									                   Total Project Budget Template for Project Scope and Budget

Notes
   This template was prepared by the MSBA as a tool to assist districts and their teams in the understanding of
   MSBA policies and practices: their potential impact on the MSBA’s calculation of a potential Basis of Total
   Facilities Grant; and potential Total Maximum Facilities Grant. This template does not contain a final, exhaustive
   list of all evaluations which the MSBA may use in determining whether items are eligible for reimbursement by the
   MSBA.
   Yellow Highlighted Cells include formulas which should not be overwritten in the submitted version of the Total
   Project Budget Form.
   The MSBA will perform an independent analysis based on a review of information and estimates entered into the
   Total Project Budget Template submitted by the District for the proposed school project. The MSBA's analysis
   may differ from the analysis performed by the district.
   All costs associated with ineligible construction items (refer to 963 CMR 2.16(5) for more information) including
   design, permitting, construction monitoring, testing etc. are to be identified and included in the Ineligible Cost
   Column.

   If the project is to include alternates, all construction costs must be included within the Estimated Budget of the
   alternate. Associated management and design costs are to be carried as scope excluded items within the related
   categories above. If more than three alternates are being considered add rows to the template and list each
   alternate separately and include separate budgets for each alternate.
Data Entry
   Enter the District and School Names into the top of the form
   Enter the Submittal Date
   Enter the agreed upon Design Enrollment for the proposed facility, see item 106
   Enter the Total Gross Square Footage of the Proposed Facility, see item 107
   Enter the Reimbursement Rate before incentives see item 105. Contact the MSBA assigned field coordinator for
   current rate.
   Enter the Districts maintenance score (refer to Maintenance Score Card), see item 109
   Enter anticipated Incentive points for remaining categories, see items 110-118.
   In the Estimated Budget Column Enter estimated budget items for all categories that apply to the Proposed
   Project. Do not combine multiple categories. For example, separate budgets must be included for Construction
   Contract Documents and Bidding; Bidding budget may not be combined with the Construction Contract Documents
   budget.
   When entering Construction Markups - If the project is to be based on D/B/B, enter 0 for the GMP budget
   categories. If the project is to be based on CM@R, enter 0 for the D/B/B budget categories.
   If the District is considering multiple alternatives contact the MSBA assigned Field Coordinator.
   Identify items that are ineligible for reimbursement based on MSBA regulations. Refer to 963 CMR 2.16 (5)
   Ineligible Costs, and enter associated costs under Ineligible Costs adjacent to the appropriate uniform category.
   MSBA regulations are available at www.MassSchoolBuildings.org.
   Enter costs associated with abatement of asbestos containing floor materials under Ineligible Costs in the
   appropriate category, see item 69.
Standard Reimbursement Calculations
   Site Cost Reimbursement - If the value of "Eligible Minus Reimbursable" within the Site Cost Reimbursement
   section of the spreadsheet is positive, enter that into the "Scope Excluded Site Cost" category in the "Scope
   Excluded Items" column see item 77.
   Construction Cost Reimbursement - If the value of "Eligible Minus Reimbursable" within the Construction Cost
   Reimbursement section of the spreadsheet is positive, enter that into the "Overall Excluded Construction Cost"
   category in the "Scope Items Excluded" column, see item 88.
   FFE Reimbursement - If the value of "Eligible minus Reimbursable" within the FFE Reimbursement section of the
   spreadsheet is positive, enter that applicable amount into the "Scope Excluded Items column for each category of
   costs, see items 99-101.
   Soft Cost Reimbursement - If the value of "Eligible minus Reimbursable" within the Soft Cost Reimbursement
   section of the spreadsheet is positive, enter that into the "Soft Costs that exceed 20% of Const'n Cost" category in
   the "Scope Items Excluded" column, see item 103.
                                                                                                                          Total Project Budget
     Insert City/Town
                                                                                                                                                Insert Submittal Date
     School Name
                                                                                   Scope Items Excluded from
                                                                                   the Basis of Estimated Total
     Total Project Budget: All costs associated with the                           Facilities Grant or Otherwise   Basis of Estimated Total    Estimated Maximum Total
     project are subject to 963 CMR 2.16(5)                Estimated Budget                   Ineligible               Facilities Grant1            Facilites Grant1
     Feasibility Study Agreement
 1   OPM Feasibility Study                                                                                                               $0                                                                                 ProRated 20% Exclusion
 2   A&E Feasibility Study                                                                                                               $0                                                                                                   $0 -Administration
 3   Env. & Site                                                                                                                         $0                                                                                                   $0 -A/E Services
 4   Other                                                                                                                               $0                                                                                                   $0 -Miscellaneous Proj Costs
 5   Feasibility Study Agreement Subtotal                                     $0                              $0                         $0            #DIV/0!           Soft Cost Reimbursement                                              $0 Sum of Three Soft Costs
     Administration                                                                                                                                                      Est'd Budget         Excluded                      Eligible Soft Costs Category
 6   Legal Fees                                                                                                                          $0            #DIV/0!                             $0           $0                                    $0 -Administration
     Owner's Project Manager                                                                                                                                                               $0           $0                                    $0 -A/E Services
 7   Design Development                                                                                                                  $0                                                     Ineligible therefore not included in calculation -Site Acquisition
 8   Construction Contract Documents                                                                                                     $0                                                $0           $0                                    $0 -Miscellaneous Proj Costs
 9   Bidding                                                                                                                             $0                                                $0           $0                                    $0 FFE
10   Construction Contract Administration                                                                                                $0                                                                     Not included in this calculation Owners Contingency
11   Closeout                                                                                                                            $0                                                                                                   $0 Total Eligible Soft Costs
12   Extra Services                                                                                                                      $0
13   Reimbursable & Other Services                                                                                                       $0                              Construction Costs associated with Soft Cost Cap Calculation
14   Cost Estimates                                                                                                                      $0                              Est'd Budget                                    Construction Costs      Category
15   Advertising                                                                                                                         $0                                                $0                                               $0   -CM Preconstruction services
16   Permitting                                                                                                                          $0                                                $0                                               $0   -Construction Cost
17   Owner's Insurance                                                                                                                   $0                                                                   Not included in this calculation   -Construction Contingency
18   Other Administrative Costs                                                                                                          $0                                                                                                 $0   Total Construction Cost
19   Administration Subtotal                                                  $0                              $0                         $0            #DIV/0!                                                                           20%     Soft Cost Allowance
     Architecture and Engineering                                                                                                                                                                                                       $0.00    Reimbursable Soft Cost
20   Basic Services
21   Design Development                                                                                                                  $0                                                                                                $0.00 Eligible minus Reimbursable
22   Construction Contract Documents                                                                                                     $0                                                    -If Eligible minus Reimbursable is negative OK.
23   Bidding                                                                                                                             $0                                                    -If Eligible minus Reimbursable is positive enter value into Soft Costs that
24   Construction Contract Administration                                                                                                $0                                                      exceed 20% of Const'n Cost below in the Ineligible column.
25   Closeout                                                                                                                            $0                                             Cosntruction Budget               $0
26   Other Basic Services                                                                                                                $0                                                                                                      OPM Fee @
27   Basic Services Subtotal                                                  $0                              $0                         $0                              OPM Services                          Eligible Fees Total % of Const              3.50% Value > 3.5%
     Reimbursable Services                                                                                                                                               Basic Services                    $0             $0       #DIV/0!                     $0           $0
28   Construction testing                                                                                                                $0                              Extra Services                    $0                      #DIV/0!
29   Printing (over minimum)                                                                                                             $0                                                                                                      Dsg'r Fee @
30   Other Reimbursable Costs                                                                                                            $0                              Designer Services                                                               10.00% Value > 10%
31   Hazardous Materials                                                                                                                 $0                              Basic Services                    $0             $0       #DIV/0!                     $0           $0
32   Geotech & Geo-Env.                                                                                                                  $0                              Extra Services                    $0                      #DIV/0!
33   Site Survey                                                                                                                         $0
34   Wetlands                                                                                                                            $0
35   Traffic Studies                                                                                                                     $0
36   Architectural/Engineering Subtotal                                       $0                              $0                         $0            #DIV/0!
     CM & Risk Preconstruction Services
37   Pre-Construction Services                                                                                                           $0            #DIV/0!
     Site Acquisition
38   Land/Building Purchase                                                                                                              $0
39   Appraisal Fees                                                                                                                      $0
40   Recording fees                                                                                                                      $0
41   Site Acquisition Subtotal                                                $0                              $0                         $0            #DIV/0!
     Construction Costs

42 SUBSTRUCTURE
43    Foundations
44    Basement Construction
45 SHELL
46    SuperStructure
47    Exterior Closure
48        Exterior Walls

       Rev. 2: Jan 2012                                                                                                          Page 2 of 4
                                                                                                                           Total Project Budget
      Insert City/Town
                                                                                                                                                 Insert Submittal Date
      School Name
                                                                                    Scope Items Excluded from
                                                                                    the Basis of Estimated Total
      Total Project Budget: All costs associated with the                           Facilities Grant or Otherwise   Basis of Estimated Total    Estimated Maximum Total
      project are subject to 963 CMR 2.16(5)                Estimated Budget                   Ineligible               Facilities Grant1            Facilites Grant1
 49           Exterior Windows
 50           Exterior Doors
 51      Roofing
 52   INTERIORS
 53      Interior Construction
 54      Staircases
 55      Interior Finishes
 56   SERVICES
 57      Conveying Systems
 58      Plumbing
 59      HVAC
 60      Fire Protection
 61      Electrical
 62   EQUIPMENT & FURNISHINGS
 63      Equipment
 64      Furnishings
 65   SPECIAL CONSTRUCTION & DEMOLITION
 66      Special Construction                                                                                                                                             Site Cost Reimbursement =                  8.0%
 67      Existing Building Demolition                                                                                                                                     Direct Site Cost     Excluded                    Eligible Site Costs
 68      In-Bldg Hazardous Material Abatement                                                                                                                                               $0             $0                                $0 Eligible Site Costs
 69      Asbestos Cont'g Floor Mat'l Abatement                                                                                                                            Direct Bldg Cost
 70      Other Hazardous Material Abatement                                                                                                                                                 $0                                               $0 Reimbursable Site Cost
 71   BUILDING SITEWORK                                                                                                                                                                        Scope Excluded Site Cost                      $0 Eligible minus Reimbursable
 72      Site Preparation                                                                                                                                                                      If Eligible minus Reimbursable is negative OK. No ineligible needed
 73      Site Improvements                                                                                                                                                                     If Eligible minus Reimbursable is positive enter value into Scope Excluded Site Cost
 74      Site Civil/ Mechanical Utilities
 75      Site Electrical Utilities
 76      Other Site Construction                                                                                                                                          Construction Cost Reimbursement
 77      Scope Excluded Site Cost                                                                                                                                                            $0 Eligible Demo
                                                                                                                                                                                             $0 Eligible Abatement
      Construction Trades Subtotal                                             $0                             $0                                                                             $0 Total Eligible Demo & Abatement
 78    Contingencies (Design and Pricing)                                                                 #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Trades            #DIV/0!    Total $/sf
 79    D/B/B Sub-Contractor Bonds                                                                         #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Trades            #DIV/0!    Eligible $/sf
 80    D/B/B Insurance                                                                                    #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Trades
 81    D/B/B General Conditions                                                                           #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Trades
 82    D/B/B Overhead & Profit                                                                            #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Trades
 83    GMP Insurance                                                                                      #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Trades
 84    GMP Fee                                                                                            #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Trades
 85    GMP Contingency                                                                                    #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Trades
 86    Escalation to Mid-Point of Construction                                                            #DIV/0!                                                                        #DIV/0!                 #DIV/0!   % of Cumulative sum of Trades and Markups
 87 Overall Excluded Construction Cost                                                                                                                                           #DIV/0!         Marked Up Demo & Abatement
 88 Construction Budget                                                        $0                         #DIV/0!                     #DIV/0!           #DIV/0!                  #DIV/0!         Eligible Construction Cost
 89   Alternates                                                                                                                                                                              -    If eligible area if less than total area enter eligible area here.
                                                                                                                                          $0                                                   275 Reimbursable Const Cost for New Construction $/sf (subject to change)
 90                                                                                                                                       $0                               $                  -    Reimbursable Const Cost
 91                                                                                                                                       $0                                        #DIV/0!        Marked Demo & Abatement
 92 Alternates Subtotal                                                        $0                              $0                         $0            #DIV/0!                     #DIV/0!        Reimbursable Const Cost
 93 Miscellaneous Project Costs                                                                                                                                                     #DIV/0!        Eligible Minus Reimbursable
    Utility company Fees                                                                                                                  $0                              If Eligible minus Reimbursable is negative OK. No ineligible entry needed
 94 Testing Services                                                                                                                      $0                              If Eligible minus Reimbursable is positive enter value into Overall Excluded Construction Cost
 95 Swing Space/Modulars                                                                                                                  $0
 96 Other Project Costs (Mailing & Moving)                                                                                                $0
 97 Misc. Project Costs Subtotal                                               $0                              $0                         $0            #DIV/0!
 98 Furnishings and Equipment                                                                                                                                             FFE Reimbursement
    Furnishings                                                                                                                           $0                                               $0 Eligible FFE
 99 Equipment                                                                                                                             $0                                                0 Enter Design Enrollment
100 Computer Equipment                                                                                                                    $0                                           $2,400 Reimbursable/student (Subject to change)

        Rev. 2: Jan 2012                                                                                                          Page 3 of 4
                                                                                                                                                                            Total Project Budget
      Insert City/Town
                                                                                                                                                                                                        Insert Submittal Date
      School Name
                                                                                                             Scope Items Excluded from
                                                                                                             the Basis of Estimated Total
      Total Project Budget: All costs associated with the                                                    Facilities Grant or Otherwise Basis of Estimated Total Estimated Maximum Total
      project are subject to 963 CMR 2.16(5)                                             Estimated Budget               Ineligible             Facilities Grant1         Facilites Grant1
101 FF&E Subtotal                                                                                         $0                            $0                       $0          #DIV/0!                                                                             $0 Reimbursable Cost
102                                                                                                                                                                                                                                                              $0 Eligible Minus Reimbursable
    Soft Costs that exceed 20% of Const'n Cost                                                                                                                                                                                             If Eligible minus Reimbursable is negative OK.
103   Project Budget                                                                                              $0                               #DIV/0!                              #DIV/0!                                #DIV/0! If Eligible minus Reimbursable is positive enter value into Scope Excluded FFE Cost
104
                                  Board Authorization                                                                                                           Reimbursement Rate Before Incentive Points
105                                     Design Enrollment                                                                                  #DIV/0!              Total Incentive Points
106                 Total Building Gross Floor Area (GSF)                                                                                   #DIV/0!             MSBA Reimbursement Rate
107                                        Project Budget                                          $0
108           Scope Items Excluded or Otherwise Ineligible                                     #DIV/0!                                        1.00              (0-2) Maintenance
109                        Third Party Funding (Ineligible)                                        $0                                         0.00              (0-1) CM @ Risk
110              Basis of Estimated Total Facilities Grant1                                    #DIV/0!                                        0.00              (0-6) Newly Formed Regional School District
111                                  Reimbursement Rate                                        #DIV/0!                                     #DIV/0!              (0-5) Major Reconstruction or Reno/Reuse
112             Estimated Maximum Total Facilities Grant1                                      #DIV/0!                                                                                                                        0
113                                                                                                                                                                                                                           0
                                                                                  2                                                             0.00            (0-1) Overly Zoning 40R and 40S
              Potentially Eligible Construction Contingency
114               Potentially Eligible Owner's Contingency2                                                                                     0.00            (0-0.5) Overlay Zoning 100 units or 50% of units 1,2,
                                                                                  2
115                      Total Potentially Eligible Contingency                                        $0                                                                or 3 family structures
116                                        Reimbursement Rate                                  #DIV/0!                                        0.00              (0-2) Energy Efficiency - "Green Schools"
117                                                                               2            #DIV/0!                                        0.00              (5) Model Schools
             Potential Additional Contingency Grant Funds
118                          Maximum Total Facilities Grant                                    #DIV/0!                                     #DIV/0!              Total Incentive Points
119                                     Total Project Budget                                       $0
120
       NOTE: This template was prepared by the MSBA as a tool to assist Districts and their teams in the understanding of MSBA policies and practices and their potential impact on the MSBA’s calculation of a potential Basis of
      Total Facilities Grant and potential Total Maximum Facilities Grant. This template does not contain a final, exhaustive list of all evaluations which the MSBA may use in determining whether items are eligible for reimbursement
      by the MSBA. The MSBA will perform an independent analysis based on a review of information and estimates provided by the District for the proposed school project that may or may not agree with the estimates generated by
      the District using this template.

      1. Does not include any potentially eligible contingency funds and is subject to review and audit by the MSBA.

      2 - Pursuant to Section 3.20 of the Project Funding Agreement and the applicable policies and guidelines of the Authority, any project costs associated with the reallocation or transfer of funds from either the Owner's
      contingency or the Construction contingency to other budget line items shall be subject to review by the Authority to determine whether any such costs are eligible for reimbursement by the Authority. All costs are subject to
      review and audit by the MSBA.




         Rev. 2: Jan 2012                                                                                                                                                             Page 4 of 4

								