Inv MaintCost CD

Shared by: HC121002054828
Categories
Tags
-
Stats
views:
0
posted:
10/1/2012
language:
English
pages:
1
Document Sample
scope of work template
							Prefeasibility Study for the                                                  Annex5.3.4 Infrastructure
Reopening of the Shire - Zambezi Waterway                             Investment and Maintenance Cost




   Summary of Investment and Maintenance Cost Estimates
                                 Scenario 1       Scenario 2      Scenario 3a       Scenario 3b
   River training and
   capital dredging              USD 4,250,000   USD 19,000,000    USD 550,000         USD 50,000
   Annual maintenance
   of waterway                     USD 425,000    USD 1,900,000     USD 55,000          USD 5,000
   Port structures in
   Nsanje                          USD 900,000     USD 900,000     USD 900,000        USD 400,000
   Port structures in
   Chinde                        USD 1,800,000       NA           USD 1,800,000          NA
   Access channel to the
   Indian Ocean in Chinde        USD 8,100,000    USD 1,750,000       NA                 NA
   Annual maintenance
   of access channel               USD 810,000     USD 175,000        NA                 NA

						
Related docs
Other docs by HC121002054828
college of applied sciences and arts
Views: 0  |  Downloads: 0
CITY OF TYLER
Views: 0  |  Downloads: 0
Inv MaintCost CD
Views: 0  |  Downloads: 0
9 heco 7 addendum 1 jdp
Views: 0  |  Downloads: 0
INSTRUCTIONS TO APPLICANTS
Views: 0  |  Downloads: 0
PRESQUE ISLE CITY COUNCIL
Views: 1  |  Downloads: 0
Job Description � Intrinsiq Materials Ltd
Views: 3  |  Downloads: 0
Travel Agency Information:
Views: 3  |  Downloads: 0