1 09 Hotel Master Critical Path 18p (PDF)

Document Sample
1 09 Hotel Master Critical Path 18p (PDF) Powered By Docstoc
					FC.1

1.09 Hotel Master Critical Path 18p.xls

Risks and Issues
Key Issues to be Managed Immediately Items Issue HOES long lead items to be ordered [F&B] Main & Beach kitchen to be designed and priced Patesserie to be designed and priced Maning Guide/ recruitment schedule Saving to server Exec Sous Exec Housekeeper Action PC/PK/SS SS/AK meet Wed pm SS/AK meet Wed pm K.Theera/ Nigel to lead Immediate word of mouth - all team at least one phone call word of mouth - all team at least one phone call By PK SS/AK SS/AK TP/NT ALL ALL ALL Date Sep wk 2 8th Sep 8th Sep 10th Sep Immediate

Key Risks to be Managed Items Risk Some dept heads unlikely to be board for mass recruitment Chief Steward Restuarant Manager Room Service Manager Spa Manager Chief Engineer Training venue to be found Training accomodation to be found Opening date needs to be finalized Computer system and PABX to be finalized Staff Accomodation in Khao Lak finalized All FOH Furniture to be finalized Ability to take bookings from Sept 15th Pre opening uniforms -order

Mitigating Strategy word of mouth word of mouth word of mouth word of mouth Word of mouth. Khun Treepop, Chairman of HEA shortlist options to follow up follows training venue location Meeting Tues 7th Sept pm Pending refs checks Carmen [FC]; quotations Arrange meeting 15-17th Sept [TP/NT] AK follow up Meet / finalize 6-10th Sep Follow up + T shirts

By ALL ALL ALL ALL

Date

TP/NT TP/NT AK/KK/NT/AS PC/AK TP/NT AK PC/AS/BB/KK PK

Sep wk 4 Sep wk 4 10th Sep 10th Sep Sep wk 3 Sep wk 2 Sep 14th Sep 10th


				
DOCUMENT INFO
Description: Hospitality Manuals for the Hotels, Resorts and Travel Agencys.