GPRS Main Concepts - DOC

W
Shared by: HC12100114543
Categories
Tags
-
Stats
views:
11
posted:
10/1/2012
language:
Latin
pages:
9
Document Sample
scope of work template
							3GPP TSG CN WG1 / ETSI STC SMG3 WPA                                                Tdoc N1-99538
Sophia Antipolis, France
1-4 June, 1999



Source:        Rapporteur GSM 03.60

Topic:         GPRS

Subject:       Summary of Change Requests to GSM 03.60

Date:          28 May, 1999



Introduction

GSM 03.60 is the stage-2 service description for GPRS network and signalling issues.

GSM 03.60 v5.0.0 was approved by SMG#22 in June 1997.

GSM 03.60 v5.1.0 was approved by SMG#23 in October 1997.

GSM 03.60 v5.2.0 was approved by SMG#24 in December 1997.

GSM 03.60 v6.0.0 was approved by SMG#25 in March 1998. Due to late approval of CR A044, v5.3.0
was distributed as a temporary version with all SMG#25-approved CRs included except A044.

GSM 03.60 v6.1.0 was approved by SMG#26 in June 1998. ETSI subsequently produced v6.1.1 which
differed from v6.1.0 only in the cover pages and in the history section.

GSM 03.60 v6.2.0 was approved by SMG#27 in October 1998.

GSM 03.60 v6.3.0 was approved by SMG#28 in February 1999. ETSI subsequently produced v6.3.1.

This document contains an overview of all known change requests (CRs) to GSM 03.60, and the
status of each CR.

Rapporteur's contact details

Hans Petter Naper                      +47 67 80 04 12 (phone)
Motorola                               +47 67 80 04 13 (fax)
Linderudgrenda 44                      +47 92 65 66 44 (mobile)
N-1353 Bærums Verk, NORWAY             Hans-Petter_Naper@europe34.mot.com
CRs to create GSM 03.60 v8.0.0 (GSM99) from v7.x.y

CR #   Rev   Subject                           Description                                                             SMG12       SMG3 A     SMG3 P    SMG#29
A116    1    Tunnelling of Non-GSM             Proposes that a non-GSM MSC/VLR can be connected to the                 Agreed
             Messages                          SGSN. Also proposes a method to transparently tunnel messages
                                               between the MS and the non-GSM MSC/VLR.
A111    1    Introduction of HPLMN Address     Proposes a method to force a roaming GPRS MS to use a GGSN in           Withdrawn   -          -         -
             Allowed flag                      the visited PLMN.
A103    1    Introduction of EGPRS             Proposes text to reflect the EGPRS radio interface, e.g., increased     Agreed,     Noted      On hold
                                               bitrates.                                                               on hold



CRs to create GSM 03.60 v7.0.0 (GSM98) from v6.x.y

CR #   Rev   Subject                           Description                                                             SMG12       SMG3 A     SMG3 P    SMG#28
A1??    0    Ga interface to the GPRS Logi-    Adds the Ga interface and a reference to GSM 12.15.
             cal Architecture diagram etc.
A115    1    Clarification to the PDP-type     Describes the protocol stack used for the PDP type PPP service.         Rev 0       Agreed
             PPP                                                                                                       reviewed
A106    1    MS and GSN-initiated PDP          Proposes that the MS, the SGSN, and the GGSN be allowed to              Rev 0       Rev 0
             context modification              initiate modification of a negotiated QoS profile.                      agreed      reviewed
A104    1    Octet Stream Protocol and         Proposes stage-2 description for the work items "Unstructured           Rev 0       Agreed
             Internet-Hosted Octet Stream      Octet Stream PDP Type" and "Connecting an Octet Stream to a             reviewed
             Service                           Port on an Internet Host".
A099    2    GGSN-initiated QoS Re-            Proposes that the GGSN be allowed to initiate modification of a         Replaced    -          -         -
             negotiation                       QoS profile.                                                            by A106
A091    1    ANSI references                   Need to support Bellcore-specific X.75’ interface for interworking      Rev 0       Agreed     Agreed    Approved
                                               with BOC’s data networks.                                               agreed
A087    2    Introduction of PDP type PPP      Introduces the new PDP type PPP, and proposes solution for PPP          Agreed      -          -         Approved
                                               operation in LLC unacknowledged mode.
A086    1    Introduction of additional        Proposes architecture to provision end-to-end QoS guarantees.           Reviewed
             functions to provide end-to-end
             QoS
A085    6    Involvement of BSS in QoS         Proposes a method to include the BSS in QoS negotiation and             Rev 5 QoS
             provisioning                      policing.                                                               ad-hoc
                                                                                                                       reviewed
A084    4    MS initiated triggering of QoS    Allows the MS to initiate modification of the negotiated QoS profile.   Replaced    -          -         -
             Renegotiation                                                                                             by A106
A081    1    Enhanced QoS Support in           Proposes a method for end-to-end QoS negotiation and policing.          Replaced    -          -         -
             GPRS for UMTS phase 1                                                                                     by A084 -
                                                                                                                       A086

                                                                                     2
A067    0    RA update for anonymous              Proposes that RA updates shall be added to the anonymous access       Reviewed,   -            -        -
             access                               case                                                                  on hold



CRs to GSM 03.60 v6.3.1

CR #   Rev   Subject                              Description                                                           SMG12       SMG3 A       SMG3 P   SMG#29
A1??    0    MS class mode of operation           Proposes that the definition of MS classes be replaced by a                       Reviewed
                                                  reference to GSM 02.60.
A119    1    Clarification of the null routeing   Proposes that the cells not supporting GPRS in a location area be                 GPRS ad-
             area                                 grouped into a "null routeing area".                                              hoc agreed
A118    1    Information storage                  Removes an old reference to a non-existent SGSN context table                     GPRS ad-
                                                  field, and adds APN to SGSN and MS context tables.                                hoc agreed
A117    2    SGSN Failure                         Aligns SGSN failure situations including subsequent routeing area                 GPRS ad-
                                                  updates and paging with recent stage-3 developments.                              hoc agreed
A114    0    Selection Mode consistency           Aligns the APN Selection Mode parameter values with the more          Agreed      Agreed
             between 09.60 and 03.60              descriptive values in GSM 09.60.
A113    0    Correction of the handling of        Same as CR A112.                                                      -           Withdrawn    -        -
             CKSN in the attach procedure
A112    2    Correction of the handling of        Proposes that the authentication procedure can be used to start                   Agreed
             CKSN in the attach procedure         ciphering without at the same time re-autenticating the MS.
A107    2    Improving the user data loss-        Proposes that the LLC V(R)-based inter-SGSN RA update data                        GPRS ad-              0
             less inter-SGSN RA update            recovery mechanism be replaced by an SNDCP N-PDU-based                            hoc agreed
                                                  mechanism.



CRs to GSM 03.60 v6.2.0

CR #   Rev   Subject                              Description                                                           SMG12       SMG3 A       SMG3 P   SMG#28
A110    1    MM/GMM coordination                  Proposes clarifications to the behaviour of MSs operating in mode B               Reviewed
                                                  when the periodic RA update timer expires.
A109    0    Periodic routing area update         Proposes that the periodic RA update and mobile reachable timers      -           Withdrawn    -        -
             and Mobile Reachable Timer           be controlled by RA update procedures and not by STANDBY /
                                                  READY state transitions.
A108    0    SGSN Failure                         Aligns handling of MSs after SGSN failure with stage-3                -           Agreed       Agreed   Approved
                                                  specifications.
A105    0    No more combined periodic RA /       Proposes removal of the combined periodic RA / LA update              Agreed      Agreed       Agreed   Approved
             LA updates                           procedure as this procedure is not needed.
A102    0    STANDBY state clarifications         Clarifies that an MS may be paged, and that SMs may be delivered,     Agreed      Agreed       Agreed   Approved
                                                  even if no PDP context has been activated.


                                                                                      3
A101   0   Alignments with GSM 04.64 and       Proposes minor changes to ensure that 03.60 matches GSM 04.64          Agreed     Agreed     Agreed   Approved
           04.65                               and 04.65.
A100   0   Roaming restriction corrections     Proposes improvements to the regional subscription and roaming         Agreed     Agreed     Agreed   Approved
           and alignments with 03.15 and       restrictions descriptions.
           09.02
A098   0   Protocol Configuration Options      Proposes that PDP Configuration Options be added to the Activate       Agreed     -          -        Approved
           at PDP context activation reject    (AA) PDP Context Reject messages.
A097   0   Force to Standby procedure          Proposes that only the SGSN, and not the MS, can indicate Force        Agreed     Agreed     Agreed   Approved
                                               to STANDBY.
A096   2   Corrections to APN selection        Proposes that a user with a single PDP context subscription record     Rev 0      Agreed     Agreed   Approved
           tree                                containing a static PDP address shall be able to activate the PDP      reviewed
                                               context without explicitly including the PDP address in the Activate
                                               PDP Context Request.
A095   1   Correction to the HLR restart for   Proposes that, subsequent to an HLR restart, the SGSN shall            Agreed     -          -        Approved
           combined attached Mobile            indicate the first MS activity to the VLR.
           Stations
A094   0   Suppression of SM delivery via      Proposes that the operator shall be able to specify that SMs for an    Reviewed   Reviewed
           GPRS route                          individual subscriber shall not travel via an SGSN.
A093   0   Unsuccessful Update PDP             Proposes that an inter-SGSN RA update be accepted even if the          Agreed     -          -        Approved
           Context                             SGSN cannot update one or several GGSN PDP contexts.
A092   1   Clarification for the MM Context    Proposes that the SGSN classmark be transferred from the old to        Agreed     -          -        Approved
           Information Element                 the new SGSN upon inter-SGSN RA updates.




                                                                                    4
CRs to GSM 03.60 v6.1.0

CR #   Rev   Subject                      Description                                    SMG12      SMG#27
A090    0    A interface suspend and      Clarifies that it is not necessary to          Agreed     Approved
             resume                       support the BSS-to-BSS information
                                          transfer mechanism in order to provide
                                          suspend and resume.
A089    ?    Mandatory BSS to BSS         Alcatel?                                       -          -
             information
A088    0    GPRS Information in the      Describes usage of GPRS information in         Agreed     Approved
             SIM and the ME               GPRS-aware SIMs.
A083    0    Clarification for usage of   Proposes to simplify QoS handling by           Reviewed   -
             QoS parameters               allowing only certain QoS profiles.
A082    1    Various improvements         Offers a number of improvements as             Agreed     Approved
                                          summarised on the cover page.
A080    1    Inconsistency in MS          Clarifies that the SGSN returns an MS          Agreed     Approved
             unreachable specification    Unreachable message when PPF is
             between 09.18 and 03.60      cleared, and that the association in the
                                          MSC/VLR shall not change when the MS
                                          Unreachable message is received.
A079    1    Removing GPRS's de-          Renames the Identification procedure to        Agreed     Approved
             gradation of CAMEL's         MS Information procedure. Expands the
             Any Time Interrogation       functionality of the procedure to enable
             procedure                    query of the cell last used by an MS.
A078    2    Alignment of references      Introduces transaction identifiers to the      Agreed     Approved
             to NSAPI and addition of     session management procedures.
             TI to context tables
A077    1    Handling of GPRS             Introduces the two-split GPRS                  Agreed     Approved
             Classmark                    classmark; one part for radio access
                                          capabilities, and one part for the SGSN.
A076    2    Signalling and SMS radio     Removes hardcoding of radio priority           Agreed     Approved
             priority levels              levels for signalling and SMS. Proposes
                                          that the radio priority level to be used for
                                          MO SMS is included in Attach Accept.
A075    0    Generation and distri-       Aligns 03.60 with GSM 12.05 by adding a        Agreed     Approved
             bution of Charging Id        description of GGSN Charging Id
                                          generation and distribution.
A074    0    PDP context deactivation     Specifies that the SGSN shall deactivate       Agreed     Approved
             after GGSN failure           a PDP context when the GGSN reports
                                          reception of an uplink tunnel PDU for
                                          which no PDP context exists in the
                                          GGSN.
A073    0    PDP Context Modifica-        Clarifies that, due to the introduction of     Agreed     Approved
             tion for one NSAPI only      transaction identifiers in GSM 04.08
                                          session management signalling, only one
                                          PDP context can be modified with one
                                          SM signalling message.
A072    2    Incremental Insert and       Allows the HLR to insert, modify, and          Agreed     Approved
             Delete Subscriber Data       remove PDP contexts in the SGSN.
             procedures
A071    0    Restoration procedures       Specifies that the SGSN shall only relay       Agreed     Approved
                                          paging requests received via Gs for an
                                          MS that is unknown in the SGSN if the
                                          SGSN has not yet completed recovery.
A070    2    Alignment of 03.60 and       Specifies that RAC and LAC shall be            Agreed     Approved
             08.18 CR "RAC added to       included with every uplink LLC frame
             cell identity IE"            delivered by the BSS to the SGSN.
A069    0    BSSGP flow control           Aligns the outdated description of Gb          Agreed     Approved
                                          flow control with the solutions agreed by
                                          SMG2.
A068    1    Improvement for the          Improves the handling of inter-SGSN            Agreed     Approved
             SGSN change procedure        routeing area updates for the case when
                                          the MS reselects the old SGSN before
                                          the ongoing RAU is completed.
A066    1    Clarification for usage of   Clarifies that combined procedures are         Agreed     Approved
             combined procedures          only and always used in network

                                                      5
                                          operation mode I by MSs that are both
                                          GPRS and IMSI attached, except when
                                          these MSs are CS connected. Specifies
                                          that separate RA update and LA update
                                          remove the association at the SGSN and
                                          MSC/VLR, respectively.
A065    1    Deletion of Standby timer    Claims that the STANDBY timer is              Agreed      Approved
             function                     unnecessary, and proposes that the
                                          periodic RA update and Mobile
                                          Reachable timer functions are adequate.
A064    -    -                            -                                             -           -
A063    -    -                            -                                             -           -



CRs to GSM 03.60 v6.0.0

CR #   Rev   Subject                      Description                                   SMG12       SMG#26
A062    1    Mapping of QoS profile to    Proposes that the uplink GPRS radio           Agreed      Approved
             GPRS radio priority level    priority level is indicated in the Activate
                                          PDP Context Accept message.
A061    1    Clarification of network     Clarifies mode III: GPRS paging may be        Agreed      Approved
             operation mode III           performed on either PCH or PPCH.
A060    1    Recovery procedures          Proposes that any valid uplink LLC            Agreed      Approved
             after HLR and VLR            frame, and not just RA updates, shall
             restart                      trigger recovering location updates.
A059    0    Clarification of TLLI and    Introduces A-TLLI and AA-TID for              Agreed      Approved
             TID for anonymous            identification of anonymous access
             access                       transmission.
A058    4    Use of APN: some             Proposes that the MS shall send APN           Agreed      Approved
             clarifications               upon context activation, and modifies the
                                          SGSN's APN handling.
A057    3    Terminology of GPRS          Proposes that MS class be described as        Agreed      Approved
             MS class and its use         MS mode of operation.
A056    0    Suspension and               Proposes an MSC-based method for              Rejected    -
             Resumption of GPRS           handling of suspend and resume.
A055    2    Data forwarding in inter-    Proposes a double handshake                   Agreed      Approved
             SGSN routing area            mechanism between the new and old
             update                       SGSNs during inter-SGSN RA update.
A054    3    Align 03.60 and 09.60        Proposes that the GGSN shall be able to       Agreed      Approved
             with regard to QoS           restrict QoS Negotiated during context
             negotiation on the           activation, and that the GGSN shall be
             backbone                     able to impact QoS Negotiated during
                                          context modification.
A053    1    Attach and RA update         Proposes that the attach and location         Agreed      Approved
             alignment with 04.08 and     update procedures be aligned with the
             09.18                        solutions in 04.08 and 09.18.
A052    1    Various improvements         Proposes a few minor improvements as          Agreed      Approved
                                          summarised on the CR cover page.
A051    4    Suspend and Resume           Proposes a method for MS-requested            Agreed      Approved
                                          suspend that works in all network modes
                                          of operation.
A050    4    Addition of the implicit     Proposes a new implicit detach timer in       Agreed      Approved
             detach timer functionality   the SGSN, and that the timer is separate
             in the SGSN                  from the STANDBY timer.
A049    0    Use of dedicated             Proposes capabilities to enable LLC           Withdrawn   -
             channels for GPRS            frame transmission on dedicated
             Mobility Management          channels.
A048    4    Usage of reliability class   Proposes a more relaxed relationship          Agreed      Approved
                                          between PDP Type and Reliability Class.
A047    4    Triggering of the            Proposes that it shall be possible for the    Agreed      Approved
             Location Updating            SGSN to update the MSC/VLR before
             procedure between the        the Update Location procedure to the
             SGSN and the MSC/VLR         HLR has completed.
A046    6    Subscription withdrawn       Proposes that the HLR shall be able to        Agreed      Approved
                                          indicate if the Cancel Location message

                                                      6
                                          is sent due to an update procedure or
                                          due to an operator-determined abort.
A045    5    Description of the Send      Proposes that the network-requested           Agreed     Approved
             Routeing Information for     PDP context activation procedure be
             GPRS procedure               described in more detail.



CRs to GSM 03.60 v5.2.0

CR #   Rev   Subject                    Description                         SMG3 SA      SMG3 Pl   SMG#25
A044    3    Suspend / Resume           Removes the need for the MS         Rev 1        Rev 2     Approved
             operation requires         to indicate it's GPRS class to      agreed       agreed
             further analysis           the network, and states that
                                        further study is needed for
                                        suspend / resume operation.
A043    1    Screening functionality    Clarifies that network-controlled   Agreed       Agreed    Approved
             for GPRS phase 1           screening is supported, and
                                        that subscription-controlled and
                                        user-controlled screening are
                                        not supported in the first phase
                                        of GPRS.
A042    2    Applicability of DRX       Clarifies that DRX shall not be     Rev 1        Agreed    Approved
             during MM signalling       applied during certain signalling   agreed
             procedures                 events.
A041    0    Selection mode             Proposes that the GGSN be           Withdrawn    -         -
             parameter                  informed how Access Point
                                        Name was resolved.
A040    3    More robust Inter          Proposes a fix to a problem         Rev 1        Agreed    Approved
             SGSN Routeing Area         with inter-SGSN RA update           reviewed,
             Update                     back to old SGSN.                   agree by
                                                                            email
A039    0    Provision of resilience    Proposes that the HLR may           Withdrawn    -         -
             upon GGSN failure          point to secondary GGSNs for
                                        each PDP context.
A038    3    Packet TMSI                Introduces Packet TMSI, and         Rev 0        Agreed    Approved
                                        changes TLLI allocation and         reviewed,
                                        usage accordingly.                  agree by
                                                                            email
A037    1    Selection and sub-         Clarifies GPRS usage of the         Agreed       Agreed    Approved
             scription options of       Domain Name Service and
             external packet data       translation of Access Point
             network                    Names into GGSN addresses.
A036    9    GPRS Paging co-            Proposes CCCH constellation         Agreed       Agreed    Approved
             ordination                 depending on the operator's
                                        network configuration.
A027    6    Addition of the Gs         Adds the existing 04.08             Agreed       Agreed    Approved
             interface MS               Identification and MM
             identification and MM      information procedures to the
             information                Gs interface.
             procedures to 03.60



CRs to GSM 03.60 v5.1.0

CR #   Rev   Subject                    Description                         SMG3 SA      SMG3 Pl   SMG#24
A035    2    No more combined           Proposes that the SGSN and          Agreed       Agreed    Approved
             (GPRS + non-GPRS)          MSC/VLR shall independently
             “Ready for SM”             send Ready for SM messages
             notification to HLR        to the HLR.
A034    0    GTP-MAP protocol-          Proposes explicit definition of     Withdrawn    -         -
             converting GSN             protocol-converting GSN
                                        functionality.
A033    0    Detach indication from     Proposes that a new GPRS            Agreed       Agreed    Approved
             the SGSN to the VLR        Detach Indication message be
                                        used instead of Location
                                                       7
                                     Updating Request and Accept.
A032   1   Further description of    Adds a cause parameter to the      Agreed      Agreed   Approved
           the Network-              Send Routeing Information for
           Requested Context         GPRS Response message to
           Activation procedure      improve the procedure.
A031   2   Alert and monitoring      Proposes a procedure that          Agreed      Agreed   Approved
           procedures at the         allows the MSC/VLR to request
           MSC/VLR for class A       that the SGSN indicates when
           and B mobiles             a MS shows activity.
A030   5   QoS Definitions           Proposes QoS additions             Rev 1       Agreed   Approved
                                     according to GSM 02.60 v5.2.0.     reviewed
A029   0   GPRS Attach               Proposes that GGSN PDP             Withdrawn   -        -
           procedure                 contexts used for network-
           enhancement               initiated activation shall be
                                     updated with the SGSN
                                     address every time the MS
                                     changes SGSN.
A028   5   Handling of CS paging     Adds capability for the MSC to     Agreed      Agreed   Approved
           requests by the SGSN      include Area in Gs interface
           after a failure           paging request in case the MS
                                     is not known in the SGSN.
A026   1   Addition of a reset       Specifies that the SGSN shall      Agreed      Agreed   Approved
           indication message        send a Reset message to the
           from the SGSN to the      MSC/VLR after a SGSN failure.
           VLR
A025   3   More robust Network-      Converts the PDU Notification      Rev 2       Agreed   Approved
           Requested PDP             and PDU Reject procedures to       agreed
           Context Activation        explicitly confirmed procedures.
           Procedure
A024   4   Access Point Name         Renames GGSN Address in            Rev 3       Agreed   Approved
                                     PDP context activation to          agreed
                                     Access Point Name.
A023   3   GSN number and            Clarifies the usage of the         Agreed      Agreed   Approved
           address                   SGSN PDP context table fields
                                     GGSN Address and GGSN
                                     Address in Use.
A022   3   Additional PDP            Adds the capability for the MS     Agreed      Agreed   Approved
           configuration options     and GGSN to transparently
                                     exchange configuration data
                                     upon PDP context activation.
A021   2   TLLI reallocation         Adds a TLLI reallocation           Agreed      Agreed   Approved
                                     procedure.
A020   2   LLC and RLC               Allows the user to select LLC      Replaced    -        -
           transmission modes        and RLC transmission modes.        by A030
A019   3   Clarification of the      Allows the SGSN to extract the     Agreed      Agreed   Approved
           Routing Area Update       RA identifier from uplink
           procedure and cell        messages rather than having to
           identifier                translate CI to RAI.
A018   5   Routing Area Update       Proposes fix to the potential      Rev 4       Agreed   Approved
           procedure                 security problem associated        agreed
                                     with sending Routeing Area
                                     Update Request messages in
                                     plain text.
A017   4   To align the              Allows dynamic PDP address         Rev 3       Agreed   Approved
           anonymous PDP             allocation and GGSN selection      agreed
           context activation with   upon anonymous access PDP
           the non-anonymous         context activation.
           PDP context activation
A016   3   Maximum N-PDU size        Limits the maximum network         Agreed      Agreed   Approved
                                     layer PDU size to 1500 octets.
A015   4   MS Purge for GPRS         Adds MAP Purge mechanism           Rev 3       Agreed   Approved
                                     to GPRS.                           agreed
A014   5   Editorial changes and     Various, mostly minor,             Rev 4       Agreed   Approved
           clarifications on GSM     changes. For a list of changes,    agreed
           03.60                     see the CR cover pages.
A013   3   Editorial changes on      Various editorial changes. For     Agreed      Agreed   Approved
           03.60                     a list of changes, see the CR
                                                   8
                                       cover pages.
A012    1    SMS delivery path         Specifies that the preferred        Agreed    Agreed    Approved
                                       delivery path for mobile-
                                       terminated SMs shall be
                                       chosen by the SMS-GMSC and
                                       not by the HLR.
A011    1    Idle mode and             Corrects references to GSM          Agreed    Agreed    Approved
             connected mode            IDLE state and CONNECTED
                                       state to idle mode and
                                       connected mode.



CRs to GSM 03.60 v5.0.0

CR #   Rev   Subject                   Description                         SMG3 SA   SMG3 Pl   SMG#23
A010    0    Clarification on the      Clarifies when the VLR address      N.A.      Agreed    Approved
             update of the SGSN-       shall be updated in the SGSN
             VLR association           in order to avoid that a Detach
                                       is sent to the relay MSC.
A009    0    Clarifications to         For a summary of the changes,       N.A.      Agreed    Approved
             network-requested         see the CR cover page.
             PDP context activation
A008    3    SMS over GPRS             Offers improvements to the          N.A.      Agreed    Approved
                                       solution for SMS support over
                                       GPRS. For a summary of the
                                       changes, see the CR cover
                                       page.
A007    1    Various improvements      Various outstanding issues. For     N.A.      Agreed    Approved
             to GSM 03.60              a list of changes, see the CR
                                       cover pages.
A006    0    Anonymous Access          Enables the GGSN or                 N.A.      Agreed    Approved
             PDP Context               anonymous access server to
             Deactivation              initiate PDP Context
                                       Deactivation based on for
                                       example unauthorised use.
A005    1    Allocation of NSAPI in    - Changes NSAPIs from being         Agreed    Agreed    Approved
             the PDP Context           fixed as part of the subscription
             Activation procedure      to be dynamically allocated
                                       upon PDP Context Activation.
                                       - Also impacts TIDs because
                                       TID=IMSI+NSAPI.
A004    1    Selection of the          Adds the possibility for the user   Agreed    Agreed    Approved
             external network          to in the PDP Context
             reference point by the    Activation procedure select a
             user                      logical GGSN. This enables the
                                       user to select external network
                                       or transit network.
A003    0    Reliable MM signalling    Adds the requirement that "The      Agreed    Agreed    Approved
             over the radio            MM procedures shall provide
             interface                 information to the underlying
                                       layers to enable reliable
                                       transmission of MM messages
                                       on the Um interface.".
A002    1    Maximum network           - N-PDUs may be longer than         Agreed    Agreed    Approved
             layer PDU length          1600 octets.
                                       - The network shall support at
                                       least 1600 octets N-PDUs.
A001    0    Clarifications to 03.60   Clarifies the Relay function in     Agreed    Agreed    Approved
                                       protocol stacks, and improves
                                       the Gb interface section.




                                                      9

						
Related docs
Other docs by HC12100114543
Timberframe
Views: 1  |  Downloads: 0
Bkbw Proc
Views: 0  |  Downloads: 0
AVID BINDER EXPECTATIONS
Views: 21  |  Downloads: 0
Contite Concrete Waterproofing Specifications
Views: 0  |  Downloads: 0
Innovation, concurrence et croissance
Views: 3  |  Downloads: 0
Quest�es RH- Prof
Views: 5  |  Downloads: 0
EdOlson RESUME2009
Views: 1  |  Downloads: 0
Recordkeeping
Views: 2  |  Downloads: 0
PowerPoint Presentation
Views: 0  |  Downloads: 0