									                Implementation
                           Request for Certification and Release of Funds Form
                               ALL CERTIFIED PROJECTS MUST FOLLOW NM STATE POLICIES AND PROCUREMENT CODE



 PROJECT NAME                          Campaign Finance Information System (CFIS)

 PROJECT NUMBER                                                                   DATE                 01/20/10

 LEAD AGENCY                           SOS                                        AGENCY CODE          37000

 OTHER AGENCIES                                                                   PROJECT PHASE        Implementation

 EXECUTIVE SPONSOR                     Mary Herrera, Secretary of State

 PROJECT MANAGER                       Jose Hernandez

 AGENCY HEAD                           Mary Herrera, Secretary of State

 AGENCY CIO/IT LEAD                    Venkatesh Dhagumudi



 PROJECT DESCRIPTION (PROVIDE A BRIEF DESCRIPTION AND PURPOSE FOR THIS PROJECT)


 Replace the current Political Finance Reporting System with a more user-friendly Campaign Finance
 Reporting System for use by candidates for public office, political committees, lobbyists, receipting
 associated with these functions and to provide better service to the general public.

 Planned Start Date                    12/01/09                         Planned End Date          03/31/10
 Amount Requested this Certification                                    $136,500
 Amount Previously Certified                                            $40,000
 Remaining Appropriation not Certified                                  $136,500
 Total Appropriated Amount (include any new funds)                      $176,500



 CERTIFICATION HISTORY (INCLUDE ANY PREVIOUS PROJECT OR PHASE CERTIFICATIONS)

        Date                  Amount                Funding Source(s) (use specific citations to laws, grants, etc.)
 04/06/09             $176,500.00              HOUSE BILL 2, LAWS OF 2008, SECTION 7, ITEM 19




 PROPOSED CERTIFICATION SCHEDULE FOR CURRENT FISCAL YEAR (AGENCY TO COMPLETE FOR ALL PHASES)
 Phases                      Amount               Major Deliverable(s) / Performance Measure(s)                   Due
                            Requested                                                                             Dates
 Initiation:           $0.0                    Project Charter                                                 04/06/09
 Planning:             $40,000.00              Project Management Plan and IV&V Selected and                   01/01/10
                                               Contracted
 Implementation:       $136,500.00             Initial IV&V Report submitted; Update Project                   01/22/10
                                               Management Plan

                This is a controlled document, refer to the document control index for the latest revision
Revision: 2/14/08                                   Page 1
                  Implementation
                               Request for Certification and Release of Funds Form
                                  ALL CERTIFIED PROJECTS MUST FOLLOW NM STATE POLICIES AND PROCUREMENT CODE


 Closeout:               $0.0                    Final IV&V Report                                             03/31/10

 APPROPRIATION HISTORY (INCLUDE ALL FUNDING SOURCES, E.G. FEDERAL, STATE, COUNTY, MUNICIPAL LAWS OR GRANTS)

    Fiscal Year                 Amount                                       Funding Source(s)
 FY09                   $0.0                     HOUSE BILL 2, LAWS OF 2008, SECTION 7, ITEM 19




 BUDGET

 Comments: The initial budget requested for this project was $176,500.00 in FY09. Upon
 successful implementation of the CFIS application, RealTimSites will host this application for the
 first year. Therefore, RealTimeSites will provide hardware and staff to administer the CFIS
 application for the first year.

                    Description          FY07 & Prior          FY08             FY09             FY10           FY11
 Staff -
 Internal

 Contract           RealTimeSites                                                            $171,500
 Services           Contractor
 Hardware

 Software


    TOTAL                                                                                     $171,500



 IT SYSTEM ANALYSIS
 On this document, or as an attachment, provide a summary response, including changes, to
 the following IT infrastructure topics relating to this project:

       Describe or estimate this project’s impact on the Enterprise/DoIT infrastructure.
               o Hardware         Not Applicable
               o Network (Include Diagram) Not Applicable
               o Software / Applications Not Applicable
               o Where is this system hosted?
                     The contractor will host and fully support the CFIS system for the Secretary of State
                     for one year at Prism Technologies.
                               If not hosted at DoIT Data Center what is your strategy to host at DoIT Data
                                Center: (When, Why?)

                  This is a controlled document, refer to the document control index for the latest revision
Revision: 2/14/08                                     Page 2
                Implementation
                           Request for Certification and Release of Funds Form
                               ALL CERTIFIED PROJECTS MUST FOLLOW NM STATE POLICIES AND PROCUREMENT CODE


                            Following successful deployment, the Secretary of State during the first year
                            will develop a plan to migrate the CFIS system to the New Mexico
                            Department of Information Technology’s (DoIT) Data Center for hosting
                            purposes.
                           DoIT Migration Collaboration
       Summarize your collaboration with DoIT on moving this project from initialization through
        close (full production). Identify points of contact, dates of discussions, and results
          The Secretary of State CFIS Project team will conduct weekly meetings regarding the progress
          of the CFIS project. The Project coordinator will conduct weekly meeting with the selected
          contractor for the project. The project manager and IT Director will report back the status of
          project to DoIT POCB consultant through monthly status report. The project manager will
          produce the documents as required by DoIT‘s TARC and PCC for their approval and
          continuation of this project from the planning phase into the implementation phase. Before
          closing out the project the SOS Project Management Team will collaborate with assigned
          DoIT consultant and scheduled UAT testing and closing procedures of this project.
       Provide Application Architecture Schematic
                                                Software Architecture
 The application is architected to use a number of tiers, services and components; all of them
 will contribute to accomplish a separation of concerns; the application will make use of OOP
 (Object Oriented Programming) as programming technique as well as the latest technologies,
 best practices and design patterns. Please refer to diagram below.




                This is a controlled document, refer to the document control index for the latest revision
Revision: 2/14/08                                   Page 3
                Implementation
                           Request for Certification and Release of Funds Form
                               ALL CERTIFIED PROJECTS MUST FOLLOW NM STATE POLICIES AND PROCUREMENT CODE




                Application
                                                                                                       D
                                                  Presentation Layer                                   o
                    Security                                                                           m
                     Layer                     Business Logic Layer                                    a
                                                                                                       i
                                                          Data Layer                                   n




                                                           Database
                                                   Data Layer




                This is a controlled document, refer to the document control index for the latest revision
Revision: 2/14/08                                   Page 4
                Implementation
                           Request for Certification and Release of Funds Form
                               ALL CERTIFIED PROJECTS MUST FOLLOW NM STATE POLICIES AND PROCUREMENT CODE



BUSINESS CONTINUITY STRATEGY

On this document, or as an attachment, provide a summary response, including changes, of your
business Continuity Strategy.
Emergency and Disaster Management:
A description of the portions of the plan that will be implemented based on various levels of incident
severity, for example, minor interruption of service, total service failure or loss of facility. Recovery
strategies should be built to accommodate a worst case scenario, loss of service and facility.

 Severity                                    Impacts                                      Response
 Power Outage                                Local Area Network                           Off-site generator backup
                                             Infrastructure
 Total Equipment Failure                     Data loss, downtime, cost to                 Acquire latest backups and start
                                             replace server hardware. Time                restore process, transfer to hot
                                             involved to restore and                      site replace down server
                                             configure CFIS application and
                                             system
 Loss of Data Center Facility                The entire SOS office is out of              Determined by Vendor –
                                             business, employee productive                Application will be hosted at
                                             time comes to a halt                         Vendor facility 1st year




                This is a controlled document, refer to the document control index for the latest revision
Revision: 2/14/08                                   Page 5
                Implementation
                           Request for Certification and Release of Funds Form
                               ALL CERTIFIED PROJECTS MUST FOLLOW NM STATE POLICIES AND PROCUREMENT CODE




                This is a controlled document, refer to the document control index for the latest revision
Revision: 2/14/08                                   Page 6
                Implementation
                           Request for Certification and Release of Funds Form
                               ALL CERTIFIED PROJECTS MUST FOLLOW NM STATE POLICIES AND PROCUREMENT CODE



 SECURITY STRATEGY (APPLICATION AND DATA SECURITY PROCESS, PLAN, OR STANDARD)


 Operational Recovery Planning :
        1. Upon implementation of the CFIS RealTimeSites contractor will develop a Operational
           Recover Planning procedures supporting application and data security process, plan and
           or standards. In the mean time RealTimeSites has a security layer that will provide
               Authorization / Authentication capabilities to any user that interacts with the
               application. Communications between the client browser and the server will
               be encrypted via Secure Socket Layer (SSL).




 INDEPENDENT VERIFICATION & VALIDATION (INCLUDE SUMMARY OF THE LATEST IV & V REPORT)
 An Independent Verification & Validation will be performed by POD contractor. The first IV&V
 report will be delivered to SOS by 01/22/10. The interim IV&V report will be delivered to SOS
 on 02/15/10. The post implementation report will be delivered by 03/31/10.




 SIGNIFICANT RISKS AND MITIGATION STRATEGY

 RISK 1: CONTRACTOR PROVIDING DELIVERABLES ON SCHEDULE
      MITIGATION 1: WEEKLY CFIS PROJECT MEETINGS WITH INTERNAL PROJECT TEAM AND
      CONTRACTOR. FEEDBACK FROM THE IV&V CONTRACTOR CONCERNING THE
      DELIVERABLES, RISK FACTORS, PROJECT SCHEDULE AND WEEKLY UPDATES.


 RISK 2: AMPLE TIME TO PERFORM COMPLETE USER ACCEPTANCE TESTING OF CFIS APPLICATION
      MITIGATION 2: COORDINATING STAKE MEMBERS, SUBJECT MATTER EXPERTS AND SOS IT
      STAFF TO PERFORM AND EVALUATE A COMPLETE UAT.




                This is a controlled document, refer to the document control index for the latest revision
Revision: 2/14/08                                   Page 7
                Implementation
                           Request for Certification and Release of Funds Form
                               ALL CERTIFIED PROJECTS MUST FOLLOW NM STATE POLICIES AND PROCUREMENT CODE



 RECORD RETENTION POLICY (DESCRIBE THE AGENCY’S RECORDS RETENTION REQUIREMENTS FOR THIS PROJECT)



 RealTimeSites will conduct daily incremental backups of the operating environment and data
 comprising the CFIS application. Backups are moved to a secure off site location on a weekly basis
 and retained for a period of 1 month unless otherwise requested. Documentation that addresses
 disaster recovery for the CFIS application will be generated and made available to Secretary of
 State and RealTimeSites staff.




 MAINTENANCE STRATEGY (DESCRIBE HOW THE AGENCY PLANS TO MAINTAIN THIS PROJECT AFTER DEPLOYMENT)


      Following successful deployment, the contractor will host and fully support the CFIS
      system for the Secretary of State for one year. The Secretary of State, during this first
      year, will then develop a plan to migrate the CFIS system to the New Mexico Department
      of Information Technology’s (DoIT) Data Center for hosting purposes. During this first
      year of hosting by the Contractor, the Secretary of State will develop a migration plan, to
      include all migration specifications and requirements. The Agency will own the new
      system and its source code in its entirety after completion of the project. The Contractor
      will provide hosting for the first full year of project deployment.




 INTEROPERABILITY (DESCRIBE HOW THIS PROJECT INTERFACES WITH EXISTING SYSTEMS/APPLICATIONS WITHIN THE AGENCY)


 The CFIS application does not interface with any other application within the SOS agency.