WATER SYSTEM OF THE OROS DAVAANII AR
Shared by: HC121002235045
-
Stats
- views:
- 0
- posted:
- 10/2/2012
- language:
- English
- pages:
- 2
Document Sample


Project title: WATER SYSTEM OF THE “OROS DAVAANII AR”
Project The purpose of carrying out program is a developing watering agricultureto
background, provide from governmental activity for operation about production of
project outline: agriculture evenly.
Production scale: Capasity of managing a watering crop is 70.45 square m of 95 square m
Market The last productions going to be a wheat, potato and other vegetables. So , we
orientation and plan to supply with goods to the Darkhan city, Selenge summon and Ministry
market analyses, of Agriculture of The Developing Agriculture Foundation or other flour
market survey: industries.
Cooperation
Joint venture , Share- holder 80% and project executor 20.
mode:
Total investment 155022 $
Requested
Investment from 124000$
foreign partners:
Project venue,
Construction venue is located at the left-side terrace of “Hyaraan” river and 18
construction
km from Altanbulag summon to southeast
venue:
Occupation area ,
95 square m
construction area:
Estimated The amount of harvest will be increase by 3.3 times . So, the benefit will be
investment profit develop.
rate:
Investment Investment recovery will pay during 2 nd year of operation
recovery period:
Project progress: The project made a high quality at the Ministryof Enviroment and institute of
water dependent on Academy of Science and office-in-charge of watering draw a
qualification conclusion .
Introduction to the Mongolian patner
Enterprise name: ”Deed shivee“Co.,Ltd
Ownership: Private
Construction ,
Agriculture, hotel, trading, the public cookery place, traveling, vegetables and industry
production
of processing wood & wooden products
conditions:
Contact
Address: Chandmana trading service. 1 subdivision of Altanbulag sumon Selenge province
Telephone: 99492088, 99091300
Fax: 01362-23609
Related docs
Other docs by HC121002235045
Get documents about "