DrashtiPowerCons Baroda

Document Sample
DrashtiPowerCons Baroda Powered By Docstoc
					Er. Shri K.K. BHATIA
     Retired Chief Engineer ( GETCO-SLDC )(GEB)
     Major tenure in various cadre in Transmission
Er. Shri P.R. MEHTA
     Retired Chief Engineer ( GSECL )(GEB)
     OSD - For 4 Years after retirement
     Worked for Various Power Project   from
     Conceiving to commissioning.
     Worked as Add, C.E. Commerce
Er. Shri G. R. Darji
     Retired Add. Chief Engineer ( MGVCL)(GEB)
     Major tenure in various cadre in Distribution
 Providing Services for Sale and Purchase
  of Power and report for Technical and
  economical Viability.
 Matter related to filing petition with
  regulators at state level and Central level .
 New connections for EHV Supply, License
  for becoming Licensee.
 Matter related with Utility and CGRF
  presentation .
 Technical evaluation of new power
  generation project.
 Application_ For HT Power
             _ For LT Power
Supported with authenticated documents
Registration fee as per fixed by Regulator
Load and Limit of Load for different voltage
Duration_ temporary or permanent
Estimate and its understanding
Security Deposit
Agreement
SrNo.   Particulars of Registration       Charges In
        Charges                           Rs.
   i    Single phase . supply for             40/-
        Residential.
  ii    Three    phase    supply    for       100/-
        Residential.
  iii   Single phase supply and Three         100/-
        phase supply for commercial
  iv    Three phase supply for LT             200/-
        Agricultural
  v     Three    phase supply for LT          400/-
        Industrial
Sr.    Particulars of Registration Charges
No.
  i    HT Power Supply New connection and Additional
       Load
       Rs. 10/- per KVA with ceiling of Rs. 25000/
  ii   HT Power Supply and Reduction of l Load
       Rs. 10/- per KVA with ceiling of Rs. 2000/
 iii   Change of name Rs.2000/-

 iv    Testing charge for Meter of HT Supply Rs. 1000/-


  v    Testing charge for CT/PT Unit of HT Supply Rs.
       100/-
         PRORATA GETCO CHARGES

         VOLTAGE IN
SR NO.                AMOUNT PER KVA IN Rs.
             KV

  1         220                815

  2         132                825

  3          66                835

  4        11/22               850
• AGREEMENT

• An applicant shall enter into am
  Agreement with DOSCOM before
  commencement of work ,
  accepting the terms relating to
  tariff and other conditions of
  supply code
• EXECUTION OF WORK
• On payment of Estimate and on execution of
  agreement, the work of erection of line and
  infrastructure is taken upon hand.
• The amount deposited by the Applicant shall be
  subsequently adjusted, on completion of the work
  on the basis of actual cost plus supervision charges
  at 15% & Other applicable Charges of the total cost
  of the materials and labour.
• Prospective consumers may be allowed to execute
  works on turnkey basis.
Maximum load permissible
Sr. No. Voltage and connection     Load
1      Single Phase Resi./ Comm.           6 KW
2      Three Phase Resi./ Comm.            10KW
3.     LT 3 phase                         125 HP
4.     HT 11 KV/22 KV                 4000 KVA
5.     EHT 66 Kv and Above         Above 4000
                                   KVA
• Security Deposit [1] Methodology

• The applicants for electricity shall pay in the
  beginning a Security Deposit towards the
  electricity to be supplied to them as 1.5
  times the monthly Consumption Charges
  taking demand charges based on 85% of
  contract demand plus energy charges
  based on 80% of load factor & considering
  Power Factor 90% plus all other levies and
  taxes.
• Security Deposit [2] Interest
  Provision
• The DISCOM shall pay interest on
  Security Deposit of consumer, at the
  Bank Rate (as on 1st April of every
  year) notified by Reserve Bank of India
  or such higher rate as may be fixed by
  the Commission from time to time.
• Security Deposit [3]
• The consumer can pay 90% of an
  advance bill in lieu of SD. The 90% of
  bill amount is based on the highest
  monthly bill during the last year.
• Security Deposit [4]
• Differential security deposit on a/c of
  revision of tariff can be paid in 12
  monthly installments.
• Security Deposit [5]
• The consumer having Captive Power
  Plant (CPP) facility can have option for
  Bank Guarantee also.
Agrrement
An applicant shall enter into am Agreement
with DOSCOM before commencement of
work , accepting the terms relating to tariff
and other conditions of supply code. Period
of agreement is minimum 2 years from date
of connection either by billing or by
physically release of connection which ever
is earlier
Sr. No   Registration charges                Charges in
                                               Rs.

   i     Single phase supply for                 40/-
           Residential.
  ii     Three     phase     supply    for      100/-
           Residential.
  iii    Single phase supply and Three          100/-
           phase supply for commercial
  iv     Three phase supply for LT              200/-
           Agricultural
Sr. No Registration charges                     Charges
                                                in Rs.

  v     Three      phase    supply   for   LT    400/-
        Industrial

  vi    HT and EHT supply     with aceling of 10/- per
        Rs. 25000/-                            KVA

  vii   All other Categories not enumerated      100/-
        above
Sr    Change of name registration   Rs
No.   charges on base of supply
1.    Single Phase Residential      20/-
2.    Single Phase Commercial and   100/-
      Three phase Residential
3.    LT Industrial                 400/-
4.    HT and EHT                    2000/-
5.    LT agricultural               300/-
Sr No.   Testing fees           Rs.
1.       Single Phase Meter            100/-
2.       Three Phase Meter             300/-
3.       Maximum demand                500/-
         Meter LT
4.       Maximum demand               1000/-
         Meter HT/EHT
5        CT for LT                     100/-
6        CT / PT Unit for HT/          100/-
         EHT
Standard of Performance and Time Limit
Type of      Estimate from   Release of connection
connection   date of         from date of Payment of
             registration    an estimate
LT           10 days         For A category -20days
Industrial                   Other Category -60Days
HT           15 Days         45 days
EHT          30 Days         180 days
Load = No. of unit Consumed during definite period
Factor (Maximum No. of unit which can be
           consumed during above period
           it may be daily; monthly .yearly
Diversity =Total connected Load
Factor          (Maximum load )

Power    =Active power in KW/ KWh
Factor    Apparent power in KVA/ KVAh
Maximum Demand = The highest units
                      consumed during block of
                       30 minutes period during
                       the month
Billing demand = Either of 85% of Contract
                 demand or recorded which ever
                 is higher
Sealing and checking report must be maintained
by the consumer. If seal is removed for any
reason , it should have record for reasons, and
record of resealing . Record of date play
important role when the question of
supplementary bill arise and representation is to
be made for ascertaining the quantity of energy
assessed is to be challenged or reviewed. For
accuracy of meter it can be confirmed by paying
testing fees.
Generally in Static meters all parameters are
displayed , hence if something abnormal is
observed it should be brought to the notice of
officer of discom. The MRI data reveals all such
instances and can be used for arriving final
conclusion for assessment of period at time of
review.
Generally in Static meters all parameters are
displayed , hence if something abnormal is
observed it should be brought to the notice of
officer of Discom. The MRI data reveals all such
instances and can be used for arriving final
conclusion for assessment of period at time of
review.
Maximum Demand = The highest units
                 consumed during block of
                  30 minutes period during
                  the month
Billing demand = Either of 85% of Contract
                 demand or recorded which
                 is higher
Load requirement for HT Power supply
Demand can be made in Slab of 10 KVA,
25 KVA , 50 KVA, 100 KVA and 250 KVA
The limit of range are as under
>100 + 10 KVA slab up to 200 KVa
>200 + 25 KVA slab up to 500 KVa
>500 + 50 KVA slab up to 1000 KVa
>1000 + 100 KVA slab up to 5000 KVa
>5000 + 250 KVA slab

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:10
posted:9/29/2012
language:Unknown
pages:28