(Please print on green paper)
Document Sample


(Please print on green paper)
CITY OF VANCOUVER
OFFICE OF THE CHIEF BUILDING OFFICIAL
Community Services, 453 West 12th Avenue, Vancouver, BC, V5Y 1V4
REQUEST FOR ACCEPTANCE OF EXISTING CONDITION
WITH MITIGATING FEATURES
(For Existing Buildings Only)
_________________ _______________________________________ _______________________
Building Permit No. Project Address Date
For office use only
Payment $ _______________ Invoice Number: ____________________ AL Number: AL____________________
APPLICANT INFORMATION (Professional Seal)
Proposed By: __________________________________________________________________
Firm: _________________________________________________________________________
Address: ______________________________________________________________________
Phone: _______________ Fax: _______________ Email: _____________________________
CODE REFERENCE(S) & SUMMARY OF DEVIATION(S) FROM VANCOUVER BUILDING BY-LAW:
BRIEF PROJECT DESCRIPTION:
For office use only
PROPOSED REQUEST FOR ACCEPTANCE OF EXISTING CONDITION IS:
ACCEPTABLE ACCEPTABLE (Subject to condition(s) noted below) REFUSED (For the reason(s) noted below)
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
______________________________________ ______________________________
CHIEF BUILDING OFFICIAL DATE
cc: Sender/Certified Professional Manager, Processing Centre (Buildings) Engineer/Project Coordinator
Chief Building Official Manager, Building Inspection Branch District Building Inspector
Deputy Chief Building Official Manager, Plumbing & Gas Inspection Branch District Electrical Inspector
City Electrical Inspector Other Department _____________________ Sprinkler Plan Reviewer
Building Policy Engineer FILE
SUMMARY OF EXISTING CONDITION WITH MITIGATING FEATURES CONTINUED:
OBJECTIVE(S) OF THE VANCOUVER BUILDING BY-LAW REQUIREMENT(S):
SUMMARY OF MITIGATING FEATURES:
ANALYSIS AND EVALUATION TO VALIDATE ACCEPTANCE:
For office use only
STAFF COMMENTS AND RECOMMENDATIONS:
Attached Noted in Prism
Comments By: _____________________________ Position: _______________________ Date: ___________________
REVIEW PANEL COMMENTS:
Comments By: _____________________________ Position: _______________________ Date: ___________________
H:\CBO\01 Administration\01-0500 Policies and Procedures\22 Departmental policies and procedures\Bulletins\2007 VBBL\2000\063_Existing
Conditions form.doc
Get documents about "