JOINT INSPECTION CUM SATISFACTORY PERFORMANCE REPORT OF SOLAR WATER HEATING SYSTEM

Document Sample
JOINT INSPECTION CUM SATISFACTORY PERFORMANCE REPORT OF SOLAR WATER HEATING SYSTEM Powered By Docstoc
					 JOINT INSPECTION-CUM-SATISFACTORY PERFORMANCE REPORT OF
   SOLAR WATER HEATING SYSTEM INSTALLED UNDER GENERAL
         SUBSIDY SCHEME/JNNSM IN THE STATE OF PUNJAB

 Certified that a solar water heating system of FPC/ETC type of capacity………………LPD has
                              been installed & Commissioned at House
no……………………./Institution…………………………………………………………………
                                      ………………………of
Sh./Smt……………………………………….S/W/O……………………………Village/Mohalla/
 Sector……………………………….City………………………………….Teh…………………
……….Distt………………………………..By M/s (manufacturer / dealer name )........................................
…………………The detail of the system is as under:-

Type of system (FPC/ETC)                           :-
Size of Tubes ( Diameter X Length ) in case of     :-…………..mm x………………mm
ETC systems                                        :-                Nos.
No. of Tubes in one collector                      :-                Nos.
Total No. of collectors                            :-                Nos.
Total No. of Tubes                                 :-                Sq.m
Area of collectors (Photograph to be enclosed)

The System is as per BIS/PEDA/MNRE specifications manufactured by M/s…..............................
…………………………………………Further the system has been inspected for its performance
by us jointly on dated……………….and is working satisfactorily. The hot water temperature
gauge is……………. Degree C.
               The system has been supplied with 5 years performance guarantee by the
manufacturer / supplier. The manufacturer / supplier and beneficiary are fully responsible for the
performance guarantee and any type of repair and maintenance of this system .The system has
been installed with mutual understanding between the supplier and the beneficiary under market
intervention scheme of MNRE, Govt. of India. The expected life of the collector is about 15 years
for FPC and 10 years for ETC system.




Signature & Name of the rep. of                           Signature & Name of the beneficiary
Supplier with seal and date




                            Signature, Name &Designation
                            of verifying officer of PEDA

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:44
posted:10/2/2012
language:Unknown
pages:1