation by revenue authorities by 2.11.2011 at 9.00
A.M and submit the report to the Court Committee.
However, no demarcation report has been submitted
before the court Committee till date.



Water exists in water body and some area belonging to
Government near water body also exists. Hence
demarcation of the entire area was directed to be carried
out on 15.11.2011 and report be submitted to the
Committee. However, no demarcation report has been
submitted before the Court Committee till date.
Developed water body. DDA was directed to maintain the
same by keeping the water body clean.




Today it is a shameful sight. Situated in area strewn with
cimy waste, it is filled with local sullage. The area of the
water body needs to be demcarcated and the water body
be restored.
There is water in the depression but due to inefficient
sewage into all the local sewage also finds its way into the
pond. This problem should be immediately resolved as
the water body is otherwise well located with plenty of
scope for directing rainwater from outside into it.




since there was dispute with regards to the area/extent of
water body. Re-demarcation is fixed for 24.5.2011 with
concerned authorities and submit a report to the
committee within two weeks of demarcation.
Sullage is flowing into the water body. MCD and Delhi Jal
Board officials were absent despite prior intimation. MCD
and Delhi Jal Board are directed to immediately stop the
sullage and divert it to drain. Encroachment also exists
after demarcation, encraochment be got removed and
handed over to developing agency. Demarcation has
been fixed for 07.04.2010

since there was dispute with regards to the area/extent of
water body. Re-demarcation is fixed for 24.5.2011 with
concerned authorities and submit a report to the
committee within two weeks of demarcation.
Natural water body. Water exists on spot. The committee
was informed the same dispute is pending and matter has
been remanded to the Consolidation Officer. The BDO as
well as Consolidation officer were directed to get the case
decided at the earliest and hand over the water body to
developing agency.
Natural water body exists at site. Award was passed by
LAC in Rohini scheme and has been handed over to DDA
and DDA has further handed over to DSIIDC. No one has
present from DDA and DSIIDC despite prior intimation.
DDA, DSIIDC and other developing agency be directed
not to destroy the said water body as the same would
serve in maintaining the ecological balanced in the area.

Park exists at site water harvesting is the best option as
the area is low lying area. The said park is maintained by
MCD.
Boundary wall is required for purpose of water harvesting.
Sullage is required to be diverted from water body. MCD
as well as Delhi Jal Board be directed to do the needful at
the earliest.
Encroachment exists. The same shall be get removed
after demarcation and water body be handed over to
developing agency. Sullage be diverted from water body.
Bdo was directed to submit the matter before religious
committee for removal of Mandir demarcation is fixed for
09.04.2010
Boundary wall is required to be constructed. The site is
stated to be have been tendered for developing maternity
centre by MCD without approval of Gaon Sabha, which is
illegal. BDO was directed to spot out the issue and place
the matter before the competent authority to preserve the
water body.
Well developed and being maintained by the villagers.
BDO was directed to protect the water body from
encroachment and plantation work be carried out by the
Horticulture water body has sufficient catchment area so
that the water does not go waste and is canalized into the
water body.                                         Where
the concerned authorities are of the opinion that a water
body cannot ben information to that effect the first brought
to notice of teh committee so that viability as to whether a
water body can be constructed/revived upon the area or
not be decided.
   However, the ame does not mean that the area
earmarked for the water body should be/can be used for
any other purpose. What has to be seen is as to what
best use can be made of that area for making it Green;
rechanging of the underground water, harvesting the
water so that underground water, harvesting the water so
that the level of underground water increases etc.
            The STP's which were required to be
constructed in the village of Delhi for treatment of the
Seventy five percent area is covered by boundary wall
and kikar plants are there. DDA informed that Court case
is pending. On 25 % of land road and flats exists. DDA
was directed to provide the status report and submit the
report to the Court Committee latest by 30 th October
2011. However, no report has been submitted before the
Court Committee till date.
Water body developed. Handed over to BDO by I&FC.
BDO staff not present. Water Body be preserved and
protect in order to avoid encroachment.
The site is known as Nirmal Park in Nangloi Extension,
Najafgarh Zone and maintained by MCD. The area is low
lying and could be used for water harvesting by diverting
rain water through pipes catchment area could be
increased for the said purpose.
Work is in progress. The area is free from encroachment
with sufficient surrounding area which should be used as
catchment area. Previous photographs show it as a dump
yard. Protective wall should be provided to prevent nearby
colony water from entering into the water body.




Encroachment exists. BDO&SDM were directed to get the
area demarcated and thereafter to take steps and get the
encroachment removed for development of water body by
DDA.
Heavy built up. Is stated to be allotted to Ramanand in
1984 under 20 point programme. He was also directed to
get the land retracted from the person who has been
allotted of the water body.
One of the villager has been declared bhumidhar of area
around 3-5. Rest of land is vacant out of which, 1100 sq.
yds. Has been handed over to DDA. The rest of land be
demarcated for handing over to DDA for development of
water body. He was also directed to get the land retracted
from the person who has been allotted of the water body.

Water body is developed. Only maintenance is required.



Sullage is flowing into the water body. MCD and Delhi Jal
Board officials were absent despite prior intimation. MCD
and Delhi Jal Board be directed to immediately stop the
sullage and divert it to rain.
DDA informed that the land was handed over to it in 1974.
DDA has failed to take care of its land and allowed
construction of Mandir and House at site. DDA also
informed that the Mandir has been left over at the
instance of the order of the Lt Governer. DDA was
directed to provide alternate site for development of water
body.




This is a developed water body and only requires proper
maintains from time to time.



DDA led the committtee to a park in the name of Paschim
Vihar district Park. The park has been developed in such
a form that is in form of a water body. DDA was directed
to provide catchment area from the road for inflow of
water in the park as the same is below the road.


Boundary wall exists around 1 Acre of area. The said
portion is deep and is in the form of a water body. In a
small portion next to the gate a Citizen Welfare society
temporary room is built. DDA was directed to submit a
report as to how the said are is to be developed/ultilized.
There is very little depression remaining at site which
contains water in the middle. The area is used as
community park. The residents oppose development
work. However, since it is a water body the authority
under whose jurisdiction it is obligated to develop it. For
this purpose desilting is required and the water body be
preserved as such. There is adequate area which can be
left open on far side for local use. It should be ensured
that the size of the water body is not compromised. Rain
water from adjoining road should pass into this water
body which is not happening now as a shallow drain is
running along side the water body. Sewage facility is not
available in the area and therefore, it should be ensured
that the local sewage does not pass into the water body.
Tender work should be initiated at the earliest.


The water body is encroached. Further public urinal and
pandal has also been constructed within the water body
area. It is strongly recommended that these and other
encroachments should be removed and the water body
be fenced. Access to rain water from the road and
through the wall so that rain water from the open space
outside the public urinal and pandal can enter the water
body.

Although the actual area appears to be much more. A
Barat Ghar and a community centre has been set up.
Since the same cannot be removed now, roof top rain
water harvesting should be introduced as there is plenty
of open area.
Four artificial lake exist inside the park which have been
developed by DDA. The same are filled up by tubewells.
Road exists around the park. DDA was directed to
develop the catchment area around the park so that water
inflow take place and harvesting system be developed. At
the south side of park, construction of shopping Mall DC-I
was going on. It was also found that for construction of
Basement the underground water was being pumped out
and drained our on the road resulting in wastage of water.
DDA was directed to preserve the water being pumped
out of basement and divert it into the water body. DDA is
directed to report back to committee within two weeks.




Park has been developed around the water body, the
area is below the road level. DDA was directed the
recharge pits for rain water so as to allow water flow
inside the park from the road and also develop water
harvesting system.


The water body has been converted into a dumping yard.
DDA was directed to stop dumping of malba into the
water body and plants trees are beneficial to the public at
large. It was also directed to provide the catchment area
from road side and develop the water body. Horticulture
department of DDA assured that area would be submit
report to this effect.

Park exists at site. No one was present from office of
BDO (W) and SDM concerned. DDA stated that the park
was developed by MCD, however it failed to identify the
correct khasra no. DDA was directed to co-ordinate with
MCD, SDM Staff and BDO and identify the khasra no and
report back to the committee within two weeks.

Well developed water body, Plantation exists on spot only
maintenance is required.
Well developed neighboring land is stated to have been
vested in Gaon Sabha under Section 81 of DLR Act. BDO
was directed to take possession of the said land and be
made part of water body so that the same could be
utilized for benefit of the villagers.

Shani Mandir exists at site. Construction was going on.
BDO was directed to stop the same immediately and the
water body be protected from further encroachment.


Encroachment exists. The same shall be get removed
after demarcation and water body be handed over to
developing agency for development. Demarcation fixed
for 12.04.2010.



Water body developed. Water body be preserved and
protected in order to avoid encroachment. Sullage is
flowing into the water body. MCD and Delhi Jal Board
officials were absent despite prior intimation. MCD and
Delhi Jal Board be directed to immediately stop the
sullage and divert it to drain.


Encroachment exists towards North West side, i.e.
opposite SC Chaupal. The same shall be got removed
after demarcation and water body be handed over to
developing agency for development. Sullage is flowing
into water body. MCD and Delhi Jal Board officials were
absent despite intimation. MCD and Delhi Jal board be
directed immediately stop the sullage and divert it to
drain. Demarcation is fixed for 20.04.2010

Since there was dispute with regard to the area/extent of
water body. Re-demarcation is fixed for 12.5.2011 with
concerned authorities and submit a report to the
committee within two weeks of demarcation.
Sullage is flowing into the water body. MCD and Delhi Jal
Board officials were absent water body. MCD and Delhi
Jal Board officials were absent despite prior intimation.
MCD and Delhi Jal Board be directed to immediately stop
the sullage and divert it to drain.


Sullage is flowing into the water body. MCD and Delhi Jal
Board officials were absent despite prior intimation. MCD
and Delhi Jal Board be directed to immediately stop the
sullage and divert it to drain. Boundary wall is damaged.
The same be gor repaired in order to avoid
encroachment. BDO be directed to get the wall
constructed/repaired through the developing agency.

Water body is developed. Catchment area and Greenery
be increased near the boundary wall.



Water body developed. No work is required. Only
catchment area needs to be increased. Water body be
preserved and protected in order to avoid encroachment.
Well exists in the centre of water body. Holes are required
to be made in the boundary wall of the well which would
increase the provide and increase the catchment area.




Water body is developed and has clean water. Only
catchment area and greenery is to be increased. Only
maintenance is required by the BDO/concerned
authorities.
Vide award No. 47/71-72, area of 17-4 of water body was
handed over to DDA in 1972. DDA being land owing
agency allowed construction of School and Mandir. DDA
failed to give any satisfactory reply. DDA was directed to
provide the details as how the structures came up over
the land meant for water body and was in existence at the
time of handing over to it. Rest of the area has been
encroached upon. The DDA has been directed to get the
encroachment removed after carrying out the
demarcation of the water body. The report is to be
submitted within a period of two weeks so that further
directions could be issued.
           The authorities should comply with the
directions issued at site and send the action taken report
at the earliest so that further course of action can be
decided.
Committee’s Observations
It has been observed that despite information through writings sent through writings sent
through Nodal Officers and information/directions given during discussion/meeting held with
the representative of the authorities. The status report since 2005 has out come forth. It is
relevant to mention the said status report was called in order to check as to what steps have
been taken by the authorities concerned for either revival of water bodies and/or
It may be added that non-submission of the status report by the authorities concern results
into presumption that none of the directions/observations/commitments made by the
authorities have been carried out and the water bodies as being allowed and permitted to be
encroached upon and go out of the hands of the authorities concerned. the committed
further observes that the sullage/sewerage is being allowed to go into the water bodies
thereby defeating the very purpose of the water bodies.
It was found that access of water into the water bodies from the surrounding area is
inadequate. It is necessary that the peripheral area should be cleaned and encroachment,
construction should be removed. Reference is drawn to action plan 2007-08 which emphasis
development of 228 water bodies and thereafter, handing them over to Government or
Forest Department for tree plantation and facilitation of water harvesting in according with the
action plan report.
Efforts should be made to have more catchment areas so that water overflowing or otherwise
going in drains/sewage can be collected and diverted to the water bodies.
                                                       The canal/channels should be
constructed and the same should be at the ground level where ever feeble. PVC pipes
should also be introduced to feed the water into water bodies.
                                  In the course of inspection, DSIDC and IFC Department have
assured and committed that the water bodies being visited, would be developed before
Monsoon within span of two or three months and progress report would be submitted to the
committee. So far none of the agencies has reported to the committee.
                            The committee would like to visit the sites. Since large number of
water bodies have been encroached, lish of such water bodies be provided by concerned
BDO. DDA and other authorities some of which are also under litigation and have not been
visited so far.                                                  Committee found several cases
where natural water body exists in a depression. The revenue records do not show them to
be water bodies. These places falls under Gram Sabha land of Government land. There is
no reason why such places cannot be preseved as a water body especially since large
number of water bodies have been destroyed and converted. The authorities should
therefore include these stretches of water in list of water bodies.                The concerned
officer of the district in whose area of the water bodies exists should visit the office of Shri VK
Tandon, Government Counsel, 404 Lawyers Chamber, Delhi High Court New Delhi, as it is
intended that further inspection of the water bodies is to be conducted.
It was found that access of water into the water bodies from the surrounding area is
inadequate. It is necessary that the peripheral area should be cleaned and encroachment,
construction should be removed. Reference is drawn to action plan 2007-08 which emphasis
development of 228 water bodies and thereafter, handing them over to Government of
Forest Department for tree plantation and facilitation of water harvesting in according with the
actin plan report.                                            Efforts should be made to have
more catchment areas so that water overflowing or otherwise going in drains/sewage can be
collected and diverted to the water bodies.                                               The
canal/channels should be constructed and the same should be at the ground level where
ever feeble. PVC pipes should also be introduced to feed the water into water bodies.
It was found that access of water into the water bodies from the surrounding area is
inadequate. It is necessary that the peripheral area should be cleaned and encroachment,
construction should be removed. Reference is drawn to action plan 2007-08 which emphasis
development of 228 water bodies and thereafter, handing them over to Government or
Forest Department for tree plantation and facilitation of water harvesting in according with the
action plan report.




In the course of inspection, DSIDC and IFC Department have assured and committed that
the water bodies being visited, would be developed before Monsoon within span of two or
three months and progress report would be submitted to the committee. So far none of the
agencies has reported to the committee.




The committee would like to visit the sites, since large number of water bodies have been
encroached, list of such water bodies be provided by concerned BDO. DDA and other
authorities some of which are also under litigation and have not been visited so far.
                                      Committee found several cases where natural water
body exists in a depression. The revenue records do not show them to be water bodies.
These places falls under Gram Sabha land or Government land. There is no reason why
such places cannot be preserved as a water body especially since large number of water
bodies have been destroyed and converted. The authorities should therefore include these
stretches of water in list of water bodies.    The concerned officer of the district in whose
area of the water bodies exists should visit the office of Shri VK Tandon, Government
Counsel, 404 Lawyers Chamber, Delhi High Court, New Delhi as it is intended that further
inspection of the water bodies is to be conducted.
It has been observed that despite information through writings sent through writings sent
through Nodal Officers and information/directions given during discussion/meeting held with
the representative of the authorities. The status report since 2005 has not come forth. It is
relevant to mention the said status report was called in order to check as to what steps have
been taken by the authorities concerned for either revival of water bodies and/or
maintenance/progress/removal of encroachment/demarcations etc. of various water bodies.
                        It may be added that non-submission of the status report by the
authorities concern results into presumption that none of the
directions/observations/commitments made by the water bodies are being allowed and
permitted to be encroached upon and go out of the hands of the authorities concerned.
                      The committee further observes that the sullage/sewerage is being
allowed to go into the water bodies therby defeating the very purpose of the water bodies.
               In some areas no catchment of water is provided meaning thereby that the
water bodies constructed are only for name sake and are not to be used/allowed to be used
for the purpose they have been constructed/renovated.                                 The
committee has also found that some of the water bodies have been got converted into parks
Reply/response by the
concern Authorities
Complaint received by DDA.
AS per report SDM PBdt.
28/3/2011.
DISTRICT SOUTH WEST
S. No   Name of Village’s   Land     Khasra            Years & Dates of
        No. of Water        owner    No/Areas          Inspection
        Bodies/Pond's       ships
1       Ambarhai F/02       DDA      (a) 57 (7-0)      03.09.2011




                                     (b) 38/10(4-16)




2       Asalatpur           BDO/MCD (a)15//7&24 (11- 04.04.2009
                                    13)

                                     (b) 9//6/2&15/2
3       Badu Sarai          BDO      (a)44(13-10)      23.07.2005




                                                       06.06.2008
                                                       04.04.2009




                                     (b) 49 (04-16)    23.07.2005
                          (b) 49 (04-16)


                                              04.04.2009



                          (c) 51(5-5)         04.04.2009


                          (d) 52(9-7)
4   Bakkar garh     BDO   (a)76(9-14)X
5   Bijwasan F/02   DDA   (a)168(20-18)       06.06.2008




6   Bharthal        BDO   184(15-18)          03.09.2011




                          52/10/3 min.(2-8)




                          147&148 (7-18)




7   Bagdola         BDO   31(9-13)            03.09.2011
                      40/1(13-9)




                      1 etc/157(12-4)




8    Bharthal   BDO   147, 148, 184      26.12.2011

9    Bamnoli    BDO   547(4-15) and      26.03.2011
                      new khasra No.
                      232(4-15)


                      565 min(4-6) and
                      new Khasra No.
                      28/5(4-6)




10   Chhawla    BDO   215(12-8)          06.06.2008


                      196/1 (19-15)      26.12.2011


                      192 (5-15)


                      27/7 (9-18)

                      96 (12-6)


                      199 (14-17) &
                      200(4-3)
                            215(12-8)            26.03.2011




11   Daryapur khurd   BDO   6//26(2-9)X
12   Daulatpur        BDO   29/7(08-14)          23.07.2005


13   Daurala          BDO   (a) 46(08-10)        04.04.2009


                            (b) 43(04-02)



                            (c) 44(03-09)


                            (d) 45(07-05)

14   Dhansa           BDO   (a) 137(11-14)       23.07.2005




                            (b) 138(3-4)
                            (c) 152(9-12)
                            (d) 153(13-0)
15   Dichaun kalan    BDO   (a) 81//14/1 (7-9)

                            (b) 82//4/2(5-14)
                            (c) 97//15/2(4-5)
                            (d) 158//24/1(22-
                            7)
                            (e) 96/202/1
16   Dindarpur     BDO   338(5-6)          26.12.2011



17   Dindar pur    BDO   1087/234 (20-0)   26.12.2011



18   Dasgraha      BDO   257               26.03.2011

19   Dabri         BDO   38(55-3)          26.03.2011




20   Dhool Siras   BDO   85(7-13)          26.03.2011




                         72/2(8-9)
                             245(0-14)




                             227/3(7-9)




21   Galib pur         BDO   46(12-11)
22   Ghitorni          BDO   437(17-9)
23   Goela khurd       BDO   9//29(10-9)      26.12.2011




24   Gumanhera         BDO   104(10-12)       23.07.2005
25   Hasan pur         BDO   74(09-07)        04.04.2009


26   Haibat pur        BDO   44/26 (8-14).    26.12.2011


27   Issa pur          BDO                    23.07.2005


28   Jafar pur kalan   BDO   (a)896(7-16)
29   Jain pur @Jaun    BDO   (a)5//15(2-19)
30   Jharoda kalan   BDO   (a)75/17 (09-     23.07.2005
                           04)
                           (b) 162(17-09)




                           (c) 19/9(43-6)
                           (d) 84//4/2(1-14)
                           (e) 165(2-8)
                           (f) 91//22(11-9)
                           (g) 166(28-6)
                           (h) 60//5(4-18)
                           (i) 59//10(4-16)
                           (j) 59//1(4-16)
                           (k) 60//6(4-16)
                           (l) 85/9min(1-16)
31   Jhatikra        BDO   (a)84(abadi deh) 04.04.2009




                           (b)96(06-05)      04.04.2009




                           (c) 101(6-18)     04.04.2009


32   Jhul jhuli      BDO   (a)10/9/2   (1-
                           16)
33   Kair                BDO   (a)19/24 (12-
                               17)
34   Kangan heri         BDO   (a)32/7(4-16),     06.06.2008
                               14(4-12)total
                               area(9-8)

                                                  04.04.2009

                               (b) 111(13-10)     04.04.2009




                               (c) 78(08-05)      04.04.2009




                               (d) 83(04-04)      04.04.2009

                               (e) 25/1 25/3      04.04.2009
35   Kusumpuri           BDO   (a)271(3-7), 334   Naib-Tehsildar
36   Khaira              BDO   (a)79(2-13)
37   Khar khari jatmal   BDO   75/1(5-5)          06.06.2008




38   Khar khari nahar    BDO   (a)23/27   (02-    04.04.2009
                               05)
39   Khar khari rond   BDO   (a)50(20-18)X




40   Kajipur           BDO   (a)31(9-2)




41   Khera dabar       BDO   (a)178          04.04.2009

42   Kutuba pur        BDO   (a)27(22-5)




43   Kakrola F/02      BDO   (a) 184min(0-15) 23.12.2009
43   Kakrola F/02   BDO


                          (b) 194(15-4)    23.12.2009




                          (c) 14/20/2min(1- 23.12.2009
                          8)




                          (d) 175(17-10)   23.12.2009




                                           07.06.2009
44   Kapeshera        BDO   664/1 min (7-3)   03.09.2011




                            664/5min (0-4)&   03.09.2011
                            664/8(0-15)




45   Luharheri F/02   DDA   4//26(3-11)
46   Matiala F/02    DDA   (a) 8/7(4-16)       07.06.2010




                           (b) 22/29(9-17)




47                         (c) 22/26(06-12)    04.04.2009




48   Malikpur Kohi   BDO   (a) 11//23(4-16)
                           11//24(5-0) Total
                           area (9-16)
(b) 42//9/2(4-13)




(c) 71(5-1)




(d) 58(19-1)




(e) 81(0-12)
49   Malikpur zar   BDO   (a) 11//24/2(0-3)
     NazafGarh




                          (b) 42//9/1(0-3)




                          (c) 59//14(0-5)




50   Masoodpur      DDA   205(40-6)           26.03.2010




                                              26.03.2011




                                              03.09.2011
51   Mitrauon            BDO       (a) 188min(8-15)




52   Mundela kalan       BDO     (a)78(7-16)
53   Mohd. Pur Munrika   MCD/DDA (a) 823/1,2(8-7)     04.12.2010
     F/66




                                   (b) 705/2(14-11)   04.12.2010




                                   (c) 201/2(7-12)    04.12.2010




54   Munirka F/66        BDO       (a) 19/41(20-3)
54   Munirka F/66      BDO




                             (b) 44/3/1(24-13)




55   Mundela khrud     BDO   (a)1/41min (20-0)




56   Mahipalpur F/89   BDO   (a) 451(1-2) &      04.12.2010
                             524(27-3)



                                                 03.09.2011



                             (b) 1030(1-6)       04.12.2010




                             (c) 1085(4-         04.12.2010
                             16)&1074(4-16)

                             (d)             04.12.2010
                             1124/1127,1283,
                             1282,1273,1274
                             &1287
                                             03.09.2011



57   Masudabad F/74    DDA   (a) 165(17-9)
58   Mayapuri           BDO                        26.03.2011


59   Nanak heri         BDO      26/27(3-13)




60   Nangal dewat       BDO      (a)1196    (23-
                                 14)




61   Nangli sakrawati   BDO     (a)51(3-10)
62   Nangal Raya F/66   MCD/DDA (a) 372(7-10)




63   Najaf Garh         BDO      12/11/1 (6-5),    26.12.2011
                                 12/12 (8-12),
                                 12/19 (7-5).
63   Najaf Garh


                  23/5/1 (6-9)   26.12.2011




                  23/23 (1-16)   26.12.2011
64   Naraina    MCD/DDA (a)           23.12.2009




                        1699(11-8)    26.03.2011




65   Nasirpur   DDA     612 (13-19)   23.12.2009
               07.06.2010




               26.03.2011




(b) 111(0-4)




(c) 302(0-1)
                             (d) 724/379(0-18)




66   Nawada            DDA   (a) 178(6-19)       07.06.2010




                             (b) 330(4-6)



                             (c) 665(8-5)




67   Posangipur F/66   DDA   (a)358(2-2)




68   Paprawat          BDO   (a)142(0-5)
69   Pindwala kalan    BDO   (a)57(19-4)
70   Pindwala khurd    BDO   (a)31//4(4-15)
71   Palam   DDA   (a) 123(20-15)   23.12.2009




                   (b) 153(13-10)   23.12.2009



                   (c) 122(21-12)   23.12.2009




                   (d) 155(28-05)   23.12.2009



                   (e) 122(21-12)   07.06.2010
(f) 123(20-15)   07.06.2010




(g) 156 min (2-2) 26.03.2011



(h) 162(15-18)   26.03.2011
72   Pochan Pur   DDA   (a) 36(6-16)       04.12.2010




                        (b) 35(11-14)      04.12.2010



                        (c) 26/26(11-17)   04.12.2010



                        (d) 32(62-12)      04.12.2010




                                           26.12.2011




                        (e) 34(7-6)        04.12.2010
                                           26.12.2011




73   Qutba pur   BDO   27 (22-8)           26.12.2011



74   Qazi pur    BDO   (a)31(9-2)X




75   Radhopur    BDO   (a)17/12     (13-   23.12.2009
                       14)




76   Rajokari    BDO   (a)41(2-0)          06.06.2008



                       (b)695(05-13)       06.06.2008
(c)251(04-11)    06.06.2008




(d)1150(13-11)   06.06.2008




(e)1234/11(11-4) 06.06.2008




(f)695(5-13)




(g)1689(32-16)
(h)1164(19-4)
                       (i)848(1-1)




                       (j)1698(4-7)
                       (k)1817(1-18)




                       (l)446(40-18)
77   Rang puri   BDO   (a)105(6-9)      06.06.2008


78   Rawta       BDO   (a)37/26(6-15)
79   Rewla khan pur   BDO   (a)77(12-08)      23.07.2005




                            (b)76(07-15)      23.07.2005


                            (c)74(15-3)       23.07.2005




                            (d)80(4-16)




                            (e)81(3-3)

                            (f)98(5-8)



                            (g)23//27
                            (h)46/29(11-12)
                            (i)61/10(1-12)
80   Roshanpura        BDO   506min(3-0)      26.12.2011

81   Salahpur          BDO   (a)16//15(5-4)
82   Samalkha          BDO   (a)54 (7-18)     06.06.2008


83   Samaspur khalsa   BDO   (a)17/28(5-5)
84   Saragpur          BDO   (a)71(8-16)X




85   Shikar pur        BDO   (a)96(17-18)     23.07.2005
                        (b)98(10-6)




86   Surakh pur   BDO   (a)204(4-6)
                        (b)64(7-4)
87   Surhera      BDO   (a)15//1/2 (51-
                        14)X
88   Shahbad mohd.   DDA/MCD (a)1/42(12-12)




                              (b)1/72(28-17)




                              (c)1/1532(31-6)
89   Sahupura F/02   DDA      (a)92(9-1)        26.03.2010




90   Taj pur khurd   BDO      (a)33(18-16)      26.12.2011
91   Togan pur F/02   DDA   (a)1etc/170(4-5)




                            (b)1etc/183(12-2)




92   Ujwa             BDO   (a)98(23-15)        23.07.2005
57   Masudabad F/74     DDA      (a) 165(17-9)
58   Mayapuri           BDO                       26.03.2011




59   Nanak heri         BDO     26/27(3-13)
60   Nangal dewat       BDO     (a)1196 (23-
                                14)
61   Nangli sakrawati   BDO     (a)51(3-10)
62   Nangal Raya F/66   MCD/DDA (a) 372(7-10)

63   Najaf Garh         BDO      12/11/1 (6-5),   26.12.2011
                                 12/12 (8-12),
                                 12/19 (7-5).



                                 23/5/1 (6-9)     26.12.2011
                                 23/23 (1-16)     26.12.2011
64   Naraina   MCD/DDA (a)          23.12.2009




                       1699(11-8)   26.03.2011
65   Nasirpur   DDA   612 (13-19)         23.12.2009




                                          07.06.2010




                                          26.03.2011




                      (b) 111(0-4)
                      (c) 302(0-1)
                      (d) 724/379(0-18)
66   Nawada            DDA   (a) 178(6-19)    07.06.2010




                             (b) 330(4-6)




                             (c) 665(8-5)




67   Posangipur F/66   DDA   (a)358(2-2)
68   Paprawat          BDO   (a)142(0-5)
69   Pindwala kalan    BDO   (a)57(19-4)
70   Pindwala khurd    BDO   (a)31//4(4-15)
71   Palam   DDA   (a) 123(20-15)   23.12.2009




                   (b) 153(13-10)   23.12.2009



                   (c) 122(21-12)   23.12.2009




                   (d) 155(28-05)   23.12.2009
(e) 122(21-12)   07.06.2010




(f) 123(20-15)   07.06.2010




(g) 156 min (2-2) 26.03.2011




(h) 162(15-18)   26.03.2011
72   Pochan Pur   DDA   (a) 36(6-16)       04.12.2010



                        (b) 35(11-14)      04.12.2010




                        (c) 26/26(11-17)   04.12.2010




                        (d) 32(62-12)      04.12.2010




                                           26.12.2011



                        (e) 34(7-6)        04.12.2010



                                           26.12.2011
73   Qutba pur   BDO   27 (22-8)       26.12.2011




74   Qazi pur    BDO   (a)31(9-2)X
75   Radhopur    BDO   (a)17/12 (13-   23.12.2009
                       14)




76   Rajokari    BDO   (a)41(2-0)      06.06.2008




                       (b)695(05-13)   06.06.2008
(c)251(04-11)    06.06.2008




(d)1150(13-11)   06.06.2008




(e)1234/11(11-4) 06.06.2008




(f)695(5-13)
(g)1689(32-16)
(h)1164(19-4)
(i)848(1-1)
(j)1698(4-7)
                             (k)1817(1-18)
                             (l)446(40-18)
77   Rang puri         BDO   (a)105(6-9)       06.06.2008




78   Rawta             BDO   (a)37/26(6-15)
79   Rewla khan pur    BDO   (a)77(12-08)      23.07.2005




                             (b)76(07-15)      23.07.2005




                             (c)74(15-3)       23.07.2005




                             (d)80(4-16)
                             (e)81(3-3)
                             (f)98(5-8)
                             (g)23//27
                             (h)46/29(11-12)
                             (i)61/10(1-12)
80   Roshanpura        BDO   506min(3-0)       26.12.2011



81   Salahpur          BDO   (a)16//15(5-4)
82   Samalkha          BDO   (a)54 (7-18)      06.06.2008




83   Samaspur khalsa   BDO   (a)17/28(5-5)
84   Saragpur          BDO   (a)71(8-16)X
85   Shikar pur       BDO      (a)96(17-18)        23.07.2005




                              (b)98(10-6)
86   Surakh pur       BDO     (a)204(4-6)
                              (b)64(7-4)
87   Surhera          BDO     (a)15//1/2 (51-
                              14)X
88   Shahbad mohd.    DDA/MCD (a)1/42(12-12)
                              (b)1/72(28-17)
                              (c)1/1532(31-6)
89   Sahupura F/02    DDA     (a)92(9-1)           26.03.2010




90   Taj pur khurd    BDO      (a)33(18-16)        26.12.2011




91   Togan pur F/02   DDA      (a)1etc/170(4-5)
                               (b)1etc/183(12-2)
92   Ujwa   BDO   (a)98(23-15)   23.07.2005
Site position/Directions/opinions


New water body near Sant Nirankari Bhawan some
Court case is stated to be pending in respect of one
biswa. 5 bigha 8 biswa is within boundary wall. Report
be submitted by 20.9.2011 for further directions.
However, no report has been submitted before the
Court Committee till data.
As per spot, road is stated to be running on the Water
body opposite Vardhman crown Mall. Actual status be
submitted to the Committee within two weeks.
However, no actual report has been submitted before
the Court Committee till date.
The water body is developed. Recharge pits installed.
Since there is no water as such the water body is lying
dry. Needs plantation.
Developed. Lying dry. Needs plantation.
Depression contained little water but has been deep
end and provided with embankments. Department
informed that sanction for constructed of a wall has
been approved which would be constructed with in
two months. Free from encroachment as it is located
in abadi area.
Development work is in progress.
small gate only. The remaining entrance should be
closed by a wall. Plantation work along the sides must
be completed. A tube well of Delhi Jal Board exists at
the corner or south west direction of the pond. The
said tube well is reported to be not in use. In case
water is released through the said tube well, the water
body can be best utilized. However, it must also be
ensured that NO SWEARAGE/DIRTY WATER is
allowed to deep in the water body.

The water body contains little water although the
depression had been disilted. Free from
encroachment as it is located in ababi area.
It is located outside village abadi and large catchment
area. Presently contains little water. No work is
required. Should be left untouched. The area of johar
be protected by barricading.
Developed by DSIDC. Plantation work done. Provision
to allow access of rainwater into water body not given.
Work is incomplete.


The water body is in a state of total disrepair. It is filled
with sewage water and converted with Halycnth. The
boundary wall is broken and garbage is being dumped
into it. There is another Dhalao located on the
boundary wall. However, instead of the dhalao, all the
garbage is being thrown into the water body probably
making it easier for the garbage pickers and reduce
their work. However, if effort is made to develop the
water body, given it size, work n developing it sould
not be difficult.
I&FC constructed stairs adjoining the Mandir. It looks
like a stadium. Catchment area not developed. The
agency shall develop the catchment area. The plan be
submitted to the committee for discussion by
20.9.2011.However, no plan with detail report has
been submitted before the Court Committee till date.

Authorities could not identify the site. The water body
shall be idenrified by authorities and report be
submitted to the committee for further directions in this
regard. However, no report has been submitteed
before the Court Committee till date.
Authorities could not identify the site.The water body
shall be get identified and report b e submitted to the
committee for further direction in this regard.
However, no report has been submitted before the
Court Committee till date.
Water body developed by DDA in form of Park. No
catchment area has been developed. Debis exists in
the water body be developed properlyl Report be
submitted within a week. However, no report has been
submitted before the Court Committee till date.
Boundary wall exists on spot. Dispute of 20 point
programme plot exists. Actual area to be identified by
the authorities by 6.9.2011 and report be submitted to
the committee. The water body be handed over to
DDA for necessary action. However, no report has
been submitted before the Court Committee till date.

Authorities could not identify the site. The water body
shall be identified and report be submitted to the
committee for further directions in this regard.
However, no report fhas been submitted before the
Court Committee till date.
Area still not confirmed and not identified.

Same position as wasonlast visit. Directions were
issued on 4.12.2010 however the same have not been
folllowed by the DDA and DJB till date. They were
again directed to comply with the directions dated
4.12.2010.
No one was present from the revenue staff. BDO was
not having revenue record. Malba is being dumped
into the water body by the villagers. Villagers present
inlarge number at site stated that there is a Phirni
dispute with the authorities. DDA And BDO were
directed to carry out the demarcation with revenue
staff thereafter DDA is to develop the same.

The engineering work required is to ensure that the
rainwater run off from the main road and also the
catchment area finds its way into the water body.
Water is available. Dumping yard exists there. Same
status as on March 2010. No further development.

Boundary wall is built up. No catchment system is
maintained. Cleaning is required. Nobody present
from BDO Office.
Water is available. Planted by trees. Boundary wall is
broken.
Surrounded by houses on three sides. Dirty water
available. Area encroached on one side. Sewage
flowing into. It has been kept as dumping yard.
Filled by sewage
Same position exists since various visits of the
committee. Revenue staff was not present. Sewer is
still flowing into the water body. DJB on 4.12.2010
was directed to make best use of the water body and
report back to the Committee. There was no co-
operation coming forth from the agencies more
particularly the BDO (SW) and the SDM staff during
the visit and lot of time was being wasted, hence the
committee decided to return back from Chhawla
village.

Some encroachment including a DESU Office existing
within the water body. Further desalting work and
boundary wall needs to be constructed.
Visited earlier. Contains water. Removal of keekar
trees required. Beautification by planting of Oxygen
generation trees is suggested.
Requires boundary wall and other development work.
Such as deepening and availablity of catchment area
and clearing of shrubs. Handed over to I&FC on
02.04.2009
Contains water.However, the pond area can be
increased and the boundary wall upto temple wall
should be constructed.
Water body not developed at all. Scheme to be got
prepared and the water body be developed.
Water body exists only contained a small amount of
water. Development work for deepening and
construction of wall under progress. The water body
had been demarcated from the surrounding areas.
The water body had been demarcated from the
surrounding areas.
Converted in to the park. Surrounded by boundary
wall on three sides. Heavily encroached by local by
keeping cattle there. It is known that some cases are
pending in the Court.
Well maintained water body. Boundary wall built up on
all sides but there is not water. Plants are grown in the
vacant area.

Work in progress. Plantation work is required to be
done.
No one was present from the office of SDM and from
office of BDO (SW). Water body was found to exist
within the Lal Dora. From site visit, it was found that
the water body has been encroachment removed at
the earliest and report back to the Committee.

Same position as was on last visit. Sewerage is still
flowing into water body. On last visit, directions were
issued for stopping of sewerage and DJB assured the
committee that the same would be complied within
two weeks as sewer system is functioning in the area.
However, nothing has been done by DJB. Neither the
BDO staff nor Revenue staff were present at site.
BDO HQ was telephonically contacted from site who
confirmed that the message has been conveyed in
writing to DC (SW), SDM Najafgarh, Delhi Cantt &
Vasant vihar as well as to BDO(SW) vide diary
No.4397-441 on 23.3.2011. DJB was again directed
that the sewerage be immediately stopped and repair
of boundary wall be carried out and report back to the
committee thereafter preferably within two weeks

Dirty water exists in the water body. Encroachment
was also found at site. Neither the BDO staff nor
Revenue staff was present at site. BDO HQ was
telephonically contacted from site who confirmed that
the message has been conveyed in writing to
DC(SW), SDM Najafgarh, Delhi Cantt & Vasant Vihar
as well BDO(SW) and SDM staff should carry out
demarcation and after removal of encroachment, the
same should be handed over to the developing
agency. This exercise of demarcation and handing
over should be completed by I&FC Deptt.
BDO was present without records. He stated that the
water body is to be identified by the revenue staff.
Revenue staff was also not present despite prior
comminication about the visit. It is very strange that
the land owning agency is not aware about its land as
to where it is situated. BDO and revenue staff are
directed to co-ordinate with each other and identify the
water body thereafter same be handed over to the
developing agency for developed the water body.

BDO was present without records. He stated that the
water body is to be identified by the revenue staff.
Revenue staff was also not present despite prior
comminication about the visit. It is very strange that
the land owning agency is not aware about its land as
to where it is situated. BDO and revenue staff is
directed to co-ordinate with each other and identify the
water body. Thereafter the water body be handed over
to the developing agency for development.



It is informed by the Revenue Officials that the Water
Body has been notified for acquisition. Full of water. It
is directed by the Court Commissioner if water body is
acquired alternate side and record of acquisition
should be provide BDO & BDO Staff not present. It
may be done that on an over bridge can be built over
the water body as is done in Neela Hauz. Even after
discussion with DC concerned. BDO not present.

Contained water. Development work in progress.
Developed. Recharges pit installed. Plantation work
done. No catchment area. Same to be gone done.

Bridge dirty water, sewage flowing in to it, demarcation
is required. No body present from BDO Office.

Water body dry. Water is filled on festive occasion
through supply from Haryana. Otherwise the water
bodies is well protected.
Contained clean water is protected by boundary wall.

Work is in progress for landscaping, is protected by a
boundary wall with a walk way around the body. The
existing water body needs enlarging. Director
(panchayat) directed further deepening and widening
orf water body. The Panchayat to be directed fruther
deepening and widening of water body.




It is natural water body. Contains water. Itr was also
noticed that though the land is for Johar/water body
but MCD has constructed drain thereby discharging
dirty village water into the water body. MCD be
requested to restrain from discharging the dirty water
into the water body immediately.
There was also some dispute noticed regarding
pathway on one corner. The minimize the dispute, it is
suggested that a boundary wall be constructed around
the water body and have the maximum area covered
in that boundary wall. Futher, it should be brought to
the notice of the committee if any litigation is pending
or not. Thereafter, direction, if any for removal
encroachment would be given.
     As per information received DSIDC was assigned
the development of water body. However, no
development at site has been found. Steps for
development be initiated immediately.

Called Peelia Pond. The water body be maintained
and be not allowed to either being encroached or dirty
water or sullage is diverted into it.
The water body is surrounded by open fields. More
emphasis upon feeder channels for allowing
maximum water into the water body should be made.

Work almost completed. It is surrounded by open
land. Plantation work, as directed is carried out.
Situated in the centre of the village. But has large
catchement area. Boundary wall has to be constructed
in some pictures. At present part of it is being used as
a village throughfare.After visualizing the situation,
demarcation was fixed for 09.04.2009 in the presence
of Revenue Staff and I&FC Demarcation Report along
with the proposed scheme of developing the water
body be intimated at the earliest.

Work has not been done started as there is no access
from road. Since the water body is surrounded by
private agricultural land has natural catchments area,
very little civil work is required. No need for pathway.
Only erecting boundary wall and deepening only
plantation be done.
Except for some cleaning of water body. No further
work is required.
Though water body is found to be existing in the list
Site could not be identified by the agencies. The

The water body is in complete state of disrepair.
There is only little bit of encroachment which should
be removed. The water body should be cut off from
the settlement area which is existing on one side. The
boundary wall body exist strengthened and water body
Though water should be but the same is fruitless
when the same cannot catch/fetch any water. The
excess water from roads/rain drains needs to be
captured. Reservoir needs to be developed
Dry water body. Boundary wall exist. No wsork
required to be done.The committee felt that the work
done by the BDO and the department of I&FC was




The water body is located in open and natural
surrounding but requires immediate attention for
cleaning, cutting of shrubs and plantation of saplings
There is a road around the water body. Mandir also
exists. The DDA was directed to look into the
possiblity of catchment area as otherwise the very
purpose of the water body would be frustrated and it
would become another dumping yard.




DDA indicated that the demarcation of the land has
been carried out and as such the exact location of
water body can not be determined. The authorities
were directed to have it fenced as there was possiblity
of encroachment. Further only after demarcation is
carried the exact position whether the water body is
free area could not be located. be known. Further only
The from encroachment would The authorities sought
time for its identification.




Site was not confirmed by DDA. Even on last visit, the
same position existed. DDA was earlier directed to get
the site confirmed but of no use. Committee has to
wait for around 30 minutes for arrival of revenue staff.
Still none of then confirmed the site. Both of them has
been directed to work out together and confirm the
site and submit the report to the committee so that
The water body has been converted into dumping
yard and encroachment also exists over it. The area
was being kused as parking by villagers. Demarcatin
and identification of water body shall be carried out by
the revenue authorities. The water body shall be get
cleaned and the report shall be get cleaned and the
report shall be submitted to the committee by
20.9.2011. However , no report has been submitted
before the Court Committee till date.

The water body has been converted into dumping
yard and encroachment also exists over it. The area
was being kused as parking by villagers. Demarcatin
and identification of water body shall be carried out by
the revenue authorities. The water body shall be
submittted to the committee by 20.9.2011. However,
no report has been submitted before the Court
Committee till date.
Park developed by MCD. MCD was directed to
develop water harvesting so that rain water is not
wasted away and bring rise to the water table.




Park and Community centre. MCD was directed to
develop water harvesting system so that roof top rain
water is not wasted away and divert the same through
pipe into the park so that it brings rise to the water
table.




Recharge pits installed. Needs plantation work.
The DDA has not developed the water body and
instead have proposed to develop a Park, pathway,
having a water body in the middle having hardly an
area 200 sq.yds. out of total of 2000 sq.mtrs
approximate on the spot. The design shown in non-
On the last visit 26.3.2010, DDA was directed that
acceptable and it requires fresh re-drawing so to
develop the water body after preparing fresh drawing
so that maximum area can be used for the
development of water body. Later on it was brought to
the notice of the Committee that the area of the water
body is around 40 bigha 6 biswa whereas at the spot
the area is shown only of around 200 sq yds and that
too in form of a park. DDA and BDO (SW) were
directed to carry out demarcation on 11.3.2011 at 11
A.M. However no demarcation report has been
Panchayat Secretary of the village was not present.
Rajesh Patwari informed that the Panchayat Secretary
left without intimation from Mahipal pur. On 26.3.2011,
the BDO and DDA were directed to submit the report
in respect of the said water body, however they did
not even cared to report to the committee about the
steps taken by them, It appears that the BDO and
DDA are least bothered to follow the directions of the
committee for development fof water body.
The site was handed over to the MCD on 26.08.1987
by DDA. At present only some portion of water body is
in form of park and rest of the same is being used for
parking of vehicles. DDA was directed to call for report
from MCD as to how and under whose orders the site
is being used as parking site when the same is
recorded as water body. DDA to maintain the Water
Body.
Park, spot complex and water body exists at site.
Villagers met the Court Commissioner at site and
informed that inflow of water through pipe the hill top
has been closed by the DDA and requested that the
same be get opened so that water gets collected in
Some part of water body is outside the boundary wall
of the park and encroachment exists. DDA was
directed to carry out the demarcation and remove the
encroachment. It was noticed that park is being used
as parking for vehicles. DDA was directed to get the
parking removed fence the area and revive the water
body.
Part of the area was found to be encroached.
Demarcation was stated to have already been carried.
Steps to remove the encorachment be followed &
report be submitted to Court Committee with in one
month.
Same position as per last visit. Detailed report be
submitted within one week by the authorities.
However, no detail report has been submitted before
the Court Committee till date.
Site has open Land without specific fencing. Actual
area of water body was also in dispute. Demarcation
was directed to be carried out on 07.12.2010 and
thereafter it be handed over to the developing agency,
i.e. I&FC for the needful.
Land is open at site. DDA was directed to carry out
demarcation and develop the same. No demarcation
report has been received till date.
Site was not identified by any of the agency. They had
been directed to identify the same and submit their
report by 10.12.2010. No report has been submitted
by any of the agency till date.
Not identified by authorites.Detailed report be
prepared by the authorities and be submitted within a
week. However, no detail report has been submitted
before the Court Committee till date.
Same position as was on 23.12.2009. PWD has
handed over to I&FC. I&FC that the water body would
be developed within a period of 8 months.




Boundary wall built up but not water. One side there is
Bus Terminal exist.
This will be ready by April 2012. Plantation must.




There is encroachment. Five soaps are operated from
this water body.
The water body is near the fly over abandoning
Naraina and Mayapuri. The I&FC Department
informed that the plan for constructing proper water
body is under process and the same would be
finalized in about 10 days time. The Department
further indicated that after approval of the plans they
would required about three to four months for
constructing proper water body. The Department was
shown the sewerage that was flowing into the water
body and the Department should ensure that the
same should be diverted and should not fall in the
water body. It is respectfully submitted that Central
Affluent Treatment Plant (CETP) was about to be in
operation. The main worry is flow of swerage from
cantonment area. The cantonment board must be
directed to stop flow of seweage into the water body
DDA staff failed to identify the site. No one was
present from the office of SDM and also from office of
BDO (SW). DDA was directed to co-ordinate with
revenue department to identify the site and report to
the committee by 20.4.2011. No report has been
submitted till date.
The water body is constructed in the middle of village
abadi and colony. There was a small Mandir and
some rooms adjoining the Mandir. Encroachment was
also found all around the said water body. Sullage
was found in the water body. Interestingly Tehsildar
DDA (Land Management) who was present on the
spot informed that the land has till date not been
handed over to DDA by the Gaon Sabha, though it
was admitted that Notification under Section 22(1) of
DDA Act had been published. The DDA was directed
to sort out the matter with Gaon Sabha and report
back to the committee about the said development
within 15 days. The authorities were also directed to
get the clear the encroachment and develop the
Catchment area so that clean water flows into the
water body.
Work is found in progress. However, sewerage was
found flowing into the water body. Encroachment still
not removed. Neither BDO, SDM nor any staff was
present on spot. DDA is directed to get the
encroachment removed dand submit the report of
removal of encroachment within a period of two
weeks, so that the water body is properly developed.
MCD and DJB have been directed to stop the
sewerage immediately.




Shri K.S Meena, A.E, MCD was present at site, who
stated that the sewerage flowing into the water body
shall be closed within one week. DDA officials were
present at site and were directed to get Khasra no
111(0-4), 302(0-1), 724/379 (0-18) which are part of
Water body identified by 7.4.2011 and report back to
committee. DJB officials assured the committee that
sewerage system shall be operational by December
2011.
Encroachment exists. BDO and SDM were directed to
get the area demarcated and thereafter to take stpes
and get the encroachment removed for development
of water body by DDA.



Heavy built up. Is stated to be allotted to Ramanand in
1984 under 20 point programme. He was also directed
to get the land retracted from the person who has
been allotted to the water body.
One of the villager has been declared bhumidhar of
area around 3-5. Rest of land is vacant out of which
1100 sq.yds. has been handed over to DDA. The rest
of the land be demarcated for handling over to DDA
for development of water body. He was also directed
The DDA informed that only 10 bigha of the land has
been handed over by the Gaon Sabha though it was
admitted that Notification under Section 22(1) of DDA
Act had been published. The DDA was directed to sort
out the matter with Gaon Sabha and report back to
the committee about the said development within 15
days. Further the committee was informed the
development plan has been made and the
Department would require about six months to
develop the water body. Let the Department develop
the water body however they should not shall the
proceedings/efforts for procuring the entire notified
land and further add the same in the water body as
the land is marked as water body.

The work or water body development was in progress.
The department indicated that the work would be
completed within six months. This is a newly
developed water body.
The DDA informed that only 10 bigha of the land has
been handed over by the Gaon Sabha in 2003.
However, rest of the land still remains to be handed
over to DDA Unfortunately there was nobody present
from the Revenue Department (BDO and/or SDM) to
controvert the position. Surprisingly their absence
inspite of due notice was undesirable. The committee
should not pass any direction and had no option but to
move on without any positive result.
The work of water body was in progress in 0.298
hectares. The department indicated that the work
would be completed within six months. This is a newly
developed water body.
Same position existed as was on last visit. A meeting
was also prior to the survey of water body wherein
BDO and SDM assured that demarcation would be
carried out after clearing the dispute regarding
allotment under 20 point programme but nothing was
done till the survey was carried out. Not even
demarcation was carried. BDO and DDA has been
directed to carry out demarcation on 08.06.2010 and
submit the demarcation report to the committee within
two weeks so that further direction could be issued for
development of water body.
Same position existed as was on last visit. A meeting
was also prior to the survey of water body wherein
BDO and SDM assured that demarcation would be
carried out after clearing the dispute regarding
allotment under 20 point programme but nothing was
done till the survey was carried out. Not even
demarcation was carried. BDO and DDA has been
directed to carry out demarcation on 08.06.2010 and
submit the demarcation report to the committee within
two weeks so that further direction could be issued for
development of water body.

Natural water body in the name of Ram Johri Mandir.
Land scaping is required to be done. Catchment area
is also required to be developed. Encroachment
should be removed.
Health Centre and Fly over exists. Since the are falling
under water body has been taken over as aforesaid
endeavor should be made for harvesting the water
which would ultimately result not in only raise the
water level but help in recharging the water.
Accordingly. all efforts should be made for. water
harvesting in the Health centre by the concerned
authorities.
It is the form of park. DDA was directed to carry out
proper demarcation of the site and maintain it.




Well developed water body. A mandir and community
centre exist within the boundary of the water body.
The same the is being maintained by the villagers.

The water body is on road. However very poorly
maintained by DDA. DDA was directed to maintain the
water body and carry out plantation so that it could be
utilized by public.
Out or total area 5 bigha 6 biswas was in the from of
water body as was informed by villagers. Water body
as on date is fully encroached upon. It was also
informed that proceedings under section 86-A were
initiated by the Gaon Sabha however nothing has
happened till date. BDO was directed to check its
area not confirmed. Area to be confirmed. Totally
encroached


Water agency is required to be maintained by the
concerned agency.
No maintenance. Kept as dumping yard. Boundary
wall broken.




This village is a Be Chirag Mauza. Water body is
surrounded by boundary wall on all sides. Round the
water body steps are built up. Plantation is required.
On one side it is encroached by temple. Dirty water is
there. It is known that a FIR is lodged against the




The work was in progress and would be completed in
about three months time as was told by I&FC. Further
water bodies in the area could not be inspected as
there was no staff present from Revenue Department
(BDO and/or SDM). Surprisingly their absence inspite
of due notice was undesirable. The committee could
not pass any direction and had no option but to move
on without any positive result.
This water body is adjoining farmhouses It is now
being maintained as a garden as it is not possible to
develop it as a water body . The area should remain
green and be used as plant nursery.
The area has good potential as a water body as it has
sufficient catchment area.The area has no settlement
and as such there is no threat of seweage entering it.
Besides the natural terrain should supply runoff to the
water body.
Measuring 4 bigha 1 biswa the water body is in a state
of neglect. Although it can be developed into an
excellent water body yet on the pretext of
encroachment in a tiny area comprising ot two & three
small houses, no work of restoration is being
undertaken. The garbage which is being dumped
should be immediately stopped and the protecting wall
be renovated. Much work remains to be done as the
The land use of the water body has unauthorize been
changed and has been converted into Harijan Basti.
Construction of houses is going on at the moment.
The Hon'ble High Court has repeatedly reminded that
a water body should be maintained as a water body
and is not amendable to any change of use as it does
not fail in the definition of word 'land'. Enquiry should
be conducted as to why the order of the Hon'ble High
Court has been violated as the local authorities had
sufficient information and the knowledge of the same.
The findings should be forwarded to the present
committee so that the Hon'ble Court is apprised of it.


The water body is under the jurisdiction and care of
DSIDC. It measures 11 bighas. A part of it is under
encroachment, which must be removed. The area
offers excellent potential as it has plenty of catchment
area and the terrain is well suited to provide ran water
runoff. The encroachment should be removed as they
are located on the far side and are blocking the
rainwater runoff. The catchment area would vastly
increase thereafter.
Part of the open area has unauthorized misuse iron
pillars should be erected at the entrance so that water
body area is not misused.
Water Body had been desilted, catchment area
provided. Contained some amount of water. Freefrom
encroachment as it is located in abadi area.




Water body had been desilted and embankment built
around it. Did not contain much water. Free from
encroachment as it is located in abadi area.
Water body had been desilted and embankment built
around it. Did not contain much water. Boundary wall
to be constructed to protect it, from encroachment
surrounded on three sides by farm houses. Boundary
well to be constructed to protect it.
In fact no water body exists there. There is situated a
Community Hall.

Some plantation work is needed and more channels
for entry of rain water into the water body should be
explored.




Water body contains water. Although the water body
is well protected for encroachment, however, it
requires cleaning and diversion of sewerage flowing
into it. Water body exists within the village itself. Work
for construction of boundary wall under progress. It
requires cleaning and diversion of sewerage flowing
into it.
Both the khasra numbers are stated to have been
handed over to DDA and boundary wall has been
erected. Halqa Patwari Rakesh from revenue
department was stated to be busy in Court. At the
spot, official from DDA Shri Arvind Kumar Astt.
Engineer, was present who stated that he does not
know as to where the water body exist as the land is
plain land. DDA was directed to contact the revenue
staff and get the water body demarcated and be
developed accordingly.
Water is available in the water body and is surrounded
by the trees on all sides. One side there is
encroachment by temple. Demarcation was done four
years ago but Revenue Department is not aware.
A large body exists. Boundary wall constructed around
the water body. Boundary wall constructed around the
water body.
Same position as was on 23.12.2009. PWD has
handed over to I&FC. I&FC that the water body would
be developed within a period of 8 months.




Boundary wall built up but not water. One side there is
Bus Terminal exist.




This will be ready by April 2012. Plantation must.
There is encroachment. Five soaps are operated from
this water body.
The water body is near the fly over abandoning
Naraina and Mayapuri. The I&FC Department
informed that the plan for constructing proper water
body is under process and the same would be
finalized in about 10 days time. The Department
further indicated that after approval of the plans they
would required about three to four months for
constructing proper water body. The Department was
shown the sewerage that was flowing into the water
body and the Department should ensure that the
same should be diverted and should not fall in the
water body. It is respectfully submitted that Central
Affluent Treatment Plant (CETP) was about to be in
operation. The main worry is flow of swerage from
cantonment area. The cantonment board must be
directed to stop flow of seweage into the water body
and set up their own STP. Encroachments in the
vicinity should also be removed as sewerage is also
coming from there. The authorities concerned assured
the committee that it would take all necessary steps to
ensure a clean water body and also develop the
catchment area with minimum constructions.

DDA staff failed to identify the site. No one was
present from the office of SDM and also from office of
BDO (SW). DDA was directed to co-ordinate with
revenue department to identify the site and report to
the committee by 20.4.2011. No report has been
submitted till date.
The water body is constructed in the middle of village
abadi and colony. There was a small Mandir and
some rooms adjoining the Mandir. Encroachment was
also found all around the said water body. Sullage
was found in the water body. Interestingly Tehsildar
DDA (Land Management) who was present on the
spot informed that the land has till date not been
handed over to DDA by the Gaon Sabha, though it
was admitted that Notification under Section 22(1) of
DDA Act had been published. The DDA was directed
to sort out the matter with Gaon Sabha and report
back to the committee about the said development
within 15 days. The authorities were also directed to
get the clear the encroachment and develop the
Catchment area so that clean water flows into the
water body.
Work is found in progress. However, sewerage was
found flowing into the water body. Encroachment still
not removed. Neither BDO, SDM nor any staff was
present on spot. DDA is directed to get the
encroachment removed dand submit the report of
removal of encroachment within a period of two
weeks, so that the water body is properly developed.
MCD and DJB have been directed to stop the
sewerage immediately.



Shri K.S Meena, A.E, MCD was present at site, who
stated that the sewerage flowing into the water body
shall be closed within one week. DDA officials were
present at site and were directed to get Khasra no
111(0-4), 302(0-1), 724/379 (0-18) which are part of
Water body identified by 7.4.2011 and report back to
committee. DJB officials assured the committee that
sewerage system shall be operational by December
2011.
Encroachment exists. BDO and SDM were directed to
get the area demarcated and thereafter to take stpes
and get the encroachment removed for development
of water body by DDA.




Heavy built up. Is stated to be allotted to Ramanand in
1984 under 20 point programme. He was also directed
to get the land retracted from the person who has
been allotted to the water body.




One of the villager has been declared bhumidhar of
area around 3-5. Rest of land is vacant out of which
1100 sq.yds. has been handed over to DDA. The rest
of the land be demarcated for handling over to DDA
for development of water body. He was also directed
to get the land retracted from the person who has
been allotted of the water body.
The DDA informed that only 10 bigha of the land has
been handed over by the Gaon Sabha though it was
admitted that Notification under Section 22(1) of DDA
Act had been published. The DDA was directed to sort
out the matter with Gaon Sabha and report back to
the committee about the said development within 15
days. Further the committee was informed the
development plan has been made and the
Department would require about six months to
develop the water body. Let the Department develop
the water body however they should not shall the
proceedings/efforts for procuring the entire notified
land and further add the same in the water body as
the land is marked as water body.

The work or water body development was in progress.
The department indicated that the work would be
completed within six months. This is a newly
developed water body.
The DDA informed that only 10 bigha of the land has
been handed over by the Gaon Sabha in 2003.
However, rest of the land still remains to be handed
over to DDA Unfortunately there was nobody present
from the Revenue Department (BDO and/or SDM) to
controvert the position. Surprisingly their absence
inspite of due notice was undesirable. The committee
should not pass any direction and had no option but to
move on without any positive result.




The work of water body was in progress in 0.298
hectares. The department indicated that the work
would be completed within six months. This is a newly
developed water body.
Same position existed as was on last visit. A meeting
was also prior to the survey of water body wherein
BDO and SDM assured that demarcation would be
carried out after clearing the dispute regarding
allotment under 20 point programme but nothing was
done till the survey was carried out. Not even
demarcation was carried. BDO and DDA has been
directed to carry out demarcation on 08.06.2010 and
submit the demarcation report to the committee within
two weeks so that further direction could be issued for
development of water body.

Same position existed as was on last visit. A meeting
was also prior to the survey of water body wherein
BDO and SDM assured that demarcation would be
carried out after clearing the dispute regarding
allotment under 20 point programme but nothing was
done till the survey was carried out. Not even
demarcation was carried. BDO and DDA has been
directed to carry out demarcation on 08.06.2010 and
submit the demarcation report to the committee within
two weeks so that further direction could be issued for
development of water body.



Natural water body in the name of Ram Johri Mandir.
Land scaping is required to be done. Catchment area
is also required to be developed. Encroachment
should be removed.



Health Centre and Fly over exists. Since the are falling
under water body has been taken over as aforesaid
endeavor should be made for harvesting the water
which would ultimately result not in only raise the
water level but help in recharging the water.
Accordingly. all efforts should be made for. water
harvesting in the Health centre by the concerned
authorities.
It is the form of park. DDA was directed to carry out
proper demarcation of the site and maintain it.


Well developed water body. A mandir and community
centre exist within the boundary of the water body.
The same the is being maintained by the villagers.




The water body is on road. However very poorly
maintained by DDA. DDA was directed to maintain the
water body and carry out plantation so that it could be
utilized by public.


Out or total area 5 bigha 6 biswas was in the from of
water body as was informed by villagers. Water body
as on date is fully encroached upon. It was also
informed that proceedings under section 86-A were
initiated by the Gaon Sabha however nothing has
happened till date. BDO was directed to check its
record and submit the report with regard to out of the
proceedings so that furture course of action can be
decided.


area not confirmed. Area to be confirmed. Totally
encroached


Water agency is required to be maintained by the
concerned agency.


No maintenance. Kept as dumping yard. Boundary
wall broken.
This village is a Be Chirag Mauza. Water body is
surrounded by boundary wall on all sides. Round the
water body steps are built up. Plantation is required.
On one side it is encroached by temple. Dirty water is
there. It is known that a FIR is lodged against the
encroacher. Court Commissioner questioned about
the status of FIR. BDO has taken no action against
the encroacher. Thus BDO has allowed encroacher as
is evident from his absence



The work was in progress and would be completed in
about three months time as was told by I&FC. Further
water bodies in the area could not be inspected as
there was no staff present from Revenue Department
(BDO and/or SDM). Surprisingly their absence inspite
of due notice was undesirable. The committee could
not pass any direction and had no option but to move
on without any positive result.



This water body is adjoining farmhouses It is now
being maintained as a garden as it is not possible to
develop it as a water body . The area should remain
green and be used as plant nursery.



The area has good potential as a water body as it has
sufficient catchment area.The area has no settlement
and as such there is no threat of seweage entering it.
Besides the natural terrain should supply runoff to the
water body.
Measuring 4 bigha 1 biswa the water body is in a state
of neglect. Although it can be developed into an
excellent water body yet on the pretext of
encroachment in a tiny area comprising ot two & three
small houses, no work of restoration is being
undertaken. The garbage which is being dumped
should be immediately stopped and the protecting wall
be renovated. Much work remains to be done as the
area has the potential of being developed into an
excellent water body. Action for removal of
encroachment should also proceed along with
simultaneously.

The land use of the water body has unauthorize been
changed and has been converted into Harijan Basti.
Construction of houses is going on at the moment.
The Hon'ble High Court has repeatedly reminded that
a water body should be maintained as a water body
and is not amendable to any change of use as it does
not fail in the definition of word 'land'. Enquiry should
be conducted as to why the order of the Hon'ble High
Court has been violated as the local authorities had
sufficient information and the knowledge of the same.
The findings should be forwarded to the present
committee so that the Hon'ble Court is apprised of it.




The water body is under the jurisdiction and care of
DSIDC. It measures 11 bighas. A part of it is under
encroachment, which must be removed. The area
offers excellent potential as it has plenty of catchment
area and the terrain is well suited to provide ran water
runoff. The encroachment should be removed as they
are located on the far side and are blocking the
rainwater runoff. The catchment area would vastly
increase thereafter.
Part of the open area has unauthorized misuse iron
pillars should be erected at the entrance so that water
body area is not misused.



Water Body had been desilted, catchment area
provided. Contained some amount of water. Freefrom
encroachment as it is located in abadi area.



Water body had been desilted and embankment built
around it. Did not contain much water. Free from
encroachment as it is located in abadi area.


Water body had been desilted and embankment built
around it. Did not contain much water. Boundary wall
to be constructed to protect it, from encroachment
surrounded on three sides by farm houses. Boundary
well to be constructed to protect it.




In fact no water body exists there. There is situated a
Community Hall.



Some plantation work is needed and more channels
for entry of rain water into the water body should be
explored.
Water body contains water. Although the water body
is well protected for encroachment, however, it
requires cleaning and diversion of sewerage flowing
into it. Water body exists within the village itself. Work
for construction of boundary wall under progress. It
requires cleaning and diversion of sewerage flowing
into it.




Both the khasra numbers are stated to have been
handed over to DDA and boundary wall has been
erected. Halqa Patwari Rakesh from revenue
department was stated to be busy in Court. At the
spot, official from DDA Shri Arvind Kumar Astt.
Engineer, was present who stated that he does not
know as to where the water body exist as the land is
plain land. DDA was directed to contact the revenue
staff and get the water body demarcated and be
developed accordingly.



Water is available in the water body and is surrounded
by the trees on all sides. One side there is
encroachment by temple. Demarcation was done four
years ago but Revenue Department is not aware.
A large body exists. Boundary wall constructed around
the water body. Boundary wall constructed around the
water body.
Committee’s Observations
Court Commissioners have directed to Revenue Officials to identify the Khasra No. and Area.




Court Commissioner suggested the DC, (South-West) to call explanation from BDO for his
absence.




Court Commissioner has directed DJB and MCD to develop sewage system. He has further
directed the Revenue officials to complete the demarcation by 17/01/2012.
Court commissioner directed the Revenue Officers to submit the report of court cases with in
a week.


Court Commissioner directed the DJB Officials to complete sewage system by 15 May 2012.
1 Biswa out of the total area is possessed by some private person. Catchment and Water
Harvesting System of water should also be developed there. Demarcation to be done by
Revenue Officials by 15/01/2012.
Court Commissioner directed to the Revenue Department to demarcate the land Najaf Garh.
Plantation to be done with in two days.
It has been observed that despite information through writings sent rhrough Nodal Officers
and informations/directions given during discussion/meeting held with the representative of
the authorities. The status report since 2005 has not come forth. It is relevant to mention the
It may be added that non-submission of the status report by the authorities concern results
into presumption that none of the directions/observations/commitments made by the
authorities have been carried out and the water bodies as being allowed and permitted to be
encroached upon and go out of the hands of the authorities concerned.




The committee further observes that the sullage/sewerage is being allowed to go into the
water bodies thereby defeating the very purpose of the water bodies.




In some areas no catchment of water is provided meaning thereby that the water bodies
constructed are only for name sake and are not to be used/allowed to be used for the
purpose they have been constructed/renovated.




The committee has also found that some of the water bodies have been got converted into
parks with no provision of water going underground for recharging and increasing level of
underground water. The authorities concerned should:
(a) Take steps to get the water body area free from all encroachments.
          (b) Maintain/revive the area earmarked for water body, as a water body, as per
various observations/directions/orders passed by the competent Court of Law.
               It should be the prime concern authorities are of the opinion that a water body
It has been observed that despite information through writings sent rhrough Nodal Officers
and informations/directions given during discussion/meeting held with the representative of
the authorities. The status report since 2005 has not come forth. It is relevant to mention the
said status report was called in order to check as to what steps have been taken by the
authorities concerned for either revival of water bodies and/or maintenance/
progress/removal of encroachment/demarcations etc. of various water bodies.
Court Commissioner directed DDA to either the evacuate water body or provide alternate
side. 1 Bigha is allotted to someone. Case is pending in the Court. Plantation to be done.
Court Commissioner directed the Revenue Officer to demarcated the land by 11 Jan. 2012.
It has been observed that despite information through writings sent rhrough Nodal Officers
and informations/directions given during discussion/meeting held with the representative of
the authorities. The status report since 2005 has not come forth. It is relevant to mention the
said status report was called in order to check as to what steps have been taken by the
authorities concerned for either revival of water bodies and/or maintenance/progress/removal
of encroachment/demarcations etc. of various water bodies.
The committee has also found that some of the water bodies have been got converted into
parks with no provision of water going underground for recharging and increasing level of
underground water. The authorities concerned should:
(a) Take steps to get the water body area free from all encroachments.
           (b) Maintain/revive the area earmarked for water body, as a water body, as per
various observations/directions/orders passed by the competent Court of Law.
                It should be the prime concern authorities are of the opinion that a water body
cannot be constructed upon then in that case an information to that effect that first brought to
notice of the committee so that viability as to whether a water body can be
constructed/revived upon the area or not be decided.
                  However, the same does not mean that the area earmarked for the water
body should be/can be used for any other purpose. What has to be seen is as to what best
use can be made of that area for making it Green; rehcarging of the underground water
harvesting the water so that the level of underground water increases etc.
 The STP's which were required to be constructed in the village of Delhi for treatment of the
sullage/sewerage have not been constructed so far. This requires immediate attention.
It has been observed that despite information through writings sent rhrough Nodal Officers
and informations/directions given during discussion/meeting held with the representative of
the authorities. The status report since 2005 has not come forth. It is relevant to mention the
said status report was called in order to check as to what steps have been taken by the
authorities concerned for either revival of water bodies and/or maintenance/progress/removal
of encroachment/demarcations etc. of various water bodies.




It may be added that non-submission of the status report by the authorities concern results
into presumption that none of the directions/observations/commitments made by the
authorities have been carried out and the water bodies as being allowed and permitted to be
encroached upon and go out of the hands of the authorities concerned.
The committee further observes that the sullage/sewerage is being allowed to go into the
It has been observed that despite information through writings sent rhrough Nodal Officers
and informations/directions given during discussion/meeting held with the representative of
the authorities. The status report since 2005 has not come forth. It is relevant to mention the
said status report was called in order to check as to what steps have been taken by the
authorities concerned for either revival of water bodies and/or maintenance/progress/removal
of encroachment/demarcations etc. of various water bodies.
            It may be added that non-submission of the status report by the authorities
concern results into presumption that none of the directions/observations/commitments
made by the authorities have been carried out and the water bodies as being allowed and
permitted to be encroached upon and go out of the hands of the authorities concerned.
                 The committee further observes that the sullage/sewerage is being allowed to
go into the water bodies thereby defeating the very purpose of the water bodies.
               In some areas no catchment of water is provided meaning thereby that the
water bodies constructed are only for name sake and are not to be used/allowed to be used
for the purpose they have been constructed/renovated.                                       The
committee has also found that some of the water bodies have been got converted into parks
with no provision of water going underground for recharging and increasing level of
underground water. The authorities concerned should:
(a) Take steps to get the water body area free from all encroachments.
           (b) Maintain/revive the area earmarked for water body, as a water body, as per
various observations/directions/orders passed by the competent Court of Law.
                 It should be the prime concern authorities are of the opinion that a water body
cannot be constructed upon then in that case an information to that effect that first brought to
notice of the committee so that viability as to whether a water body can be
constructed/revived upon the area or not be decided.
                   However, the same does not mean that the area earmarked for the water
body should be/can be used for any other purpose. What has to be seen is as to what best
use can be made of that area for making it Green; rehcarging of the underground water
harvesting the water so that the level of underground water increases etc.
 The STP's which were required to be constructed in the village of Delhi for treatment of the
sullage/sewerage have not been constructed so far. This requires immediate attention.
Court Commissioners have directed to Revenue Officer to complete the survey.
Court Commissioner has commented that the water body has been kept at mercy of God.




Court Commissioner has suggested the DC concerned to take action promptly against the
BDO.
Court Commissioner directed DDA to either the evacuate water body or provide alternate
side. 1 Bigha is allotted to someone. Case is pending in the Court. Plantation to be done.




Court Commissioner directed the Revenue Officer to demarcated the land by 11 Jan. 2012.
It has been observed that despite information through writings sent rhrough Nodal Officers
and informations/directions given during discussion/meeting held with the representative of
the authorities. The status report since 2005 has not come forth. It is relevant to mention the
said status report was called in order to check as to what steps have been taken by the
authorities concerned for either revival of water bodies and/or maintenance/progress/removal
of encroachment/demarcations etc. of various water bodies.




The committee has also found that some of the water bodies have been got converted into
parks with no provision of water going underground for recharging and increasing level of
underground water. The authorities concerned should:
(a) Take steps to get the water body area free from all encroachments.
           (b) Maintain/revive the area earmarked for water body, as a water body, as per
various observations/directions/orders passed by the competent Court of Law.
                It should be the prime concern authorities are of the opinion that a water body
cannot be constructed upon then in that case an information to that effect that first brought to
notice of the committee so that viability as to whether a water body can be
constructed/revived upon the area or not be decided.
                  However, the same does not mean that the area earmarked for the water
body should be/can be used for any other purpose. What has to be seen is as to what best
It has been observed that despite information through writings sent rhrough Nodal Officers
and informations/directions given during discussion/meeting held with the representative of
the authorities. The status report since 2005 has not come forth. It is relevant to mention the
said status report was called in order to check as to what steps have been taken by the
authorities concerned for either revival of water bodies and/or maintenance/progress/removal
of encroachment/demarcations etc. of various water bodies.




It may be added that non-submission of the status report by the authorities concern results
into presumption that none of the directions/observations/commitments made by the
authorities have been carried out and the water bodies as being allowed and permitted to be
encroached upon and go out of the hands of the authorities concerned.
The committee further observes that the sullage/sewerage is being allowed to go into the
water bodies thereby defeating the very purpose of the water bodies.
   In some areas no catchment of water is provided meaning thereby that the water bodies
constructed are only for name sake and are not to be used/allowed to be used for the
purpose they have been constructed/renovated.                                    The
committee has also found that some of the water bodies have been got converted into parks
with no provision of water going underground for recharging and increasing level of
underground water. The authorities concerned should:
(a) Take steps to get the water body area free from all encroachments.
It has been observed that despite information through writings sent rhrough Nodal Officers
and informations/directions given during discussion/meeting held with the representative of
the authorities. The status report since 2005 has not come forth. It is relevant to mention the
said status report was called in order to check as to what steps have been taken by the
authorities concerned for either revival of water bodies and/or maintenance/progress/removal
of encroachment/demarcations etc. of various water bodies.
            It may be added that non-submission of the status report by the authorities
concern results into presumption that none of the directions/observations/commitments
made by the authorities have been carried out and the water bodies as being allowed and
permitted to be encroached upon and go out of the hands of the authorities concerned.
                 The committee further observes that the sullage/sewerage is being allowed to
go into the water bodies thereby defeating the very purpose of the water bodies.
               In some areas no catchment of water is provided meaning thereby that the
water bodies constructed are only for name sake and are not to be used/allowed to be used
for the purpose they have been constructed/renovated.                                       The
committee has also found that some of the water bodies have been got converted into parks
with no provision of water going underground for recharging and increasing level of
underground water. The authorities concerned should:
(a) Take steps to get the water body area free from all encroachments.
           (b) Maintain/revive the area earmarked for water body, as a water body, as per
various observations/directions/orders passed by the competent Court of Law.
                 It should be the prime concern authorities are of the opinion that a water body
cannot be constructed upon then in that case an information to that effect that first brought to
notice of the committee so that viability as to whether a water body can be
constructed/revived upon the area or not be decided.
                   However, the same does not mean that the area earmarked for the water
body should be/can be used for any other purpose. What has to be seen is as to what best
use can be made of that area for making it Green; rehcarging of the underground water
harvesting the water so that the level of underground water increases etc.
 The STP's which were required to be constructed in the village of Delhi for treatment of the
sullage/sewerage have not been constructed so far. This requires immediate attention.
Court Commissioners have directed to Revenue Officer to complete the survey.




Court Commissioner has commented that the water body has been kept at mercy of God.
Court Commissioner has suggested the DC concerned to take action promptly against the
BDO.
Reply/response by the concern
Authorities
Wall under progress.
Wall under progress.
DISTRICT - NORTH
S. No   Name of         Land    Khasra No/Areas Years &
        Village’s       owner                   Dates of
        No. of Water    ships                   Inspection
        Bodies/Pond's
1       Badarpur majra BDO/MC
        burari          D
2       Burari (4) and  BDO   (a)148 (12-15      10.06.2009
        Kamal pur majra       as per kathoni,
        burari                12-18 as per
                              khasra
                              girdawari,15-17
                              as per field book)




                                (b)151/1 (08-02) 10.06.2009
                                village burari and
                                alongwith Khasra
                                No 4//4/2 (05-18),
                                5/1 (4-0), 6/1 min
                                (01-00), 7/2 (2-
                                16) 8/1 (1-6)
                                village kamalpur
                                majra burari total
                                23 bigha 12 biswa


                                (c) 149/2/2 (28-   10.06.2009
                                02)




                                (d) 193/2 (08-11) 10.06.2009
                                & 150 (07-13)
                                Total area (16-04)
3    Civil line        BDO
4    Delhi             BDO
5    Delhi patti       BDO
6    Dasghara          DDA                     05.06.2009




7    Dhoula Kuan (1) DDA     (a) 15000 sq.
                             mtrs.
8    Gopal pur         DDA   14(2000sq.mtrs.) 05.06.2009
                             & 137
                             (3500sq.mtrs.)


9    Harsh Vihar       DDA                     05.06.2009




10   Jagatpur delhi    BDO
11   Jagatpur shah     BDO
12   Jharoda majra     BDO
     burari
13   Jwala heri F/89   DDA
14   Khuni jheel &     DDA                     05.06.2009
     Seepentine lake

15   K.N. ridge Khuni DDA     K.no. 333,346,   05.06.2009
     jheel                   347 Area
                             6839,26 Acre &
                             K.No ridge
                             seepentine lake
                             K.no 333, 346,
                             346 Area
                             3844,56 Acre
                             village civil
                             station.
16   Mukandpur          BDO   175 &179 total   10.06.2009
                              area (08-07)




17   Nai sarak          DDA
18   Naini Lake         DDA
19   Nimari F/74        DDA
20   Patti jahanuma     BDO
21   Purana quila (1)   DDA
22   Pitampura-A &      DDA                    05.06.2009
     Distt. Park
     Pitampura
23   Prasad Nagar       DDA                    05.06.2009

24   Silampur majra     BDO
     madipur
25   Silampur majra     BDO
     (burari)
26   Sadhora Khurd      DDA
     F/74
27   Timarpur           BDO
28   Wazirabad F/89     DDA
29   Zoo Lake           DDA
Site position/Directions/opinions                Committee’s Observations




Out of 12-15,03bigha-02biswa has been
allotted to private person by order of FC. The
site is meant for water body and is a dry one.
The land use cannot be changed. BDO is
required to take steps to get the allotment
cancelled. However demarcation be carried
out in remaining area atleast and possession
can be handed over to I&FC department for
preservation of the water body. At the first
instance MCD be directed sewerage to be
stop immediately.
The said water body exists on the boundaries
of two villages namely Burari and Kamal pur
majra. Demarcation is fixed for 17.06.2009.
Sewerage was flowing into water body. The
same shall be altered to some other place.
MCD to take action in this regard.




The water body is well developed. However
out of the said area, an area of 02 bigha 10
biswa has been allotted to a private person.
The BDO to furnish report as to how the area
of water body has been allotted. BDO to get
the same cancelled as land is meant for water
body cannot be changed for other purposes.
Plantation work is required to be done at the
periphery.
The water body is situated near village abadi.
MCD to take action for diverting the sewerage
into water body to some other place. Water
body is required to be cleaned up and be
developed by I&FC.
It is situated under ridge and measures 2.768
hectares. However, it is absolutely
undeveloped. The DDA landscape architect
has proposed to prepare a plan and on basis
of which the water body would be developed.
As of today, the depression contains keekar
trees which would have to be removed. Not
only that the entire area would have to be
fenced since it is used for parking of trucks
and other vehicles.


The water bodies (two in number) are located
in side the institutional area at burari namely
Yamuna Bio Diversity Park. The same is
maintained by respects of the institution.

This water body is fairly well developed and is
also surrounded by a park. However,a drain
which flows through the park carries sewage
water and in times of overflow contaminates
the water body. MCD be directed to take
necessary steps to prevent contamination.




They are located in the northen ridge near
delhi university and are fairly well developed.

They are located in the northen ridge near
delhi university and are fairly well developed.
Demarcation by total station machine was
fixed for 13.06.2009. Sewerage flowing into it
as the same is surrounded by colony. MCD is
to required take action diversion of sewerage .
After demarcation the same would be handed
over to I&FC for its development.




Two water bodies are located in the park.
They are being maintained by DDA.

This is a developed water body and only
require proper maintains from time to time.
Reply/response by the concern
Authorities
Given to Education dept. on 10/10/2005
DISTRICT- NORTH EAST
S.No   Name of Village's   Land    Khasra              Years & Dates
       No of Water         owner   No/Areas            of Inspection
       Bodies/Pond's       ships
1      Babar pur (2)       BDO     (a) 14(2-2)     27.08.2011
                                       (b) 137 min
                                   (3-5)
       (b) Babarpur        BDO     13 min (01-0)   27.08.2011




       (c) Babarpur        BDO     137 min (3-5)       27.08.2011




2      Badar pur khaddar   BDO
3      Bakiabad            BDO
4      Biharipur (1)       BDO
5      Ghonda chauhan      BDO     (a) 5 (0-12)
       banger (2) DJB                   (b) 6 (6-15)

6      (A)Gonda Chauhan BDO        1 etc/136(10-       27.08.2011
       Bangar                      19)
       (B)Gonda Chauhan BDO        1 etc/ (3-3)        27.08.2011
       Bangar
7    Ghonda chauhan     BDO
     khaddar
8    Ghonda gujran      BDO
     banger
9    Ghonda gujran      BDO
     khaddar
10   Gokulpur           BDO          (a)300/1 (2-4)   27.08.2011




                        BDO          656(0-18) &      27.08.2011
                                     657 (012)




11   Garhi mande
12   Ghonda F/74        DDA
13   Ghonda neemka      DDA
     F/89
14   Jafarbad           BDO
15   Johripur           BDO          6//17/1(2-16)    27.08.2011

16   Jeevenpur johirepur BDO         (a) 6//16/2/2(1- 27.08.2011
     (2)                             5)
17   Jhilmil tahirpur F/66 MCD/DDA   (a) 8400
     (1)                             sq.mtrs. K No. 1

18   Jhilmil tahirpur   DDA          1000 sq.mtrs.    25.02.2007
     (najul) (2)
                                (b) 1000 sq.     03.06.2009
                                mtrs.




19   Karawal nagar        BDO   (a) 96(2-10)     27.08.2011




                                (b) 173(4-16)    27.08.2011




20   Khajuri khas         BDO
21   Khanpur khani        BDO
22   Mandoli              BDO
23   Mirpur turk          BDO
24   Mustafabad           BDO   (a) 368/1 (28-2) 27.08.2011

25   Mandoli Kachi F/89   DDA
26   Mandoli fazilpur     DDA
     F/74 (4)
27   Maujpur F/74 (3)     DDA   772/73 min (0-   27.08.2011
                                12)
                                773/73 min (0-   27.08.2011
                                12)
                                774/73 min (1-   27.08.2011
                                3)
28   Maharaja surajmal   DDA   7500 sq. mtrs.   25.02.2007
     park                      K No. 94




                               7500 Sq. mtrs.   03.06.2009
                               K No. 94




29   Pur Delhi           BDO
30   Pur Shahdara        BDO
31   Sabahpur Delhi      BDO
32   Sabahpur            BDO   (a)486 (5-2)     27.08.2011
     Shahdara (1)

33   Shaadatpur          BDO
     musalman
34   Shaadatpur gujran   BDO
35   Saqdarpur           BDO
36   Saboli F/74 (4)     DDA
37   Usmanpur F/89       DDA
38   Ziauddenpur         BDO
Site position/Directions/opinions            Committee's observation




                                             DDA acquired the area vide award no. 92 of
                                             1986-87. DDA was directed to identify the land
                                             and submit the report to the Committee within
                                             a period of 15 days. However, no report has
                                             been submitted before the Court Committee till
                                             date.
                                             03 bigha of area is developed as water body.
                                             However sewer is flowing intof water body.
                                             DJB was directed to divert the sewer. 5 biswa
                                             of area is out of boundary wall. BDO informed
                                             that Court case is pending is Court of
                                             Revenue Assistant in respect of said area.
                                             BDo was directed to place the particulars of
                                             the case to the Committeed within two weeks.
                                             However, no report has been submitted before
                                             the Court Committee tilldate.




DDA stated that the water body has been
handed over to it under Section 22(1) of
DDA Act. DDA handed over the same to
Horticulture department allotted to Mother
Diary booth. DDA was directed to submit
the report as to how the water body has
been allotted to Mother Diary booth when
Sectin 22(1) of DDA Act specifies that
such lands are to be maintained as green
area only. However, no report has been
submitted before the Court Committee till
date.
Site has been converted into a dumping
ground. BDO was directed to get the
matter with MCD. I&FC was directed to
get the plan prepared for increasing the
catchment area and submit the same to
the Court Committee. Needful be done
within two weeks
Both Khasara No's are heavily built up.
The agencies were directed to identify the
site and submit the report to the
committee within a period of 15
days.However, no report has been
submitted before the Court Committee till
date.




BDO informed that Shamshan Ghat has
been developed at site.




The Tahirpur (b) water body falls between
Tahirpur village and the sports complex.
An area of 1000 sq.mtrs. is proposed for
the development of a water body. The
total area of vacant land available at the
site is approx. 8000 sq.mtrs. The other
water body namely Jhilmil Tahirpur (a)
had a water body admeasuring 5000
sq.mtrs. The said area has been handed
over to MCD for construction of Super
Specialty Rajeev Gandhi Hospital. The
said hospital is under construction. The
photographs of the site and the map are
annexed as Annexure-XIII andXiii(a).
The DDA has not developed the water
body and instead have proposed to
develop a park, hut, pathway, having a
water body in the middle of hardly area
500 sq. yds. out of total area of 1000 sq.
mtrs on the spot. The design show has
been totally rejected and it requires fresh
redrawing so that maximum area is given
to the water body.
Encroachment exist over the entire water
body. A case is stated to be pending
against some persons in the Court of
Revenue Assistant. BDO was directed to
get the matter decided at the earliest.
Thereafter demarcation of the water body
to be carried out site be handed over to
the devloping agency for its development.

BDO inform that 4 bigha 5 biswa land has
been aloted to DTC. A case is stated to
be pending in the Court of Revenue
Assistant, in respect of encroached area.
At site no depo was found. BDO was
directed to take up the matter with DTC
and get the land back for development of
water body. BDO was also directed to get
the matter pending in Court of Revenue
Assistant decided at the earliest.




Ldgah exists over 2 (two) Acre of land.
Rest of area is in form of Kabristan.




MCD park exists on boundary wall.
Electric transformer exists on the water
body land.
The water body is located opposite               The committee is the opinion that the entire
Surajmal Vihar Colony having an area of          7500sq.mtrs. is already an existing water
2000 sq.mtrs. Surprisingly this proposed         body. Further ,the wall encircling the lake to be
water body is with in an already                 removed, so that the rain water from the
developed lake admeasuring approx.7500           surrounding open lands of the park and the
sq.mtrs. The photographs of the site and         adjoining roads could be diverted to the water
the map are annexed as Annexure-XIV              body.
and XIV(a).
The water body inside the park is mostly
dry partially because no facility for entry of
water body has been provided. The DDA
is proposed to carry out the necessary
remedial measures and also entry of the
road is to be provided.




Illegal construction. BDO and SDM are
directed to stop the illegal consturction.
Demarkation is required.
Reply/Response by the concern
Authorities

Shamshan Ghat exists on Water body site.
     (b) Work complete 9 point.
Work complete 9 point




Encroachment/built up




Shamshan Ghat exists on Water body site.

Shamshan Ghat exists on Water body site.
Built-up, land allotted to DTC




Built-up, land allotted to DTC




Kabristan
Built-up, case pending before SDM
concerned.
DISTRICT-EAST
S.no   Name of Village's No. Land        Khasra            Years & Dates
       of Water              owner       No./Areas         of Inspection
       Bodies/pond's         ships

1      Chandrawli shahdarra     BDO
2                               BDO
       Chilla saroda banger(2)
3      Chilla saroda khaddar BDO
4      Chilla saroda           BDO
5      Dallu pura (4)    (1)   BDO/DDA   15900 sq. mtr.    04.02.2007
       DVB-BDO         (2) DP-           (a)to(d) Khasra
       BDO                               no. 171 to 175
                                         min




6      Gharoli (7) (a) to (d)   DDA      (a) to (d) 13380 04.02.2007
       and (e) to (g)                    sq. mtrs. (e) to
                                         (g) 1002 sq.
                                         mtrs.Kno 947/672




7      Gharonda neemka          BDO
       khadar
8      Gharonda neemka          BDO
       nangar
9      Gharoda neemka           BDO
       bhangar
10    Ghazipur F/74(4) (1) DDA/BDO    (a) 6620 sq.       04.02.2007
      Bus Stand                       mtrs. Kno. 519
     (2) Ench villagers               (DDA list)
         (3) Alloted to Delhi
      agricultute marketing
      board (1 to 3 allotted
              by BDO)




                                                         02.02.2007




                                                         03.06.2009



11   Ghondli F/74           DDA
12   Hasanpur F/74          DDA
13   Kondli WB Under the    BDO       (a) 471/1 29(1-4) (I&F list Serial
     possession MCD staff                               No.221)
     quarters

14   Kotla shahdara         BDO
15   Kaithwara F/66         MCD/DDA
16   Karkarduma F/74 (2)     DDA   (a) 1600 sq.mtr.   25.02.2007
                                   Kno. 560 min




                                   (b) 3500 sq.mtr. 25.02.2007
                                   K No. 483 to 492



17   Khichripur F/74 (4)     DDA   (a) 1875 sq. mtrs. 04.02.2007




                                   (b) 1500 sq. mtrs 03.06.2007
                                   KNo. 360
                                        (c)1000 sq.
                                   mtrs.         (d)
                                   Khasra no.
                                   587/702 &
                                   587/316 55
                                   acres Samriti Van




18   Khureji khas F/74 (3)   DDA
     W.B
19   Kotla F/89               DDA
20   Mandawali fazilpur       MCD/DDA   MCD Kh. No.       03.06.2009
                                        625, 626 (30-0)




21   Older pur                BDO
22   Rampura F/66             MCD/DDA
23   Saleempura               BDO
24   Samaspur Jahagir         BDO
25   Seema puri               BDO
26   Shakarpur baramad        BDO
27   Seelam pur F/74(3) (1)   DDA/MCD/B MCD               03.06.2009
     DP-BDO                   DO




28   Shahdara F/74            DDA
29   Shakarpurkhas F/74       DDA
30   NH-24 I.P. Extension     DDA       (a) 20000 sq.    04.02.2007
     (1)                                mtrs. Khasra no.
                                        513
     31   Sanjay Lake (1)   DDA   (a) 170000 sq.    04.02.2007
                                  mtrs.




                                  170000 sq. mtrs. 03.06.2009




32        Vinod Nagar (3)   DDA   (a) 6600 sq.      04.02.2007
                                  mtrs. K No. 882
                                  to 885




                                  (b)34000 sq.      04.02.2007
                                  mtrs. K No. 625
                                  MCD Park
                               (c) 3.5 hectares   03.06.2009




33   Shastri Park (2)    DDA   (a) 1000 sq.     25.02.2007
                               mtrs. Khasra no.
                               109




                               (b)                03.06.2009


34   Nand Nagari (2)     DDA   (a) 34027 sq.      25.02.2007
                               mtrs. K No.911,
                               912




                               (b)                03.06.2009




35   Sunder Nagari (1)   DDA   (a) 1500 sq. mtrs 25.02.2007
(b)   03.06.2009
site position/Directions/Opinios




These water bodies admeasuring about 15900
sq.mtrs. are located between Chilla Sports
Complex and Village Dallupura. This area has been
developed and allotted for fire station petrol pump,
service station, electric sub-station, school, college,
etc. The officers present were unable to pin point
on the site plan the exact location of the said
weater bodies.
                           There are large stretches
of vacant land which have yet not constructed
upon. The Committee is of the view that DDA be
directed to earmark suitable land admeasuring
atleast 5000 sq.mtrs. as near as possible to the
main road for developing a water harvesting body.
The photographs of the site and the map are
annexed as Annexure-V & V(a).
These water bodies are located near Gharoli Dairy
Farm. Gharoli (a) to (d) admeasures about 13380
sq.mtrs. and Gharoli (e) to (g) admeasures about
1002 sq. mtrs The undeveloped land at the Gharoli
(a) to (d) site is about 19000 sq.mtrs. and Gharoli
(e) to (g) is 9600 sq.mtrs. It was stated that the said
lands have been earmarked for School. Electricity
Sub-Station, Police Station, etc.
This water body is situated adjacent to NH-24
admeasuring 15000 sq. mtrs. The inspection of the
site shows that the land is lying vacant and nothing
has been constructed on the said area. It was
stated that the land has been earnmarked for
construction of a integrated Freight complex. This
area is yet vacant and hence, it can easily be
developed as a water body with suitable water
harvesting systems. The photographs of the site
and themap are annexed as Annesure-1 and 1(a).




The water body is situated between DDA flats at
NH-24 and village Ghazipur. The area of the water
body is approximately 6620 sq. mtrs. The total area
of vacant land at the site is 6341 sq mtrs. The
committee is of the opinion that the entire vacant
land be maintained as a water body. The
photographs of the site and the map is annexed as
Annexure 11 and 11(a).

Its area is 6200 sq. mtrs. Work in progress. It is
expected to be completed in 4 months.
The Karkardooma waterbody (a) admeasuring
1600 sq. mtrs has been developed as a park for the
residents of the area.




The water body at Karkardooma (b)
admeasuring3500 sq. mtrs has been constructed
upon and a commercial centre exists at the site.

Khichripur (a) water body admeasures about 1875
sq. mtrs. And that of Khichripur (b) is about 1500
sq. mtrs. These water bodies are located between
Khichripur Village and NH-24 Khichripur (c)
admeasures about 100 sq. mtrs and is situated
between MCD Primary School and Kalvan Vas
Colony. this land is partially encroached and there
is no proper catchment to divert water into this
body. The photographs of the site and the map
area annexed as Annexure-III and III(a)

The water bodies numbering two have been
encroached and these are plans to develop a multi-
storey building for economically weaker section i.e.
the encroachers. In lieu of these two water bodies
and four water bodies at Dhalupura, DDA has
developed an area of 55 acres at Samriti Van
where a water body has also been earmarked in
the joint plan. For source of water for this water
body, it is proposed to have water from the sewage
treatment plant for which a reservoir has also been
constructed. The DDA landscape Architect had
also visited the site and after discussions it is
proposed to provide rain water harvesting through
direct outlets from the open road. The water from
the STP is also not clean enough and will have to
be further treated before allowing it to fill the water
body.
This water body had been transferredby DDA to
MCD for development of a park and wher a
community hall had been proposed. This is totally
illegal. The water body should be restored. It may
also be mentioned that the concerned Executive
Engineer failed to join the inspection.




The water body is looked after by MCD. This is a
very large time water body which mainly remains
dry except during monsoons. Although efforts have
been made to restore it yet on one side due to the
settlement outside the water body, the boundary
wall has been broken. It was suggested that the
time area be afforested so that people do not rake
it to be a garbage pit. This should help in
maintaining the water body.


This water body admeasuring about 20000 sq.
mtrs. Is located between NH-24 and the central
group housing society are I.P. Extension. It is within
the green belt admeasuring about 66700 sq. mtrs.
Committee suggests that appropriate water
harvesting body be developed within the said water
body. The photographs of the site and the map are
annexed as Annexure-VI and VI(a)
This is a natural lake admeasuring about 170000
sq. mtrs. And is located between mayur vihar
phase I and II. Cammittee was informed to its utter
shock that the water level in the lake during non-
monsoon seasons is maintained by pumping out
ground water.




This lake has been reduced in size probably
because to stop sewage from entering and
contaminating the entire water body. DDA has not
done enough to develop the entire water body or
provide any rain water harvesting. Sewage has filed
much of the water and no steps to prevent its entry
into water body.
This water body is located behind Mother Dairy
booth at Pandav Nagar. It admeasuring about
6600sq. mtrs. This water body should be
developed. The Committee was informed that the
working drawings of the water body are under
preparation. The photographsof the site and the
map are annexed as Annexure-VIII and VIII(a).


This water body admeasuring about 34000 sq.
mtrs. Falls within the Vinod Nagar West Colony
near Senior Secondary School. It has been
developed as a park by MCD. The photographs of
the site and the map are annexed as Annexure-IX
and IX(a).
Sewerage and Malba was found flowing into it. It is
proposed to be developed within a period of two
months, for which tenders have been invited for
16.06.2009. At present it contains only dirty water
as the neighboring area is surrounded by
settlement.
This water body falls within the land earmarked for
District Park and “Facility Centre”. The area of the
body has been shown as 1000sq. mtrs. At the time
of inspection the entire area of the park had been
leveled out. It was stated that a water body
admeasuring 1000 sq. mtrs. has been earmarked
in the plan and which would be developed at the
earliest. The photographs of the site and the map
are annexed as Annexure-X and X(a).

This is a water body where work is in progress. It is
relatively well developed and has a large green
area within it.
The water body is situated in an largr open
depression measuring 34027 sq. mtrs. Along
Wazirabad Road,Green Belt No.9. It was stated out
of the said totel area only an area of 13500 sq.
mtrs. Has been earmarked for developing a water
body .The committee after inspection is of the
opinion that in order to compensate the loss of the
adjoining water body area which has been allotted
for construction of jail, the area of the water body
needs to be increased to atleast half of the area
are under preparation. A sketch plan has been
submitted which is annexed as Annexure-XI and
XI(a).

The water body is next to the proposed a jail. It is a
very large area and part of it is being developed as
a water body and the remaining area will be
afforested. The area needs special care.
This water body is situated between Leprosy
Hospital and Sunder Nagri resettlement colony. An
area 1500 sq. mtrs. Has been earmark for
developing a water body out of the total area of
vacant land admeasuring 3.60 hectares (36000 sq.
mtrs.). It was stated that the site plan has been
prepared an approved on 17-01-2007.
This is a large water body. However, DDA had
missed the purpose of developing with a view to
enhance water collection. The design shown
provides a very small area for the water body and
the remaining area is been developed as a park
with a walk way and also having a parking area.
Committee's Observation                       Reply/Response by the concern
                                              Authorities




The committee observed that a full fledged
school was functioning from the said land .




Committee is of the view that atleast 3000
sq.mtrs. be carved out of the total area of
19000+9600=28600 sq.mtrs and be
earmarked for developing a water
harvesting body. DDA requested to
prepare a plan accordingly. The
photographs of the site and the map are
annexed as Annexure IV and IV (a).
The committee inspected the adjoining
areas to locate alternative sites for a
composite water body. The committee
observed that a large stretch of vacant land
including a park rightacross the
Karkardooma (b) site is available for
developing a proper harvesting water body.




The committee is of the view that one
composite water body he developed at
Khchripur (a) site admeasuring 5000 sq.
mtrs as the total land area avaliable at
Khichripur (a) site is 13500.
The committee observed that towards he
East side of the lake Lal Bahadur Shastri
Hospital end a Kacha bandh has been
constructed which was obstructing the flow
of lake water to the east end. Committee
on enquiry was informed that a portion of
other facilities. The committee is of the
opinion that the area of the lake should not
be reduced and he maintained as depicted
in the drawing approved by DDA inits
landscape plan of Sanjay Lake at
Trilokpuri. Father, the cucha band should
be demolished forthwith. The photogrpahs
of the site and the map are annexed as
Annexure-VII and VII (a)




Committee is the opinion that appropriate
water harvesting systems should be
installed at the site.




Committee of the opinion that an
appropriate portion of the said atleast 5000
sq. mtrs. Be earmarked for developing of
water harvesting body by MCD.
it was suggested that the area of the water
body should be enhanced and also located
towards the road side given the depression
and the gradation. Further rain water from
the road side also to be diverted into the
water body.
DISTRICT- NORTH WEST
S. No   Name of Village’s   Land    Khasra               Years & Dates
        No. of Water        owner   No/Areas             of Inspection
        Bodies/ Pond,s      ships
1.      Akbarpur majra      BDO     (a) 62 (6-10)        09.06.2008




                                                         10.06.2009


                                    (b)29/1/2      (1-   10.06.2009
                                    17)


                                    (c)63min             10.06.2009
                                    (00-19)




2       Awantika            DDA     (a)2000Sq.mtrs
                                    (b)15000sq.mtrs

3       Alipur              BDO     64/27 (19-00)        23.12.2008
                                                         24.12.2008
4       Azad pur F/74       DDA     (a)22       (11-1)   27.11.2010
                          (b)85   (1-7)   27.11.2010




5   Bakhtawar pur   BDO   (a)115 (19-4)   09.06.2008




                          115 (19-4)      10.06.2009




                          (b)110 (22-4)   09.06.2008




                                          10.06.2009
                    (c)113 (9-10)     10.06.2009




                    (d)109 min (18-   10.06.2009
                    16)




                    (e)111 (04-18)  10.06.2009
6   Bankner   BDO   (a)37/28&29(14- 09.06.2008
                    8)




                                      28.12.2012




                    (a)37/28&29       23.12.2008
                    (14-08)
                                      24.12.2008

                    (b)43/26   (14-   23.12.2008
                    08)
                                      24.12.2008
                    (c)42/27min          23.12.2008
                    (18-10)
                                         24.12.2008
                    (e) 38//28/2 (23-
                    18)
                    (f)10//26 (0-4)W
                    (g)32//28(0-5)
                    (h)32//29 (0-6)
                    (i)37//26,27(0-6)
7   Bakoli    BDO   (a)13//6 (4-16)      28/12/2011
                        7min (4-11)      28/12/2011
                        8min (2-17)
                       14min (1-16)

                       total area (14
                    00)




8   Barwala   BDO   (a)87//4     (30-    23.07.2005
                    18)


                    (b)87//6     (08-    23.07.2005
                    10)

                    87//6 (8-10)         24.12.2009

                    87//4      (30-18)
                   (c)27//10/1 (02-    24.12.2009
                   08)




                   (d)28//13   (02-
                   15)
                   (e)28//18    (04-
                   03)


                   (f)35//12 (03-
                   00)
                   (g)82 (26-06)




9   Bawana   BDO   (a)202/2    (11-    09.06.2008
                   10)




                                       23.12.2008

                                       24.12.2008
                   (b)74/18 (04-       23.12.2008
                   16)      23
                   (04-14) Total       24.12.2008
                   area
                   (c)108/25 (04-      23.12.2008
                   16)
                                       24.12.2008
                   (d) 203(07-03)      23.12.2008

                                       24.12.2008
                   (e)130//4min
                   (03-16)
                   (f)161//1 (01-
                   12)
                   (g) 205 (02-11)
                   (h) 206 (06-13)
                               (i)206/1min
                                          (09-
10   Bajeetpur thakran   BDO   (a)22//4 (04-       23.12.2008
                               16)
                               5(04-16)              24.12.2008

                               Total-(09-12)
                               (b)30//9/1 (02-    23.12.2008
                               06)          10(3-
                               08)                  24.12.2008
                                  Total-(05-14)

                               (c) 8//17 (03-18) 23.12.2008
                                          18 (4-
                               16)                 24.12.2008
                                    Total- 08-14)


                               (d)76//8    (04-
                               14)
11   Begumpur            BDO   (a)12//6 (04-      28.12.2011
                               16)
                               (b)12//7/2 (03-15)

                               (c)12//13/3 (02-
                               16)
                               (d)12//14 (04-
                               16)
                               (e)12//15min (2-
                               0)
                               (f)12//17min (2-
                               0)
                               (g)16//23min(4-0)

12   Bhalswa jahangirpur BDO   1051 (13-10)        05.06.2009



                               LAKE                10.06.2009




13   Bhorgarh            BDO   (a)30//19 (06-
                               12)
13                      BDO

     Award no.9/04-05         (b) 41//15(04-16)
     DDA                      41//16(01-16)
                              total area (6-12)

14   Budhnpur           BDO   (a)10//24 (01-
                              05)
                              (b)11//4 (2-2)
                              (c)11//7 (3-7)
                              (d)11//13(1-8)
                              (e)11//14 (3-17)
                              (f)11//17min (0-8)

                              (g)11//18(3-5)
                              (h)11//23min1-
                              11)
                              (i)11//24 (0-6)
                              (i)11//24 (0-6)
                              (j)34//5 (4-16)
                              (k)34//6 (4-16)
                              (l)36//2 min(0-
                              1),       3(0-3),
                                 7(4-11), 8(4-
                              16), 10/1(3-0)
                              10/2 (0-19)
                              13/3 (2-10),
                              24(5-7)
                              (m)49 (34-9)
15   Budhpur bizapur    BDO   Old 21//15,16     23.12.2008
                              new33 (8-2)
16   Badli F/89         DDA   100/27            24.12.2009
                               (a)182 (14-3)     27.11.2010




16.   Bharola F/74      DDA    (a)1//21min       27.11.2010
                               (0-11)

17    Bharola F/74      DDA
18    Chand pur         BDO
                               (b)33//6 (5-1)
                               (a) 519 (22-9)
19    Chatesar           BDO   (a)107 (19-17)
20    Chaukri mubarikbad BDO                     23.12.2008
      F/74
                                                 24.12.2008
21    Daryapur kalan    BDO                      24.12.2009

                               (b)71/29   (36-   23.12.2008
                               09)
                                                 24.12.2008
                                  (c)44/26   (03-   24.12.2009
                                  12)




                                  (d) 65/1&2        23.12.2008
                                        (9-12)
                                                    24.12.2008
                                  (e)69/31 (2-3)    24.12.2009



                                                    24.12.2009


22   District Park Rohini   DDA   (a)293,296,297,2 05.06.2009
                                  99,300,301,302,3
                                  03,322,355,356to
                                  tal=75 hectares

23   Dhir pur F/74          DDA   293,296,297,299, 24.12.2009
                                  300,301,302,303,
                                  322,355,356total
                                  =75hectares




                                  (b)NIRANKARIE 24.12.2009



                                                    05.06.2009


                                                    05.06.2009
24   Fateh pur jat    BDO   Nil water body
                            as per Tehsildar
                            (N)report

25   Garhi randhala   BDO   (a)24 (4-16)
                            (b)165 (9-11)
                            Nil water body
                            as per Tehsildar
                            (N)report

26   Ghari khusro     BDO   (a)222-223/1 (22-
                            00)
27   Ghewara          BDO   (b)264 min(5-4) 09.06.2008




                            (c)212 (11-13)     09.06.2008



                                               09.06.2008




28   Ghogha           BDO   (a)193 (17-11)     23.12.2008

                                               24.12.2008

                            (b)180 (05-11)     23.12.2008

                                               24.12.2008
29   Hamid pur        BDO   (b)31/41   (10-    10.06.2009
                            18)

                            (c)53 (0-15)       10.06.2009

                            (d)54 (0-5)

30   Harewali         BDO   (a)10//11 (4-
                            16)
                            (b)11//20min
                            (2-11)
                            (c)11//20min
                            (2-11)
                           (d)10//21min
                           (2-10)
                           (e)11//16min
                           (2-12)
                           (f)11//25min (1-0)

                           (g)19//19min
                           (4-16)
                           (h)19//20 (4-
                           16)
31   Hirnki          BDO   (a)534, 535 (12- 10.06.2009
                           13)


                                                10.06.2009




32   Holambi Kalan   BDO   (b)35/3 (03-08)      23.12.2008
                                   4(03-05)
                           4(03-05) 8(03-       24.12.2008
                           08) Total = (14-
                           16)




                                                23.12.2008

                                                24.12.2008
33   Holambi khurd   BDO   (a)119 (43-8)        23.07.2005




                           119(43-8)            23.12.2008

                                                24.12.2008
                             (b)117, 118    24.12.2009
                             (19-2)




                                            24.12.2009




34   Haider pur F/74   DDA   (a)48 (6-7)    24.12.2009
                             (b)198 (3-0)
                             (c)482 (5-8)   28.12.2011
                             (d)501(0-14)
                             (a)48 (6-7)




35   Ibrahimpur        BDO   (a)90 (4-09)   10.06.2009

                                            10.06.2009
                       (b)17//24min
                       (1-13)


36   Jat khor    BDO   (b)17//24min
                       (1-13)
                       (c)32//7/1(4-8)
                       (d)35//25min (3-
                       6)
37   Jaunti      BDO   (a)330/20 min     09.06.2008
                       (14-16)
                       (b)4//4/2 (2-2)
                       (c)28//7/2(1-9)
                       (d)86//21/2(0-11)

                       (e)86//22/1 (2-0)

                       (f)19//22 (4-2)
                       (g)19//23 (5-
                       13)
                       (h)225 (29-7)
38   Jindpur     BDO   (a)42/2 (05-10)     28.12.2011




39   Kanjhawla   BDO   (b) 144/103 (12-    23.12.2008
                       00)
                                           24.12.2008
                       (c)42/127 (20-      23.12.2008
                       00)
                                           24.12.2008
                       (d)142/27(9-0)      23.12.2008

                                           24.12.2008


                       Pond before
                       Consolidation
                       30//14/2 (1-0)
                       15/2(3-0)
                       16min (4-0)
                         17/2 (1-12)
                         21(2-14)
                         22min (3-19)
                         23min (3-15)
                         24/1min (2-10)
                         32//15 (3-9)
                         33//11 (6-1)
                         40//8/2 (2-1)
                         9/1(3-0)
                         9/2(1-16)
                         10(3-11)
                         11/1 (2-19)
                         12/1(3-0)
                         2/2(1-16)
                         3/2(2-17)
                         65//1 (4-16)
                         2(4-16)
                         3(4-16)
                         6(4-16)
                         7/1(2-9)
                         15(4-16)
                         16(4-15)
                         66//3/1/2 (3-7)
                         21(4-16)
                         22(4-16)
                         95//3/2 (3-12)
                         6/1(2-9)
                         7/1(4-13)
                         8(4-16)
                         9/2(2-7)
                         12/2(2-7)
                         13(4-16)
                         14(4-16)
                         15/2(2-9)
                         16/2(2-9)
                         17(6-8)
                         18(5-14)
                         19/2(2-7)
                         101/25 (7-5)
40   Kabir Basti   DDA   124 (80-1) total
                         area 233-18

41   Karala        BDO   55/27 (01-10)      23.12.2008

                                            24.12.2008
                         267/1 (19-04)
                         267/2 (05-08)
42//6/1(0-4),
6/2(3-2), 8 min(3-
11), 9 min(0-16),
10 min(0-8), 11
min(2-8), 12 min
(4-8), 13(4-16),
14(4-16), 15(4-
16), 16(4-16),
17(4-16), 18(4-
16), 19(4-16),
21(4-16), 22(4-
16), 23(4-16),
24(4-16), 25(4-
16), 59//1/2(2-8),
2(4-16), 3(4-16),
4(4-16), 5(4-16),
Total area (96-1



267/1(19-4)          07.05.2011




55//27(1-10)         07.05.2011




267/2(5-8)           07.05.2011


13 (4-16)            07.05.2011




14(4-16)
                         15(4-16)
                         16(4-16)
                         17(4-16)
                         19(4-16)
                         59/1/2 (02-08)
                         2(04-16)
42   Katewara      BDO   (b)692 (4-16)       23.12.2008

                                             24.12.2008

                         (c)824 (7-01)       23.12.2008

                                           24.12.2008
                         49(4-05) 50(5-    23.12.2008
                         09) total=(19-14)
                                           24.12.2008




                                             23.12.2008

                                             24.12.2008


43   Khera kalan   BDO   (b)37//26(4-6)      23.07.2005
                         (c)39//26 (18-
                         16)


44   Khera khurd   BDO   (b)268 (8-13)       24.12.2009




                         (c)269(7-14)        24.12.2009

                         (d)277(0-10)
45   Kirari        BDO   (a)148 (10-0) out
                         of 148 (50-19)
45   Kirari    BDO


                     (b)1007min(04-       23.12.2008
                     15)
                                          24.12.2008
                     (c) 569 (7-17)       23.12.2008

                                          24.12.2008
                     (d)1270min           23.12.2008
                     (10-16)
                                          24.12.2008

                     (e)966 (17-11)       23.12.2008
                     out of 966 (67-
                     02)                  24.12.2008
                                          23.12.2008

                                          24.12.2008

46   Lad pur   BDO   (b)77//22/3(2-0), 07.05.2011
                     23/2(4-0), 24/1(4-
                     0) Total area (10-
                     0)
                     (c)72//2/1(3-2),   07.05.2011
                     9/3(0-1),
                     78//23/1 (4-14),
                     total area earn
                     (12-13)
                     (d)80//17/1 (3-5) 07.05.2011




47   Lam pur   BDO   (a)21//26(1-3)
                     (b)25//1 (5-6)
                     (c)50//4min (3-8)

                     (d)50//6 (4-16)
                     (e)50//7 (4-16)
                     (f)50//15min (1-6)

                     (g)51//1 (0-7)
                     (h)54//11/21 (2-1)

                     (i)37//19/1min
                               (0-3)
                               (j)19//2 (0-5)
                               (k)19//21min(0-8)

48   Libas pur           BDO   (a)24//3(2-7)
                               (b)27 (16-19)
49   Madanpur dabas      BDO   (a) 76(10-16)       07.05.2011

                               (b)77/2 (9-4)       07.05.2011

                               (c)79 (21-13)       07.05.2011



50   Mamoor pur          DDA   (a) 25//7 (1-12)  28.12.2011
     Award no202/86-87         (b) )25//8 (1-18)
     DDA                       (c)26//1 (4-16)
                               (d)43//26 (13-7)

51   Mohd pur maijri     BDO   (b)10//27min (8- 23.12.2008
                               13)
                                                24.12.2008
51                             (c)18/26 (33-    23.12.2008
                               18)
                                                24.12.2008

                                                   23.12.2008

                                                   24.12.2008
52   Mohd pur ramjanpur BDO    37//4
53   Mubarikpur dabas   BDO    37/4(01-01)         23.12.2008

                                                   24.12.2008


                               (b)13//16     (4-   07.05.2011
                               16)




                               (c)14//20, 21,      As per site
                               13//15, 16          pond exists.
                                                   Maintained in
                                                   khathoni
                              (d)37/72(2-4)        07.05.2011




                              (e)13//25      (4-   07.05.2011
                              16)

                              (f)14//20   (4-16)

                              (g)14//21 (4-
                              16)
54   Mukhmail pur       BDO   (a)299/1 (1-0)
                              Forest
                              (b)312 min (2-0)
                              forest
55   Mungesh pur        BDO   (a)49(12-17)      09.06.2008
                              (b)4//21 (4-16)
                              (c)11//26 (4-
                              16)
                              (d)314/2 (6-1)
                              (e)308/2 (0-15)
                              total area (6-16)
56   Mangol pur kalan   DDA   (a)17/3 (4-16)    27.11.2010
     F/89                     (b)28//4/1min,2mi
                              n,6,7min total
                              area(14-0)
                              (c)18/16/2(5-1)   27.11.2010


                              (d)5/24(7-5)         27.11.2010




57   Mangol pur khurd   DDA   (a)18 (5-12),
     F/74,89                  19(6-13),

                              21(3-14),
                              22(4-14),
                              23(3-0),
                              74(4-6),
                              75(1-14),
                              76(2-11),
                            77(5-5),
                            78(3-4),
                            79(2-2),
                            80(2-13),
                            81(2-19),
                            83(1-3),
                            88(2-1) tolal area
                            (51-11)
                            (b)372min(10-4)
                            (c)476min(5-4)
                            (d)674min(10-3)
58   Nangal Thakran   BDO   (a)92 (19-9)          23.07.2005
                            92min (2-0)           23.07.2005
                            Asami Sher
                            Singh s/o Nobat
                            (2-4) Asami
                            Bagwan s/o Mul
                            chand Total area
                             (23-9)as per
                            khathoni
                            (a)92 (19-9)          23.12.2008
                            92min           (2-
                            0) Asami Sher         24.12.2008
                            Singh s/o Nobat
                            (2-4) Asami
                            Bagwan s/o Mul
                            chand Total
                            area (23-9)as
                            per khathoni
                            (b)87 (9-7)           23.07.2005

                                                  23.12.2008

                                                  24.12.2008
                            (c)9/3 (2-16)         23.12.2008
                            4(04-16) 7(04-
                            16) 8(04-16)          24.12.2008
                            total= (17-04)



                            (d)81 (14-12)         23.12.2008
                            83(9-15)
                            total=(24-07)         24.12.2008


                            (e)90(4-17)
                         (a)61/26 (7-18)    24.12.2008
                         396(06-11)
                         total=(14-19)

59   Nangli puna   BDO   48min (3-111/2) 10.06.2009



60   Narela        BDO   (a)61/26 (07-18)   23.12.2008
                                  (b) 239
                         (29-6)             24.12.2008

                         (a)61/26 (07-18)   28.12.2011
                                  (b) 239
                         (29-6)


                         396 (06-11)        23.12.2008

                                            28.12.2011



61   Naya bans     BDO   (a)42/28 (01-17) 23.12.2008
                                            24.12.2008
                         (b)44/28 (05-17) 23.12.2008
                                            24.12.2008
                         (c)12/29, 30 total 23.12.2008
                         area (07-05)       24.12.2008




                         (d)55/6,7,14,15 23.12.2008
                         total area= (16-7) 24.12.2008

                         (e)19/27 (7-5)     24.12.2009

62   Nithari       BDO   (a)24/26   (26-    23.12.2008
                         14)
                                           24.12.2008
                         (b)23/5 (4-11)    23.12.2008
                         24/1(5-16) total=
                         (10-07)           24.12.2008
                               (c)24//2 (4-16)
                               (d)24//3 (4-14)
                               (e)37//15 (4-
                               16)
63   Nizampur rasidpur   BDO   (a) 23/22(2-9),   09.06.2008
                               23(4-16),24(3-
                               13) total area
                               (10-18)
                               (b)30/6,31/10, 11 09.06.2008
                               total area (14-8)

                               (c)505 (8-13)       09.06.2008




                               (d)13//12 (4-       09.06.2008
                               16)
                               (e)13//11 (4-
                               16)
                               (f)13//19 (4-16)
                               (g)13//20 (4-
                               16)
                               (h)28//19 (4-
                               16)
                               (i)30//3 (2-4)
                               (j)30//4 (3-1)
                               (k)30//6 (4-16)
                               (l)49//6/1 (0-
                               12)
                               (m)50//10(6-6)
                               (n)269 (12-19)
                               (o)269/2 (0-8)
                               (p)335 (4-8)
65   Nahar pur F/89      DDA   (a)184 (0-13)       02.04.2011




66   Ochandi             BDO   (a)45//6/1 (2-5)
                               (b)45//7min (3-0)

                               (c)85 (10-3)
                               (d)88 (7-0)
                               (e)89 (25-10)
67   Palla                BDO
68   Pansali              DDA   (a)17//26 (16-16) 27.11.2010
         Award no. 14/05-
     06




                                (b) new near       27.11.2010
                                deep vihar




69   Pehladpur bangar   BDO     (a) 46/26(10-18)   24.12.2009

                                (b)86/58 (9-7)     24.12.2009

                                (c)38/26(9-16)     24.12.2009

70   Pooth kalan        BDO     (a)30//24(4-9)     27.11.2009
                                25(4-16)
                                41//4/2(0-14) 5(4-
                                2) 42//1(4-16)
                                2(4-16) total
                                area (23-13)


71   Pitampura          DDA     (a)135 (7-19)      05.06.2009

72   Pooth khurd        BDO     (b)136/2 old 157 07.05.2011
                                new (27-2)
72   Pooth khurd       BDO

                             515 (19-17)       07.05.2011




73   Punjab Khore      BDO   515 (19-17)       09.06.2008



                             (b)1340,1341,134
                             2,1343 total area
                             (7-1)
                             (c)195/1(1-1)
74   Pipalthala F/89   DDA   (a)88 (3-14)      27.11.2010
                             (b)89 (2-14)
                             (d)428/ 90 (2-5)
                             (e)92min (3-
                             12)
                             (e)427/90(1-7)
75   Qutab garh        BDO   (a)58//8 (2-8)
                             (b)58//13 (3-
                             16)
                             (c)107/2 (11-
                             13)
76   Qadi pur          BDO
77   Qulakpur          BDO
78   Rani Khera        BDO   (a)74/2 (17-18)   23.12.2008

                                               24.12.2008
78   Rani Khera         BDO


                                  (b)89 (03-09)        23.12.2008
                                  90(0-17) total
                                  area (4-6)           24.12.2008
                                  (c)95 (2-04) 96(0-   23.12.2008
                                  19) total area (3-
                                  03)                  24.12.2008
                                  (d) 58 (9-18)        07.05.2011




79   Rasul pur          BDO       (a)28 (5-19)
                                  (b)29 (5-10)
                                  (c)33 (5-9)          07.05.2011




                                  (d)52 (2-15)         07.05.2011




                                                       07.05.2011

                                  (a)672&673(75-2)

80   Rajpur Chhawni F/66 MCD/BDO Nil water body   27.11.2010
                                 as per report of
                                 sdm MT dated….




81   Rithala F/89       DDA
82   Sajarpur           BDO
                               (a)20//12     (4-
                               16)
                               (b)20//13     (4-
                               16)
                               (c)20//14     (4-
                               16)
                               (d)21//23/2   (2-5)

                               (e)22//13 (2-
                               19)
                               (f)24//3/2(2-4)
                               (g)24//23 (4-
                               16)
                               (h)33//2 (4-15)
                               (i)33//3 (4-16)
                               (j)33//4/2 (1-
                               12)
                               (k)33//7/1(3-1)
                               (l)33//8 (6-4)
84   Sanooth             BDO   (b)229(38-18)
85   Sawada              BDO   (c)200 (10-4)
                               (c)236 (5-5)
                               (d)308 (13-0)
                               (e)430 (8-14)

86   Sahibabad           BDO   (a)68(6-12)
87   Sahupur             BDO
88   Shabad daulat pur   BDO
                               (a)68 (6-12)
                               (a)28//26(9-2)
                               (b)12//26 (4-18)      23.12.2008

                                                     24.12.2008
89   Singhola            BDO   (c)7//26/1(0-4)       23.12.2008

                                                     24.12.2008
                               (a)43 (9-19)
                               (b)6/26 (9-1)         10.06.2009

90   Singhu              BDO   (c)26/28 (3-12)       10.06.2009
90   Singhu            BDO


                               (b)625/3min (11- 05.06.2009
                               9)




91   Siras pur         BDO     (c)759 (10-3)       05.06.2009




                               (d)968/2 (0-5)
                               (a)35//37 (7-
                               16)
                               (b)72//26/2 (5-2)

92   Sultanpur dabas   BDO     (c)96//1/1 (30-
                               11)
93   Sultanpur mazra   BDO
94   Sungar pur        BDO     (a)13/26 (4-16)
                               24/27 (1-8) total
                               area(6-4)
95   Sungar pur shahdara BDO   (b)40/33 (5-2)    24.12.2009

96   Samay pur F/89    DDA     (c)13/26 (4-16)     24.12.2009
(d)24/27 (1-8)   30.12.2009
                                                 30.12.2009




                             (a)30//26/2(0-11)

                             (b)30//27(1-1)      02.04.2011




97   Shakur pur F/74   DDA   (c)50//10(4-16), 07.05.2011
                             11(4-16), 12(3-
                             17), 18(3-10)
                             total area (16-19)
                                 (d)50//10(4-16)   07.05.2011




                                 (e)11 (4-16)      15.10.2011




                                 (f)12 (3-17)

                                 (a) 7000sq.mtrs
98    Shalimar F/79        DDA   (a)42(6-16)
99    Swarna Jyanti Park   DDA   (b)41min (6-13)   10.06.2009


100   Tajpur kalan         BDO   (c)39min (7-      10.06.2009
                                 17.5)
                                 (d)18 (3-10)      10.06.2009




                                 Tehsildar (N) NIL
                                 water body in
                                 said village
                                 (a)11//13(1-4)
101   Tehri daulat pur     BDO   (b)11/12 (1-13)   10.06.2009
                                 58(3-18) total
                                 area (5-11)
102   Tigi pur             BDO   (c)14/14min (0- 10.06.2009
                                 14) 15(4-16)
                                 total area (5-10)
                                                   10.06.2009

                                 (a)15//9 (4-16)
                                 (b)30//1 (4-16)
103   Tikri khurd          BDO   (c)30//3 (4-15)
                                 (d)30//4 (0-9)
                                 (a)532/2(19-4)
104   Wazirpur             DDA
Site position/Directions/opinions                        Committee's Observation


Proposed boundary wall to be completed in about a
months time. Demarcation of water body is to be
done. Encroachment is to be removed. Immediate
steps to remove the encroachment be undertaken.

Since last visit no steps takenby the revenue/BDO
staffs against the encroachment.

Community centre exist there. In case any other
space is available the same may be earmarked for
water body.

Some of the private persons has been declared
bhumidhar against the land occupied by them. Land
admeasuring 19 biswas is lying vacant. However,
there is no approach road to this piece of land. BDO
to take action in this regard.




Well developed. Iron grills are required for safety of
children.
Site was found encroached up 75% encroachment.
DDA stated that possession of the site has not been
handed over to it after urbanization of the area. The
committee directed the authorities i.e. DDA and
Revenue staff to carry out demarcation on
02.12.2010 at 10 A.M and further to show the
documents to confirm whether the area has ever
been handed over or not and who would be said to
be incharge of the same.
Fly over exists at the site and the area of
Pond/Water Body falls in the area where the flyover
is constructed and surrounding to it as confirmed by
the revenue staff. DDA stated that possession of the
site has not been handed over to it after urbanization
of the area.




Lies in open area and is presently dry. It requires
demarcation. Waterbody needs to be developed
properly as it has plenty of open catchment area in
the form of Gaon Sabha land. Case pending before
FC should be expedited and progress made should
be submitted to the nodal agency.




Nothing has been done till date since the last visit. It
was informed that BDO has not provided the
demarcation despite several requests. BDO to
submit report, as to why the demarcation was not
provided to the executing agency.




Case pending at High Court. Progress reportbe
submitted to the nodal agency as also to the
Committee members so that it can be followed up in
Court.



Boundary wall of water body is complete. However,
inside the boundary wall, there is encroachment. It
was informed that the party has lost the Court case.
BDO to get encroachment removed. I&FC to get the
boundary wall repaired and to fix a gate in order to
prevent further encroachment. Plantation work is
required to be done at the periphery.
Water body is developed by I&FC. However, there
are no catchments. I&FC is required to develop the
catchment area. Stadium look given. Natural land
escaping ignored. Depts. Should avoid unnecessary
construction. Plantation work is required to be done
at the periphery.




In the water body it is found sewerage flowing into it.
MCD to take action for diversion of same. STP
facility be provided, I&FC to develop the same
except a portion of 400 sq.yds. over which a Court
case is pending.




Filled with dirty water. There is encroachment at site.
The Committee was informed at the site by the
villagers that tender for rejuvenation of the pond has
been issued many times but the encroacher each
times manipulates things and the encroachment still
continues. They submitted that the revenue staff is
in connivance with the encroacher as he had filed
Court cases in different names of his family
members. The litigation is continuing since last 30
years.
Khasra no. 37/29 (14-4): Boundary Wall is
completed. It is dry and encroachment is one side.
Boundary wall be completed by I&FCD. It is known
that one case is pending before SDM. It is further
known that the said case is dismissed in the Hon'ble
High Court. Court Commissioner directed the BDO
to provide the copy of High Court Order and take
appropriate steps before SDM.

Dry, partly encroached. Encroachment be removed.
Court case be expedited. BDO is required to take
personal interest to get the matter disposed of.

Dry, needs much effort for development. A public
park would be a better option.
Developed into a temple. Complex with small
pondage. No development required. Maintenance to
be done.




It is newly created water body. Demarcation is
required. Boundary wall should be constructed
around the water body. It is also suggested that till
the sanction is accorded, the funds be released
temperorally by Director, panchayat. Court
commisioner discuss the matter with DC to hand
over the water to BDO and it should enclosed be.As
the waterbody is enclosed.


Water body exist within the abadi area and contains
water. Some encroachment exist which is being
removed. Further plans for increasing the size of the
water body is being implemented
Dirty sewerage water is being diverted to this water
body in order to preserve the bigger water body.

Water Bodies are completely developed however
Sewerage was found in one of the water body. The
I&FC was directed to divert the sewerage.
four tanks are built up there for Fish-culture. It is also
covered by boundary wall and owned dby Fishery
Deptt. of Govt. of NCT of Delhi.
Water Bodies are completely developed however
Sewerage was found in one of the water body. The
I&FC was directed to divert the sewerage.
It is well developed water is available sewer line is
maintained on one side, but is not in operation.
Court Commissioner desired to maintain it also.
No water is available in the Water Body. Boundary
wall is built up.
Khasra no. 27/10/1 (2-8): The work is in progress for
deepening and boundary wall by I&FCD. One side,
road and on other side, DDA Flats exists. The DDA
has constructed a road on the water body land. DDA
officials were not present. Court Commissioner has
directed I&FCD officials to continue its job as per
demarcation received from the Revenue Department.

It is covered by boundary wall. It is owned by DJB.

Work is in progress for deepening and construction.
It is likely to be completed by March 2012 and
catchment system is also to be developed by I&FC
Department.


Its area is not confirmed. A school is stated to be
running in the area of this water body but could not
be visited due to blockage of road by I&FC
Department on account of construction.
Water body has been encroached. Case is pending
before Financial Commissioner and Revenue
Assistant.
       I&FC-Stay exist, request has been made to
DC(N/W) to demarcate the land of pond after
removal of encroachment.
Encroached upon. Litigation is pending. Same be
got decided at the earliest.
Work is in progress and would be completed by
DSIDC. Minimum concretization by done. Narrower
pathways, more greenery and rainwater access be
ensured.
Work to be completed by March, 2009. Minimum
concretization. Narrower pathways, more greenery
and rainwater access be ensured.
Encroachment exists. Litigation be got decided at
earliest.
It is next to Dada Malda temple, being developed by
I&FC. Catchment area and greenery need to be
enhanced.


Developed. Has clean water. Catchment area and
greenery be increased



Water body has been encroached by way of
constructing hutments over the periphery. Filled up
with sewage. Requires planned development.
Drainage should be linked to nearby nallah.
Encroachment is required to be removed. Has
Natural catchment area.


Khsara No. 12/6, 7/2, 13/3, 14, 15 min., 17min. (15-
2): A Sr. Secondary school is being run by Delhi
Government on some vacan land which seemes to
be the area of water body. It is stated to be allotted
under 20 point programme of Delhi Govt.on vacant
land of water Body. Court Commissioner has
directed the Revenue officials that the demarcation
should be done by 6/01/2012.




The water body look after by the MCD(sulb&J.J.).
Boundary wall exist on the site. Encroachment has
been removed by MCD. Development work should
start immediately.
The water body was developed by DDA as Lake
which now transferred to MCD (Slum & JJ). The
same is filled up with sewerage which is now slowly
drying up. MCD should get same cleaned up and
develop before monsoon season.
Developed .Contains dirty water. Needs care,
afforestation.
The part of the area where the water body existed is
heavily builtup,however, ther is atill some portion,
agood area, still lying vacant and there is every
possibility of its being encroached if necessary ateps
are not taked immediately. The DDA official were
directed to have the demarcation of the vacant area
and also get the same fenced immediately so that
no further encroachment takes place on the spot.
Further directions would be made only after the
demarcation is reported and the actual areais made
known to the committee . The DDA officials
indicated that they would revert back within 15 days
to the committee for further necessary steps in the
matter.
DDA and Revenue staff stated that the status of the
water body is same as it was on last visit. DDA
informed that the site has not been handed over to
them. It as land was stated to have been allotted
under 20 point programe. DDA and Revenue staff
were directed to provide the records so that further
course of action could be suggested.
                                   Thereafter records
by the BDO and a status report by DDA was
submitted.                                      The
records and discussions held in chamber meeting on
24.11.2010 and noting on status report indicates that
the physical possession was not handed over to
DDA. The records of BDO show that the land has
been allotted under 20 point programme to landless
persons.                             Since the land
was built up, therefore BDO and DDA were directed
to identify another land which could substitute the
present water body and he put to best use for
making a better environment. site. DDA agreed to
Authorities failed to identify the
carry out demarcation of the site on 30.11.2010 at
10.00A.M




Water body being developed at site. Minimum
concretization. Narrower pathways, more greenery
and rainwater access be ensured.
Water body is developed. Clean water exist, hence
only maintenance is required.
90% has been encroached. Encroachment to be
removed. 33 person are stated to have been
declared bhomidhar by the authorities. No action
taken by the revenue authorities to challenge the
said orders. Action needs to be taken against the
encroacher by the revenue authorities. Part of the
same is in form of low lying and have water.
Revenue authorities to demarcate the area which is
having water and develop the same in the form of
water body.
The position is same as was in the last visit. No work
has been done till date. Further encroachment has
been reported. Let the vacant land be handed over
to the concerned agency for development. The
revenue authorities shall take up the matter of
encroachment.
Concerned revenue authorities should explain as to
how the area marked for water body has been
allotted for other purpose.
Committee was informed that there are plots allotted
under 20 point program. Committee suggested that
another site may be made available for developing
the water body.
On the spot park exist. Committee suggested that
another site may be made available for developing
the water body.




This is a vary large water body. However, much
more is required to be done to develop it. Even the
area of the water body has been identified and for
which the patwari has been asked to submit the
record. It is proposed to develop the water body in
two months time and a landscape map has also
been prepared. Since the surrounding area is being
developed into commercial complexes, provisions
would have to be made to ensure that the
complexes recycled the water used by them and
which have to be diverted into this water body.
Concerned department not provided the revenue
record on spot asked by the Court commissioner.

The DDA had prepared the plans and the work of
water body is under process. The work would be
completed in six months.

The water body is now under the Nirankaries ,who
have converted it into a large artificial pond for
religious purposes.
The water body has become large dumping yard.
The water body is situated in lal dora of village
Dhirpur. The DDA must prepare plans and redevelop
the water body.
Water body surrounded by boundary wall but is lying
dirty and is filled with sewerage water. Needs proper
cleaning and development . Encroachment existing
at side. Falls under DSIIDC. Immediate steps to
remove the said encroachment should be
undertaken.
Falls under DSIIDC. It is lying dirty with sewerage
water flowing from neighbouring basti. Place needs
a sewerage system which is the only way to clean
the water body.
The water body has clean water. It requires
development work and greening in catchment area.
The boundary wall needs to be constructed which is
being objected to by local peoples.
Totally encroached by way of construction of
houses, metalled roads etc. Action needs to be
taken against the encroachers by due process of law.

NPC Building at site for public purpose.


Encroachment as well as sewerage exit in water
body. MCD and BDO to take action in this regard at
the earliest. I&FC to construct the boundary wall.
Plots exist over the area of water body. BDO to take
action in this regard
Work in progress by DSIDC. No pathway required
on one side .Effort should be made to tap rain water
from road side. Natural land scaping be done.

Water body is developed by I&FC. However there
are no catchments. I&FC is required to develop the
catchment area. Water harvesting from road not
done properly as inlet pipes are blocked. Stadium
look given. Natural land escaping ignored. Depts.
should avoid unnecessary construction.

90% encroachment. There is some vacant land not
encroached. Efforts be made to have possession of
said land. For that purpose it is suggested that
demarcation be carried out preferably by Total
Machine Method. Further direction would be given
after perusing the demarcation report and after
doing the inspection of the site once again needful
be done at the earliest.

Developed as Playground by agencies as the same
ws dry pond.

Although there was water yet the size of the water
body had been reduced and in its place a park has
been developed with a walk way around it. Director
(Panchayat) gave directions to maximizing the water
holding capacity of the water body.

Developed and contains water. Maintenance to be
done.
The water is developed but the same is in shambles.
I&FC informed that Horticulture Department is
maintaining the same. The said site had also been
visited by the committee on earlier occasions but on
seeing such dilapidated the committee felt shame on
the concerned authorities. The money for
constructing the said water body would have been
spent in lacs, but on seeing the condition of the
water body it can safely be said that the entire
money has gone into drains. All the concerned
authorities should coordinate and look into the
matter and get the water body revived at the earliest.
The matter requires immediate action of the higher
authorities. The status report with regard to the steps
undertaken by the concerned authorities should be
intimated to the committee so that further
inspections can be planed thereafter..

The position is same as was in the last visit. No work
has been done till date. Unfortunately there was
nobody present from the Revenue Department
(SDM) to controvert the position. Surprisingly their
absence inspite of notice was undesirable. The
committee has no option but to proceed further
without any positive result. The water body is
encroached upon. The position remains the same
since the time of last visit. The matter 4requires
immediate action of the higher authorities.

TSM is required for demarcation from higher
Authority to be provided by DC Revenue. Court
Commissioner has desired that the work to be done
by 15/01/2011.
Both DDA and Revenue staff were unable to identify
the site. As per the Revenue staff the Water Body
does not exists in revenue record. DDA had no
knowledge. DDA was directed to produce the record
pertaining to the said khasra No's

Well developed water body by DSIDC. Work
completed
This water body is situated next to school and filled
up with sewerage. MCD is required to take action for
diversion of sewerage. I&FC would fence the same
byway of construction of boundary wall.
Encroachment exists which has to be removed.
Water channel for access of rainwater from adjacent
road as proposed should be implemented




Encroachment exists which has to be removed.
Water channel for access of rainwater from adjacent
road as proposed should be implemented.




Mandu Pond contains water. Requires demarcation
and boundary wall.
      It is Khasra No. and areas are not confirmed.
Its Allotment was done in 2002. Ponds are in
existence even today. One case is pending in the
Hon'ble Court asTarip Singh and Ors. Vs. GNCTC
and Ors. Court Commissioner desired the status of
Court Case in a week time.

Mandu Pond contains water. Requires demarcation
and boundary wall.

Allotment by CO under Section 21(1) of
Consolidation Act.

Lal dora area plotted under Section 21(1) of
Consolidation Act by the CO Court case pending
before Financial Commissioner. Nine bigha existing
in form of pond which requires development.
DSIIDC transferred to I&FC STP site. Sewage
flowing into it. Required a boundary wall and sewage
to be provided for dirty water. Demarcation to be
carried out by revenue authorities and give to
concerned authority for constructed a boundary wall
around the pond
flowing into it. Required a boundary wall and sewage
to be provided for dirty water. Demarcation to be
carried out by revenue authorities and give to
concerned authority for constructed a boundary wall
around the pond




Natural water body. Same position as was on last
visit. Sewerage still flowing into it. However, the
committee was informed that Khasra No. 42//10
min(0-8), 11min(2-8), 12min(4-8) have been allotted
to private persons. BDO was directed to report about
the allotment and under whose directions. Report be
submitted within a period of 15 days so that further
directions could be issued.
Natural water body in the unauthorized colony
Anand Pur Dham Karala, back side of school
B.S.M.S. Secondary Public School. Only boundary
wall is required to be constructed for protection of
the water body. It may be added that previously in
High Court Ministry of Tourism had stated that the
water body would be developed for Tourist purpose.

DDA acquired the area vide award no. 1/10-11. No
one was present DDA. DDA was directed to identify
the land and develop the water body.
Encroachment was found going on in the water
body. Demarcation was directed to be carried out on
18.5.2011 at 10 A.M. SDM and BDO were directed
to remove the encroachment immediately and
transfer the same to the developing agency for
development.
At site, the water body is having larger area having
clean water and is being fed from canal. A
forestation around the water body is required to be
done.
Development is under progress by I&FC
Department. A forestation as well as catchment area
is to be maximized.
It adjoins Dada sati temple. The same is dry and
outside village abadi two temples and rooms exist
for religious purposes. The area around one bigha
exist in the form of deepening which requires a
boundary wall to be developed as a pond. The area
around should be beautified by way of plantation as
well as catchment area be also developed.

Allotted under 20 point programme 105 plots carved
out as per statement of BDO staff. BDO is required
to explain as to how the area which is earmarked for
water body has been converted for residential use.

The water body contains clean water. Work in
progress for construction of a boundary wall. The
water body is being well preserved.


The water body was constructed and shown as
completed in the year 2008. However, looking at the
condition whatever developed/construction was
carried on has fallen of and broken within one year.
The pitching area as well as the footpath had started
coming off. Immediate repairs are required for
maintaining the said water body.
One side boundary wall is broken. Same is to be
repaired maintenance is required.
Fully encroached. Action needs to be taken against
the encroacher by the revenue authorities under due
process of law.
Allotment. BDO is required to explain as to how the
area which has been earmarked for water body has
been converted for other purpose.
Not traceable as heavily constructed. BDO/Tehsildar
to furnish report.


Development work yet to start. Since it is located
next to STP, development should be done with
careful planning
Filled with dirty water and heavily encroached.
Encroachment to be removed by due process of law.
Steps be taken for getting the sewerage diverted

Natural water body. Only boundary wall is required.



Developed water body. Sewerage flowing into it.
MCD and DJB were directed to stop the sewerage
flowing into the water body by introducing of
sewerage line.

The site is in form of Natural water body existing
within the Lal Dora having khasra No. 72//2/1(3-2),
9/3(0-1), 78//23/1 (4-14), total area earn (12-13),.
However the same is in very bad shape with sewer
flowing into it. MCD was directed to get the same
cleaned at the earliest and divert the sewer sot hat
no dirty water or sewerage for flows into it and the
water body could be developed.
Well developed water body. Plantation work is
required.
Natural water body. Only boundary wall and
plantation work is required.
Well developed water body being maintained by the
villagers. Mandir exists in water body approximately
over an area of 1 bigha. Plantation work is required
around the boundary wall.
(i) Khasra No.43/26: The water body is under DDA.
Some dirty water and dumping waste is in the
waterbody. On the side, encroached by temple and
some houses. The Court Commissioner has directed
the DDA official that the cleaning, demarcation and
Contain clean water. Demarcation to be carried out
by the revenue authorities and boundary wall is to be
developed by the developing agency.
Awarded (6-13) to Delhi Jal Board for STP remaining
(02-00) needs to reclaimed and surrounding area be
developed as water body. BDO to take necessary
action immediately.
27bigha08biswa acquired by DDA vide award no.
20/05-06 for Plan Development of Delhi . Dirty water.
Requires to be developed.


Covered with water plant, exist next to cremation
ground. Development is underway. Needs cleaning
and access to rainwater. Area should be beautified
in form of park and requires maintenance.

Khasra No.37//4 is recorded as water body however
21//4, 5, which are just near to Khasra no. 37/4 is
not recorded as water body in was directed get the
same mentioned as water body in revenue records
by processing the case immediately as the land is
recorded in the name of Gram Sabha.
Not mentioned in revenue records. However it is a
Natural water body having clean water. BDO was
directed get the same mentioned as water body in
revenue records by processing the case immediately
as the land is recorded in the name of Gram Sabha.
The water body only needs maintenance and
cleaning.
Chopal exists over the site. Agencies have been
directed to develop water harvesting system at the
site for conservation of water.




Contains dirty stagnant water. The water channel
flowing in the near vicinity contains water with toxic
chemicals which must be brought to the notice of the
Haryana Authorities on urgent basis. Water body
has also been encroached. Immediate steps to
remove the encroachment be undertaken.

DDA was unable to identify the site. DDA was
directed to identify the site and carry out
demarcation on 02/12/2010 at 11.00 A.M. along with
revenue staff and report be submitted by
Water body was shown by DDA. Park exists on the
site. DDA to develop the catchment area so that
harvesting of water can be achieved.
DDA was unable to identify the site. DDA was
directed to identify the site and carry out
demarcation on 02/12/2010 at 11.00 A.M. along with
revenue staff and report be submitted by
20/12/2010. No report has been received till date.
Park exists on the site DDA to develop the
catchment area so that harvesting on water can be
achieved and water body be kept clean.
Contains little but clean water. Work for construction
of wall is in progress. Water body has been desilted.




Water body exists. Lies in open area. Access to rain
water from road to be implemented.
         Allotment is stated to be made Sher Singh
and Bhagwan Singh as a Asami by the order of the
Naib Tehsildar Narela. BDO and Revenue
Authorities to explain as to how the allotment was
made.


It contains clean water. Wall has been constructed
around the water body which has been reclaimed as
Being developed by I&FC. Water is to be diverted
from canal. Catchment area be maximized

Earlier with DSIDC, no with I&FC, Development work
yet to be started. Has rainwater in it. Demarcation
already given. Sought for its development in 8
months. Work to be done with emphasis being laid
on catchment area, greenery and concretization.
Smaller water bodies should have smaller pathways.

Visited earlier. No change. Part of it is stated to be
allotted under 20 point programme. Area still open
and filled with sewage. Concerned BDO should
explain as to how the area marked for water body
has been allotted for residential use.
Next to national highway. Might be included for
widening. Sewerage flowing into it. MCD to take
action for diversion of sewerage. I&FC to develop
the same by way of boundary wall.
Next to national highway. Might be included for
widening. Sewerage flowing into it. MCD to take
action for diversion of sewerage. I&FC to develop
the same by way of boundary wall.
Allotted to estate and town planning department of
MCD, by the order of SDM (HQ), as per Case
No.1455/2000 dated 29.8.2000. The same finds
mentioned in the revenue record.
khasra No. 239 (29-6): Bus Terminal exists there in
the Water Body area. Handing over to MCD, record
is not available. Court commissioner directed the
BDO to provide the concerned documents within 5
days.
Khasra No. 396 (6-11): It is under the control of DDA
. Record is not available. Court Commissioner
commented that this amounts to contempt of court.
He directed the revenue staff to apprise the facts to
him and Nodal Officer Water Bodies.

Developed by DSIDC. Work in progress.

Developed by DSIDC. Work in progress.

Being developed by DSIDC. Under litigation pending
before SDM/RA Narela, Alipur, New Delhi being
used as farm land. The BDO and Revenue Authority
should take personal interest in the matter and effort
be made to expedite the litigation.

The water body has been handed over to I&FC by
DSIDC I&FC informed that plan is ready and would
be completed within three months.
Work is in progress by the DSIDC. The same would
be completed within three months.
Work in progress, minimum concretization, narrower
pathways, more greenery and rainwater access be
ensured
Sewage ws found flowing into it. Road is also
constructed on one side of water body. It is
surrounded by abadi and unless sewage is
stapped/diverted, no development at progress of
water body can take place.
Water body has clean water.



Water body is dry. It needs development work
including greening and developing of catchment
area.
Water body has been handed over to DSIDC.
Encroachment has to be removed. It is large in size
and contains water. Unfortunately village sewage
flows into it. Development work has been planned
and action for demolition proposed.




DDA informed that the land was handed over to it in
1974. DDA has failed to take care of its land and
allowed construction of Mandir and House at site.
DDA also informed that the Mandir has been left
over at the instance of the order of the Lt Governer.
DDA was directed to provide alternate site for
development of water body.
As per DDA staff on area of 16-12 was given over to
DDA by revenue staff. An area of (0-4) has been
encroached. Water Body exist in over an area 6
bigha 4 biswa. DDA stated that tender has already
been issued for fencing the area. Rest of the area
10-08 is to be developed as park by DDA. Plans be
submitted within 2 weeks.
A low lying area was found to exist in the area
adjoining Deep Vihar unauthorised colony (Pansali
Village) which seems to be around 10 acres and was
lying clean water. The DDA was directed to place
the site status if the land in question so that further
course of action could be suggested. The committee
feels that since many water body under DDA have
been destroyed, these water bodies would
effectively compensate for part of the loss. The
water bodies can be developed at the site with
minimum expenditure.
The work is n progress and would be completed
within three months. Sullage was found in the water
Encroachment was found over the water body.
Unfortunately, there was nobody present from the
Unfortunately, water body was not traceable. There
was nobody present from the Revenue Department
Developed water body. Park also exist at site.
However, water body is showing sings of dirt. It
appears that water body is not being taken care of
as garbage is being dumped in it. DDA was directed
to get it cleaned and also take proper care through
their horticulture department. The person incharge of
cleaning should be strongly instructed to perform
their duties diligently.
Two water bodies are located in the park. They are
being maintained by DDA.
Developed water body. Mandir inside the water body.
Natural water body. Some encroachment was found
to exists on site. Consolidation Officer vide its report
submitted that as per records of village Pooth Khurd,
Khasra No. 136/2 was allotted new Khasra no. 157
and no allotment has been made of said khasra no.
However khasra No. 157 is pond at site but as per
consolidation scheme, the said khasra no. is not
recorded as water body. In responce to the said
report of C.O,. the committee immediately wrote a
letter on 15.4.2011 to the Settlement Officer, that the
said khasra no. is a natural body and needs to be
protected and requested him to look into the same
and carry out necessary Drusti of records no action
Taken Report has been received thereafter. The
Revenue Authority was again reminded to said
Action Taken Report. The same is still awaited.
Further the extent/area of Water Body also under
question as such, demarcation was fixed for
16.5.2011 and report was directed to be submitted
to committee with two weeks of demarcation.


Development work is in progress. Water body must
be provided with access to rain water along the
surrounding walls. It is proposed to bring water also
from the Haryana Canal.




Water body is developed in the form of Park(Bharma
Shah Park). It was stated by revenue staff and DDA
staff that the site has been developed by PWD,
PWD was not present as such it was proposed to
call PWD.




Developed. Access to rainwater should be done
through boundary wall.
Given to DDA, water body should be developed.


Falls near Haryana Canal. Land pertains to Haryana
Irrigation Scheme.

Water Body is on the periphery of the two villages.
Sewer was flowing into the water body. J.E from
MCD undertook that the sewer would be diverted
within a period of two weeks. Demarcation has been
fixed for 20.5.2011 at 9 A.M. After demarcation is
carried and sewer is diverted, I&FC to develop the
same. Demarcation report be submitted before the
Court Committee.


Sewerage flows into the water body. MCD and DJB
were directed to divert the sewerage at the earliest.
A report was also directed. The committee within two
weeks as to how the MCD and DJB proposed to
direct the sewerage and how much time the same
would take.
Well developed water body having clean water.
However, encroachment was found in form of
ongoing construction of Mandir. BDO was directed to
get the same removed immediately and report back
to the committee.
Natural Water Body. Boundary wall exists around
the water body. Needs only maintenance.


As per statement by DDA staff, out of an area of 51-
8 that was awarded, an area of 44 bigha 9 biswa
only was handed over by Revenue staff.
Encroachment over an area of 5 bigha 19 biswa was
found to exist at site. The committee directed the
authorities i.e, DDA & Revenue staff to carry out
demarcation on 30.11.2010 at 11 A.M. The
authorities were directed to look into the aspect of
catchment of water, from road site and developing
water harvesting as well to know the actual status
area of water body & the status and situation of
encroachment. Further the revenue authorities were
also requested to indicate/intimate the steps initiated
for removal of encroachment.
Demarcation to be done and handed over to the
concerned development authority.

Polluted with dirty & sewerage water. Demarcation to
be carried out and proper action required to be taken
for development of pond.

Water body is developed by I&FC. Catchments to be
provided.
It is natural water body. Boundary wall already exist
plantation work is required to be done.
This is a water body which is totally undeveloped
and filled with dirty water. The landscape plan has
been prepared. However, much planning is required
since multistoried residential quarters are being
proposed . Besides, sewerage treatment plan is also
being proposed which should provide water to this
water body.
This water body has been developed by the I&EC
Dept. Explanation should be called as to why the
water body has been developed on scientific lines
and so much money has been wasted. The design
of the water body is such that no water from outside
can enter it.




The said water bodies are not traceable. The
authorities sought time for its identification.
DDA informed that the land has till date not been
handed over to DDA by the Gaon Sabha, though it
was admitted that Notification under Section 22(1) of
DDA Act had been published. The DDA was directed
to sort out the matter and report back to the
committee about the said development within 15
days.
The area is next to mandir. Though none of the
authorities were aware of this water body. However,
the committee had searched/located the same from
the records, as submitted by the authorities before
the Hon'ble High Court from time to time. The DDA
staff along with their Revenue Department visited
the site along with the committee and it was found
that a boundary wall is constructed around the said
area and a fresh soil/mud was put inside the
boundary wall. The local people informed that there
used to be a pond within this boundary wall. A path
for morning walkers also found constructed. Efforts
can be made to dig the area inside the constructed
path where a beautiful water body can be
constructed. The other area/surroundings can be
constructed for the people in the vicnity to enjoy.
DDA officials assured the committee that they would
immediately take necessary steps in this regard and
report back to committee with positive results.
The DDA staff along with their Revenue Department       The Committee also feels that
visited the site along with the committee and it was    the land owning agency at the
found that the area is next to Mandir. On enquiry       time of taking back possession
from the local persons the committee was informed       ofwater body, after its
that pond existed some time back. The entire area at    construction/development,
the moment is green with grass laid on the carpet.      should satisfy that the water
Since the area of the pound earlier existing could be   body constructed is developed
carved out, as such, DDA officials were requested to    in all respects. Since the
take appropriate steps for carving out the pound        Committee is surveying the
once again. DDA officials assured the committee         water bodies of entire Delhi from
that they would immediately take necessary steps in     time to time, they can also be
this regard and report back to committee with           joined for inspecting the site at
positive results.                                       the time of handing over the
                                                        same back to the land owning
                                                        agency. Land owning agency
                                                        i.e. BDO concerned, at the time
                                                        of taking back possession of the
                                                        water body after its
                                                        construction/development
                                                        should satisfy itself about the
                                                        construction/development of
                                                        water body. NOC may be
                                                        obtained from BDO concerned
                                                        that the water body
                                                        constructed/developed work is
                                                        complete in all respects. The
                                                        suggestion is being made in


Khasra No. 30/26/2 (0-11), 27(1-1), 50/10 (4-16),
12(3-17), & 18(3-10) was not identified by DDA. It
was really strange to find that no one was present
from the office of SDM and BDO despite prior
communication about the visit of committee.
Accordingly, DDA was directed to identify the land
and report back within a week as re-visit of the area
was fixed fro 7.5.2011.
Encroachment exists over Khasra no. 30/26/2 in the
form of newly constructed houses, mandir and
Samadhi. Community Centre exists in Khasra no.
30/27 constructed by MCD. Authorities were directed
to submit report as how encroachment has been
allowed over the water body allowed over the water
body and action taken against encroachers of the
water bdoy.
None was present on Behalf of Revenue
Department. Despite prior information, Since, none
was present on belhalf of Revenue Deptt. exact
location could not be trace out. DDA was directed to
carry out demarcation and submmit report within two
weeks.
DDA stated that Lawrence scheme exists on spot as
per award. Demarcation was directed to be carried
out on 11.11.2011 by DDA in coordination with
revenue authorities. The scheme and entire
revenure recored be submitted within one week after
demarcation to the Court Committee. In complete
report submitted by DDA, no demarcation report has
been received till date.




Work in progress by I&FC. Minimum construction
involved. Natural land escaping only. Plantation work
is required to be done at the periphery.
Work in progress by DSIIDC. Natural land escaping
only is required in the Water body.
Wet water body. It was informed that part of area
has been plotted under 74(4) of DLR Act and
encroachment is being done. BDO to take action in
this regard.




Developed by3DSIDC. No work required.


Developed by I&FC. No work required.


Children park at the site. Water body with depth up
two meters be developed.
Reply/Response by the concern
Authorities.




As per report of DDA-G.S. Land
placed at disposal of DDA U/S-
22(1) DDA Act Vide Notification
No - SO No 2190 dated 20.08.74.
But Physical possession has not
been handed over to DDA by the
BDO till date.
BDO till date.
As per revenue record field book.
Court case pending MCD.
As per DDA report award no.
50/80-81 and 22(1)-
F10(15)78/L&B dt. 27.08.80
NOTE- Khasra no. 42//10min(0-8),
11min(2-8),12min(4-8) allotted to
Rampat s/0 Nanhye, dated on
19/5/1999
11min(2-8),12min(4-8) allotted to
Rampat s/0 Nanhye, dated on
19/5/1999
As per report DDA, Award no.
8/91-92




As per report DDA G.S land and
disposal of DDA N.No.
F9(4)89/L&B dt. 05.10.89. But
physical possession not handed
over to DDA by BDO till date.
physical possession not handed
over to DDA by BDO till date.
As per DDA report-Located in the
park, maintained by DDA.
ARCHAEOLOGICAL SURVERY OF INDIA.
S.No       Name of Villages     Water      khasra No   Date of Inspection
                                owing
                                agencies

1          Tughlkabad Fort      ASI                    27.12.2011


2          (b) Tughlakabad      ASI                    27.12.2011
           Fort

3          (c)Tughlakabad       ASI                    27.12.2011
           Village


4          (d) Tughlakabad      ASI                    27.12.2011
           Village




5          Wazirpur Tomb,       ASI        634         27.12.2011
           Sector - 5, R.K.
           Puram
6          Ugrasain ki Baoli,   ASI                    27.12.2011
           Hally Road,
           Cannaught Place.
7          Firozshah Kotla.     ASI        325         27.12.2011

8          Hazrat nizamuddin ASI                       27.12.2011
           ki Baoli
9          Arab ki sarai - Baoli ASI       738/578     27.12.2011

10         Purana Quila - Baoli ASI        499         27.12.2011

11         Bara Hindurao        ASI        319         27.12.2011
           Hospital


12         Red Fort             ASI        225         27.12.2011
                                             DATED : 27/12/2011
Site                                   Committee's Observation
position/Directions/Opinions



  Khasra No. not identified. Area -
840 sq.mtr. Built up by stones and
no water is available.
  Khasra No. not identified. Area -
414 sq. mtr. Built up by stones and
no water is available.
Khasra No. not identified of this      Court Commissioner has
Baoli. Area - 1551 sq.mtr. Dirty      suggested the ASI Officials to
water is available. Dumping waste     fortify the water body.
by people.
Khasra No. not identified of this     Court Commissioner has
Baoli. Area - 22,500 sq. mtr. Dirty   directed the ASI Officials to
water is available and sewage         demarcate and protect the
flowing into it.                      water body. ASI Officials
                                      informed that the matter is
                                      pending in Apex Court to
                                      remove the encroachment
                                      from the Fort Area and Water
                                      Body.
 Khasra No. 634 of this Baoli. Area
- 350 sq.mtr. Water is available.

 Khasra No. not identified. Area -
435 sq.mtr. Water is available.

 Khasra No. 325. Area – 876.13
sq.mtr. Water is available.
Khasra No. not identified. Area –
657.8 sq.mtr. Water is available
  Area – 54.6 sq.mtr. Water is
available.
Area–675 sq.mtr. Water is
available.
Area–1250 sq.mtr. Baoli is dried.
16 Pipale Trees are a standing
round the Baoli and are likely to
shift to recently.
Area–597 sq.mtr. Water is
available
2011
       Reply/Response by the
       concern Authorities.

				