           FORM TO SUBMIT REQUEST FOR REVISION OF MONITORING PLAN
                                             (Version 01)


                                                                            F-CDM-REVMP
                      CDM : Form to submit request for revision of monitoring plan
                                             (Version 01)

                      (To be used by the DOE, for requesting a revision of monitoring plan prior
                                        to submitting request for issuance)

                   Section 1, 2 and 3 below are to be completed by the DOE

                       Section 1: Request for revision of monitoring plan
Name of the designated operational entity (DOE)
Reference number/Title of the CDM project activity

                                                              a)     Proposed revision only includes the
                                                              request by the CDM EB
                                                              b)     Proposed revision includes not only
Type of revision                                              the request by the CDM EB but also
                                                              additional revisions proposed by the
                                                              PP/DOE
                                                              c)     Proposed Revision includes
                                                              revisions proposed by the PP/DOE
                                                              Date:

We herewith submit the request for revision of                Print name of DOE representative:
monitoring plan

                                                              Signature:


                                               Section 2:
     Validation opinion relating to the submitted request for revision of monitoring plan

  We confirm that each of the proposed
  revision points have been described, and
  an assessment has been provided to                   a)       Yes
  substantiate the reason(s) for each of the           b)       No
  proposed revision points of the registered
  monitoring plan, using objective evidence.




Version 01/ September 2009
                                      UNFCCC/CCNUCC

CDM – Executive Board
                                                                                          EB 49
                                                                                          Report
                                                                                        Annex 29
                                                                                         Page 2


We confirm that the proposed revision of the
monitoring plan ensures that the level of
                                                    a)       Yes
accuracy, or completeness in the
monitoring and verification process is not          b)       No
reduced as a result of the revision;

We confirm that the proposed revision of the
monitoring plan is in accordance with the           a)       Yes
approved monitoring methodology
applicable to the project activity whilst           b)       No
ensuring the conservativeness of the
emission reductions calculation;

We confirm that the findings of previous            a)       Yes
verification reports, if any, have been taken
into account.                                       b)       No
                                                    c)       Not applicable

                Section 3: Documents submitted in relation to Sections 1 and 2

The revised monitoring plan (in clean and
                                                         Please check to confirm
track change versions) is attached:
The validation opinion is attached:
                                                         Please check to confirm

                                                    a)       Yes
                                                    b)       No

A list of documents submitted is attached
                                                    Please ensure that all documents listed are
                                                    submitted, or links are provided:
                                                    _________________________


                                            -----




Version 01/ September 2009
                                   UNFCCC/CCNUCC

CDM – Executive Board
                                                           EB 49
                                                           Report
                                                         Annex 29
                                                          Page 3


                                   History of document

Version        Date                 Nature of Revision

01             EB 49, Annex 29      Initial adoption
               11 September 2009

Decision Class: Regulatory
Document Type: Form
Business Function: Issuance




Version 01/ September 2009