							Bond Construction Update
Facilities Advisory Committee
 Long Beach Community College District
          September 1, 2010




                                         1
Agenda
   Latest Completed Construction Projects
       LAC Bldg. J – Theater lighting control panel replacement
       LAC Bldg. E – Renovation upgrades
       LAC CDC – new carpet installation
       PCC Bldg. II – Added new landscaping around perimeter

   Current & Upcoming Construction Projects
       LAC Building A, Student Services Retrofit
       LAC Math Technology Building
       LAC Parking Structure
       LAC Building O Complex
       LAC Infrastructure Improvements and District Wide – Energy
        Efficiency Project
       LAC Building I (Bookstore)
       PCC MDAB (Multi-Disciplinary Academic Building)
       PCC Building CC Retrofit
       District Wide – Electronic Signage Plan
       LAC South Walkway Extension
       LAC Building P FPP

   Planned Phasing of Future Projects

   Q&A                                                              2
Current and Upcoming
Construction Projects
          LAC Building A – Student Services Retrofit
                            Measure E 2008




   Awaiting DSA Final approval on Structural portion
   Adds 6,500 Sq. Ft. to existing building
   Will house A&R, Counseling, Health Services, Cashier, Transfer Ctr., etc.
   Estimated start of construction end of Fall 2010                            3
Current and Upcoming
Construction Projects
   LAC Math Technology Building – Measure E 2008




  Completed Schematic Design
  Will house Math and Culinary Arts instructional
   program as well as Reprographics
  Estimated start of construction Winter 2013
                                                     4
Current and Upcoming
Construction Projects
           LAC Parking Structure – Measure E 2008




   Spaces for 900 Vehicles
   Photovoltaic Electrical Generation Array on top level
   To be located Southeast corner of Lot J adjacent to the Verizon building
   Outfitted with single-axis tracking system
   Minimum 450 KW+ output
   Curriculum building opportunity
   Exhibit classroom
   Construction started Summer of 2010
   Anticipated end of Construction Fall 2011                                  5
Current and Upcoming
Construction Projects
         LAC Building O Complex – Measure E 2008
    Two structures totaling 87,000 square feet
    Current Occupants:
        ERD, Foundation, Warehouse Facility, and
         one leasee
    Future Occupants:
        IITS and BMT
    Start of construction of Building O1 began
     April 2010
    Anticipated completion October 2010




                                                    6
Current and Upcoming
Construction Projects
      LAC Infrastructure Improvement Project and
          District Wide Energy Efficiency Project
                      Measure E 2008

    Project to be completed in a phased
     construction schedule
    Total annual estimated savings of 1.5 million
     Kwh
    Project started Fall 2009; currently working on
     phase 6, 9, & 10
    Landscaping upgrades to be implemented in
     conjunction with infrastructure project phasing
    Majority of existing building HVAC systems to be
     upgraded and connected to the Central Plant
    Exterior lighting and controls upgrades in
     progress
    Anticipated end of construction Winter 2011


                                                        7
Current and Upcoming
Construction Projects
        LAC Building I - Measure E 2008

                                Received Final DSA
                                 approval
                                Adds additional 4,000
                                 square feet to existing
                                 building
                                Architecture to match
                                 LAC Mediterranean
                                 Theme
                                Currently in Bid Phase
                                Construction
                                 scheduled for Fall
                                 2010
                                Bookstore Swing
                                 Space relocated July
                                 2010
                                                           8
Current and Upcoming
Construction Projects
                       PCC MDAB
(Multi-Disciplinary Academic Building) - Measure E 2002




    Received Final State (DOF) approval
    NTP issued on 7/29/10; Contractor mobilizing
    Installed portables for swing space Summer 2010
    Anticipated start of MDAB construction Fall 2010
    Project to be completed in two phases              9
Current and Upcoming
Construction Projects
        PCC Building CC Retrofit - Measure E 2008




    Currently in DSA for plan check (Structural)
    Houses the Fitness Center, Gymnasium, Weight Room, and
     Faculty and Staff Offices
    Swing space to be located on PCC Campus (Bldg. GG)
    To be completed concurrently with MDAB project phase 1
    Anticipated end of construction 2012                     10
Current and Upcoming
Construction Projects
          District Wide – Electronic Signage Plan
                      Measure E 2008




    District Wide Signage Plan complete for LAC & PCC
    Daktronics digital signs currently in fabrication
    Installation of footings to begin on 9/1
    Anticipated construction completion of Marquee Signs
     Fall 2010
                                                            11
Liberal Arts Campus
Site Plan




                      liberal arts
Pacific Coast Campus
Site Plan




                       pacific coast
Planned Phasing of Future Projects
 2009-10
   Begin infrastructure construction – Fall 2009
      Master landscaping implementation will follow this project
   Parking Structure – groundbreaking anticipated May
    2010
   Building O2 occupancy scheduled
      BMT and IITS – Fall 2010
   Install portables for swing space at PCC – Summer
    2010
   Begin construction of Buildings DD and EE at PCC
      Anticipating Fall 2010 start
   Anticipating swing space move for Building A at LAC –
    Summer 2010
   Marquees complete – Fall 2010                                   14
Planned Phasing of Future Projects
 2010-11
   Begin construction of Building I (Bookstore) and move to
    portable swing space – Summer 2010
   Retrofit completion of Building Z – Spring 2010
   Begin construction of Building A at LAC – Fall 2010
   Begin Schematic Design for Buildings C and F at LAC
      Submit plans to DSA no later than Summer 2011




                                                               15
Planned Phasing of Future Projects
 2011-12
   Infrastructure project complete at LAC – Summer 2011
   Submit plans to DSA for Math/Technology Building at LAC –
    Summer 2012
   Construction completion of Buildings DD and EE at PCC –
    Fall 2011
   Begin construction of Buildings AA, BB and CC at PCC –
    Fall 2011
   Anticipated construction completion of Building I
    (Bookstore) at LAC – Fall 2011
   Anticipated construction completion of Parking Structure at
    LAC – Spring 2012




                                                                  16
Planned Phasing of Future Projects
 2012-13
   Move Buildings C and F programs into Swing Space (M/N
    Building) and begin construction – Summer 2012
   Anticipated Construction completion of Building A at LAC –
    Summer 2012
   Submit plans to DSA for M/N Building at LAC and Building
    MM (Phase 1) at PCC – Summer 2012
   Begin Schematic Design for Building P at LAC and Building
    MM (Phase 2) at PCC – Summer 2012
      Submit to DSA – Spring 2013
   Begin construction of Math/Technology Building at LAC –
    Winter 2013



                                                                 17
Planned Phasing of Future Projects
 2012-13   (continued)
   Begin Schematic Design for Building D and E renovations –
    Fall 2013
   Anticipated Construction completion of Buildings AA, BB and
    CC at PCC – Summer 2013




                                                                18
Planned Phasing of Future Projects
 2013-14
   Anticipated Construction completion of Buildings C and F at
    LAC – Fall 2013
   Begin construction of Buildings M/N at LAC and MM (Phase
    1) at PCC – Fall 2013
   Submit plans to DSA for Buildings D and E renovations at
    LAC – Fall 2013
   Schematic design for Performing Arts Building (G & H) and
    Building R at LAC – Spring 2014




                                                                  19
Planned Phasing of Future Projects
 2014-15
   Anticipated Construction completion of Math/Technology
    Building at LAC – Summer 2014
   Begin construction on Buildings D and E at LAC – Fall 2014
   Submit plans to DSA for Performing Arts Building and
    Building R (Gym) at LAC – Spring 2015
      Anticipate construction start – Spring 2016
   Anticipated construction completion of Buildings M/N at LAC
    and MM at PCC – late Spring 2015
   Begin construction on Buildings P at LAC and MM (Phase 2)
    at PCC – Spring 2015




                                                                  20
QUESTIONS
    &
ANSWERS



            21

						
Related docs
Other docs by HC120929091255
RAC Advert
Views: 1  |  Downloads: 0
12 Supply List
Views: 1  |  Downloads: 0
58 personal development planning policy v3
Views: 0  |  Downloads: 0
Basics of Government Marketing
Views: 3  |  Downloads: 0
Rev PhilSyl 2011 FallONLN 16
Views: 0  |  Downloads: 0
P�r sh�rbimin e mbrojtjes s� bim�ve
Views: 2  |  Downloads: 0
Which Road Will You Take?
Views: 0  |  Downloads: 0
AOF Application form
Views: 0  |  Downloads: 0
MIDWESTERN ENDOCRINOLOGY, P
Views: 0  |  Downloads: 0