					Copper Mining: 398

SAP Best Practices for Building Materials (U.S.)




SAP Best Practices
Scenario Overview – 1


      Purpose and Benefits:

           Purpose
              This scenario covers the mining and processing of copper ore. Two main operational
               processes are represented, primary product mining to produce ROM coarse ore for crusher
               feed and crushing to product fine copper ore for subsequent refining.
               It can be also used to describe the process in raw material extraction in building material
               industries, e.g. in the cement industries where wheel loaders and dumper trucks transport the
               raw materials to the crushing installations, where the rock is broken down to roughly the size.

           Benefits
              PI sheet provides a user friendly interface that allows production operators to enter data in a
               customized manner. The same data could be updated automatically.
              A production batch is created for the process order, which allows quality characteristics
               (assays) to be recorded in the system. This batch represents the quantity and quality of the
               crushed copper ore for the time period specified by the process order. The batch
               characteristics for the stockpile batch are used to calculate the value of the stockpile based on
               copper content .
              PM measurement point is integrated, truck related KPI is stored in the created measurement
               documents.

           Key process flows covered
              Create a Process Order for Mining (Crushing) Copper Ore
              Control Recipe Monitor
              Maintain Production Data Using PI Sheet
              Process the Entered Production Data
Scenario Overview – 2


        SAP Applications Required:
            Required
               SAP enhancement package 4 for SAP ERP 6.0

            Company roles involved in process flows
               Production Planner
               Shop Floor Specialist
               Equipment Operation Manager
               Warehouse Manager
Scenario Overview – 3


      Detailed Process Description:

        Mining Copper Ore

        The mine production planner creates a process order for loading and
        hauling of ore in an open pit mine. The hauled quantity as well as some
        truck related KPIs like fuel consumptions or operating hours will be
        confirmed on a PI Sheet by the operation supervisor. The mined ore then is
        posted into inventory as a batch. The truck related KPIs will be stored in a
        measuring document.

        Crushing Copper Ore

        The next step includes the crushing of the mined ore to fine ore. The
        process operator records the quantities as well as its quality characteristics
        for copper-, arsenic-, sulphur-, gold- and moisture-content on an easy entry
        PI-Sheet. The crushed copper is moved as a separate batch to the
        stockpile. Valuation can now be done for the copper ore.
Process Flow Diagram (1)
Copper Mining (Mining Operations)
Process Flow Diagram (2)
Copper Mining (Crushing Operations)
Process Flow Diagram (3)
Appendix: Product Costing
Legend

Symbol                         Description                                             Usage             Symbol                 Description                           Usage Comments
                                                                                       Comments

                               Band: Identifies a user role, such as Accounts          Role band                                To next / From last Diagram: Leads    Flow chart continues on the next /
                                                                                                                                to the next / previous page of the    previous page
   <Function>




                               Payable Clerk or Sales Representative. This band        contains tasks
                                                                                                                                Diagram
                               can also identify an organization unit or group,        common to
                                                                                                                   Diagram
                               rather than a specific role.                            that role.                 Connection
                               The other process flow symbols in this table go into
                               these rows. You have as many rows as required to
                               cover all of the roles in the scenario.
                                                                                                                                Hardcopy / Document: Identifies a     Does not correspond to a task
                                                                                                                                printed document, report, or form     step in a document; instead, it is
                                                                                                                  Hardcopy /                                          used to reflect a document
                               External Events: Contains events that start or end                                 Document                                            generated by a task step; this
   External
   to SAP




                               the scenario, or influence the course of events in                                                                                     shape does not have any outgoing
                               the scenario.                                                                                                                          flow lines



                                                                                       Connects two                             Financial Actuals: Indicates a        Does not correspond to a task
                               Flow line (solid): Line indicates the normal sequence                                            financial posting document            step in a document; instead, it is
                               of steps and direction of flow in the scenario.         tasks in a
                                                                                       scenario                    Financial                                          used to reflect a document
                               Flow line (dashed): Line indicates flow to              process or a                 Actuals                                           generated by a task step; this
                               infrequently-used or conditional tasks in a scenario.   non-step event                                                                 shape does not have any outgoing
                                                                                                                                                                      flow lines
                               Line can also lead to documents involved in the
                               process flow.

                                                                                                                                Budget Planning: Indicates a          Does not correspond to a task
                                                                                                                                budget planning document              step in a document; instead, it is
                               Business Activity / Event: Identifies an action that    Does not                                                                       used to reflect a document
                               either leads into or out of the scenario, or an         correspond to                Budget                                            generated by a task step; this
                Business       outside Process that happens during the scenario        a task step in              Planning                                           shape does not have any outgoing
                Activity /                                                             the document                                                                   flow lines
                 Event

                                                                                                                                Manual Process: Covers a task         Does not generally correspond to
                               Unit Process: Identifies a task that is covered in a    Corresponds to                           that is manually done                 a task step in a document;
                               step-by-step manner in the scenario                     a task step in               Manual                                            instead, it is used to reflect a task
                                                                                       the document                 Proces                                            that is manually performed, such
                Unit Process                                                                                                                                          as unloading a truck in the
                                                                                                                       s                                              warehouse, which affects the
                                                                                                                                                                      process flow.

                               Process Reference: If the scenario references           Corresponds to
                               another scenario in total, put the scenario number      a task step in                           Existing Version / Data: This block   Does not generally correspond to
                  Process      and name here.                                          the document                             covers data that feeds in from an     a task step in a document;
                 Reference                                                                                          Existing    external process                      instead, this shape reflects data
                                                                                                                    Version /                                         coming from an external source;
                                                                                                                                                                      this step does not have any
                                                                                                                      Data                                            incoming flow lines
                               Sub-Process Reference: If the scenario references       Corresponds to
                   Sub-        another scenario in part, put the scenario number,      a task step in
                               name, and the step numbers from that scenario           the document
                  Process      here                                                                                             System Pass / Fail Decision: This     Does not generally correspond to
                 Reference                                                                                          System      block covers an automatic             a task step in the document;
                                                                                                                    Pass/F      decision made by the software         instead it is used to reflect an
                                                                                                                      ail                                             automatic decision by the system
                                                                                                                    Decisio                                           that is made after a step has been
                               Process Decision: Identifies a decision / branching     Does not                                                                       executed.
                               point, signifying a choice to be made by the end        usually                        n
                  Proces       user. Lines represent different choices emerging        correspond to
                     s         from different parts of the diamond.                    a task step in
                                                                                       the document;
                  Decisio                                                              Reflects a
                    n                                                                  choice to be
                                                                                       made after step
                                                                                       execution

				