					                           MUHAMMAD KHURSHEED
                               (PMP CERTIFIED)
    Tel #: 0092-21-36315446 (PAK)                    Mobile #:00971-50-3812576 (UAE)
                                                              0092-345-2440172 (PAK)
                             E-mail: engr.khurshid@yahoo.com
                                     khurshidmec@gmail.com

CAREER OBJECTIVE

To advance career in the field of Engineering Management while working in challenging environment of a reputable and result
oriented organization that seeks an ambitious and career conscious person, where acquired skills and education will be utilized
toward continued growth and advancement.

PROFESSIONAL SUMMARY

A result oriented PMP Certified Engineer, having more than 4 years of total working experience in Petrochemical and Oil &
Gas sector including about 4 years in Planning, monitoring and controlling and 1 year in HVAC designing. Currently working
in ADGAS Shutdown core team in planning department as a Planning/ Scheduling Engineer of a diversified engineering
company, dealing mainly in Oil & Gas projects. Conversant in scheduling with Primavera (P3 & P6). Ability to schedule and
handle Project management activities in accordance with the international standards and approved safety documents. Excellent
written, communication, analytical, interpersonal and problem solving skills with the ability to work in multi cultural &
multilingual environment. A well trained team leader & a good team player.

PROFESSIONAL CERTIFICATION

Project Management Professional “PMP” (PMPNo. 1350089)                                                       July 2010
Project Management Institute PMI-U.S.A

EDUCATIONAL QUALIFICATION

Bachelor of Mechanical Engineering                                                                          (2004- 2007)
N.E.D University of Engineering and Technology, Karachi, Pakistan                                            1st Division

EXPERIENCE PROFILE

 Currently Working in Descon Engineering, Abu Dhabi as a Planning/ Scheduling Engineer from May-08 to
  Date.

PROJECT DETAILS

 Working as a Planning/ Scheduling Engineer in Descon Engineering, Abu Dhabi in ADGAS Shutdown core
    team for Train-2 Shutdown.
Project            :       Abu Dhabi Gas Liquefaction Company “ADGAS” Train-2 & Boiler 3 & 4 Shutdown
Client             :       Abu Dhabi Gas Liquefaction Company “ADGAS”
Location           :       Das Island, Abu Dhabi, U.A.E
Project Duration   :       April 2012 to May 2012 (35 Days Shutdown)
Scope of Work      :       Major Over Hauling of ADGAS Plant Train-2 & Boiler 3 & 4

 Worked as a Planning/ Scheduling Engineer in Descon Engineering, Abu Dhabi for ADGAS Train-1 Shutdown.

Project            :       Abu Dhabi Gas Liquefaction Company “ADGAS” Train-1 & Boiler 1 & 2 Shutdown
Client             :       Abu Dhabi Gas Liquefaction Company “ADGAS”
Location           :       Das Island, Abu Dhabi, U.A.E
Project Duration   :       March 2011 to May 2011 (35 Days Shutdown)
Scope of Work      :       Major Over Hauling of ADGAS Plant Train-1 & Boiler 1 & 2

                                                                                                                    Page 1 of 5
Responsibilities as Planning/ Scheduling Engineer :

   Preparation of work packages for execution team and close coordination for elucidation of scope to Supervisor and Unit
    In charges.
   Monitoring and controlling of Site activities.
   Analysis of bottlenecks and timely remedial action of potential delays.
   Ensuring availability of all resources (manpower, equipment, tools, consumables & material, specialist sub-contractors
    etc) before start of work.
   Studies scope of work, perform field verification and incorporate the additions/deletions and corrections in execution plan
    in Primavera Project Planner (P6).
   Read, understand and implement the Company Safety Policy and the arrangement described in the Company and area
    Safety Management System documents in relation to the Planning function.
   Monitoring and managing the all maintenance and overhauling jobs executed according to scope of work include cleaning
    & maintenance of Heaters, Heat Exchangers, Air Fin Coolers, Flare, Column, Vessels, Reactors, PSV’s, Control Valves,
    Pumps, Compressors and piping modifications.
   Coordinating with Site Management for the specific activities and keeping the overall contractual and day-to-day
    commitments with client.
   Update progress in Level III, Level IV plans and S-Curve. Prepare man-hours analysis for calculating efficiencies.
   Cost estimation of additional jobs.
   Preparation of Project Closure Reports.

 Worked as a Cost Engineer in Descon Engineering, Abu Dhabi from July-10 to December-10.

Project            :      Abu Dhabi Gas Liquefaction Company “ADGAS” Train-1 & Boiler 1 & 2 Shutdown
Client             :      Abu Dhabi Gas Liquefaction Company “ADGAS”
Location           :      Das Island, Abu Dhabi, U.A.E
Project Duration   :      October 2010 to November 2010 (35 Days Shutdown)
Scope of Work      :      Major Over Hauling of ADGAS Plant Train-1 & Boiler 1 & 2
Status             :      Shutdown Postponed till March 2011 due to operational works

Responsibilities as a Cost Engineer:

   Prepare Postponement Claim with all its supporting documents.
   Estimate cost of Direct and Indirect Manpower, Equipment and Plant, Direct material, Direct consumables etc.
   Prepare cost baseline and budget for cost performance monitoring.
   Monitor usage of direct material, direct consumables.
   Monitor deployment of direct and indirect manpower, Equipment and Plant against the budget.
   Prepare and verify Invoices for Client and Sub-contractors.
   Estimate cost impact whenever there is a change in scope or plan is revised.
   Update Cost baseline whenever there is a change in scope or plan is revised.
   Keep tracking of triggers and raise flags so that proper corrective or preventive action can be taken.
   Prepare contingency plan.

 Worked as a Planning Engineer in Descon Engineering, Abu Dhabi from May-08 to June-10.

Project            :      Offshore Associated Gases Package-1 “OAG-1”
Client             :      Abu Dhabi Gas Liquefaction Company “ADGAS”
Partner            :      Middle East Projects International “MEPI-Technip”
Location           :      Das Island, Abu Dhabi, U.A.E
Project Duration   :      January 2007 to July 2010
Scope of Work      :      All Mechanical and Electrical Installations

Responsibilities as a Planning Engineer :

Planning
 Provide full assistance to the project team.
 Ensure smooth launching of project with respect to PMS process.

                                                                                                                     Page 2 of 5
   Ensuring proper break up of 4-week look-ahead schedule (based on 3 months look-ahead plan).
   Operate Primavera to make schedules for different construction site activities.
   Prepare risk analysis on the basis of progress and efficiencies in order to raise the flag at right time
   Prepare daily schedule time sheet against drawings and supervisors.
   Prepare reports for daily progress for its proper monitoring and controlling.
   Prepare weekly progress report and its backup sheets for client’s verifications and update Master schedule and client’s
    software CPMS “Construction Progress Monitoring System”.
   Prepare Monthly progress report for month invoicing.
   Prepare weekly internal progress report to ensure that project is progressing as planned and targets would be met.
   Critically analyze the weekly project performance report using S- Curve, Earned and Actual man hours, and analysis of
    efficiencies of construction team and generate recovery and forecast results.
   Giving feed back to Construction department for the available work fronts on site.

Resource Availability
 Determine requirements for resources such as manpower, skills, estimated man hours, material, spares, and special
    support devices such as cranes, forklifts, etc. in order to plan and requisition for the same.
 Identify client issued material against given drawings through Stores/ Material Coordinator.

Feedback
 Ensure that DSTS system is smoothly working and prompt feedback is being provided to all concerned department.

Cost Control
 Responsible for cost control measures and take actions to eliminate re-work, idling of manpower, equipment, wastage of
    material and consumables, etc.

Quality Control and HSE
 Directly responsible for Quality of work.
 Give prime importance to human and assets safety.

Human Resource Development
 Directly responsible for coaching discipline supervisors and frontline supervisors.

 Worked as a Project Engineer in “FND” (HVAC Consultants) from June 2007 to April 2008.

Project            :      Installation of New Air Handling Unit at Roche
Client             :      Roche Pharmaceutical Company
Project Duration   :      February 2008 to July 2008
Scope of work      :      HVAC design

Project            :      Air conditioning in new offices at gsk
Client             :      Glaxo Smith Kline
Project Duration   :      November 2007 to March 2008
Scope of work      :      HVAC design

Project            :      Air contaminants in environment at P&G offices
Client             :      Proctor & Gamble
Project Duration   :      June 2007 to November 2007
Scope of work      :      Investigation of air contaminants

Responsibilities as a Project Engineer:

   Determine load calculation (cooling load) for the required space.
   Ducting design according to the load calculation for the entire system.
   Calculate bill of quantities and bill of material.
   Selection of mechanical equipments for the system like Air Handling Unit, Diffusers etc.
   Contact different companies for procurement of mechanical equipments.
   Work towards producing standard templates for work orders, work plans to ensure systematic data representation.


                                                                                                                   Page 3 of 5
   Make sure to implement all standard codes (ASHRE & Carrier).

INTERNSHIPS

   6 Weeks Internship Experience in Fauji Fertilizer Bin Qasim Limited, Karachi, Pakistan. (June 06- July 06)
   3 Weeks Internship Experience in Alkaram Textile Private Limited, Karachi, Pakistan.    (Nov 06- Dec 06)

SOFTWARE SKILLS

1) Primavera Project Planner P6                                    2) Primavera Project Planner PIII
3) CPMS                                                            4) MS Project
5) Hourly Analysis Program 4.22                                    6) Tora
7) Pro Engineering Wildfire-3                                      8) PROCeSs
9) SMART                                                           10) ACCPAC 7.3
11) Auto-Cad 2006                                                  11) MS Office

AWARDS AND CERTIFICATES

   Letter of Appreciation by Project Manager “Brian Victor Voak” (Descon Engineering, OAG-1) for the successful
    installations of 2 largest modules on time.
   Letter of Appreciation for contributing in 8 Million safe working Man Hours with out Lost Time Injury at OAG from
    MEPI-Technip.
   Letter of Appreciation for contributing in 6 Million safe working Man Hours with out Lost Time Injury at OAG from
    Descon Engineering, UAE.
   Certificate for reporting highest number of Near Misses in a month from ADGAS.
   Certificate for Certified Breathing Apparatus Instructor from ADGAS.
   Certificate for signing as Authorized Gas Tester from ADGAS.
   Certificate for signing as Performing Authority from ADMA-OPCO.
   Certificate for signing as Performing Authority from MEPI-Technip.
   Certificate for reporting Best Near Miss of the month from MEPI-Technip.

TRAININGS
.
   Work Shop on Project MGMT. Methodology and PMP Certification Exam Course        (PMI-Karachi Chapter)
   Work Shop on Graduate Engineering Training Program                              (Descon Engineering)
   Work Shop on Primavera Project Planner “P3”                                     (Descon Engineering)
   Work Shop on SMART                                                              (Descon Engineering)
   Work Shop on Basic Fire Fighting                                                (ADMA-OPCO)
   Work Shop on Breathing Apparatus                                                (ADMA-OPCO)
   Work Shop on Basic SAP Training                                                 (ADGAS)
   Work Shop on E-Learning of Permit To Work                                       (ADGAS)
   Work Shop on E-Learning of Authorized Gas Tester                                (ADGAS)
   Work Shop on E-Learning of H2S Awareness                                        (ADGAS)
   Work Shop on Hazard Awareness in Process Plants                                 (ADGAS)
   Work Shop on Environmental Awareness                                            (ADGAS)
   Work Shop on How to Deliver Tool box Talks                                      (ADGAS)
   Work Shop on Advance Safety Audit                                               (ADGAS)
   Work Shop on Breathing Apparatus                                                (ADGAS)
   Work Shop on EMS- ISO 14001                                                     (ADGAS)
   Work Shop on HSEMS Awareness Training                                           (ADGAS)

MEMBERSHIP

   Member of Project Management Institute “PMI”
   Member of American Society of Mechanical Engineers “ASME”
   Member of Pakistan Engineering Council “PEC”

                                                                                                             Page 4 of 5
KEY STRENGTH

   Ability to effectively communicate with people on all levels and build up client relationship skills.
   Independent and accountable, able to work with minimum direct supervision or guidance
   Well versed presentation skills.
   Efficient analytical, written and oral communication skills.
INTERESTS /EXTRACURRICULAR ACTIVITIES

   Newspaper and articles reading.
   Traveling to new locations.
   Playing and watching cricket matches.

COMMUNICATION SKILLS

Can effectively communicate with people in English and Urdu.

REFERENCES

Furnished upon request.

PERSONAL PARTICULARS

Marital Status             :   Single
Nationality                :   Pakistani
Date of Birth              :   25th September 1984
Permanent Address          :   House No. R-162 Block-9 Dastagir Society F.B Area, Karachi, Pakistan.
Pass Port No.              :   AM4128541
Pass Port Expiry Date      :   27th April 2013




                                                                                                            Page 5 of 5

				