Commissioning Sequence Progress Check Sheet

Document Sample
Commissioning Sequence Progress Check Sheet Powered By Docstoc
					                         Commissioning Sequence Progress Check Sheet

                                              System: LSI Bulk Sterilizer


Overview: Includes Bulk Sterilizer BS-1 on level 1. This is a steam sterilizer 49” x 84” x 84” in size
designed to process animal caging systems.

Spec Section: 11609

Cx Sequence:
Initial acknowledgment and date when item is complete.

Acknowledgments
Owner     Contractor


                        _____             Shop Drawings Approved

                        _____             Major Components Delivered

_____                   _____             Installation Manuals submitted

                        _____             Pre-Installation Check Sheets Completed

                        _____             Mechanical Complete

                        _____             Electrical Complete

_____                   _____             Mfgr. Check-Test-Start

                                             _____ Mfgr. Check-Test-Start Report

_____                   _____             Pre-Start check sheet complete

_____                   _____             Start – up Notification Submitted

_____                   _____             Functional Testing check sheet complete

_____                   _____             Training Plan (Draft) submitted and approved

_____                   _____             Training Scheduled

_____                   _____             Training Completed

                        _____             All Punch-List Items Completed

_____                   _____             Contract Commissioning Requirements Completed




C:\Docstoc\Working\pdf\4129cd16-5351-41a9-9c20-c9c7c77fdc97.doc
LSI
9/30/2012

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:9/30/2012
language:Unknown
pages:1