							                                                      APPENDIX 3: DEFERRED REVIEWS AND INTERIM REPORTS 2008/09 AUDIT PLAN

      REVIEW CARRIED FORWARD FROM
                                                 REASON              CURRENT STATUS / PLANNED ACTION                    ACTION DATE
           2008/09 AUDIT PLAN
To review accounting and commitment            Interim      The last implementation date for a recommendation       Include in 2010/11
systems used in the department of              review       contained in the action plan is 31 July 2009.           Audit Plan
Enterprise, Tourism and the Environment        completed
and assess whether procedures are used         March 2009
appropriately and are complied with.

To review the adequacy of controls for the     Deferred     The Business Health Check of Planning and               Included in the
delivery of the Local Transport Plan.                       Transport will include an assessment of Traffic         2009/10 Audit Plan
                                                            Management function.
                                                            The outcome of this review will influence the risk
                                                            assessment of the area and whether further coverage
                                                            is required.

To assess the arrangements for the             Deferred     An investigation into irregularities in this area has   Consider as part of
collection of monies from the Penalty Charge                recently taken place and procedural changes are in      the risk assessment
Notices.                                                    progress.                                               for the 2010/11 Audit
                                                                                                                    Plan
                                                            The operation of the new enforcement contract to be
                                                            assessed as part of next risk assessment.

To assess the use of Section 106               Interim      The last implementation date for a recommendation       Include in 2011/12
agreements.                                    review       contained in the action plan is April 2011.             Audit Plan
                                               completed
                                               June 2009

To review the new contract arrangement for     Deferred     The Council is still only using the contract for        Consider as part of
consultants, agency and contract staff.                     recruiting temporary staff, and the contract has only   the risk assessment
                                                            been operating since October 2008.                      for the 2010/11 Audit
                                                                                                                    Plan

To assess whether Democratic Service           Deferred     Substantially covered by review of Cabinet, Scrutiny    Included in the
provide robust support to Members.                          and Standards Committees completed August 2009.         2009/10 Audit Plan



                                                               Page 1 of 4
                                                        APPENDIX 3: DEFERRED REVIEWS AND INTERIM REPORTS 2008/09 AUDIT PLAN

      REVIEW CARRIED FORWARD FROM
                                                   REASON             CURRENT STATUS / PLANNED ACTION                     ACTION DATE
           2008/09 AUDIT PLAN
To assess the effectiveness of procedures to     Deferred    Business Health Checks will review the effectiveness     Included in the
identify, process and resolve complaints.                    of complaint handling in one service in each             2009/10 Audit Plan
                                                             department. This is also covered as part of the
                                                             planned assurance work.

To establish whether Facilities Management       Interim     One recommendation remains outstanding relating to       Include in 2010/11
contractual and staffing arrangements are        report      the development of corporate facilities management       Audit Plan
robust.                                          completed   contracts. Further review to check on progress will
                                                 January     be undertaken next year.
                                                 2008

To assess the control environment Covalent       Deferred    Current work in progress                                 Included in the
Application.                                                                                                          2009/10 Audit Plan

To review the processes for ensuring all         Deferred    Current work in progress                                 Included in the
required Criminal Records Bureau checks                                                                               2009/10 Audit Plan
are carried out.

To assess the adequacy and standard of           Deferred    Not planned to be undertaken as part of the new          Consider as part of
plans and reviews undertaken by the                          audit approach to be piloted in Children and Learning.   the risk assessment
Children and Learning Specialist and                         However, the area will be considered as part of the      for the 2010/11 Audit
Resources and Quality Assurance Team.                        next risk assessment.                                    Plan

To assess the adequacy of the follow up          Deferred    The wider Local Children’s Safeguarding Board            Included in he
process of recommendations made within                       arrangements are to be reviewed by the Local             2009/10 Local
Children’s Serious Case Reviews.                             Strategic Partnership Internal Audit Working Group.      Strategic Partnership
                                                                                                                      Audit Plan

To assess whether robust arrangements are        Deferred    This was deferred as there were fundamental              November 2009
in place to deliver the aims and objectives of               changes taking place relating to these arrangements.
Section 31 Agreements.
                                                             Work is to be undertaken to establish and risk assess
                                                             those Section 31 Agreements now in place.


                                                                Page 2 of 4
                                                    APPENDIX 3: DEFERRED REVIEWS AND INTERIM REPORTS 2008/09 AUDIT PLAN

       REVIEW CARRIED FORWARD FROM
                                               REASON              CURRENT STATUS / PLANNED ACTION                   ACTION DATE
            2008/09 AUDIT PLAN
To evaluate the project and contract         Deferred     A review of Programme Office to be undertaken to       Included in the
monitoring arrangements for the:                          assess whether there are robust corporate              2009/10 Audit Plan
                                                          arrangements to monitor and manage capital
   school capital programme                              projects.
   new swimming pool                                     This work will also incorporate some testing of
   Progress Road and Victoria Station                    individual projects.
    project.

To assess whether the Council’s Risk         Interim      Business Health Checks include some work on            Include in 2010/11
management framework is fit for purpose      report       service risk management arrangements and the           Audit Plan
and applied consistently.                    produced     assurance work considers the corporate processes.
                                             March 2009
                                                          As the consolidation of the arrangements won’t be
                                                          complete until later in 2009/10, a more detailed
                                                          review won’t be undertaken again until next year.

To assess whether the Council’s Project      Deferred     Business Health Checks include some work on            Included in the
Management Framework is fit for purpose                   service risk management arrangements and the           2009/10 Audit Plan
and applied consistently.                                 assurance work considers the corporate processes.

To assess whether supporting systems         Interim      Follow up work was completed in August 2009 on         Include in the
collect relevant, reliable information and   report       National Indicators submitted to Audit Commission’s    2009/10 Audit Plan
National Indicators have been correctly      completed    Data Hub.                                              onwards
calculated in accordance with the current    February
                                                          Audit Plan going forward will include quarterly spot
guidance.                                    2009
                                                          checks of national and local indicators.

To assess the effectiveness of the asset     Interim      Work is to be undertaken to assess the robustness of   Included in the
management approach to ensure best use of    report       these arrangements taking into account the             2009/10 Audit Plan
the Council’s land and buildings.            completed    requirements of the Audit Commission’s Use of
                                             January      Resources.
                                             2009



                                                             Page 3 of 4
                                                        APPENDIX 3: DEFERRED REVIEWS AND INTERIM REPORTS 2008/09 AUDIT PLAN

      REVIEW CARRIED FORWARD FROM
                                                   REASON             CURRENT STATUS / PLANNED ACTION                    ACTION DATE
           2008/09 AUDIT PLAN
To assess effectiveness of operational team      Deferred    Complete August 2009                                    Included in the
to deliver high quality street scene services.                                                                       2009/10 Audit Plan

To assess whether the Council has an up to       Interim     Work is to be undertaken to assess the robustness of    Included in the
date energy management policy which is           report      these arrangements taking into account the              2009/10 Audit Plan
being effectively delivered.                     completed   requirements of the Audit Commission’s Use of
                                                 November    Resources.
                                                 2008

To assess the effectiveness of the economic      Deferred    Consider whether it is appropriate to review this as    Included in the
regeneration team.                                           part of the Programme Office audit.                     2009/10 Audit Plan

To assess the extent transport services          Interim     Follow up review yet to be undertaken. Scheduled for Include in 2010/11
provide value for money.                         report      2010/11                                              Audit Plan
                                                 completed
(Review from the 2007/08 Audit Plan)
                                                 Sept 2007

To assess whether the Drug and Alcohol           Deferred    Work currently in progress                              Included in the
Action Team has effective arrangements in                                                                            2009/10 Audit Plan
place to deliver the National Drugs Strategy.

To evaluate progress towards obtaining level     Deferred    Level 3 of the Equality Standard for local government   None
3 of the Equality Standard for local                         has been obtained.
government.

Assess whether the Cumberledge                   Interim     The Cumberledge Intermediate Care Centre operates       November 2009
Intermediate Care Centre is delivering in line   report      under a Section 31 agreement.
with agreed care criteria and provides value     completed
                                                             This was deferred as there were fundamental
for money.                                       November
                                                             changes taking place relating to these arrangements.
                                                 2007
(Review from the 2007/08 Audit Plan)
                                                             Work is to be undertaken to establish and risk assess
                                                             those Section 31 Agreements now in place.



                                                                Page 4 of 4

						
Related docs
Other docs by LiamMessam
070621 Pineapple Strategic Plan - Final
Views: 25  |  Downloads: 1
Annual Audit Plan - FY 2008
Views: 19  |  Downloads: 1
plan-cadre 103 dernière version _édité_
Views: 20  |  Downloads: 0
D57 Education Foundation Plans
Views: 8  |  Downloads: 0
Canada Pension PlanOld Age Security
Views: 8  |  Downloads: 0
Plan Brazil
Views: 3  |  Downloads: 0
Individualized Transition Plan
Views: 14  |  Downloads: 0