SBC Designer Selection Information - Download as DOC

Shared by: HC120929053056
Categories
Tags
-
Stats
views:
1
posted:
9/28/2012
language:
Unknown
pages:
1
Document Sample
scope of work template
							                        STREAM Designer Letter of Interest

Project Title:       Morgan County Correctional Complex – Kitchen and Shower Floor Replacement
Agency / Project Location:            Tennessee Department of Correction (TDOC)
                                      Wartburg, Morgan County, TN

A.      Project Contact
1. Firm name, address, and website:

2. Contact name, address, phone number, and email:

B.      Project Experience
1. Summary of your project team’s expertise to address the scope of the project. Emphasis shall be
   given on remedial design of kitchens and equipment relocation.

2. List and provide a brief description of up to 5 projects of similar scope, completed within the past 5
   years including experience in meeting project budgets, schedules and project programs. Emphasis
   shall be given on remedial design within active detention facilities

3. List of up to the last 5 state projects previously awarded: Provide SBC No., title, description, agency,
   project value and the year completed:

C.      Services
1. Proximity, in miles, of project team to the project(s) and familiarity with the area where projects are
   located: Design Team shall be from an area within 100 miles of the site and/or surrounding counties.

2. Proposed project administration capabilities and approach: The designer shall demonstrate proficiency
   in the design and administration of remedial projects within an active detention facility. The designer
   shall also demonstrate an understanding of the Department of Correction Detention Project
   Procedures 01 35 13.16 (May 2012) and the State of Tennessee Sustainability Guidelines.

3. The role, qualifications, and office location of proposed project team: The team shall demonstrate
   proficiency in the remedial design of kitchens within an active detention facility. The team shall also
   demonstrate an understanding of the Department of Correction Detention Project Procedures 01 35
   13.16 (May 2012) and the State of Tennessee Sustainability Guidelines.

4. The role and qualifications of, and previous experience with proposed consultant(s): The consultant(s)
   shall proficiency in the remedial design of kitchens within an active detention facility.

D.      General
1. Current and proposed firm work load:

2. Record of past evaluations on State projects that your firm has completed. If no or limited prior State
   projects, letters of reference on completed non-State projects will be considered:

3. Record of any ongoing litigation or disputes, and any contracts terminated for cause:

						
Related docs
Other docs by HC120929053056
www colchester ac
Views: 14  |  Downloads: 0
coasts and reefs
Views: 3  |  Downloads: 0
TOWNSHIP OF WEST DEPTFORD
Views: 0  |  Downloads: 0
SEPSIS TANIMLAMA - EPIDEMIYOLOJI
Views: 30  |  Downloads: 0
business data
Views: 422  |  Downloads: 0
August 2011 minutes
Views: 3  |  Downloads: 0
AMBULATORY LEARNING TIP OF THE WEEK:
Views: 3  |  Downloads: 0
2010 Assumption College FOOTBALL Roster - DOC
Views: 9  |  Downloads: 0