Mfg format Part D by HC121002192511

VIEWS: 1 PAGES: 2

									                      Application for FTZ Manufacturing Authority

               Part D – Additional Information Needed for
           Optional Secondary Scope for Permanent Authority

Note: There are instructions relevant to filling out this part in the section entitled
“Completion of Detailed Products and Components Section(s)” at the end of Part A of
the application format.


CONFIRMATION OF SECONDARY SCOPE LIMITATIONS

D1. Does the company understand that the finished products and components listed in
its secondary scope: 1) are not items for which the company currently has definite plans
for manufacturing under FTZ procedures and 2) may not constitute a significant amount
of the company's overall FTZ savings (unless the company has submitted an application
to the FTZ Board to expand its primary scope to include the products and components
at issue). Yes ___ No ___

You can type an “X” directly into the appropriate space in Question D1.


FINISHED PRODUCTS

D2. List the finished products (as defined by 4-digit HTSUS headings) which you are
proposing for your secondary scope for permanent manufacturing authority. (You can
add rows to the table as needed.)

                                                                4-digit    Current
Product description                                             HTSUS      duty rate(s)
INPUTS

D3. List the inputs (as defined by 4-digit HTSUS headings) which you are proposing for
your secondary scope for permanent manufacturing authority. (You can add rows to the
table as needed.)

                                                              4-digit   Current
Input description                                             HTSUS     duty rate(s)

								
To top