August 01, 2012 to August 31, 2012
Table of Contents
Report of Construction Engineer 3
Projects Completed - Final Estimate Not Processed 4
Projects Under Construction 41
Contracts Awarded - NTP Not Processed 113
ODOT Residency Directory 117
Construction Status Report Page 2
Activity for Month of August 2012
Number of
Contracts Contract Amount Amount Paid
Contracts Finaled 34 48,630,285.65 51,159,881.43
Contracts Completed 26 35,192,593.95 34,349,257.43
NTP Issued 32 70,634,206.95 0.00
Contracts Awarded 35 41,210,866.73 0.00
Contracts Let 35 44,705,198.19 0.00
Status of Construction Projects as of August 31, 2012
Number of
Contracts Contract Amount Amount Paid
Contracts Completed, Final Estimate Not Paid 322 1,243,312,018.25 1,253,062,894.16
Contracts Under Construction 376 1,462,074,697.91 1,015,962,153.91
Contracts Awarded, NTP Not Processed 43 56,362,078.03 0.00
Active Contracts 741 2,761,748,794.19 2,269,025,048.07
Construction Status Report Page 3
County: Adair Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
23105(08) Contract: 110230 US-59 Residency: 01200 0.00 MI. US-59/BRIDGE WATER
PROOF SEAL;SH-31/SH-82; AT
BRFY-101C(097) SALLISAW
VARIOUS LOCATIONS IN DIV. I.
Contractor: GARY A. CRAIN, INC.
Engineer: Edwards, Carl
Contract Amount: $39,997.50 Completion Date: 01/10/2012
Letting Date: 04/14/2011 Final Est Sub:
24229(04) Contract: 090608 US-59 Residency: 01200 2.680 MI. GRADING, DRAIN &
SURFACE US-59 BEGIN AT THE
STPY-101A(072) SALLISAW
DELAWARE COUNTY LINE & EXTEND
Contractor: FORSGREN INC. SOUTH.
Engineer: Edwards, Carl
Contract Amount: $9,155,608.77 Completion Date: 02/23/2012
Letting Date: 10/15/2009 Final Est Sub:
18258(04) Contract: 090514 US-59 Residency: 01200 1.302 MI. US-59;GRADE,DRAIN &
SURFACE;BEGIN 1.3 MI. S. OF
STPY-101A(037)SS SALLISAW
US-412, EXTEND NORTH.
Contractor: APAC-CENTRAL, INC.
Engineer: Edwards, Carl
Contract Amount: $4,942,919.10 Completion Date: 10/12/2011
Letting Date: 08/20/2009 Final Est Sub:
20883(05) Contract: 100056 US-59 Residency: 01002 0.00 MI. US-59;BRIDGE REHAB-
ILITATION/US-64 AT VARIOUS
BHFY-101A(060) TETRA TECH
LO-CATIONS IN DIV. 1.
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer: TETR
Contract Amount: $1,112,270.07 Completion Date: 11/23/2011
Letting Date: 07/22/2010 Final Est Sub:
County: Alfalfa Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
20937(04) Contract: 110183 SH-45 Residency: 06700 0.00 MI. SH-45 OVER EAGLE CREEK,
1.2 MI. EAST OF WOODS C/L
BRFY-NBIP(387) DIV. 6 BRIDGE
Contractor: TARPON INDUSTRIAL, INC.
Engineer: Roesner, Wayne
Contract Amount: $159,720.00 Completion Date: 05/01/2012
Letting Date: 09/15/2011 Final Est Sub:
26922(04) Contract: 100019 SH-8 Residency: 06100 6.940 MI.;SH8/RESURFACE
(ASPHALT)FROM THE SH-11 JUNC-
STP-JOBS(080)3R BUFFALO
TION W. OF BURLINGTON, EX-
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING TEND N. TO THE KANSAS STATE LI
Engineer: Burke, David
Contract Amount: $1,858,043.16 Completion Date: 10/05/2011
Letting Date: 04/01/2010 Final Est Sub: 07/24/2012
26826(04) Contract: 100205 SH-8 Residency: 06100 *STPY-176B(190)/0.00 MI. SH
-8/US-281; BRIDGE REHAB.;OVER
STPY-102C(168)(169)* BUFFALO
MULE CR.,& SH-8 OVER W. CLAY CR.
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
& SALT FORK OF THE ARKANSA
Engineer: Burke, David
Contract Amount: $2,005,469.28 Completion Date: 08/31/2011
Letting Date: 05/20/2010 Final Est Sub:
Construction Status Report Page 4
24070(04) Contract: 100154 US64 Residency: 06100 0.383 MI.;US-64/GRADE,DRAIN,
SURFACE & BRIDGE.OVER TWIN
SSP-102C(109)SS BUFFALO
SPRINGS CR.,1.6 MI. EAST OF THE
Contractor: L & M CONTRACTORS, INC. SH-58 JUNCTION.
Engineer: Burke, David
Contract Amount: $1,920,007.33 Completion Date: 08/22/2012
Letting Date: 08/19/2010 Final Est Sub:
County: Atoka Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
23144(09) Contract: 120151 SH-7 Residency: 02200 0.00 MI. SH-7:BRIDGE WATER
-PROOF
BRFY-203C(003) HEAVENER
SEAL/US-59/US-79/US-270/SH-37/SH-
Contractor: GARY A. CRAIN, INC. 82. AT VARIOUS LOCATIONS IN
Engineer: Huddleston, David DIV. II.
Contract Amount: $160,145.20 Completion Date: 07/19/2012
Letting Date: 04/19/2012 Final Est Sub:
County: Beaver Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
27005(04) Contract: 110471 US-83 Residency: 06100 0.00 MI.
US-83/US-183/US-281/US-412/SH-23/
STPG-147B(171) BUFFALO
SH-34 AT VARIOUS LOCATIONS IN
Contractor: ACTION SAFETY SUPPLY CO. DIVISION 6.
Engineer: Burke, David
Contract Amount: $232,960.31 Completion Date: 05/08/2012
Letting Date: 09/15/2011 Final Est Sub:
County: Beckham Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
28960(04) Contract: 110499 I-40 Residency: 05100 0.00 MI. I-40B: FLASHING BEACONS
FROM 2ND STREET TO WADE STREET
HSIP-105C(205)TR CLINTON
IN THE CITY OF SAYRE
Contractor: TRAFFIC SIGNALS, INC.
Engineer: Greer, Randy
Contract Amount: $17,704.80 Completion Date: 03/12/2012
Letting Date: 10/20/2011 Final Est Sub: 08/20/2012
24871(05) Contract: 100420 IS-40 Residency: 05100 0.00 MI.BRIDGE REDECKING/IS
-40;REHAB. OVER I-40B & FARM-
STPY-105N(160) CLINTON
RAIL CORP. R/R, 4.5 MI. E. OF THE
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
SH-30 JCT.
Engineer: Greer, Randy
Contract Amount: $1,964,846.55 Completion Date: 10/31/2011
Letting Date: 07/22/2010 Final Est Sub:
20800(04) Contract: 100060 IS-40B Residency: 05100 1.809 MI. IS-40B;WIDEN &
RESURFACE(ASPHALT)FROM 0.25
STPY-105A(080) CLINTON
MIW. OF PIONEER ST. IN ELK
Contractor: WITTWER CONSTRUCTION CO., INC. CITY, EXTEND EAST.
Engineer: Greer, Randy
Contract Amount: $5,532,756.64 Completion Date: 08/01/2011
Letting Date: 11/18/2010 Final Est Sub:
Construction Status Report Page 5
County: Blaine Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
25453(05) Contract: 100464 CO.RD. Residency: 05005 0.436 MI. CO.RD.;BRIDGE &
APPROACHES;AT MULTIPLE COUNTY
ERSTP-106C(92)(110)(99)ER CIRCUIT ENGR. DISTR. # 7
BRDG. LOCATIONS IN DIV. V.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: CED7
Contract Amount: $960,560.57 Completion Date: 05/29/2012
Letting Date: 07/22/2010 Final Est Sub:
27200(04) Contract: 100063 SH-51 Residency: 05100 *(461)PT.3EH/ 0.822 MI. SH-
51/SH-58;PEDESTRIAN IMPROV.
STP-STIM(461)EH/STP-STIM* CLINTON
FROM GRANT ST. EXTEND E., &
Contractor: K & K CONTRACTING, INC. SH-58 FROM PK. ST.
Engineer: Greer, Randy
Contract Amount: $626,582.20 Completion Date: 02/27/2012
Letting Date: 04/15/2010 Final Est Sub: 07/30/2012
County: Bryan Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
07092(07) Contract: 110231 SH-78 Residency: 02300 0.00 MI. SH-78/RIGHT-OF- WAY
CLEARANCE;FROM 0.25 MI. NORTH
STPY-107C(174)RW MADILL
OF THE US-69 JCT, EXTEND
Contractor: SCHIRALLI CONSTRUCTION CORP. NORTH.
Engineer: Eldridge, Jerry
Contract Amount: $118,700.00 Completion Date: 06/08/2012
Letting Date: 08/18/2011 Final Est Sub:
26295(06) Contract: 090151 US-69 Residency: 02400 8.00 MI. US-69:RESURFACE
(CONC.)FROM 1.07 MI. N.E. OF THE
NHY-013N(147)3P MCALESTER
SH-78 JCT, EXTEND NORTH.
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer: Plymate, Larry
Contract Amount: $4,747,640.36 Completion Date: 12/12/2011
Letting Date: 01/20/2011 Final Est Sub:
28128(50) Contract: 120059 US-69 Residency: 02300 33.25 MI. US-69;SAFETY IM-
PROVEMENTS(FIBER OPTIC CABLE)
BTOP-207N(001) MADILL
FROM THE CITY OF DURANT TO THE
Contractor: TRANS-TEL CENTRAL, INC. CITY OF ATOKA.
Engineer: Eldridge, Jerry
Contract Amount: $2,663,361.71 Completion Date: 07/31/2012
Letting Date: 01/19/2012 Final Est Sub:
26148(04) Contract: 100064 US-69B Residency: 02300 1.254 MI. US-69B;GRADE,DRAIN
,SURFACE, & BRIDGE.;AT THE US-69
SSP-107B(148)SS MADILL
JUNCTION IN DURANT.
Contractor: OBC, INC.
Engineer: Eldridge, Jerry
Contract Amount: $5,390,236.53 Completion Date: 11/16/2011
Letting Date: 02/18/2010 Final Est Sub:
23417(04) Contract: 100368 US-70 Residency: 02300 0.505 MI. US-70;BRIDGE &
APPROACHES;OVER UNION PACIFIC
HPPY-022N(163)HP MADILL
R/R,2.0 MI. EAST OF THE US- 69 JCT
Contractor: L & N BRIDGE, LLC IN THE CITY OF DURANT.
Engineer: Eldridge, Jerry
Contract Amount: $4,684,898.34 Completion Date: 01/12/2012
Letting Date: 07/22/2010 Final Est Sub:
Construction Status Report Page 6
18847(06) Contract: 090564 US-70 Residency: 02300 2.032 MI. US-70 BYPASS; FROM
3.04 MI. S.E. OF US-70, EXTEND
SAP-022N(089) MADILL
EAST TO SH-78.
Contractor: OBC, INC.
Engineer: Eldridge, Jerry
Contract Amount: $13,232,378.18 Completion Date: 05/15/2012
Letting Date: 10/15/2009 Final Est Sub:
18847(04) Contract: 090401 US-70 Residency: 02300 2.738 MI. GRD., DRN., BR. &
EROSION CNTRL. US-70 BYPASS
ACNHY-022N(87)(88)GB MADILL
FROM US-70 (EW-208) EXT. S.; FROM
Contractor: L & N BRIDGE, LLC 1.64 MI. S. US-70 EXT. S.E.
Engineer: Eldridge, Jerry
Contract Amount: $24,231,482.43 Completion Date: 12/04/2011
Letting Date: 05/14/2009 Final Est Sub:
County: Caddo Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
27424(04) Contract: 110232 CO.RD Residency: 07300 1.717 MI. CO.RD.;GRADE,DRAIN &
SURFACE/FROM 3.2 MI. EAST OFTHE
CIRB-108C(282)RB ANADARKO
SH-146 JCT, EXTEND EAST.
Contractor: SEWELL BROS., INC.
Engineer: Knight, Reese
Contract Amount: $1,295,447.95 Completion Date: 08/08/2012
Letting Date: 04/14/2011 Final Est Sub:
26867(04) Contract: 110373 CORD Residency: 07300 0.160 MI. CO.RD./BRIDGE &
APPROACHES;OVER CEDAR CR.,6.0
BRF-108C(277)CI ANADARKO
MI. SOUTH OF THE SH-8/SH- 152
Contractor: SEWELL BROS., INC. JUNCTION IN BINGER.
Engineer: Knight, Reese
Contract Amount: $339,055.62 Completion Date: 06/21/2012
Letting Date: 08/18/2011 Final Est Sub:
24073(04) Contract: 090565 I-40 Residency: 05200 *(078)087ER/0.153 MI. GRADE,
DRAIN & BRIDGE IMPROVEMENT I-40
BHFY-108C(163)/ERIM-40-3* ALTUS
FRONTAGE RD. 0.85 MI. & 1.30 MI. E.
Contractor: HASKELL LEMON CONSTRUCTION CO. OF THE CUSTER C/L.
Engineer: Nedbalek, Will
Contract Amount: $1,435,216.20 Completion Date: 07/19/2010
Letting Date: 09/17/2009 Final Est Sub:
28749(04) Contract: 110407 PKRD Residency: 07300 3.100 MI. PK.RD.:RESURFACE
(ASPHALT)AT VARIOUS LOCATIONS
SAP-108D(303)(304)(305) ANADARKO
AT FT. COBB ST. PARK.
Contractor: MARKWELL PAVING COMPANY, INC.
Engineer: Knight, Reese
Contract Amount: $558,930.00 Completion Date: 12/23/2011
Letting Date: 07/21/2011 Final Est Sub: 06/14/2012
21713(09) Contract: 080303 SH-19 Residency: 07300 2.841 MI. GRADE, DRAIN & SURFACE
SH-19 FROM 5.5 MI. EAST OF JCT.
BRFY-108C(140) ANADARKO
US-62 EXTEND EAST.
Contractor: T & G CONSTRUCTION, INC.
Engineer: Knight, Reese
Contract Amount: $5,629,322.71 Completion Date: 07/12/2012
Letting Date: 01/22/2009 Final Est Sub:
27228(04) Contract: 100054 SH-37 Residency: 07300 *(280)PT.2/ 6.76 MI. SH-37;
RESURFACE (ASPHALT)BEGIN JUST
MC-108C(281)PT.1/MC-108C* ANADARKO
EAST OF US-281 JCT, AND
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. EXTEND EAST.
Engineer: Knight, Reese
Contract Amount: $365,144.60 Completion Date: 07/08/2011
Letting Date: 02/18/2010 Final Est Sub: 09/27/2011
Construction Status Report Page 7
28565(04) Contract: 110281 SH-37 Residency: 07300 5.99 MI. SH-37:RESURFACE
(ASPHALT)FROM THE SH-152
MC-108C(298) PART 1 & 2 ANADARKO
JUNC-TION, EXTEND NORTH.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Knight, Reese
Contract Amount: $856,408.70 Completion Date: 01/11/2012
Letting Date: 06/16/2011 Final Est Sub: 07/18/2012
County: Canadian Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
26646(04) Contract: 110509 CORD Residency: 04200 1.006 MI. CO.RD./GRADE,DRAIN &
SURFACE;FROM THE KINGFISHER
STP-109C(159)CI EL RENO
C/L., EXTEND SOUTH.
Contractor: ATLAS PAVING COMPANY
Engineer: Vonfeldt, Cole
Contract Amount: $1,023,031.08 Completion Date: 05/15/2012
Letting Date: 11/17/2011 Final Est Sub:
20539(04) Contract: 090321 I-40 Residency: 04200 *STIM(15)/IMG-40-4(421)TR 7.39 MI.
RECONSTRUCT (ADDED LANE),
IMY-040-4(396)128SS/IM-* EL RENO
BRIDGE & SAFTEY IMPROVEMENT
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
I-40 FROM M.M. 124 TO M.M. 136.
Engineer: Vonfeldt, Cole
Contract Amount: $59,384,562.21 Completion Date: 10/25/2011
Letting Date: 03/19/2009 Final Est Sub:
26224(04) Contract: 110397 IS-40 Residency: 04010 9.03 MI. IS-40 SAFETY IMPRO
-VEMENT (CABLE BARRIER)FROM 8
IMG-0040-4(424)111TR ATKINS (AKA - PBS & J)
MILES WEST OF THE US-270 JCT,
Contractor: ACTION SAFETY SUPPLY CO. EXTEND EAST.
Engineer: ATKINS (AKA - PBSJ)
Contract Amount: $984,788.73 Completion Date: 04/13/2012
Letting Date: 06/30/2011 Final Est Sub:
18257(04) Contract: 090078 US-281 Residency: 04300 3.30 MI. GRADE, DRAIN & SURFACE
US-281 FROM NEW US-281 SPUR
SEC1702Y-130N(130)HP ENID
EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $6,715,437.15 Completion Date: 10/31/2011
Letting Date: 02/19/2009 Final Est Sub:
20227(04) Contract: 090029 US-81 Residency: 07300 1.278 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-81 OVER SOUTH
BRFY-011N(053) ANADARKO
CANADIAN RIVER NORTH OF THE
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
CITY OF MINCO.
Engineer: Knight, Reese
Contract Amount: $7,435,339.82 Completion Date: 08/22/2011
Letting Date: 05/14/2009 Final Est Sub: 05/23/2012
05173(12) Contract: 090016 US-81 Residency: 04200 3.902 MI. GRADE, DRAIN & SURFACE
US-81 BEGIN AT THE SH-152 JCT. &
NHY-011N(008) EL RENO
EXTEND NORTH.
Contractor: DUIT CONSTRUCTION COMPANY, INC.
Engineer: Vonfeldt, Cole
Contract Amount: $7,978,265.75 Completion Date: 06/07/2010
Letting Date: 01/22/2009 Final Est Sub:
County: Carter Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 8
24103(04) Contract: 090597 I-35 Residency: 07200 2.473 MI. GRADE, DRAIN, SURFACE &
BRIDGE I-35 FROM 4.1 MILES NORTH
IMY-0035-1(145)029 ARDMORE
OF THE LOVE COUNTY LINE AND
Contractor: DOBSON BROTHERS CONSTRUCTION CO. EXTEND NORTH.
Engineer: Earp, Jay
Contract Amount: $21,601,135.43 Completion Date: 11/02/2010
Letting Date: 10/15/2009 Final Est Sub: 05/22/2012
27987(04) Contract: 110398 IS-35 Residency: 07200 8.20 MI. IS-35:SAFETY IMPRO
-VEMENT(CABLE BARRIER)FROM
IMG-0035-1(158)027TR ARDMORE
2.56 MI. NORTH OF THE LOVE C/L.,
Contractor: FULSOM CONSTRUCTION COMPANY, INC. EXTEND NORTH.
Engineer: Earp, Jay
Contract Amount: $1,155,791.14 Completion Date: 08/17/2012
Letting Date: 06/30/2011 Final Est Sub:
12665(04) Contract: 020039 IS-35 Residency: 07200 7.04 MI. RESURFACE (CONCRETE)
I-35 FROM 7.0 MI. N. OF US-70
IMY-35-1(101)038IR ARDMORE
EXTEND N. TO MURRAY COUNTY LINE.
Contractor: KECK CONSTRUCTION, INC.
Engineer: Earp, Jay
Contract Amount: $10,106,331.30 Completion Date: 04/30/2008
Letting Date: 08/22/2002 Final Est Sub: 12/15/2011
19739(04) Contract: 020131 SH-53 Residency: 07200 0.00 M. BR. PAINT SH-53: BR. OVER
SPRING, HICKORY & HENRY
MC-110C(93) ARDMORE
HORSE CREEKS, EAST OF
Contractor: KERRVILLE PAINTING CO., INC. SH-53/SH-76.
Engineer: Earp, Jay
Contract Amount: $64,300.00 Completion Date: 12/13/2002
Letting Date: 03/21/2002 Final Est Sub: 02/24/2005
28095(04) Contract: 110178 SH-53A Residency: 07200 1.00 MI. SH-53A;RESURFACE
(ASPHALT)FROM 1.00 MI. S. OF THE
MC-110C(231) ARDMORE
SH-53 JCT., EXTEND NORTH.
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer: Earp, Jay
Contract Amount: $149,230.00 Completion Date: 05/31/2012
Letting Date: 03/17/2011 Final Est Sub: 06/22/2012
09247(14) Contract: 090279 US-70 Residency: 07200 3.367 MI. GRD., DRN., SURF., & BR.
US-70 BEG. AT JEFFERSON C/L EXT.
STP-STIM(038)(040) ARDMORE
E./OVER RED OAK CRK. 1.8 MI. E. OF
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. JEFFERSON C/L.
Engineer: Earp, Jay
Contract Amount: $7,352,000.00 Completion Date: 08/15/2012
Letting Date: 03/19/2009 Final Est Sub:
09247(04) Contract: 080258 US-70 Residency: 07200 1.929 MI. GRADE, DRAIN & SURFACE
US-70 BEGIN 2.1 MI. W. OF JCT.
STPY-010B(302) ARDMORE
US-70/SH-76 & EXTEND EAST.
Contractor: OVERLAND CORPORATION
Engineer: Earp, Jay
Contract Amount: $5,739,555.91 Completion Date: 12/16/2011
Letting Date: 11/20/2008 Final Est Sub: 08/27/2012
09477(04) Contract: 090613 US-70 Residency: 07200 *(207)SB / 0.804 MI. US-70
;GRADE,DRAIN,SURFACE, BRIDGE.
SAP-10B(304)/SBR-110B* ARDMORE
OVER COTTON WOOD CR. 8.5 MI.
Contractor: OBC, INC. WEST OF IS-35.
Engineer: Earp, Jay
Contract Amount: $3,489,259.82 Completion Date: 07/11/2011
Letting Date: 10/15/2009 Final Est Sub: 04/13/2012
28159(04) Contract: 120083 US70 Residency: 07200 0.780 MI. US-70;RESURFACE
(ASPHALT)FROM IS-35, EXTEND
NHY-022N(203)3P ARDMORE
EAST.
Contractor: OVERLAND CORPORATION
Engineer: Earp, Jay
Contract Amount: $607,907.14 Completion Date: 08/23/2012
Letting Date: 02/16/2012 Final Est Sub:
Construction Status Report Page 9
County: Cherokee Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
28760(04) Contract: 110460 SH-51 Residency: 01100 0.00 MI. SH-51 AT THE
INTERSECTION OF W 4TH STREET IN
HSIP-111A(136)TR MUSKOGEE
CITY OF TAHLEQUAH.
Contractor: TRAFFIC SIGNALS, INC.
Engineer: Ivy, Steve (Act.)
Contract Amount: $121,929.50 Completion Date: 05/14/2012
Letting Date: 09/15/2011 Final Est Sub:
27303(04) Contract: 100211 SH-51 Residency: 01011 0.00 MI. SH-51;BRIDGE REHAB.
;OVER DOUBLE SPRING CR.,6.9
STPY-111B(127) GARVER, LLC.
MIEAST OF THE WAGONER COUNTY
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC LINE.
Engineer: GARV
Contract Amount: $574,517.60 Completion Date: 09/30/2011
Letting Date: 07/22/2010 Final Est Sub:
23108(04) Contract: 090332 SH-82 Residency: 01200 0.90 MI.;SH-82;BRIDGE &
APPROACHES/OVER TERRAPIN CR.,
SSP-111C(087)SS SALLISAW
3.6 MI. N. OF SEQUOYAH
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)LINE.
COUNTY
Engineer: Edwards, Carl
Contract Amount: $3,818,345.34 Completion Date: 08/03/2011
Letting Date: 05/14/2009 Final Est Sub:
County: Choctaw Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
20920(04) Contract: 110138 SH-2 Residency: 02200 0.00 MI.;SH-2 JOINT SEAL/
REPAIR:SH-93/SH-113:AT MULTI- PLE
BHFY-164F(164) HEAVENER
LOCATIONS IN DIV. II
Contractor: PBX CORPORATION
Engineer: Huddleston, David
Contract Amount: $247,851.00 Completion Date: 07/01/2012
Letting Date: 01/20/2011 Final Est Sub:
28462(04) Contract: 120129 US-271 Residency: 02100 0.244 MI. US-271/ INTERSEC TION
ODIFICATION:AT COX ROAD IN THE
HSIPY-112A(097)TR ANTLERS
CITY OF GRANT.
Contractor: L & N BRIDGE, LLC
Engineer: Moy, Ryan
Contract Amount: $388,196.92 Completion Date: 08/08/2012
Letting Date: 03/15/2012 Final Est Sub:
16745(04) Contract: 980376 US070 Residency: 02100 5.26700 MIS. WIDEN & RESURF. ON
US-70 BEG. APPROX. 0.75 MI. E. OF
CIP-112N(10)IP ANTLERS
THE JCT. OF US-70/SH-109 & EXT.
Contractor: PAVERS, INC. EAST.
Engineer: Moy, Ryan
Contract Amount: $2,367,601.65 Completion Date: 08/04/2000
Letting Date: 06/25/1998 Final Est Sub: 01/11/2002
County: Cimarron Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 10
13337(16) Contract: 090518 US-287 Residency: 06200 2.979 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-287 NORTH SECTION
NCIPY-017N(190)NI GUYMON
OF BOISE CITY BYPASS.
Contractor: DOBSON BROTHERS CONSTRUCTION CO.
Engineer: Michael, Charles
Contract Amount: $7,612,874.65 Completion Date: 09/18/2011
Letting Date: 08/20/2009 Final Est Sub:
29248(04) Contract: 120155 US-385 Residency: 06200 7.00 MI. US-385;RESURFACE
(ASPHALT)FROM THE TX. STATE
MC-213C(002) GUYMON
LINE, EXTEND NORTH
Contractor: HIGHWAY CONTRACTORS, INC.
Engineer: Michael, Charles
Contract Amount: $530,654.60 Completion Date: 08/15/2012
Letting Date: 04/19/2012 Final Est Sub:
County: Cleveland Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
24611(04) Contract: 110464 CORD Residency: 03200 .014 MI. CORD(EW-132) OVER
SPRING CREEK, 4.5 MI. W OF POTT.
BRO-114D(202)CO PURCELL
COUNTY LINE.
Contractor: KLAVER CONSTRUCTION COMPANY, INC.
Engineer: Riemer, Caleb
Contract Amount: $157,039.70 Completion Date: 03/29/2012
Letting Date: 09/15/2011 Final Est Sub: 08/15/2012
14391(04) Contract: 070429 CT. ST. Residency: 03002 1.920 MI GRD, DRN, SURF, & BR
(TRAFF SIG) CITY ST (TECUMSEH RD)
STPY-014B(378) TETRA TECH
BEG APPROX 0.3 MI E OF 12TH AVE
Contractor: HASKELL LEMON CONSTRUCTION CO. NW & EXT E IN NORMAN.
Engineer: TETR
Contract Amount: $7,039,963.90 Completion Date: 08/31/2009
Letting Date: 11/15/2007 Final Est Sub: 07/20/2011
09034(05) Contract: 080461 I-35 Residency: 03200 4.594 MI. GRADE, DRAIN, SURFACE &
BRIDGE I-35 FROM 0.5 MI. N. OF
SEC1702Y-114A(191)HP PURCELL
MAIN ST. & EXTEND NORTH.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Riemer, Caleb
Contract Amount: $35,304,952.60 Completion Date: 09/30/2010
Letting Date: 12/18/2008 Final Est Sub:
20997(15) Contract: 110086 US-77 Residency: 03200 0.00 MI. US-77:RIGHT-OF- WAY
CLEARANCE FROM 6.05 MI. NORTH
STPY-114C(293)RW PURCELL
OF SH-39 JCT, EXTEND NORTH.
Contractor: MIDWEST WRECKING, INC.
Engineer: Riemer, Caleb
Contract Amount: $41,210.00 Completion Date: 10/13/2011
Letting Date: 02/17/2011 Final Est Sub: 08/13/2012
County: Comanche Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
23411(04) Contract: 080435 CT.ST. Residency: 07004 1.027 MI. GRADE, DRAIN, SURFACE,
BRIDGE & SIGNALS CITY ST. (N.W.
STP-116B(138)MS JACOBS (AKA - CARTER-BURGESS)
67TH ST.) FROM CACHE RD. TO
Contractor: DUIT CONSTRUCTION COMPANY, INC. ROGERS LN. IN LAWTON.
Engineer: JACOBS (AKA - C-B)
Contract Amount: $4,889,495.46 Completion Date: 10/31/2010
Letting Date: 09/18/2008 Final Est Sub:
Construction Status Report Page 11
27048(04) Contract: 100429 CTST Residency: 07100 0.383 MI. CT.ST./GRADE,DRAIN ,AND
SURFACE;US-62 AT FT.SILL BLVD.
NHY-020N(30)(32) DUNCAN
INTERCHANGE,AND @ SHERI -DAN
Contractor: T & G CONSTRUCTION, INC. RD. IN LAWTON.
Engineer: Harwell, Jerry M.
Contract Amount: $1,307,942.52 Completion Date: 02/29/2012
Letting Date: 09/16/2010 Final Est Sub:
20299(04) Contract: 080135 I-44 Residency: 07100 0.376 MI. BRIDGE & APPROACHES
I-44 BRIDGES AT MEDICINE BLUFF
BRIY-0044-1(069)043 DUNCAN
CRK. APPROX. 2.0 MI. N. OF US-62.
Contractor: SEWELL BROS., INC.
Engineer: Harwell, Jerry M.
Contract Amount: $4,794,148.08 Completion Date: 04/08/2010
Letting Date: 03/20/2008 Final Est Sub: 08/04/2011
20951(05) Contract: 100374 IS-35 Residency: 07001 0.00 MI. IS-35/I-44/SH-5; JOINT
SEAL/REPR.;AT MULTIPLE
BRFY-116C(191) ENGR. SERV. & TESTING
LOCATIONS IN DIV. VII.
Contractor: PBX CORPORATION
Engineer: EST
Contract Amount: $456,760.00 Completion Date: 02/08/2012
Letting Date: 06/17/2010 Final Est Sub: 08/09/2012
25027(04) Contract: 090117 IS-44 Residency: 07100 *21N(52)3P / 3.85 MI. IS-44 /BEGIN
2.5 MI. N. OF US-281B, EXTEND N.
IMY-44-1(120)12 3P/NHY-* DUNCAN
SH-7 FROM THE IS -44 JCT,EXTEND
Contractor: T & G CONSTRUCTION, INC. EAST.
Engineer: Harwell, Jerry M.
Contract Amount: $1,247,960.80 Completion Date: 08/23/2011
Letting Date: 02/17/2011 Final Est Sub:
28592(04) Contract: 110375 IS-44 Residency: 07001 0.00 MI. IS-44:BRIDGE PAINT- ING;
1.7 MI. NORTH OF US-62.
BRFY-NBIP(446)3B ENGR. SERV. & TESTING
Contractor: K.V.K. CONTRACTING, INC.
Engineer: EST
Contract Amount: $410,599.00 Completion Date: 03/15/2012
Letting Date: 08/18/2011 Final Est Sub: 08/15/2012
27052(04) Contract: 100570 IS-44 Residency: 07100 *-1(114)42TR/NHIY-3N(01)/ 8. 782
MI. IS-44;RESURFACE(ASPHALT)&
IMG-44-1(115)37TR/IMG-44* DUNCAN
SAFETY IMPR.(CABLE BARR- IER)
Contractor: DOBSON BROTHERS CONSTRUCTION CO. FROM US-281B JCT,EXT.NE
Engineer: Harwell, Jerry M.
Contract Amount: $4,537,111.50 Completion Date: 06/04/2012
Letting Date: 10/21/2010 Final Est Sub:
28592(05) Contract: 110376 IS-44 Residency: 07100 0.00 MI. IS-44;JOINT SEAL/
REPR.;AT VARIOUS LOCATIONS IN
BRFY-116N(207)3B DUNCAN
DIV. VII.
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer: Harwell, Jerry M.
Contract Amount: $84,170.00 Completion Date: 06/06/2012
Letting Date: 11/17/2011 Final Est Sub:
27478(04) Contract: 100516 SH-115 Residency: 07300 2.85 MI. SH-115;GRADE,DRAIN, AND
SURFACE;FROM THE US-62
STP-116C(194)SS ANADARKO
JUNCTION,EXTEND N. TO THE
Contractor: DOBSON BROTHERS CONSTRUCTION CO. WICHITA MTS. WILDLIFE REFUGE P
Engineer: Knight, Reese
Contract Amount: $2,196,092.10 Completion Date: 08/14/2012
Letting Date: 10/21/2010 Final Est Sub:
28482(04) Contract: 110364 SH-281A Residency: 07100 0.00 MI. SH-281A/SCHOOL ZONE
:FROM THE SH-277 JUNCTION IN
STPY-116C(203)TR DUNCAN
GERONIMO, EXTEND EAST.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: Harwell, Jerry M.
Contract Amount: $14,615.50 Completion Date: 09/16/2011
Letting Date: 06/16/2011 Final Est Sub:
Construction Status Report Page 12
10439(07) Contract: 090311 SH-7 Residency: 07100 0.381 MI. GRADE, DRAIN, SURFACE &
BRIDGE SH-7 OVER BEAVER CRK.
STP-STIM(037) DUNCAN
2.44 MI. W. OF COMANCHE /
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) COUNTY LINE.
STEPHENS
Engineer: Harwell, Jerry M.
Contract Amount: $2,359,697.73 Completion Date: 12/31/2010
Letting Date: 03/19/2009 Final Est Sub:
County: Cotton Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
24114(08) Contract: 110239 SH-36 Residency: 07100 0.00 MI. SH-36: RIGHT-OF-WAY
CLEARANCE;FROM THE IS-44 JCT,
STPY-117C(089)RW DUNCAN
EXTEND NORTH.
Contractor: K & M DIRT SERVICES, LLC DBA K & M WRECKING
Engineer: Harwell, Jerry M.
Contract Amount: $39,850.00 Completion Date: 05/31/2012
Letting Date: 04/14/2011 Final Est Sub:
27210(04) Contract: 100072 SH65 Residency: 07100 *(471)PT.3EH / 0.719 MI. SH
-65;PEDESTRIAN IMPROV./RESUR-
STP-STIM(471)EH/STP-STIM* DUNCAN
FACE(ASPHALT)FROM OREGON ST.
Contractor: T & G CONSTRUCTION, INC. ,EXTEND S. TO OKLA. ST. IN TEM
Engineer: Harwell, Jerry M.
Contract Amount: $463,962.76 Completion Date: 03/18/2011
Letting Date: 04/15/2010 Final Est Sub:
County: Craig Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
23418(04) Contract: 110106 CORD Residency: 08003 0.610 MI. CO.RD.:BRIDGE &
APPROACHES:OVER BIG CABIN
BRF-118C(070)CI COBB ENGINEERING CO., INC.
CR.,2.3 MI. W. OF THE SH-2
Contractor: BELK BRIDGE, INC. JUNCTION.
Engineer: COBB
Contract Amount: $969,552.50 Completion Date: 03/15/2012
Letting Date: 01/20/2011 Final Est Sub:
23419(04) Contract: 100553 CORD Residency: 08012 0.388 MI. CO.RD.;BRIDGE &
APPROACHES;OVER PAW PAW CR.,
CIRB-118D(071)RB PSA-DEWBERRY
5.0 MI. W. OF THE SH-2
Contractor: BELK BRIDGE, INC. JUNCTION.
Engineer: PSAD
Contract Amount: $1,052,145.67 Completion Date: 10/31/2011
Letting Date: 10/21/2010 Final Est Sub: 08/24/2012
21906(04) Contract: 110395 US-60 Residency: 08300 0.364 MI. US-60/BRIDGE &
APPROACHES:OVER SL & SF RAIL-
NHY-018N(057) CLAREMORE
ROAD, 0.60 MI. NW OF THE SH-66
Contractor: (JV)
OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLCJUNCTION.
Engineer: Bray, Timothy
Contract Amount: $2,284,073.57 Completion Date: 06/27/2012
Letting Date: 08/18/2011 Final Est Sub:
16229(04) Contract: 090036 US-60 Residency: 08300 0.59 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-60 OVER BULL CRK. 0.5
BRFY-018N(009)DC CLAREMORE
MI. E. OF JCT. SH-2.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Bray, Timothy
Contract Amount: $5,381,584.57 Completion Date: 05/25/2010
Letting Date: 01/22/2009 Final Est Sub:
Construction Status Report Page 13
20886(04) Contract: 100482 US-60 Residency: 08300 0.529 MI. US-60;BRIDGE &
APPROACHES.OVER LEGION CABIN
SSP-118B(038)SS CLAREMORE
CR.,2.6 MI. EAST OF THE SH-2
Contractor: MANHATTAN ROAD & BRIDGE COMPANY JUNCTION.
Engineer: Bray, Timothy
Contract Amount: $2,836,834.48 Completion Date: 09/30/2011
Letting Date: 08/19/2010 Final Est Sub:
27781(05) Contract: 100619 US-69 Residency: 08001 0.00 MI. US-69/US-75/SH-
28/SH-48/JOINT SEAL/REPAIR;AT
BPMY-172F(500)3B ENGR. SERV. & TESTING
VARIOUS LOCATIONS IN DIV. VIII.
Contractor: KEYSTONE SERVICES, INC.
Engineer: EST
Contract Amount: $347,344.70 Completion Date: 08/28/2012
Letting Date: 11/18/2010 Final Est Sub:
County: Creek Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
22145(04) Contract: 080056 CO. RD. Residency: 08400 1.254 MI. GRADE, DRAIN, SURFACE &
BRIDGE CO. RD. (S. 49TH W. AVE.)
STP-119C(122)IG SAND SPRINGS
FROM CREEK TURNPIKE EXTEND N.
Contractor: BECCO CONTRACTORS, INC. TO 91ST ST. S.
Engineer: Williams, Mark J.
Contract Amount: $4,372,114.25 Completion Date: 03/31/2010
Letting Date: 01/17/2008 Final Est Sub:
22350(04) Contract: 100028 CO.RD. Residency: 08002 0.862 MI. CO.RD.;GRADE,DRAIN &
SURFACE;(W. 81ST. ST.)FROM
STP-STIM(275)IG TETRA TECH
FRANKHOMA RD., EXTEND EAST.
Contractor: BECCO CONTRACTORS, INC.
Engineer: TETR
Contract Amount: $1,640,579.05 Completion Date: 11/07/2011
Letting Date: 04/15/2010 Final Est Sub:
18168(04) Contract: 110008 CORD Residency: 08400 0.207 MI. CO.RD.:BRIDGE &
APPROACHES:OVER BUCKEYE CR.,
BRO-119D(044)CO SAND SPRINGS
4.7 MI. EAST OF THE SH-99
Contractor: BRIDGECO CONTRACTORS, INC. JUNCTION.
Engineer: Williams, Mark J.
Contract Amount: $736,531.95 Completion Date: 07/26/2012
Letting Date: 01/20/2011 Final Est Sub:
25446(04) Contract: 110049 SH-117 Residency: 08400 5.45 MI. SH-117:RESURFACE
(ASPHALT)FROM THE US-75A JCT,
SSR-119B(175)(210)SR SAND SPRINGS
EXTEND E. SH-117A:FROM THE
Contractor: BECCO CONTRACTORS, INC. SH-117 JCT, EXTEND NORTH.
Engineer: Williams, Mark J.
Contract Amount: $1,152,073.59 Completion Date: 09/15/2011
Letting Date: 01/20/2011 Final Est Sub: 08/14/2012
20889(04) Contract: 090522 SH-16 Residency: 08400 0.151 MI. SH-16;GRADE,DRAIN,
SURFACE, & BRIDGE;OVER BROWNS
BRFY-119C(099)DC SAND SPRINGS
CR. 1.7 MI. W. OF OKMULGEE CL.
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
Engineer: Williams, Mark J.
Contract Amount: $1,296,236.93 Completion Date: 07/30/2011
Letting Date: 08/20/2009 Final Est Sub: 09/14/2011
27621(04) Contract: 110050 SH-33 Residency: 08400 13.14 MI. SH-33:RESURFACE
(ASPHALT)FROM 3.0 MI. W. OF
STPY-119B(207)(208)3P SAND SPRINGS
SH-48 JCT, EXTEND EAST.
Contractor: THE QUAPAW COMPANY
Engineer: Williams, Mark J.
Contract Amount: $3,293,426.20 Completion Date: 02/12/2012
Letting Date: 02/17/2011 Final Est Sub: 07/02/2012
Construction Status Report Page 14
27625(04) Contract: 110052 SH-66 Residency: 08400 0.00 MI. SH-66; BRIDGE REHAB.
OVER LITLE POLECAT CR., 13.4 MI.
SBR-119C(209)SB SAND SPRINGS
N.E. OF THE SH-48 JCT.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Williams, Mark J.
Contract Amount: $885,773.73 Completion Date: 03/13/2012
Letting Date: 01/20/2011 Final Est Sub:
10157(04) Contract: 070338 SH-66 Residency: 08400 1.461 MI. GRADE, DRAIN, BRIDGE,
SIGNALS, EROSION CONTROL &
STPY-019A(314)BF SAND SPRINGS
SURFACE SH-66 FROM SH-117 ON W.
Contractor: BECCO CONTRACTORS, INC. EDGE OF SAPULPA & EXTEND E.
Engineer: Williams, Mark J.
Contract Amount: $8,991,481.69 Completion Date: 01/27/2010
Letting Date: 10/18/2007 Final Est Sub:
County: Custer Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
27036(04) Contract: 100461 I-40 Residency: 05100 10.899 MI.;IS-40/SAFETY
IMPROVEMENT (CABLE BARRIER)
IMG-0040-2(141)049SS CLINTON
FROM MILE MARKER 49, EXTEND
Contractor: JLT CONTRACTING, LLC EAST TO MILE MARKER 61.
Engineer: Greer, Randy
Contract Amount: $1,815,949.15 Completion Date: 08/22/2011
Letting Date: 07/22/2010 Final Est Sub: 07/09/2012
26035(04) Contract: 110284 SH-33 Residency: 05200 0.00 MI. SH-33:BRIDGE REHA-
BILITATION/OVER THE WASHITA
SBR-120C(168)SB ALTUS
RIVER OVERFLOW,5.3 MI. EAST OF
Contractor: (JV)
OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLCTHE SH-34 JCT.
Engineer: Nedbalek, Will
Contract Amount: $1,519,752.04 Completion Date: 02/02/2012
Letting Date: 06/16/2011 Final Est Sub: 07/09/2012
24377(04) Contract: 110240 SH-33 Residency: 05100 0.00 MI.SH-33/BRIDGE WATER
PROOF SEAL;SH-30/SH-9/US-183/
BRFY-120C(139) CLINTON
IS-40;AT VARIOUS LOCATIONS IN
Contractor: B & B CONSTRUCTION SERVICE J.T., INC. DIV. V.
Engineer: Greer, Randy
Contract Amount: $47,554.20 Completion Date: 12/16/2011
Letting Date: 04/14/2011 Final Est Sub:
18779(09) Contract: 090042 SH-34 Residency: 05100 7.237 MI. GRADE, DRAIN, SURFACE,
SIGNING & STRIPING SH-34 BEGIN
SSP-120B(076)SS CLINTON
JUST NORTH OF SH-47 & EXTEND
Contractor: CORNELL CONSTRUCTION COMPANY, INC. SOUTH.
Engineer: Greer, Randy
Contract Amount: $6,915,164.51 Completion Date: 08/31/2011
Letting Date: 06/18/2009 Final Est Sub:
02077(04) Contract: 070178 US-183 Residency: 05100 0.888 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-183 BEGIN @ I-40
NHY-009N(008) CLINTON
EXTEND N. TO I-40B IN CLINTON.
Contractor: WITTWER CONSTRUCTION CO., INC.
Engineer: Greer, Randy
Contract Amount: $9,472,045.00 Completion Date: 09/30/2009
Letting Date: 05/17/2007 Final Est Sub: 04/30/2012
County: Delaware Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 15
25900(04) Contract: 100352 CORD Residency: 08300 0.40 MI. CO.RD.; BRIDGE &
APPROACHES;OVER HOG CR., 4.3
BRF-121C(121)CO CLAREMORE
MI. S. OF THE SH-20/SH-43
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC JUNCTION.
Engineer: Bray, Timothy
Contract Amount: $409,302.55 Completion Date: 08/18/2011
Letting Date: 05/20/2010 Final Est Sub:
26456(04) Contract: 110061 CORD Residency: 08300 0.08 MI. CO.RD./BRIDGE &
APPROACHES;OVER CHEROKEE CR.,
BRF-121C(133)CO CLAREMORE
0.9 MI. N. OF SH-116 E.
Contractor: BEACHNER CONSTRUCTION CO., INC. JUNCTION.
Engineer: Bray, Timothy
Contract Amount: $402,783.90 Completion Date: 03/15/2012
Letting Date: 02/17/2011 Final Est Sub:
26228(04) Contract: 090606 SH-10 Residency: 08300 0.0 MI. SAFETY IMPROVEMENT
(CABLE BARRIER & GUARDRAIL)
HSIPG-121A(136) CLAREMORE
SH-10/SH-20/US-59 AT VARIOUS
Contractor: ACTION SAFETY SUPPLY CO. LOCATIONS IN DIVISION 8.
Engineer: Bray, Timothy
Contract Amount: $1,042,485.60 Completion Date: 08/09/2010
Letting Date: 12/17/2009 Final Est Sub: 03/16/2012
27607(04) Contract: 110056 SH-20 Residency: 08300 9.18 MI. SH-20:RESURFACE
(ASPHALT)FROM 10.0 MI. E. OF THE
SSR-121C(144)(149)SR CLAREMORE
SH-10 JCT, EXTEND N.
Contractor: HUTCHENS ASPHALT PAVING CO. DBA HUTCHENS CONSTRUCTION CO. THE ADAIR C/L.
SH-10,FROM
Engineer: Bray, Timothy
Contract Amount: $1,116,502.54 Completion Date: 10/07/2011
Letting Date: 01/20/2011 Final Est Sub:
15015(04) Contract: 080002 US-59 Residency: 08300 4.66 KM WIDEN & RESURFACE US-59
FROM 1.48 MI. N.W. OF THE
STPY-021B(273) CLAREMORE
US-59/SH-25 JCT. IN GROVE &
Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY EXTEND N.W.
Engineer: Bray, Timothy
Contract Amount: $17,356,640.46 Completion Date: 04/16/2010
Letting Date: 07/24/2008 Final Est Sub:
27613(04) Contract: 110060 US-59 Residency: 08300 1.71 MI. US-59:RESURFACE
(ASPHALT)FROM THE SH-20 WEST
STPY-121B(148)3P CLAREMORE
JUNCTION, EXTEND NORTH.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Bray, Timothy
Contract Amount: $711,099.56 Completion Date: 11/01/2011
Letting Date: 01/20/2011 Final Est Sub:
27609(04) Contract: 110057 US-59 Residency: 08300 17.24 MI. US-59:RESURFACE
(ASPHALT)FROM THE US-412A
SSR-121B(145)(146)(147)SR CLAREMORE
JCT,EXTEND NORTH.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Bray, Timothy
Contract Amount: $2,082,725.80 Completion Date: 10/27/2011
Letting Date: 01/20/2011 Final Est Sub: 05/30/2012
15015(14) Contract: 110330 US-59 Residency: 08300 4.27 MI. US-59 1.0 MI. N OR THE
SH-10 EAST JCT. EXTEND NORTH
STPY-121A(143) CLAREMORE
Contractor: APAC-CENTRAL, INC.
Engineer: Bray, Timothy
Contract Amount: $634,081.97 Completion Date: 05/10/2012
Letting Date: 09/15/2011 Final Est Sub:
County: Dewey Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 16
26653(04) Contract: 110481 CORD Residency: 05005 .123 MI. CORD:BRIDGE &
APPROACHES; OVER WEST SEILING
BRO-122D(069)CI CIRCUIT ENGR. DISTR. # 7
CREEK 1.4 MI. E OF US-183 AND .5
Contractor: KLAVER CONSTRUCTION COMPANY, INC. MI. N OF SH-51 IN SEILING.
Engineer: CED7
Contract Amount: $324,194.90 Completion Date: 08/24/2012
Letting Date: 10/20/2011 Final Est Sub:
County: Ellis Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
26544(04) Contract: 100290 CORD Residency: 06100 0.103 MI. CO.RD,;BRIDGE &
APPROACHES;OVER IVANHOE CR.,
BHF-123C(073)CO BUFFALO
2.0 MI. N. & 4.6 MI. W. OF
Contractor: SEWELL BROS., INC. SHATTUCK.
Engineer: Burke, David
Contract Amount: $364,867.36 Completion Date: 11/09/2011
Letting Date: 04/15/2010 Final Est Sub: 08/28/2012
20943(07) Contract: 090312 US-283 Residency: 06100 0.692 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-283 OVER TWENTY-FIVE
STP-STIM(034) BUFFALO
MILE CRK. 0.5 MI. N. OF SH-15 JCT.
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
Engineer: Burke, David
Contract Amount: $3,655,118.69 Completion Date: 11/10/2011
Letting Date: 03/19/2009 Final Est Sub:
County: Garfield Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
23086(04) Contract: 110172 CTST Residency: 04002 0.338 MI. CT. ST.:GRADE,DRAIN
,SURFACE & TRAFFICE SIGNAL;
STP-124B(079)UR TETRA TECH
(OAKWOOD RD.) AT THE INTER-
Contractor: TOM HUDSON PAVING, INC. SECTION OF WILLOW RD. IN ENID.
Engineer: TETR
Contract Amount: $1,458,678.76 Completion Date: 07/01/2012
Letting Date: 02/17/2011 Final Est Sub:
20855(04) Contract: 080402 SH-15 Residency: 04100 *(204)/ 1.04 MI. GRD, DRN, SURF, BR
& ERSN CNTRL SH-15 7.8 MI N OF
BRFY-124C(045)/BRFY-052C* PERRY
US-64/SH-15 2.8 MI E OF GARFIELD
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)LINE.
COUNTY
Engineer: Zachary, Ted
Contract Amount: $7,176,188.58 Completion Date: 08/17/2011
Letting Date: 08/21/2008 Final Est Sub:
28250(04) Contract: 110402 US-60 Residency: 04300 4.13 MI. US-60/US-412:RE-
SURFACE(ASPHALT)FROM SH-132
NHY-019N(129)3P ENID
EXTEND EAST.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $1,750,671.05 Completion Date: 01/20/2012
Letting Date: 06/30/2011 Final Est Sub:
County: Garvin Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 17
24762(04) Contract: 100032 SH-29 Residency: 03200 0.053 MI. SH-29;BRIDGE RE-
HAB.:OVER W. ROCK CR., 8.9 MI.E.
BHFY-125B(158) PURCELL
OF THE STEPHENS C/L.
Contractor: PBX CORPORATION
Engineer: Riemer, Caleb
Contract Amount: $482,673.00 Completion Date: 05/16/2011
Letting Date: 10/21/2010 Final Est Sub:
28158(04) Contract: 110063 SH-7 Residency: 07200 4.02 MI. SH-7:RESURFACE
(ASPHALT)FROM THE MURRAY C/L,
NHY-021N(055)3P ARDMORE
EXTEND EAST.
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer: Earp, Jay
Contract Amount: $1,165,524.55 Completion Date: 11/30/2011
Letting Date: 02/17/2011 Final Est Sub: 04/13/2012
28208(04) Contract: 110065 SH-74 Residency: 03200 8.0 MI. SH-74;RESURFACE
(ASPHALT)FROM THE SH-29 JCT,
STPY-125C(205)3P PURCELL
EXTEND NORTH.
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer: Riemer, Caleb
Contract Amount: $1,212,614.70 Completion Date: 06/21/2012
Letting Date: 02/17/2011 Final Est Sub:
28212(04) Contract: 110097 US-77 Residency: 03200 *(204)3P / 19.57 MI. US-77
:RESURFACE (ASPHALT)FROM THE
STPY-125C(202)(203)* PURCELL
MURRAY C/L, EXTEND NORTH.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Riemer, Caleb
Contract Amount: $3,660,026.68 Completion Date: 09/21/2011
Letting Date: 02/17/2011 Final Est Sub: 07/05/2012
County: Grady Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
23136(04) Contract: 100580 CORD Residency: 07300 0.245 MI. CO.RD.:BRIDGE &
APPROACHES/OVER LITTLE
BRF-126C(108)CI ANADARKO
WASHITACR., 3.5 MI. S. OF THE
Contractor: SEWELL BROS., INC. US-277 JUNTION.
Engineer: Knight, Reese
Contract Amount: $791,822.83 Completion Date: 01/11/2012
Letting Date: 11/18/2010 Final Est Sub:
22215(04) Contract: 100382 CORD Residency: 07300 0.207 MI. CO.RD.;BRIDGE &
APPROACHES;OVER OTTER CR.,
BRO-126D(102)CO ANADARKO
1.2MI. NORTH OF THE SH-9/US- 62
Contractor: D. M. DOZERS, INC. JUNCTION.
Engineer: Knight, Reese
Contract Amount: $380,799.45 Completion Date: 02/23/2012
Letting Date: 06/17/2010 Final Est Sub: 07/25/2012
28089(04) Contract: 110098 SH-17 Residency: 07300 *(188)3P/NHY-11N(90)3P / 6. 60 MI.
SH-17:RESURFACE(ASPHALT)FROM
STPY-126C(185)/STPY-126C* ANADARKO
1.02 MI. W. OF US-81, EXTEND E.
Contractor: T & G CONSTRUCTION, INC.
Engineer: Knight, Reese
Contract Amount: $1,834,143.36 Completion Date: 11/10/2011
Letting Date: 02/17/2011 Final Est Sub: 06/08/2012
20959(04) Contract: 090402 SH-19 Residency: 07300 0.189 MI. SH-19;GRADE,DRAIN
,SURFACE & BRIDGE;OVER
BRFY-126C(079) ANADARKO
ROARINGCR., 1.7 MI. W. OF
Contractor: MUNOZ CONSTRUCTION CO., INC. BRADLEY.
Engineer: Knight, Reese
Contract Amount: $1,589,481.50 Completion Date: 07/13/2011
Letting Date: 05/14/2009 Final Est Sub: 06/09/2012
Construction Status Report Page 18
20961(04) Contract: 100264 SH-37 Residency: 07004 0.766 MI. SH-37;GRADE,DRAIN
,SURFACE, & BRIDGE;OVER BUGGY
BRFY-126C(085) JACOBS (AKA - CARTER-BURGESS)
CREEK 6.5 MI. WEST OF US- 81
Contractor: SEWELL BROS., INC. JCT.
Engineer: JACOBS (AKA - C-B)
Contract Amount: $2,947,895.13 Completion Date: 05/31/2012
Letting Date: 05/20/2010 Final Est Sub:
28001(04) Contract: 110332 SH-4 Residency: 07300 .08 MI. SH-4 FROM 2.0 MI. NORTH OF
SH-37 JCT. EXTEND NORTH.
SSP-126C(184)SS ANADARKO
Contractor: MARKWELL PAVING COMPANY, INC.
Engineer: Knight, Reese
Contract Amount: $56,219.31 Completion Date: 04/06/2012
Letting Date: 09/15/2011 Final Est Sub: 07/28/2012
24515(04) Contract: 080465 US-81 Residency: 07001 0.180 MI. BRIDGE REDECKING &
REHABILITATION US-81 OVER
SSP-126N(120)(121)SS ENGR. SERV. & TESTING
LITTLE WASHITA RVR. 1.0 MI. S. OF
Contractor: PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC SH-19 (N.& S.BOUND LANES).
Engineer: EST
Contract Amount: $2,739,899.48 Completion Date: 06/30/2011
Letting Date: 09/18/2008 Final Est Sub: 02/13/2012
26225(04) Contract: 100173 US-81 Residency: 07300 1.967 MI. US-81; PAVEMENT
REHAB.(PC PAVEMENT)FROM 2.0 MI.
SSP-126N(174)SS ANADARKO
S. OF THE SH-19 JCT, EXTEND
Contractor: SCHWARZ PAVING CO., INC. NORTH.
Engineer: Knight, Reese
Contract Amount: $4,210,116.53 Completion Date: 08/19/2011
Letting Date: 05/20/2010 Final Est Sub:
27035(04) Contract: 110069 US-81 Residency: 07300 0.79 MI. US-81:WIDEN & RESUR
-FACE (ASPHALT)FROM 1.5 MI. N.OF
SSP-126N(177)SS ANADARKO
SH-19E, EXTEND NORTH.
Contractor: SCHWARZ PAVING CO., INC.
Engineer: Knight, Reese
Contract Amount: $789,461.60 Completion Date: 03/01/2012
Letting Date: 01/20/2011 Final Est Sub:
County: Grant Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
25586(04) Contract: 110379 CORD Residency: 04009 .113 MI. CO.RD.(EW-12) OVER DEER
CREEK, 3.0 MI. WEST OF KAY
BRO-127D(146)CI CIRCUIT ENGR. DISTR. # 8
COUNTY LINE.
Contractor: K & R BUILDERS, INC.
Engineer: CED8
Contract Amount: $418,872.10 Completion Date: 08/17/2012
Letting Date: 09/15/2011 Final Est Sub:
28232(04) Contract: 120123 SH-74 Residency: 04300 8.00 MI. SH-74/RESURFACE
(ASPHALT)FROM US-60, EXTEND
STPY-127C(180)3P ENID
NORTH.
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $1,643,759.20 Completion Date: 08/30/2012
Letting Date: 02/16/2012 Final Est Sub:
21850(04) Contract: 070218 US-64 Residency: 04300 0.731 MI. GRADE, DRAIN,
SURFACING, BRIDGE & APPROACHES
BRFY-127C(061)BF ENID
US-64 OVER UNNAMED CRK. 1.1 MI.
Contractor: PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC E. OF THE ALFALFA COUNTY LINE.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $3,459,978.04 Completion Date: 09/28/2009
Letting Date: 08/16/2007 Final Est Sub: 08/03/2012
Construction Status Report Page 19
County: Greer Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
26718(04) Contract: 110472 CORD Residency: 05005 .709 MI. CO.RD. (EW-151) OVER
UNNAMED CREEK, 2.0 MI. WEST
BRO-128D(080)CI CIRCUIT ENGR. DISTR. # 7
OFUS-283 JCT.
Contractor: KLAVER CONSTRUCTION COMPANY, INC.
Engineer: CED7
Contract Amount: $209,010.55 Completion Date: 08/21/2012
Letting Date: 09/15/2011 Final Est Sub:
29259(04) Contract: 120138 SH-6 Residency: 05200 5.00 MI. SH-6/RESURFACE
(UTBWC)BEGIN 2.0 MI. N. OF
STPY-228B(003)3P ALTUS
THEJACKSON C/L. EXTEND NORTH.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Nedbalek, Will
Contract Amount: $1,561,086.63 Completion Date: 06/26/2012
Letting Date: 03/15/2012 Final Est Sub: 08/07/2012
10100(07) Contract: 100602 SH-6 Residency: 05200 3.56 MI.
SH-6;SURFACE(ASPHALT)FROM 1.0
STPY-128B(004) ALTUS
MI. N. OFTHE SH-9 JUNCTION,
Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY EXTEND NORTH.
Engineer: Nedbalek, Will
Contract Amount: $3,760,594.93 Completion Date: 07/31/2012
Letting Date: 11/18/2010 Final Est Sub:
County: Harmon Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
27517(04) Contract: 110027 US-62 Residency: 05200 8.00 MI. US-62:RESURFACE
(ASPHALT)FROM 1.0 MI. E. OF THE
NHY-020N(036)3P ALTUS
SH-30 JUNCTION, EXTEND EAST.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Nedbalek, Will
Contract Amount: $1,765,814.51 Completion Date: 02/29/2012
Letting Date: 01/20/2011 Final Est Sub: 08/06/2012
County: Harper Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
25914(04) Contract: 110403 CORD Residency: 06009 9.316 MI. CO.RD.:RESURFACE
(ASPHALT)FROM THE BEAVER C/L
STP-130C(136)(137)CI CIRCUIT ENGR. DISTR. # 8
EXT E. ON EW-22 FROM US-283 EXT.
Contractor: J & R SAND COMPANY, INC. WEST, THEN NORTH ON NS-17
Engineer: CED8
Contract Amount: $2,225,101.69 Completion Date: 10/31/2011
Letting Date: 06/30/2011 Final Est Sub:
22323(08) Contract: 100435 CORD Residency: 06100 6.051 MI. CO.RD.;GRADE,DRAIN , &
SURFACE;FROM 4.0 MI. NORTHOF THE
CIRB-130C(124)RB BUFFALO
US-64/US-283 JUNCTION ,EXTEND
Contractor: J & R SAND COMPANY, INC. NORTH.
Engineer: Burke, David
Contract Amount: $2,886,458.85 Completion Date: 10/20/2011
Letting Date: 07/22/2010 Final Est Sub:
Construction Status Report Page 20
County: Haskell Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
25334(04) Contract: 100556 CORD Residency: 01100 0.141 MI. CO.RD.:BRIDGE &
APPROACHES:OVER UNNAMED CR.,
BRO-131D(088)CI MUSKOGEE
3.0 MI. WEST OF THE SH-2
Contractor: K & R BUILDERS, INC. JUNCTION.
Engineer: Ivy, Steve (Act.)
Contract Amount: $358,200.40 Completion Date: 05/18/2012
Letting Date: 04/14/2011 Final Est Sub:
28082(04) Contract: 110125 SH-31 Residency: 01200 *(110)(111)3P / 10.08 MI. SH
-31;PAVEMET REHAB. &
STPY-131C(109)/STPY-131B* SALLISAW
RESURFACE(ASPHALT)AT THE SH-2
Contractor: GLOVER & ASSOCIATES, INC. JCT IN KINTA. SH-2 .
Engineer: Edwards, Carl
Contract Amount: $2,145,997.22 Completion Date: 03/07/2012
Letting Date: 02/17/2011 Final Est Sub:
County: Hughes Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
21775(04) Contract: 110352 CORD Residency: 03300 0.198 MI. CO.RD./BRIDGE &
APPROACHES:OVER UNNAMED CR.,
BRF-132C(076)CI WEWOKA
3.7 MI. WEST OF THE SH-27
Contractor: BRIDGECO CONTRACTORS, INC. JUNCTION.
Engineer: Moore, Archie (Act.)
Contract Amount: $250,530.00 Completion Date: 05/16/2012
Letting Date: 08/18/2011 Final Est Sub: 06/27/2012
29035(04) Contract: 120094 US-75 Residency: 03200 7.76 MI. US-75;RESURFACE
(ASPHALT)FROM SH-9, EXTEND
STPY-232B(001)3P PURCELL
NORTH.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Riemer, Caleb
Contract Amount: $1,494,918.70 Completion Date: 08/08/2012
Letting Date: 02/16/2012 Final Est Sub:
County: Jefferson Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
29193(04) Contract: 120014 SH-5 Residency: 07100 1.87 MI. SH-5;RESURFACE
(ASPHALT)BEGIN AT COTTON C/L
MC-234C(003) DUNCAN
AND EXTEND EAST.
Contractor: T & G CONSTRUCTION, INC.
Engineer: Harwell, Jerry M.
Contract Amount: $202,465.08 Completion Date: 04/25/2012
Letting Date: 01/19/2012 Final Est Sub:
23231(04) Contract: 070397 SH-5 Residency: 07100 1.242 MI. GRADE, DRAIN, SURFACE,
BRIDGE & EROSION CONTROL SH-5
BRFY-134C(058)BF DUNCAN
OVER BEAVER CRK. APPROX. 5.6 MI.
Contractor: OVERLAND CORPORATION E. OF COTTON CO. LN.
Engineer: Harwell, Jerry M.
Contract Amount: $3,798,079.87 Completion Date: 03/31/2010
Letting Date: 09/20/2007 Final Est Sub:
Construction Status Report Page 21
County: Johnston Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
08931(04) Contract: 100584 SH-78 Residency: 03100 0.854 MI. SH-78;BRIDGE &
APPROACHES/OVER BRUSHY CR.,
BRFY-035C(190) ADA
JUST S. OF THE TOWN OF
Contractor: OVERLAND CORPORATION MILBURN.
Engineer: Russell, Julie
Contract Amount: $2,344,652.84 Completion Date: 12/30/2011
Letting Date: 11/18/2010 Final Est Sub: 07/25/2012
21784(04) Contract: 100438 SH-99 Residency: 03100 0.088 MI. SH-99;BRIDGE &
APPROACHES;OVER LITTLE BLUE
BRFY-135B(061) ADA
CREEK, 1.30 MI. SOUTH OF THE
Contractor: WITTWER CONSTRUCTION CO., INC. PONTOTOC C/L.
Engineer: Russell, Julie
Contract Amount: $1,204,242.73 Completion Date: 05/12/2011
Letting Date: 07/22/2010 Final Est Sub:
28606(05) Contract: 110427 US-75 Residency: 03001 0.00 MI. US-75/SH-3E/SH-7/SH-22
/CO.RD. AT VARIOUS LOCATIONSIN
BRFY-135F(136)3B ENGR. SERV. & TESTING
DIVISION 3.
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer: EST
Contract Amount: $320,373.75 Completion Date: 07/10/2012
Letting Date: 09/15/2011 Final Est Sub:
County: Kay Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
25645(05) Contract: 100557 CORD Residency: 04100 0.117 MI. CO.RD.;BRIDGE &
APPROACHES/OVER CANADIAN CR.,
BRO-136D(178)CI PERRY
12.7 MI. E. & 0.4 MI. N. OF THE
Contractor: BEACHNER CONSTRUCTION CO., INC. TOWN OF NEWKIRK.
Engineer: Zachary, Ted
Contract Amount: $289,144.45 Completion Date: 05/17/2012
Letting Date: 10/21/2010 Final Est Sub:
24432(07) Contract: 090314 I-35 Residency: 04100 4.918 MI. GRADE, DRAIN, SURFACE,
BRIDGE & CABLE BARRIER I-35
IM-STIM(019) PERRY
BEGIN AT M.M. 224.43 & EXTENDN.
Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY TO M.M. 229.33.
Engineer: Zachary, Ted
Contract Amount: $23,984,922.13 Completion Date: 08/15/2011
Letting Date: 03/19/2009 Final Est Sub:
24140(04) Contract: 080183 I-35 Residency: 04300 0.00 MI. I-35/SAFETY IMPROV.
(CABLE BARRIER);BEGIN AT MILE
IMG-0035-4(214)209TR ENID
MARKER 209 & EXTEND NORTH TO
Contractor: ACTION SAFETY SUPPLY CO. MILE MARKER 214.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $798,610.07 Completion Date: 05/12/2010
Letting Date: 04/17/2008 Final Est Sub:
12302(04) Contract: 100384 SH-156 Residency: 04100 0.340 MI. SH-156;GRADE,DRAIN
,SURFACE & BRIDGE;OVER A SALT
BRFY-036C(267) PERRY
FORK OF THE ARKANSAS RIVER,
Contractor: MANHATTAN ROAD & BRIDGE COMPANY 1.10 MI. N. OF NOBLE C/L.
Engineer: Zachary, Ted
Contract Amount: $2,144,561.13 Completion Date: 11/18/2011
Letting Date: 09/16/2010 Final Est Sub:
Construction Status Report Page 22
27533(04) Contract: 100520 US-177 Residency: 04100 *(56)SB/ 0.118 MI. US-177/
US-60:BRIDGE REHAB. OVER
SBR-136C(201)SB/SBR-18N* PERRY
STINKCR., 3.2 MI. N. OF US-60
Contractor: WITTWER CONSTRUCTION CO., INC. JCT.US-60:OVER UNNAMED CR.
Engineer: Zachary, Ted
Contract Amount: $340,640.14 Completion Date: 10/06/2011
Letting Date: 09/16/2010 Final Est Sub:
23216(04) Contract: 080373 US-177 Residency: 04100 1.563 MI GRD, DRN, SURF & BR
US-177 DRY CRK & DRY CRK O'FLOW
BRFY-136C(124)(123) PERRY
12.4 MI N US-60 & UNNAMED CRK
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) 16.2 MI N US-60.
13.1 MI &
Engineer: Zachary, Ted
Contract Amount: $5,384,031.40 Completion Date: 10/06/2011
Letting Date: 11/20/2008 Final Est Sub:
27120(04) Contract: 100519 US-77 Residency: 04100 0.057 MI. US-77;BRIDGE RE-
HAB.:OVER CHILOCCO CR.,2.2 MI.S.
SBR-136C(203)SB PERRY
OF THE OK STATE LINE.
Contractor: WITTWER CONSTRUCTION CO., INC.
Engineer: Zachary, Ted
Contract Amount: $568,950.00 Completion Date: 11/21/2011
Letting Date: 09/16/2010 Final Est Sub:
28587(04) Contract: 110452 US77 Residency: 04001 0.00 MI. US-77:BRIDGE
PAINTING;OVER CHILOCCO CREEK
BRFY-NBIP(442)3B ENGR. SERV. & TESTING
2.0 MI. SOF THE KANSAS STATE LINE
Contractor: PACIFIC PAINTING COMPANY, INC.
Engineer: EST
Contract Amount: $99,000.00 Completion Date: 04/30/2012
Letting Date: 10/20/2011 Final Est Sub: 08/27/2012
County: Kingfisher Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
28243(04) Contract: 110084 SH-51 Residency: 04300 7.65 MI. SH-51;RESURFACE
(ASPHALT)FROM THE BLAINE
STPY-137C(101)3P ENID
COUNTY LINE, EXTEND EAST.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $1,071,109.00 Completion Date: 11/03/2011
Letting Date: 02/17/2011 Final Est Sub: 08/24/2012
28083(04) Contract: 110404 US-81 Residency: 04300 0.290 MI. US-81:PAVEMENT
REHAB.(P.C. CONCRETE)FROM THE
STPY-137C(096) ENID
SH-33 JUNCTION, EXTEND NORTH IN
Contractor: REDLANDS CONTRACTING, LLC KINGFISHER.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $735,867.50 Completion Date: 01/06/2012
Letting Date: 06/30/2011 Final Est Sub:
27193(04) Contract: 100162 US-81 Residency: 04300 *(454)PT.3EH / 1.433 MI. US
-81;PEDESTRIAN IMPROV./RESUR-
STP-STIM(454)EH/STP-STIM* ENID
FACE (ASPHALT)FROM 7TH ST.,
Contractor: TMC CONSTRUCTION COMPANY EXTEND N. IN HENNESSEY.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $814,376.50 Completion Date: 11/07/2011
Letting Date: 04/15/2010 Final Est Sub: 08/08/2012
24886(04) Contract: 110294 US-81 Residency: 04300 1.38 MI. US-81;RESURFACE
(ASPHALT)BEGIN 2.0 MI. SOUTH OF
SSR-137N(098)SR ENID
SH-51, EXTEND NORTH IN
Contractor: HASKELL LEMON CONSTRUCTION CO. HENNESSEY.
Engineer: Crowl, Kenny (Act.)
Contract Amount: $618,152.00 Completion Date: 06/27/2012
Letting Date: 01/19/2012 Final Est Sub:
Construction Status Report Page 23
County: Kiowa Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
28145(04) Contract: 110088 SH-54 Residency: 05200 15.00 MI. SH-54;RESURFACE
(ASPHALT)BEGIN AT SH-9 JCT,
STPY-138C(184)(185)3P ALTUS
EXTEND SOUTH.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Nedbalek, Will
Contract Amount: $2,501,667.84 Completion Date: 02/22/2012
Letting Date: 02/17/2011 Final Est Sub:
28321(04) Contract: 110161 SH-54 Residency: 05200 *-175C(128)3R / 15.36 MI.
SH-54:RESURFACE(ASPHALT)FROM
STPY-138C(186)3P/STPY-* ALTUS
THE SH-9 JUNCTION,EXTEND
Contractor: CORNELL CONSTRUCTION COMPANY, INC. NORTH.
Engineer: Nedbalek, Will
Contract Amount: $2,415,188.26 Completion Date: 02/22/2012
Letting Date: 01/20/2011 Final Est Sub:
16063(28) Contract: 100522 US-183 Residency: 05200 1.572 MI.,US-183;GRADE,DRAIN , &
SURFACE:FROM 0.2 MI. S. OFTHE
NHY-009N(055) ALTUS
SH-9 JUNCTION,EXTEND NORTH.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Nedbalek, Will
Contract Amount: $4,048,982.70 Completion Date: 02/21/2012
Letting Date: 09/16/2010 Final Est Sub:
28134(04) Contract: 110296 US-183 Residency: 05200 7.25 MI. US-183;RESURFACE
(ASPHALT)BEGIN 0.75 MI. SOUTH OF
SSR-138A(182)SR ALTUS
SH-19, EXTEND NORTH.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Nedbalek, Will
Contract Amount: $2,059,335.56 Completion Date: 07/19/2012
Letting Date: 01/19/2012 Final Est Sub:
County: Latimer Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
23194(04) Contract: 100487 SH-82 Residency: 02200 1.102 MI. SH-82;GRADE,DRAIN,
SURFACE & BRIDGE;OVER FOURCHE
STPY-139C(070)SS HEAVENER
MALINE CR., 5.0 MI. W. OF THE
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) C/L.
LATIMER
Engineer: Huddleston, David
Contract Amount: $2,390,981.83 Completion Date: 03/30/2012
Letting Date: 10/21/2010 Final Est Sub:
26396(04) Contract: 110297 US-270 Residency: 02200 2.30 MI. US-270;RESURFACE
(ASPHALT)BEGIN 4.3 MI. EAST
SSR-139B(114)SR HEAVENER
OFSH-2, EXTEND EAST.
Contractor: JOB CONSTRUCTION CO., INC.
Engineer: Huddleston, David
Contract Amount: $962,368.80 Completion Date: 05/31/2012
Letting Date: 01/19/2012 Final Est Sub:
28189(04) Contract: 110405 US-270 Residency: 02200 1.140 MI. US-270:RESURFACE
(ASPHALT)FROM THE SH-2 JCT,
STPY-139B(113)3P HEAVENER
EXTEND EAST.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Huddleston, David
Contract Amount: $490,035.50 Completion Date: 12/22/2011
Letting Date: 06/30/2011 Final Est Sub:
Construction Status Report Page 24
County: Le Flore Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
22885(04) Contract: 110531 CORD Residency: 02013 0.392 MI. CO.RD.;BRIDGE &
APPROACHES/OVER BLACKFORTH
CIRB-140C(135)RB CIRCUIT ENGR. DISTRICT # 3
CR.0.5 MI. E. OF US-59 IN
Contractor: HUB CONSTRUCTION, INC. HODGENS.
Engineer: CED3
Contract Amount: $1,561,013.58 Completion Date: 08/31/2012
Letting Date: 11/17/2011 Final Est Sub:
28567(04) Contract: 120099 SH-1 Residency: 02200 11.00 MI. SH-1;CHIP SEAL/FROM 2.5
MI. EAST OF THE US-259 JCT, EXTEND
FH-140C(213) HEAVENER
EAST TO THE ARKANSAS STATE LINE.
Contractor: VANCE BROTHERS, INC.
Engineer: Huddleston, David
Contract Amount: $329,501.14 Completion Date: 05/30/2012
Letting Date: 02/16/2012 Final Est Sub:
17127(05) Contract: 090406 US-59 Residency: 02200 8.006 KM GRADE, DRAIN, SURFACE &
BRIDGE US-59 FROM SH-9 EXTEND
NH-STIM(169) HEAVENER
NORTH.
Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY
Engineer: Huddleston, David
Contract Amount: $20,696,687.21 Completion Date: 11/17/2011
Letting Date: 04/23/2009 Final Est Sub:
County: Lincoln Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
26064(04) Contract: 110354 CORD Residency: 03004 0.387 MI. CO.RD.:BRIDGE &
APPROACHES:OVER CHUCKAHO
BRO-141D(202)CI JACOBS (AKA - CARTER-BURGESS)
CREEK, 0.6 MI. SOUTH OF SH-66.
Contractor: BELK BRIDGE, INC.
Engineer: JACOBS (AKA - C-B)
Contract Amount: $600,000.00 Completion Date: 04/30/2012
Letting Date: 07/21/2011 Final Est Sub: 08/21/2012
29330(04) Contract: 120244 CORD Residency: 03003 1.902 MI. CO.RD.:GRADING/ FROM
3.5 MI. EAST OF US-177, EXTEND
CIRB-241C(004)RB COBB ENGINEERING CO., INC.
EAST.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: COBB
Contract Amount: $133,870.05 Completion Date: 08/21/2012
Letting Date: 05/17/2012 Final Est Sub:
17226(17) Contract: 110431 SH-66 Residency: 03003 .136 MI. SH-66 OVER CHUCKAHO
CREEK, 3.8 MI. E OF SH-18 JCT.
BRFY-141C(049) COBB ENGINEERING CO., INC.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: COBB
Contract Amount: $775,774.35 Completion Date: 08/01/2012
Letting Date: 09/15/2011 Final Est Sub:
28219(04) Contract: 120100 SH-66B Residency: 03300 1.410 MI. SH-66B;RESURFACE
(ASPHALT)FROM 1.41 MI. NORTH-
STPY-141C(227)3P WEWOKA
WEST OF US-66, EXTEND
Contractor: MARKWELL PAVING COMPANY, INC. SOUTHWEST.
Engineer: Moore, Archie (Act.)
Contract Amount: $217,246.02 Completion Date: 05/29/2012
Letting Date: 02/16/2012 Final Est Sub:
Construction Status Report Page 25
County: Love Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
19576(04) Contract: 040436 I-35 Residency: 07200 *-1(133)(134)008 / 8.13 MI. GRADE,
DRAIN, SURFACE & BRIDGE I-35
IMY-35-1(125)000/BRIY-35* ARDMORE
SEVERAL LOCATIONS ALONG I-35 IN
Contractor: DUIT CONSTRUCTION COMPANY, INC. LOVE COUNTY.
Engineer: Earp, Jay
Contract Amount: $24,831,744.31 Completion Date: 10/01/2007
Letting Date: 11/18/2004 Final Est Sub: 10/06/2011
24141(04) Contract: 070407 IS-35 Residency: 07200 0.00 MI. SAFETY IMPROVEMENT
(CABLE BARRIER PROJECT) I-35
IMG-0035-1(146)013TR ARDMORE
BEGIN AT THE TX. ST. LINE &
Contractor: JIM COOLEY CONSTRUCTION, INC. EXTEND N. TO MM 12.5 (4 LOCS.)
Engineer: Earp, Jay
Contract Amount: $1,364,152.19 Completion Date: 01/25/2010
Letting Date: 11/15/2007 Final Est Sub: 08/27/2012
22161(10) Contract: 080445 IS-35 Residency: 07200 0.88 MI. GRADE, DRAIN & SURFACE
ROGERS RD. FROM JCT. I-35 / US-77
SEC1702Y-143N(072)HP ARDMORE
EXTEND EAST.
Contractor: OVERLAND CORPORATION
Engineer: Earp, Jay
Contract Amount: $2,476,542.95 Completion Date: 04/13/2012
Letting Date: 10/16/2008 Final Est Sub: 06/21/2012
27990(04) Contract: 110336 IS-35 Residency: 07200 0.00 MI. IS-35:TRAFFIC
SIGNALS:AT THE MILE 1 INTER-
IMG-35-1(160)001TR ARDMORE
CHANGE IN THE CITY OF
Contractor: MIDSTATE TRAFFIC CONTROL, INC. THACKERVILLE
Engineer: Earp, Jay
Contract Amount: $195,190.92 Completion Date: 07/17/2012
Letting Date: 07/21/2011 Final Est Sub:
20264(04) Contract: 070007 SH-32 Residency: 07200 1.470 MI. BRIDGE & APPROACHES
SH-32 OVER WALNUT BAYOU
BRFY-143C(046) ARDMORE
APPROX. 14.7 MI. E. OF THE
Contractor: OBC, INC. JEFFERSON COUNTY LINE.
Engineer: Earp, Jay
Contract Amount: $6,059,419.07 Completion Date: 01/20/2010
Letting Date: 01/18/2007 Final Est Sub: 05/21/2012
20963(04) Contract: 080231 SH-32 Residency: 07200 0.662 MI. BRIDGE & APPROACHES
SH-32 OVER ROCK CRK. APPROX.
BRFY-143C(057) ARDMORE
4.7 MI. W. OF MARRIETTA.
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
Engineer: Earp, Jay
Contract Amount: $3,199,999.99 Completion Date: 10/12/2010
Letting Date: 05/15/2008 Final Est Sub: 02/14/2011
County: Major Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
22875(04) Contract: 100390 CORD Residency: 06100 0.980 MI. CO.RD.;GRADE,DRAIN
,SURFACE & BRIDGE/FROM 1.0
CIRB-147D(103)RB BUFFALO
MI.WEST OF THE SH-58 JUNCTION,
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
EXTEND EAST.
Engineer: Burke, David
Contract Amount: $1,173,455.08 Completion Date: 08/31/2011
Letting Date: 06/17/2010 Final Est Sub: 06/04/2012
Construction Status Report Page 26
24793(04) Contract: 090492 SH-8 Residency: 06100 0.09 MI. BR. REHAB. SH-8 OVER DEEP
CRK. 2 MI. N. OF BLAINE C/L. SH-58
SBR-147C(131)(140)SB BUFFALO
OVER INDIAN CRK. JUST S. OF
Contractor: SEWELL BROS., INC. US-60 IN RINGWOOD.
Engineer: Burke, David
Contract Amount: $1,113,263.60 Completion Date: 09/28/2011
Letting Date: 07/23/2009 Final Est Sub: 08/30/2012
27572(04) Contract: 110302 US-60 Residency: 06100 13.00 MI. US-60;RESURFACE
(ASPHALT)BEGIN AT THE US-281
SSR-147C(164)(165)SR BUFFALO
JCT, EXTEND EAST.
Contractor: J & R SAND COMPANY, INC.
Engineer: Burke, David
Contract Amount: $1,507,031.00 Completion Date: 08/02/2012
Letting Date: 01/19/2012 Final Est Sub:
County: Mayes Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
25639(04) Contract: 110011 CORD Residency: 08012 0.190 MI. CO.RD.;BRIDGE &
APPROACHES;OVER SALT CR.,1.50
BRO-NBIL(129)CO PSA-DEWBERRY
MI. NORTH OF THE SH-20
Contractor: BECCO CONTRACTORS, INC. JUNCTION.
Engineer: PSAD
Contract Amount: $533,112.80 Completion Date: 04/18/2012
Letting Date: 04/14/2011 Final Est Sub:
20230(04) Contract: 100010 SH-28 Residency: 08004 1.55 MI. SH-28;BRIDGE &
APPROACHES;OVER OSAGE CREEK,
SSP-149C(059)SS JACOBS (AKA - CARTER-BURGESS)
4.9 MI. PRYOR CR. RELIEF ,5.1
Contractor: OBC, INC. MI., BITTER CR.
Engineer: JACOBS (AKA - C-B)
Contract Amount: $6,706,958.94 Completion Date: 08/31/2012
Letting Date: 05/20/2010 Final Est Sub:
29091(04) Contract: 120103 US-69 Residency: 08300 5.22 MI. US-69;RESURFACE
(ASPHALT)FROM 8.3 MI. NORTH
NHY-013N(158)3P CLAREMORE
OFTHE WAGONER C/L, EXTEND
Contractor: APAC-CENTRAL, INC. NORTH (SOUTHBOUND ONLY).
Engineer: Bray, Timothy
Contract Amount: $886,252.05 Completion Date: 08/23/2012
Letting Date: 02/16/2012 Final Est Sub:
County: McClain Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
20999(06) Contract: 100266 IS-35 Residency: 03001 6.772 MI. IS-35;PAVEMENT RE- HAB.
(ASPHALT)FROM 2.5 MI. S. OF THE
IMY-0035-2(311)088 ENGR. SERV. & TESTING
SH-74 JUNCTION, EXT. NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: EST
Contract Amount: $8,483,906.12 Completion Date: 09/15/2011
Letting Date: 05/20/2010 Final Est Sub:
19314(08) Contract: 090623 SH-9W Residency: 03200 0.23 MI. SH-9W;GRADE,DRAIN,
SURFACE & BRIDGE;OVER I-35
SEC 1702Y-144A(124)HP PURCELL
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
Engineer: Riemer, Caleb
Contract Amount: $4,285,993.25 Completion Date: 11/03/2011
Letting Date: 12/17/2009 Final Est Sub:
Construction Status Report Page 27
13574(04) Contract: 060279 US-62 Residency: 03200 1.694 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-62 FROM GRADY
STPY-044B(319) PURCELL
COUNTY LINE EXTEND N. THRU
Contractor: HASKELL LEMON CONSTRUCTION CO. BLANCHARD.
Engineer: Riemer, Caleb
Contract Amount: $9,459,984.70 Completion Date: 03/10/2010
Letting Date: 05/17/2007 Final Est Sub:
County: McIntosh Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
25102(04) Contract: 110383 CORD Residency: 01003 0.965 MI. CO.RD./BRIDGE RE-
HAB.:OVER LAKE EUFAULA, 3.0 MI.
CIRB-146C(100)RB COBB ENGINEERING CO., INC.
SO. OF SH-9 IN VIVIAN & 6.5 MI. W.
Contractor: C-GAWF CONSTRUCTION, INC. OF US-69.
Engineer: COBB
Contract Amount: $948,053.27 Completion Date: 07/12/2012
Letting Date: 08/18/2011 Final Est Sub:
22223(04) Contract: 110486 CORD Residency: 01003 .188 MI. CO.RD.:BRIDGE AND
APPROACHES OVER TRIB TO MILL
BRF-146C(073)CI COBB ENGINEERING CO., INC.
CREEK 1.0 MI. N AND 8.0 MI. E OF
Contractor: C-GAWF CONSTRUCTION, INC. HANNA
Engineer: COBB
Contract Amount: $234,928.30 Completion Date: 07/12/2012
Letting Date: 10/20/2011 Final Est Sub:
20291(04) Contract: 090472 US-266 Residency: 01100 0.495 MI. GRADE, DRAIN & SURFACE
US-266 BEGIN 0.3 MILES WEST OF
SSP-146C(049)SS MUSKOGEE
US-69 AND EXTEND EAST.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Ivy, Steve (Act.)
Contract Amount: $5,647,930.93 Completion Date: 08/29/2011
Letting Date: 07/23/2009 Final Est Sub:
County: Murray Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
16352(04) Contract: 010235 US-77 Residency: 07200 0.00 M. BR. PAINTING ON US-77;
BRIDGE OVER TURKEY CREEK, 8.52
BRFY-NBIP(87) ARDMORE
MILES N. OF DAVIS.
Contractor: KERRVILLE PAINTING CO., INC.
Engineer: Earp, Jay
Contract Amount: $50,600.00 Completion Date: 12/12/2001
Letting Date: 06/21/2001 Final Est Sub: 02/25/2005
20965(04) Contract: 110498 US77 Residency: 07200 0.00 MI. US-77:BRIDGE REHAB OVER
TURKEY/GARNER CREEK .3 MI. S OF
SBR-150C(053)SB ARDMORE
GARVIN COUNTY LINE
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer: Earp, Jay
Contract Amount: $699,932.84 Completion Date: 07/27/2012
Letting Date: 10/20/2011 Final Est Sub:
County: Muskogee Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 28
22164(06) Contract: 090574 I-40 Residency: 01200 */BRFY-151C(209)MS/BRFY-151B
(210)MS;0.00 MI. IS-40/US-62/
BRFY-040-6(366)290MS* SALLISAW
US-64;BRIDGE IMPROV.(PIER
Contractor: JENSEN CONSTRUCTION COMPANY PROTECTION)MULTIPLE LOCATIONS
Engineer: Edwards, Carl
Contract Amount: $7,910,832.00 Completion Date: 07/02/2012
Letting Date: 06/17/2010 Final Est Sub:
20900(05) Contract: 090323 I-40 Residency: 01200 4.998 MI. PAVEMENT
REHABILITATION & BRIDGE I-40
IM-STIM(001) SALLISAW
FROM MILE MARKER 281.67 TO
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
288.22.
Engineer: Edwards, Carl
Contract Amount: $33,928,747.73 Completion Date: 03/30/2012
Letting Date: 03/19/2009 Final Est Sub:
29020(04) Contract: 120104 IS-40 Residency: 01200 1.30 MI. IS-40/RESURFACE
(ASPHALT)FROM 1.0 MI. EAST OF
IMY-0040-6(376)288 3P SALLISAW
SH-100, EXTEND EAST.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Edwards, Carl
Contract Amount: $991,037.10 Completion Date: 05/25/2012
Letting Date: 02/16/2012 Final Est Sub:
28585(05) Contract: 110385 IS-40 Residency: 01100 0.00 MI. IS-40:JOINT SEAL/
REPAIR:OVER COUNTY RD., 2.8 MI.
BRFY-151N(239)3B MUSKOGEE
EAST OF THE MCINTOSH C/L.
Contractor: PBX CORPORATION
Engineer: Ivy, Steve (Act.)
Contract Amount: $85,439.00 Completion Date: 05/15/2012
Letting Date: 08/18/2011 Final Est Sub:
28585(04) Contract: 110384 IS-40 Residency: 01001 0.00 MI. IS-40:BRIDGE PAINT
-ING:OVER COUNTY RD., 2.8 MI.
BRFY-NBIP(440)3B ENGR. SERV. & TESTING
EAST OF THE MCINTOSH C/L.
Contractor: TARPON INDUSTRIAL, INC.
Engineer: EST
Contract Amount: $196,715.00 Completion Date: 03/30/2012
Letting Date: 08/18/2011 Final Est Sub: 08/13/2012
27994(04) Contract: 110103 US-62 Residency: 01100 0.00 MI. US-62;BRIDGE REHAB.
;OVER THE MK&T R/R, 3.2 MI. E.OF
SBR-151A(229)SB MUSKOGEE
THE US-69 JUNCTION.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Ivy, Steve (Act.)
Contract Amount: $1,379,192.95 Completion Date: 05/23/2012
Letting Date: 03/17/2011 Final Est Sub:
14994(10) Contract: 070189 US-64 Residency: 01100 1.849 MI. GRADE, DRAIN, BRIDGE &
SURFACE US-64 FROM 11.3 MI. S. OF
STPY-151C(004) MUSKOGEE
SH-165 EXT. S. (5 LANE)(DIRTY CRK.
Contractor: DUIT CONSTRUCTION COMPANY, INC. & OVERFLOW).
Engineer: Ivy, Steve (Act.)
Contract Amount: $9,168,998.59 Completion Date: 08/04/2010
Letting Date: 05/17/2007 Final Est Sub:
29021(04) Contract: 120105 US-64 Residency: 01200 7.03 MI. US-64/RESURFACE
(ASPHALT)FROM SH-2, EXTEND
STPY-151C(247)3P SALLISAW
EAST.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Edwards, Carl
Contract Amount: $1,206,926.67 Completion Date: 07/20/2012
Letting Date: 02/16/2012 Final Est Sub:
28295(04) Contract: 110171 US-69 Residency: 01100 16.45 MI. US-69/RESURFACE
(ASPHALT)FROM THE MCINTOSH
NHY-013N(149)(151)3P MUSKOGEE
C/L, EXTEND NORTH FROM 0.5 MI.
Contractor: GLOVER & ASSOCIATES, INC. N. OF US-64, EXTEND N.
Engineer: Ivy, Steve (Act.)
Contract Amount: $3,036,841.00 Completion Date: 05/17/2012
Letting Date: 02/17/2011 Final Est Sub:
Construction Status Report Page 29
County: Noble Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
22352(04) Contract: 110195 CORD Residency: 04009 0.236 MI. CO.RD. BRIDGE &
APPROACHES;OVER EAST WARREN
BRF-152C(093)CI CIRCUIT ENGR. DISTR. # 8
CR., 0.60 MI. NORTH OF THE
Contractor: K & R BUILDERS, INC. SH-164 JUNCTION.
Engineer: CED8
Contract Amount: $412,917.89 Completion Date: 01/20/2012
Letting Date: 04/14/2011 Final Est Sub:
12317(04) Contract: 070333 US-77 Residency: 04100 *(111)BF / 1.52 MI. GRD, DRN, SURF
& BR US-77 RED ROCKCRK OVRFLW
SAB-52C(194)BF/SAB-152C* PERRY
1.1 MI S OF SH-15/SH-15 UNNAMED
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) E US-77.
CRK 0.7 MI
Engineer: Zachary, Ted
Contract Amount: $7,055,993.43 Completion Date: 04/08/2011
Letting Date: 07/19/2007 Final Est Sub:
County: Nowata Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
27057(04) Contract: 100607 US-169 Residency: 08300 6.00 MI. US-169;PAVEMENT RE-
HAB(ASPHALT);FROM 6.0 MI. S. OF
NHY-030N(068) CLAREMORE
THE KANSAS STATE LINE, EXTEND
Contractor: APAC-CENTRAL, INC. SOUTH.
Engineer: Bray, Timothy
Contract Amount: $2,665,265.99 Completion Date: 12/15/2011
Letting Date: 11/18/2010 Final Est Sub:
27025(04) Contract: 100272 US-169 Residency: 08300 4.817 MI. US-169:RESURFACE
(ASPHALT)FROM THE ROGERS/
NHY-030N(067) CLAREMORE
NOWATA COUNTY LINE, EXTEND
Contractor: BECCO CONTRACTORS, INC. NORTH.
Engineer: Bray, Timothy
Contract Amount: $3,750,716.40 Completion Date: 08/01/2012
Letting Date: 05/20/2010 Final Est Sub:
County: Okfuskee Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
26268(04) Contract: 090169 IS-40 Residency: 03003 0.00 MI. IS-40;SAFETY IMPRO.
(CABLE BARRIER)FROM MILE
HSIPIG-0040-5(406)216TR COBB ENGINEERING CO., INC.
MARKER 230.
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: COBB
Contract Amount: $2,334,968.32 Completion Date: 06/29/2012
Letting Date: 10/21/2010 Final Est Sub:
27568(04) Contract: 110339 IS-40 Residency: 03300 0.00 MI. IS-40:BRIDGE RE-
HAB.:OVER NS-375, 7.4 MI. EAST
SBR-154N(161)SB WEWOKA
OF THE SEMINOLE C/L.
Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer: Moore, Archie (Act.)
Contract Amount: $783,537.00 Completion Date: 01/25/2012
Letting Date: 07/21/2011 Final Est Sub:
Construction Status Report Page 30
County: Oklahoma Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
22924(04) Contract: 100301 CORD Residency: 04400 0.512 MI. CO.RD.;GRADE,DRAIN , &
SURFACE(HOGBACK RD.)AT THEI-44
SEC115-0H17(011)SG EDMOND
(TURNER TURNPIKE) INTER- CHANGE.
Contractor: MARKWELL PAVING COMPANY, INC.
Engineer: Hubbard, Tom
Contract Amount: $4,224,611.42 Completion Date: 03/30/2012
Letting Date: 04/15/2010 Final Est Sub:
22129(04) Contract: 090336 CORD Residency: 04600 0.535 MI. CO.RD.;BRIDGE &
APPROACHES(BRITTON RD.)OVER
CIRB-155C(474)(475)RB OKLAHOMA CITY
ANUNNAMED CR. & THE N. CANA-
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
DIAN RIVER.
Engineer: Howell, Terry
Contract Amount: $2,155,875.12 Completion Date: 11/06/2010
Letting Date: 05/14/2009 Final Est Sub:
25011(04) Contract: 110469 CORD Residency: 04400 .112 MI. CO.RD. SORGHUM MILL RD
(EW-90) OVER CHISHOLM CREEK AT
BRO-155D(638)CI EDMOND
WESTER AVE IN EDMOND.
Contractor: K & R BUILDERS, INC.
Engineer: Hubbard, Tom
Contract Amount: $631,562.77 Completion Date: 07/16/2012
Letting Date: 09/15/2011 Final Est Sub:
22321(05) Contract: 090419 CT.ST. Residency: 04600 0.00 MI. CT.ST.;SAFETY IM- PROV.
(TRAFFIC SIGNALS)AT VAR- IOUS
STPG-155F(671)AG OKLAHOMA CITY
LOCATIONS IN THE OKC METRO
Contractor: TRAFFIC & LIGHTING SYSTEMS, LLC AREA.
Engineer: Howell, Terry
Contract Amount: $202,702.75 Completion Date: 08/01/2010
Letting Date: 06/18/2009 Final Est Sub:
28044(04) Contract: 120025 CTST Residency: 04400 1.01 MI. CT.ST.(MAY AVE.)
RESURFACE(ASPHALT)FROM
STP-155B(812)AG EDMOND
BRITTONRD. TO HEFNER RD., IN THE
Contractor: HASKELL LEMON CONSTRUCTION CO. CITY OF THE VILLAGE.
Engineer: Hubbard, Tom
Contract Amount: $473,439.21 Completion Date: 06/06/2012
Letting Date: 01/19/2012 Final Est Sub:
27854(04) Contract: 110305 CTST Residency: 04400 0.00 MI. CT.ST.:STRIPING &
PAVEMENT MARKING:AT VARIOUS
STPG-155B(803)AG EDMOND
LOCATIONS IN THE CITY OF
Contractor: DIRECT TRAFFIC CONTROL INC. EDMOND.
Engineer: Hubbard, Tom
Contract Amount: $497,707.32 Completion Date: 02/03/2012
Letting Date: 06/16/2011 Final Est Sub:
28105(04) Contract: 110014 CTST Residency: 04002 5.28 MI. CT.ST.;GRADE,DRAIN, &
SURFACE(HEFNER RD.)FROM THE
STP-155B(813)AG TETRA TECH
BROADWAY EXTENSION,EXTEND E.
Contractor: HASKELL LEMON CONSTRUCTION CO. IN OKC.
Engineer: TETR
Contract Amount: $1,967,951.20 Completion Date: 02/01/2012
Letting Date: 01/20/2011 Final Est Sub:
22321(06) Contract: 100564 CTST Residency: 04600 0.00 MI. CT.ST.;SAFETY IMPRO.
(TRAFFIC SIGNALS)AT VARIOUS
STPG-155F(722)AG OKLAHOMA CITY
LOCATIONS IN THE OKC AREA.
Contractor: DAVIS H. ELLIOT CONSTRUCTION COMPANY, INC.
Engineer: Howell, Terry
Contract Amount: $148,808.00 Completion Date: 03/21/2012
Letting Date: 10/21/2010 Final Est Sub:
Construction Status Report Page 31
28223(04) Contract: 110306 CTST Residency: 04600 0.50 MI. CT.ST.(NE 23RD)
PAVEMENT REHAB.(PC CONC.)
MC-155D(836) OKLAHOMA CITY
FROMWALNUT STREET, EXTEND EAST.
Contractor: RUDY CONSTRUCTION CO.
Engineer: Howell, Terry
Contract Amount: $824,622.00 Completion Date: 08/31/2012
Letting Date: 08/18/2011 Final Est Sub:
17428(75) Contract: 090645 I-40 Residency: 04600 0.195 MI. GRADE, DRAIN, SURFACE &
BRIDGE I-40 FROM 0.25 MI. EAST OF
OKCY-XTWN(065)SG OKLAHOMA CITY
AGNEW AVE. EXTEND EAST IN
Contractor: SHERWOOD CONST. , ALLEN CONTR. & MANHATTAN RD. & BR. (JV)
OKLAHOMA CITY.
Engineer: Howell, Terry
Contract Amount: $22,514,185.55 Completion Date: 08/10/2011
Letting Date: 10/15/2009 Final Est Sub:
17428(26) Contract: 080120 I-40 Residency: 04600 *WN(008)HP/2.649 MI. GRADE,
DRAIN SURFACE, BRIDGE &
OKCY-XTWN(007)TI/OKCY-XT* OKLAHOMA CITY
RAILROAD I-40 E. OF PENN. AVE.
Contractor: SHERWOOD CONSTRUCTION CO., INC. EXT. E. / FROM SHARTEL AVE. EXT.
Engineer: Howell, Terry W.
Contract Amount: $40,574,036.60 Completion Date: 02/22/2010
Letting Date: 08/21/2008 Final Est Sub:
17428(30) Contract: 090105 I-40 Residency: 04400 0.773 MI. GRADE, DRAIN, SURFACE &
BRIDGE I-40 FOM MAY AVE. EXTEND
OKCY-XTWN(011)HP EDMOND
E. 0.9 MI. TO AGNEW AVE. IN OKC.
Contractor: ALLEN CONTRACTING, INC.
Engineer: Hubbard, Tom
Contract Amount: $8,926,771.72 Completion Date: 01/24/2011
Letting Date: 06/18/2009 Final Est Sub:
19693(04) Contract: 020183 IS-40 Residency: 04600 0.00 M. BRIDGE PAINTING I-40:
OVER NORTH CANADIAN RIVER IN
IMY-NBIP(281) OKLAHOMA CITY
WEST OKC.
Contractor: J & N INTERNATIONAL COATINGS, INC.
Engineer: Howell, Terry
Contract Amount: $378,000.00 Completion Date: 08/31/2012
Letting Date: 05/23/2002 Final Est Sub:
24883(05) Contract: 110114 IS-44 Residency: 04003 0.00 MI. IS-44:BRIDGE REHAB.
OVER SH-3A(BELLE ISLE BRDG.) 5.7
SBR-155N(786)SB COBB ENGINEERING CO., INC.
MI. N.E. OF THE IS-40 JCT IN OKC.
Contractor: RESTEK, INC.
Engineer: COBB
Contract Amount: $440,789.00 Completion Date: 04/22/2012
Letting Date: 03/17/2011 Final Est Sub:
25000(04) Contract: 080360 IS-44 Residency: 04600 *SAP-141A(201)/IMG-044-2
(471)223 TR; 0.00 MI. IS-44, SAFETY
IMG-0035-3(297)138 TR* OKLAHOMA CITY
IMPROVEMENT(MESSAGE
Contractor: MIDSTATE TRAFFIC CONTROL, INC. SIGN)LOCATIONS DIV. 3,4,5.
Engineer: Howell, Terry
Contract Amount: $1,837,942.75 Completion Date: 11/03/2010
Letting Date: 11/20/2008 Final Est Sub: 08/30/2012
24883(04) Contract: 100193 IS-44 Residency: 04003 0.00 ,MI. IS-44;BRIDGE REHAB.
(BELLE ISLE BRIDGE) OVER
SBR-155N(634)SB COBB ENGINEERING CO., INC.
NORTH-WEST EXPRESSWAY.
Contractor: PBX CORPORATION
Engineer: COBB
Contract Amount: $648,625.00 Completion Date: 04/16/2011
Letting Date: 03/18/2010 Final Est Sub:
17271(04) Contract: 080093 US-77 Residency: 04400 1.506 KM GRADE, DRAIN, SURFACE &
BRIDGE US-77 (BROADWAY
NHY-024N(004) EDMOND
EXTENSION) AT MEMORIAL ROAD
Contractor: ALLEN CONTRACTING, INC./MUSKOGEE BRIDGE CO., INC. (J V)
INTERCHANGE.
Engineer: Hubbard, Tom
Contract Amount: $27,947,058.47 Completion Date: 11/15/2010
Letting Date: 02/21/2008 Final Est Sub:
Construction Status Report Page 32
County: Okmulgee Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
25642(04) Contract: 110307 CORD Residency: 02100 0.169 MI.CO.RD./BRIDGE &
APPROACHES;OVER SNAKE CREEK,
BRO-156D(160)CI ANTLERS
0.5 MI. NORTH OF THE SH-16
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC JUNCTION.
Engineer: Moy, Ryan
Contract Amount: $331,800.81 Completion Date: 04/30/2012
Letting Date: 06/16/2011 Final Est Sub:
22026(04) Contract: 110463 CT-ST Residency: 01004 .041 MI. CT.ST. (4TH STREET) OVER
COAL CREEK .2 MI. SOUTH OFI-40, IN
STP-156C(102)UR JACOBS (AKA - CARTER-BURGESS)
HENRYETTA.
Contractor: B & B BRIDGE COMPANY, LLC
Engineer: JACOBS (AKA - C-B)
Contract Amount: $433,809.02 Completion Date: 06/30/2012
Letting Date: 09/15/2011 Final Est Sub:
23106(04) Contract: 100608 SH-16 Residency: 01100 B0.445 MI. SH-16;BRIDGE &
APPROACHES/OVER SALT CR.,4.2 MI.
BRFY-156C(120) MUSKOGEE
EAST OF CREEK COUNTY LINE.
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
Engineer: Ivy, Steve (Act.)
Contract Amount: $2,032,848.13 Completion Date: 05/10/2012
Letting Date: 10/21/2010 Final Est Sub:
29056(04) Contract: 120107 SH-16 Residency: 01004 6.920 MI. SH-16;RESURFACE
(ASPHALT)FROM THE CREEK C/L,
CIP-256C(003)SR JACOBS (AKA - CARTER-BURGESS)
EXTEND EAST.
Contractor: APAC-CENTRAL, INC.
Engineer: JACOBS (AKA - C-B)
Contract Amount: $1,263,902.87 Completion Date: 06/30/2012
Letting Date: 02/16/2012 Final Est Sub:
24271(04) Contract: 100345 US-75 Residency: 01100 5.611 MI. US-75;INTERSEC- TION
MOD.& SAFETY IMPROV. (CABLE
NHY-014N(079)(082) MUSKOGEE
BARRIER)FROM 6.3 MI. & 13.3 MI.
Contractor: BECCO CONTRACTORS, INC. N. OF US-62.
Engineer: Ivy, Steve (Act.)
Contract Amount: $4,944,602.43 Completion Date: 08/24/2011
Letting Date: 05/20/2010 Final Est Sub:
County: Osage Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
23987(04) Contract: 110386 CORD Residency: 08007 0.204 MI. CO.RD./BRIDGE &
APPROACHES:OVER CLEAR CREEK,
BRO-157D(094)CO CRAIG & KEITHLINE, INC.
1.0 MI. SOUTH OF THE US-60
Contractor: BELK BRIDGE, INC. JUNCTION.
Engineer: C&KI
Contract Amount: $643,520.30 Completion Date: 06/19/2012
Letting Date: 08/18/2011 Final Est Sub:
12311(04) Contract: 100013 SH-11 Residency: 08400 0.216 MI. SH-11;BRIDGE &
APPROACHES;OVER MUD CR.,2.33
SSP-057C(335)SS SAND SPRINGS
MI. EAST OF THE KAY COUNTY
Contractor: WITTWER CONSTRUCTION CO., INC. LINE.
Engineer: Williams, Mark J.
Contract Amount: $755,115.00 Completion Date: 03/16/2011
Letting Date: 01/28/2010 Final Est Sub: 05/05/2011
Construction Status Report Page 33
28259(04) Contract: 110119 SH-20 Residency: 08400 0.00 MI. SH-20 BRIDGE REHAB.;
OVER QUAPAW CR., 3.8 MI. WEST OF
SBR-157A(177)SB SAND SPRINGS
THE TULSA COUNTY LINE.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Williams, Mark J.
Contract Amount: $720,251.57 Completion Date: 02/17/2012
Letting Date: 04/14/2011 Final Est Sub:
28270(04) Contract: 110122 US-60 Residency: 08400 6.63 MI. US-60:RESURFACE
(ASPHALT)FROM THE SH-18 JCT,
NHY-018N(060)3P SAND SPRINGS
EXTEND EAST.
Contractor: APAC-CENTRAL, INC.
Engineer: Williams, Mark J.
Contract Amount: $1,880,569.24 Completion Date: 04/30/2012
Letting Date: 02/17/2011 Final Est Sub:
County: Ottawa Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
22896(04) Contract: 090033 CO.RD. Residency: 08300 0.264 MI. CO.RD.; BRIDGE &
APPROACHES;OVER NEOSHO RIVER,
CIRB-158D(101)RB CLAREMORE
3.4 MI. NO. & 2.0 MI. EAST OF THE
Contractor: M.J. LEE CONSTRUCTION COMPANY SH-125/US-60 JCT.
Engineer: Bray, Timothy
Contract Amount: $4,175,684.50 Completion Date: 07/02/2010
Letting Date: 01/22/2009 Final Est Sub:
27242(04) Contract: 110308 CORD Residency: 08003 0.126 MI.CO.RD.;BRIDGE &
APPROACHES:OVER BEE CREEK,
BRO-158D(172)CO COBB ENGINEERING CO., INC.
2.8 MI. SOUTH OF THE US- 60
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC JUNCTION.
Engineer: COBB
Contract Amount: $423,651.45 Completion Date: 06/06/2012
Letting Date: 06/16/2011 Final Est Sub:
22188(04) Contract: 100536 CORD Residency: 08300 0.163 MI. CO.RD.; BRIDGE &
APPROACHES/OVER BEAVER CR.,
BRO-158D(086)CO CLAREMORE
0.50 MI. N. OF THE I-44
Contractor: BEACHNER CONSTRUCTION CO., INC. JUNCTION.
Engineer: Bray, Timothy
Contract Amount: $479,618.20 Completion Date: 02/28/2012
Letting Date: 09/16/2010 Final Est Sub:
08932(07) Contract: 090666 SH-10 Residency: 08300 0.00 MI. SH-10;RIGHT-OF-WAY
CLEARANCE/AT LITTLE ELM CR. &
BRFY-158C(170)RW CLAREMORE
UNNAMED CR., 0.5 MI. EAST OF THE
Contractor: K & K CONTRACTING, INC. WILL ROGERS TRNPIKE.
Engineer: Bray, Timothy
Contract Amount: $105,555.55 Completion Date: 04/27/2010
Letting Date: 12/17/2009 Final Est Sub:
26609(04) Contract: 090607 SH-10 Residency: 08300 0.00 MI. SH-10;SAFETY IMPRO-
VEMENT(CABLE BARRIER &
HSIPG-158C(168) CLAREMORE
GUARD-RAIL) AT VARIOUS
Contractor: FULSOM CONSTRUCTION COMPANY, INC. LOCATIONS IN DIV. VIII.
Engineer: Bray, Timothy
Contract Amount: $979,785.00 Completion Date: 10/05/2010
Letting Date: 12/17/2009 Final Est Sub:
20894(04) Contract: 110017 US-59 Residency: 08300 0.400 MI. US-59/BRIDGE &
APPROACHES:OVER TH BNSF RAIL-
BRFY-158B(055) CLAREMORE
ROAD,2.6 MI. N. OF THE
Contractor: MANHATTAN ROAD & BRIDGE COMPANY DELAWARE C/L.
Engineer: Bray, Timothy
Contract Amount: $4,944,607.36 Completion Date: 06/27/2012
Letting Date: 01/20/2011 Final Est Sub:
Construction Status Report Page 34
28271(04) Contract: 110124 US-69 Residency: 08300 -158A(189)3P / 14.40 MI. US
-69A;RESURFACE(ASPHALT)FROM
STPY-158B(188)3P/STPY* CLAREMORE
THE US-69 JCT,EXTEND EAST.
Contractor: GLOVER & ASSOCIATES, INC. US-69 FROM THE SH-10E.
Engineer: Bray, Timothy
Contract Amount: $3,074,815.02 Completion Date: 07/11/2012
Letting Date: 02/17/2011 Final Est Sub:
27085(04) Contract: 110199 US60 Residency: 08001 0.00 MI. US-60: OVER NEOSHO RIVER
JUST W OF SH-137 JCT. AND OVER
BRFY-NBIP(434)(435) ENGR. SERV. & TESTING
SPRING RIVER JUST E OF SH-137 JCT.
Contractor: SPARTAN CONTRACTING, LLC
Engineer: EST
Contract Amount: $1,347,000.00 Completion Date: 06/07/2012
Letting Date: 09/15/2011 Final Est Sub:
County: Pawnee Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
24721(04) Contract: 110342 CORD Residency: 08400 0.047 MI. CO. RD.:BRIDGE &
APPROACHES:OVER UNNAMED
BRO-159D(084)CO SAND SPRINGS
CREEK,2.3 MI. WEST OF THE SJ-99.
Contractor: KLAVER CONSTRUCTION COMPANY, INC.
Engineer: Williams, Mark J.
Contract Amount: $176,897.25 Completion Date: 07/23/2012
Letting Date: 07/21/2011 Final Est Sub:
24086(04) Contract: 070317 US-64 Residency: 08100 *NHG-019N(107)(108)SS; 0.00 MI.
CABLE BARRIER PROJECT
STPG-159A(069)SS/* TULSA
US-64/US-412 BEGIN AT SH-48
Contractor: ACTION SAFETY SUPPLY CO. EXTEND E. TO I-244 IN TULSA.
Engineer: Arnold, Bruce
Contract Amount: $2,920,742.77 Completion Date: 08/27/2009
Letting Date: 07/19/2007 Final Est Sub:
County: Payne Commissioner District: 4
Contracts Completed - Final Estimate Not Processed
23656(04) Contract: 110520 CORD Residency: 04500 0.312 MI. CO.RD.;BRIDGE &
APPROACHES:OVER COUNCIL CR.,
BRO-160D(160)CI STILLWATER
2.0 MI. S. OF SH-51
Contractor: BELK BRIDGE, INC.
Engineer: Arps, Jonathan
Contract Amount: $731,991.33 Completion Date: 07/17/2012
Letting Date: 11/17/2011 Final Est Sub:
28224(04) Contract: 110309 SH-51 Residency: 04500 3.79 MI. SH-51;RESURFACE
(ASPHALT)FROM THE CREEK C/L,
SSR-160B(205)SR STILLWATER
EXTEND WEST TO YALE.
Contractor: APAC-CENTRAL, INC.
Engineer: Arps, Jonathan
Contract Amount: $724,541.30 Completion Date: 05/29/2012
Letting Date: 01/19/2012 Final Est Sub:
County: Pittsburg Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 35
25471(04) Contract: 100538 CO.RD. Residency: 02400 0.297 MI. CO.RD.;BRIDGE &
APPROACHES;OVER COAL CR., 2.5
CIRB-161C(215)RB MCALESTER
MI. N. OF THE US-270 JUNC- TION.
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer: Plymate, Larry
Contract Amount: $1,352,747.49 Completion Date: 04/19/2012
Letting Date: 09/16/2010 Final Est Sub:
29030(04) Contract: 120042 US-270 Residency: 02400 0.44 MI. US-270;RESURFACE
(ASPHALT) BEGIN 1.3 MI. WEST OF
SSR-261B(001)SR MCALESTER
SH-1, EXTEND EAST.
Contractor: JOB CONSTRUCTION CO., INC.
Engineer: Plymate, Larry
Contract Amount: $100,564.20 Completion Date: 06/07/2012
Letting Date: 01/19/2012 Final Est Sub:
28685(04) Contract: 120029 US-69 Residency: 02400 3.70 MI. US-69;RESURFACE
(UTBWC)BEGIN 0.4 MI. NORTH OF
NHY-013N(152)3P MCALESTER
US-270, EXTEND NORTH(SOUTH
Contractor: JOB CONSTRUCTION CO., INC. -BOUND LANES ONLY).
Engineer: Plymate, Larry
Contract Amount: $461,560.00 Completion Date: 05/22/2012
Letting Date: 02/16/2012 Final Est Sub: 08/27/2012
26296(07) Contract: 090126 US-69 Residency: 02400 2.76 MI. US-69:PAVEMENT RE-
HAB(P.C. CONC.)FROM 6.30 MI. N.
NHY-013N(131)3P MCALESTER
OF THE SH-63 JCT, EXTEND NORTH.
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer: Plymate, Larry
Contract Amount: $1,973,820.40 Completion Date: 04/27/2012
Letting Date: 01/20/2011 Final Est Sub:
County: Pontotoc Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
23496(04) Contract: 110363 CORD Residency: 03100 *162C(202)CI /0.415 MI. CO.
RD.;BRIDGE & APPROACHES:OVER
BRO-162D(154)CI/BRF-* ADA
WEST DAYS CR. 2.8 MI. S. & 1.2 MI.
Contractor: K & R BUILDERS, INC. W. OF SH-19.
Engineer: Russell, Julie
Contract Amount: $740,383.55 Completion Date: 06/06/2012
Letting Date: 07/21/2011 Final Est Sub:
28169(04) Contract: 110210 SH-1 Residency: 03100 *(218)SB / 0.00 MI. SH-1: BRIDGE
REHAB.:OVER SH-3, 1.0 MI. S. OF
SBR-162A(217)SB/SBR-162B* ADA
ADA. SH-3W;OVER SH-19, 1.5 MI.
Contractor: OBC, INC. E. OF SH-1.
Engineer: Russell, Julie
Contract Amount: $1,437,855.45 Completion Date: 04/20/2012
Letting Date: 02/17/2011 Final Est Sub:
28199(04) Contract: 120030 SH-1 Residency: 03100 7.33 MI. SH-1; RESURFACE
(ASPHALT) FROM HUGHES COUNTY
SSR-162B(221)SR ADA
LINE, EXTEND WEST.
Contractor: THE CUMMINS CONSTRUCTION CO., INC. NORTH OF JUMBO.
Engineer: Russell, Julie
Contract Amount: $2,977,352.79 Completion Date: 07/15/2012
Letting Date: 01/19/2012 Final Est Sub:
County: Pottawatomie Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 36
28464(04) Contract: 110343 IS-40 Residency: 03004 0.00 MI. IS-40:SAFETY IMPRO-
VEMENT(GUARDRAIL)FROM THE SH-
HSIPIG-40-5(418)186TR JACOBS (AKA - CARTER-BURGESS)
18 JUNCTION, EXTEND EAST.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: JACOBS (AKA - C-B)
Contract Amount: $1,000,590.50 Completion Date: 06/14/2012
Letting Date: 07/21/2011 Final Est Sub:
28206(04) Contract: 110132 SH-18 Residency: 03300 4.610 MI. SH-18:RESURFACE
(ASPHALT)FROM THE US-270B
STPY-163A(355)3P WEWOKA
JUNCTION, EXTEND EAST.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Moore, Archie (Act.)
Contract Amount: $962,817.60 Completion Date: 09/02/2011
Letting Date: 01/20/2011 Final Est Sub:
28041(04) Contract: 110362 SH-9 Residency: 03300 0.72 MI. SH-9:INTERSECTION
MODIFICATION/AT MALONE RD. & AT
STPY-163B(357)SG WEWOKA
ROCK CREEK RD., IN THE CITY OF
Contractor: HASKELL LEMON CONSTRUCTION CO. TECUMSEH.
Engineer: Moore, Archie (Act.)
Contract Amount: $1,233,668.50 Completion Date: 06/15/2012
Letting Date: 07/21/2011 Final Est Sub:
County: Pushmataha Commissioner District: 2
Contracts Completed - Final Estimate Not Processed
20395(04) Contract: 110493 CORD Residency: 02013 0.28 MI. CO.RD.: BRIDGE AND
APPROACHES;OVER CLOUDY CREEK
CIRB-164C(051)RB CIRCUIT ENGR. DISTRICT # 3
.7 MI. N AND .4 MI. E OF CLOUDY.
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer: CED3
Contract Amount: $998,530.60 Completion Date: 08/08/2012
Letting Date: 10/20/2011 Final Est Sub:
28586(05) Contract: 110388 SH-259 Residency: 02200 0.00 MI. US-259:JOINT SEAL/
REPAIR: SH-3/SH-98/SH-112. AT
BRFY-164A(166)3B HEAVENER
VARIOUS LOCATIONS IN DIV. II.
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer: Huddleston, David
Contract Amount: $215,951.43 Completion Date: 03/30/2012
Letting Date: 08/18/2011 Final Est Sub:
23201(04) Contract: 090307 US-271 Residency: 02200 0.946 MI. BRIDGE AND APPROACHES
US-271 OVER WALNUT CREEK 4.6
SSP-164C(097)SS HEAVENER
MILES SOUTHWEST OF THE LEFLORE
Contractor: HUB CONSTRUCTION, INC. COUNTY LINE.
Engineer: Huddleston, David
Contract Amount: $3,015,634.35 Completion Date: 04/19/2011
Letting Date: 04/23/2009 Final Est Sub:
23144(08) Contract: 110250 US-69 Residency: 02200 0.00 MI. US-69;BRIDGE WATER
PROOF SEAL/US-70/US-271/SH-1/
BHFY-164C(165) HEAVENER
SH-3/SH-37 AT MULTIPLE LO-
Contractor: B & B CONSTRUCTION SERVICE J.T., INC. CATIONS IN DIV. II.
Engineer: Huddleston, David
Contract Amount: $83,455.40 Completion Date: 01/30/2012
Letting Date: 04/14/2011 Final Est Sub:
County: Roger Mills Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
Construction Status Report Page 37
28023(04) Contract: 110389 CORD Residency: 05005 0.101 MI. CO.RD./BRIDGE &
APPROACHES:OVER CAMP HOLLOW
BRO-165D(118)CI CIRCUIT ENGR. DISTR. # 7
CR., 4.0 MI. NORTH OF SH-47.
Contractor: SEWELL BROS., INC.
Engineer: CED7
Contract Amount: $184,803.50 Completion Date: 03/22/2012
Letting Date: 08/18/2011 Final Est Sub:
26034(04) Contract: 100414 SH-47 Residency: 05100 0.00 MI. SH-47;BRIDGE REHAB.
:OVER CROTEN CR. 5.9 MI. EAST OF
STPY-165C(104)(110) CLINTON
THE SH-30 JT, & OVER SER- GENT
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) 13.2 MI. E. OF
MAJOR CR.
Engineer: Greer, Randy
Contract Amount: $1,544,594.87 Completion Date: 07/21/2011
Letting Date: 07/22/2010 Final Est Sub: 06/20/2012
County: Rogers Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
25427(04) Contract: 100498 CORD Residency: 08300 0.226 MI. CO.RD.;BRIDGE &
APPROACHES/OVER ELM CR., 2.4 MI.
STP-166C(210)CO CLAREMORE
S. OF SH-20 & 1.0 MI. E. OF TULSA
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC C/L.
Engineer: Bray, Timothy
Contract Amount: $1,261,809.40 Completion Date: 09/13/2011
Letting Date: 09/16/2010 Final Est Sub:
21490(04) Contract: 110392 CORD Residency: 08004 0.198 MI. CO.RD./BRIDGE &
APPROACHES:OVER PANTHER CR.,
BRO-166D(139)CI JACOBS (AKA - CARTER-BURGESS)
3.2 MI. EAST OF IS-44.
Contractor: B & B BRIDGE COMPANY, LLC
Engineer: JACOBS (AKA - C-B)
Contract Amount: $456,119.71 Completion Date: 08/15/2012
Letting Date: 08/18/2011 Final Est Sub:
20315(08) Contract: 090581 I-44 Residency: 08002 0.336 MI. BRIDGE & APPROACHES
I-44 OVER NORTH 163RD EAST
IMY-0044-2(476)238HP TETRA TECH
AVENUE.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: TETR
Contract Amount: $6,836,178.02 Completion Date: 05/19/2011
Letting Date: 09/17/2009 Final Est Sub:
19983(08) Contract: 100496 SH-412P Residency: 08300 1.421 MI. SH-412P;GRADE,
DRAIN,SURFACE & BRIDGE;US-412
SEC1702Y-166A(194)SS CLAREMORE
CT.ST.;FROM 3 MI. W. OF 305TH
Contractor: SHERWOOD CONSTRUCTION CO., INC. AVE. EXT.E., SH-412P.
Engineer: Bray, Timothy
Contract Amount: $7,818,098.00 Completion Date: 04/03/2012
Letting Date: 08/19/2010 Final Est Sub:
28578(04) Contract: 120235 SH-66 Residency: 08300 0.016 MI.:SH-66/BRIDGE REPR.
OVER THE VERDIGRIS RIVER.
MC-266C(008) CLAREMORE
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer: Bray, Timothy
Contract Amount: $173,240.00 Completion Date: 08/20/2012
Letting Date: 05/17/2012 Final Est Sub:
20899(04) Contract: 110209 SH-66 Residency: 08300 0.22 MI. SH-66:BRIDGE &
APPROACHES:SOUTHBOUND OVER
BRFY-166C(130)SS CLAREMORE
BIRD CR., & RD. UNDER 3.68 MI.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY N.E. OF THE IS-44 JCT.
Engineer: Bray, Timothy
Contract Amount: $5,316,072.19 Completion Date: 04/17/2012
Letting Date: 04/14/2011 Final Est Sub:
Construction Status Report Page 38
18887(05) Contract: 090580 SH-88 Residency: 08300 4.616 MI. SH-88; GRADE,DRAIN
,SURFACE & BRIDGE. FROM 3.5
STPY-166C(072) CLAREMORE
MINORTHWEST OF US-412, EXTEND
Contractor: BECCO CONTRACTORS, INC. NORTH.
Engineer: Bray, Timothy
Contract Amount: $8,993,188.75 Completion Date: 04/03/2012
Letting Date: 10/15/2009 Final Est Sub:
18887(04) Contract: 050537 SH-88 Residency: 08300 3.49 MI. GRADE, DRAIN, SURFACE &
BRIDGE SH-88 BEGIN @ US-412 &
STPY-166C(71) CLAREMORE
EXTEND NORTH.
Contractor: WITTWER CONSTRUCTION CO., INC.
Engineer: Bray, Timothy
Contract Amount: $11,449,145.00 Completion Date: 04/30/2009
Letting Date: 06/15/2006 Final Est Sub: 02/15/2012
County: Seminole Commissioner District: 3
Contracts Completed - Final Estimate Not Processed
13626(07) Contract: 100253 IS-40 Residency: 03300 *-40-5(405)203TR/ 6.016 MI.
IS-40;PAVEMENT REHAB. & CABLE
IMY-40-5(415)206/HSIPIG* WEWOKA
BARRIER;FROM MILE MARKER 203,
Contractor: EXTEND JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC E. TO MILE MARKER 213.
Engineer: Moore, Archie (Act.)
Contract Amount: $24,933,232.28 Completion Date: 04/30/2012
Letting Date: 08/19/2010 Final Est Sub:
21005(04) Contract: 100198 SH-9 Residency: 03300 0.205 MI. SH-9;BRIDGE &
APPROACHES;OVER CARTER
BRFY-167C(088) WEWOKA
CR.,1.4MI. EAST OF SH-99 JCT.
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
Engineer: Moore, Archie (Act.)
Contract Amount: $1,051,623.18 Completion Date: 06/13/2011
Letting Date: 07/22/2010 Final Est Sub:
13020(04) Contract: 070445 SH-99 Residency: 03300 8.665 KM GRADE, DRAIN &
SURFACING SH-99 BEGIN N. OF I-40
NHY-012N(019) WEWOKA
& EXTEND N. TO PRAGUE.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Moore, Archie (Act.)
Contract Amount: $11,884,548.98 Completion Date: 03/24/2011
Letting Date: 11/15/2007 Final Est Sub:
28463(04) Contract: 110344 SH-99A Residency: 03004 0.00 MI. SH-99A FROM
POTTAWATOMIE COUNTY LINE,
HSIPG-167C(187)TR JACOBS (AKA - CARTER-BURGESS)
EXTEND EAST.
Contractor: FULSOM CONSTRUCTION COMPANY, INC.
Engineer: JACOBS (AKA - C-B)
Contract Amount: $484,513.75 Completion Date: 06/30/2012
Letting Date: 09/15/2011 Final Est Sub:
28553(04) Contract: 110311 US-270 Residency: 03300 0.850 MI. US-270:INTERSEC- TION
MODIFICATION:FROM 4.5 MI.EAST OF
SEC117-167B(189)SG WEWOKA
THE SH-99 JUNCTION, EXTEND
Contractor: THE CUMMINS CONSTRUCTION CO., INC. EAST.
Engineer: Moore, Archie (Act.)
Contract Amount: $997,641.45 Completion Date: 01/06/2012
Letting Date: 06/16/2011 Final Est Sub:
12313(04) Contract: 110448 US-270B Residency: 03300 .159 MI. US-270B OVER UNNAMED
CREEK, .6 MI. W OF SH-56 JCT.
BRFY-067C(245) WEWOKA
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer: Moore, Archie (Act.)
Contract Amount: $1,172,111.19 Completion Date: 08/07/2012
Letting Date: 09/15/2011 Final Est Sub:
Construction Status Report Page 39
County: Sequoyah Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
22524(04) Contract: 100539 CORD Residency: 01003 0.340 MI. CO.RD.;BRIDGE/
APPROACHES:OVER LITTLE
CIRB-168D(147)RB COBB ENGINEERING CO., INC.
SALLISAW CR., 0.20 MI. S. OF
Contractor: OBC, INC. THE IS-40 JCT.
Engineer: COBB
Contract Amount: $945,558.03 Completion Date: 05/10/2012
Letting Date: 11/18/2010 Final Est Sub:
28028(04) Contract: 110174 I-40 Residency: 01200 7.67 MI. IS-40:RESURFACE
(ASPHALT)FROM DWIGHT MISSION
IMY-0040-6(372)303 SALLISAW
RD., EXTEND E. IN SALLISAW.
Contractor: JOB CONSTRUCTION CO., INC.
Engineer: Edwards, Carl
Contract Amount: $2,562,619.50 Completion Date: 03/19/2012
Letting Date: 02/17/2011 Final Est Sub:
28099(04) Contract: 110345 I-40 Residency: 01200 3.0 MI. I-40 FROM MM 322, EXTEND
EAST TO MM 325.
IMG-0040-6(371)322TR SALLISAW
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: Edwards, Carl
Contract Amount: $480,212.30 Completion Date: 06/06/2012
Letting Date: 09/15/2011 Final Est Sub:
26270(04) Contract: 090163 IS-40 Residency: 01200 9.131 MI. IS-40;SAFETY IMPR.
(CABLE BARRIER)FROM THE US-59
HSIPIG-0040-6(359)299TR SALLISAW
JUNCTION IN THE CITY OF
Contractor: ACTION SAFETY SUPPLY CO. SALLISAW,EXTEND WEST.
Engineer: Edwards, Carl
Contract Amount: $1,383,157.00 Completion Date: 08/19/2011
Letting Date: 10/21/2010 Final Est Sub:
27993(04) Contract: 110449 SH-10 Residency: 01200 0.00 MI. SH-10 OVER THE ILLINOIS
RIVER AND DEEP BRANCH CREEK1.9
SBR-168C(210)SB SALLISAW
AND 2.2 MI. EAST OF MUSKOGEE CO.
Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES LINE.
Engineer: Edwards, Carl
Contract Amount: $2,489,577.54 Completion Date: 04/18/2012
Letting Date: 09/15/2011 Final Est Sub:
12309(04) Contract: 100451 SH-101 Residency: 01200 0.643 MI. SH-101;BRIDGE &
APPROACHES/OVER BIG LEE CR. &
SSP-068C(235)SS SALLISAW
MISSION BR. CR.,0.5 MI. W. OF THE
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) SHORT.
TOWN OF
Engineer: Edwards, Carl
Contract Amount: $2,898,689.84 Completion Date: 06/15/2012
Letting Date: 07/22/2010 Final Est Sub:
08900(04) Contract: 090473 SH-82 Residency: 01200 *(127)/ 2.75 MI. SH-82;GRADE
,DRAIN,SURFACE & BRIDGE;BEGIN
BRFY-68C(229)/STPY-168C* SALLISAW
7.1 MI. NORTH OF THE US-64/ SH-82
Contractor: GLOVER & ASSOCIATES, INC. JCT, EXTEND NORTH.
Engineer: Edwards, Carl
Contract Amount: $5,082,984.23 Completion Date: 03/07/2012
Letting Date: 09/17/2009 Final Est Sub:
16952(04) Contract: 050224 US-59 Residency: 01200 1.70 MI. GRADE, DRAIN & SURFACE
US-59 FROM THE ARKANSAS RVR.
ACSTPY-168A(023)GB SALLISAW
EXTEND N. TO THE SH-141 JCT. IN
Contractor: GLOVER CONSTRUCTION CO., INC. SEQUOYAH CO.
Engineer: Edwards, Carl
Contract Amount: $5,289,626.58 Completion Date: 07/11/2008
Letting Date: 08/18/2005 Final Est Sub:
Construction Status Report Page 40
17670(05) Contract: 080139 US-59 Residency: 01200 2.968 MI. SURFACE US-59 BEGIN 2.7
MI. S. OF I-40 & EXTEND S.
NHY-033N(012) SALLISAW
Contractor: DUIT CONSTRUCTION COMPANY, INC.
Engineer: Edwards, Carl
Contract Amount: $7,688,456.48 Completion Date: 02/12/2010
Letting Date: 03/20/2008 Final Est Sub:
28292(04) Contract: 110167 US-59 Residency: 01200 *168C(217)3P / 8.28 MI. US
-59:RESURFACE(ASPHALT)FROM
STPY-168A(216)3P/STPY-* SALLISAW
THESH-101 JCT,EXTEND N. SH-101
Contractor: JOB CONSTRUCTION CO., INC. FROM THE US-59 JCT,EXTEND E.
Engineer: Edwards, Carl
Contract Amount: $1,599,833.00 Completion Date: 10/06/2011
Letting Date: 01/20/2011 Final Est Sub:
County: Stephens Commissioner District: 7
Contracts Completed - Final Estimate Not Processed
25482(04) Contract: 100363 CORD Residency: 07100 0.431 MI. CO.RD.L BRIDGE &
APPROACHES;OVER WILD HORSE
CIRB-169C(152)RB DUNCAN
CR., 1.5 MI. N. OF THE SH-7
Contractor: OBC, INC. JUNCTION.
Engineer: Harwell, Jerry M.
Contract Amount: $923,541.82 Completion Date: 07/19/2011
Letting Date: 05/20/2010 Final Est Sub:
22980(04) Contract: 080371 CT.ST. Residency: 07100 *SSP-169A(129)SS/ 1.20 MI.
CT.ST.; GRADE,DRAIN,SURFACE
STP-169B(117)UR* DUNCAN
TRAFFIC SIGNALS;FROM THE
Contractor: T & G CONSTRUCTION, INC. DUNCAN BYPASS TO CHISHOLM TRAI
Engineer: Harwell, Jerry M.
Contract Amount: $2,724,129.58 Completion Date: 12/14/2010
Letting Date: 11/20/2008 Final Est Sub:
23125(08) Contract: 110252 IS-35 Residency: 07200 0.00 MI. IS-35:BRIDGE WATER
PROOF SEAL:IS-44/US-70/US-81/
BRFY-169C(189) ARDMORE
SH-19/BOIS D'ARC AVE. AT
Contractor: B & B CONSTRUCTION SERVICE J.T., INC. MULTIPLE LOC. IN DIV. VII.
Engineer: Earp, Jay
Contract Amount: $98,607.85 Completion Date: 11/15/2011
Letting Date: 04/14/2011 Final Est Sub: 08/15/2012
26332(04) Contract: 110175 SH-7 Residency: 07100 0.00 MI. SH-7:BRIDGE REHAB.
OVER LITTLE BEAVER CR., 5.45 MI.
SBR-169N(159)SB DUNCAN
E. OF THE COMANCHE C/L.
Contractor: K & R BUILDERS, INC.
Engineer: Harwell, Jerry M.
Contract Amount: $870,509.04 Completion Date: 11/03/2011
Letting Date: 02/17/2011 Final Est Sub:
20952(04) Contract: 110327 US-70 Residency: 07001 0.00 MI. US-70/US-281/SH-7
SH-76:BRIDGE PAINTING AT
BRFY-NBIP(439) ENGR. SERV. & TESTING
VARIOUS LOCATIONS IN DIV. VII.
Contractor: K.V.K. CONTRACTING, INC.
Engineer: EST
Contract Amount: $396,990.00 Completion Date: 03/15/2012
Letting Date: 06/16/2011 Final Est Sub: 08/15/2012
20316(18) Contract: 090317 US-81 Residency: 07100 0.441 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-81 BYPASS AT AT BOIS
NH-STIM(039) DUNCAN
D'ARC AVE. 1.5 MI. W. OF US-81.
Contractor: OBC, INC.
Engineer: Harwell, Jerry M.
Contract Amount: $5,504,958.27 Completion Date: 06/15/2011
Letting Date: 03/19/2009 Final Est Sub:
Construction Status Report Page 41
County: Texas Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
20312(07) Contract: 090470 US-54 Residency: 06200 3.427 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-54 FROM 0.1 MI. N. OF
NHY-008N(057)HP GUYMON
US-64 & EXTEND NORTH.
Contractor: J & R SAND COMPANY, INC.
Engineer: Michael, Charles
Contract Amount: $6,298,630.23 Completion Date: 11/18/2010
Letting Date: 10/15/2009 Final Est Sub: 08/06/2012
County: Tulsa Commissioner District: 8
Contracts Completed - Final Estimate Not Processed
26701(04) Contract: 090648 CT. ST. Residency: 08003 1.126 MI. PAVEMENT
REHABILITATION CITY ST. (YALE
STP-STIM(282)IG COBB ENGINEERING CO., INC.
AVE.) FROM FROM ADMIRAL PL. TO
Contractor: BECCO CONTRACTORS, INC. PINE ST. IN THE CITY OF TULSA.
Engineer: COBB
Contract Amount: $2,121,387.22 Completion Date: 02/28/2011
Letting Date: 11/19/2009 Final Est Sub: 04/05/2012
26703(04) Contract: 090644 CT. ST. Residency: 08001 2.926 MI. PAVEMENT
REHABILITATION CITY ST.
STP-STIM(284)(286)(482)IG ENGR. SERV. & TESTING
(SHERICAN RD.) FROM ADMIRAL
Contractor: BECCO CONTRACTORS, INC. BLVD. EXTEND SOUTH.
Engineer: EST
Contract Amount: $4,374,893.50 Completion Date: 10/24/2011
Letting Date: 11/19/2009 Final Est Sub:
18429(06) Contract: 090024 CT.ST. Residency: 08100 STPG-172B(444)(446)IG/0.794 M I
GRD, DRN, SURF & TRAFFIC SIG
STP-172B(443)(445)IG* TULSA
ELM ST/121 ST/MAIN ST/NOGALES
Contractor: BECCO CONTRACTORS, INC. AVE IN THE CITY OF JENKS.
Engineer: Arnold, Bruce
Contract Amount: $2,126,549.74 Completion Date: 02/25/2010
Letting Date: 01/22/2009 Final Est Sub: 10/27/2011
26684(04) Contract: 090647 CT.ST. Residency: 08002 1.6820 MI. CT.ST.;(ELM PLACE
)RESURFACE (ASPHALT)CT.STS.
STP-STIM(264)(265)(268)IG TETRA TECH
9TH/NEW ORLEANS/FLORENCE/
Contractor: APAC-CENTRAL, INC. HOUSTON) IN BROKEN ARROW.
Engineer: TETR
Contract Amount: $1,245,715.28 Completion Date: 11/30/2010
Letting Date: 11/19/2009 Final Est Sub: 07/26/2012
19690(04) Contract: 080048 CT.ST. Residency: 08100 2.087 MI. GRADE, DRAIN & SURFACE
GILCREASE EXPRESSWAY L.L.
STP-172A(210)IG TULSA
TISDALE PARKWAY TO NORTH LEWIS
Contractor: DUIT CONSTRUCTION COMPANY, INC. AVENUE.
Engineer: Arnold, Bruce
Contract Amount: $9,087,350.95 Completion Date: 01/09/2009
Letting Date: 01/17/2008 Final Est Sub:
17310(04) Contract: 090385 CT.ST. Residency: 08002 0.85 MI. CT.ST.;GRADE,DRAIN, &
SURFACE;BEG. AT MAIN & DATE ST.
STP-172B(074)IG TETRA TECH
JCT,EXT. E. THEN N. ON CEDAR ST.
Contractor: PARAGON CONTRACTORS, LLC TO 'A" ST.
Engineer: TETR
Contract Amount: $2,991,711.11 Completion Date: 10/03/2011
Letting Date: 05/14/2009 Final Est Sub:
Construction Status Report Page 42
22148(04) Contract: 100567 CTST Residency: 08002 0.094 MI. CT.ST.;GRADE,DRAIN,
SURFACE & BRIDGE/(96TH ST.)
STP-172B(276)IG TETRA TECH
FROM ADAMS ST.,EXTEND E. IN THE
Contractor: PARAGON CONTRACTORS, LLC CITY OF JENKS.
Engineer: TETR
Contract Amount: $1,202,202.00 Completion Date: 01/11/2012
Letting Date: 10/21/2010 Final Est Sub:
27430(04) Contract: 100407 CTST Residency: 08011 0.307 MI. CT.ST.;INTERSEC- TION
MODIFICATION & TRAFFIC
STP-STIM(518)IG GARVER, LLC.
SIGNALS(GARNETT RD.);AT THE
Contractor: APAC-CENTRAL, INC. INTERSECTION OF ADMIRAL PL. IN
Engineer: GARV
Contract Amount: $566,985.91 Completion Date: 03/09/2012
Letting Date: 06/17/2010 Final Est Sub: 08/20/2012
27381(04) Contract: 100196 CTST Residency: 08002 0.898 MI. CT.ST.;RESURFACE
(ASPHALT)(HOUSTON ST.)FROM S.
STP-STIM(505)IG TETRA TECH
ASPEN AVE, EXTEND EAST IN THE
Contractor: APAC-CENTRAL, INC. CITY OF BROKEN ARROW.
Engineer: TETR
Contract Amount: $448,562.09 Completion Date: 04/06/2011
Letting Date: 03/18/2010 Final Est Sub:
27403(04) Contract: 100405 CTST Residency: 08003 1.00 MI. CT.ST.;PAVEMENT RE- HAB.
(ASPHALT)(LEWIS AVE.)FROM 21ST
STP-STIM(514)IG COBB ENGINEERING CO., INC.
ST.,EXTEND S. TO 31ST ST. IN
Contractor: SHERWOOD CONSTRUCTION CO., INC. TULSA.
Engineer: COBB
Contract Amount: $2,066,653.10 Completion Date: 06/27/2012
Letting Date: 06/17/2010 Final Est Sub:
27387(04) Contract: 100403 CTST Residency: 08001 0.907 MI. CT.ST.(61ST ST.)
PAVEMENT REHAB.(P.C.
STP-STIM(510)IG ENGR. SERV. & TESTING
CONCRETE)FROM YALE AVE,EXTEND
Contractor: KEYSTONE SERVICES, INC. E. TO SHERIDA RD. IN TULSA.
Engineer: EST
Contract Amount: $1,227,009.89 Completion Date: 12/23/2011
Letting Date: 06/17/2010 Final Est Sub:
26683(04) Contract: 100310 CTST Residency: 08003 0.40 MI. CT.ST.;GRADE,DRAIN , &
SURFACE (E. 131ST ST.)BE- GIN 0.15
STP-STIM(263)IG COBB ENGINEERING CO., INC.
MI. W. OF MEMORIAL DR., EXTEND
Contractor: BECCO CONTRACTORS, INC. EAST.
Engineer: COBB
Contract Amount: $1,070,372.65 Completion Date: 05/27/2011
Letting Date: 04/15/2010 Final Est Sub:
27388(04) Contract: 100404 CTST Residency: 08003 0.1500 MI. CT.ST.PAVEMENT
REHAB.(P.C. CONCRETE)(RIVER-
STP-STIM(511)IG COBB ENGINEERING CO., INC.
SIDE DR.)FROM 68TH ST.,EX- TEND
Contractor: KEYSTONE SERVICES, INC. S. TO 71ST. ST. IN TULSA.
Engineer: COBB
Contract Amount: $373,341.05 Completion Date: 07/15/2011
Letting Date: 06/17/2010 Final Est Sub:
24583(04) Contract: 080443 I-244 Residency: 08100 0.027 MI. BRIDGE REHABILITATION
I-244 ENTRANCE RAMP OVER 1ST
BHIY-0244-2(472) 096 TULSA
STREET.
Contractor: PBX CORPORATION
Engineer: Arnold, Bruce
Contract Amount: $807,534.75 Completion Date: 12/21/2009
Letting Date: 09/18/2008 Final Est Sub: 04/08/2011
06374(68) Contract: 080454 I-44 Residency: 08100 1.309 MI GRADE, DRAIN, SURFACE,
BRIDGE & UTILITIES I-44 N.
IMY-0044-2(473)225 NI TULSA
FRONTAGE RD. FROM THE ARKANSAS
Contractor: SHERWOOD CONSTRUCTION CO., INC. RVR. EXT. E. (PERRYMAN DITCH)
Engineer: Arnold, Bruce
Contract Amount: $42,395,254.70 Completion Date: 10/26/2010
Letting Date: 10/16/2008 Final Est Sub:
Construction Status Report Page 43
06374(50) Contract: 090586 I-44 Residency: 08100 1.532 MI. GRADE, DRAIN, SURFACE &
BRIDGE I-44 BEGIN AT EAST 51ST
IMY-0044-2(402)227 TULSA
STREET & EXTEND EAST.
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer: Arnold, Bruce
Contract Amount: $47,963,887.85 Completion Date: 06/17/2012
Letting Date: 10/15/2009 Final Est Sub:
06374(08) Contract: 090604 I-44 Residency: 08100 0.606 MI. GRADE, DRAIN, SURFACE
AND BRIDGE I-44 FROM DARLINGTON
IM-NHIY-0044-2(371)229 TULSA
AVENUE EXTEND NORTHEAST IN THE
Contractor: SHERWOOD CONSTRUCTION CO., INC. CITY OF TULSA.
Engineer: Arnold, Bruce
Contract Amount: $10,981,091.55 Completion Date: 06/30/2011
Letting Date: 09/17/2009 Final Est Sub:
26304(05) Contract: 100543 IS-244 Residency: 08100 0.170 MI.IS-244 BRIDGE REHAB. AT
THE EXIT RAMP TO 1ST ST. INTHE
BHIY-0244-2(484)005 TULSA
CITY OF TULSA.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Arnold, Bruce
Contract Amount: $1,141,465.31 Completion Date: 04/23/2012
Letting Date: 10/21/2010 Final Est Sub:
06374(82) Contract: 100541 IS-44 Residency: 08100 0.454 MI. IS-44;GRADE,DRAIN
,SURFACE SIGNAL,SIGNING &
IM-NHIY-0044-2(494)229 TULSA
LIGH-TING.;FROM 41ST ST., EXTEND
Contractor: SHERWOOD CONSTRUCTION CO., INC. NORTHEAST IN THE CITY OF TULSA
Engineer: Arnold, Bruce
Contract Amount: $11,762,121.05 Completion Date: 04/30/2012
Letting Date: 10/21/2010 Final Est Sub:
24959(04) Contract: 110149 SH-11 Residency: 08100 0.00 MI. SH-11:BRIDGE REHAB.
OVER EDISON RD. AT IS-244 JCT,IN
SBR-172A(390)SB TULSA
TULSA.
Contractor: KEYSTONE SERVICES, INC.
Engineer: Arnold, Bruce
Contract Amount: $423,422.00 Completion Date: 04/13/2012
Letting Date: 02/17/2011 Final Est Sub:
11143(07) Contract: 100612 SH-51 Residency: 08400 5.95 MI. SH-51;PAVEMENT RE- HAB.
(ASPHALT)/FROM 0.6 MI. E. OF THE
STPY-172C(509) SAND SPRINGS
CREEK C/L, EXTEND EAST.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Williams, Mark J.
Contract Amount: $7,979,606.92 Completion Date: 06/06/2012
Letting Date: 11/18/2010 Final Est Sub:
24110(04) Contract: 080066 US-169 Residency: 08100 0.00 MI. US-169;SAFETY IM-
PROVEMENT(CABLE BARRIER PRO-
NHG-030N(059)TR TULSA
JECT) BEGIN AT E. 36TH ST.
Contractor: ACTION SAFETY SUPPLY CO. EXTEND NO. TO BIRD CR. OVERFLO
Engineer: Arnold, Bruce
Contract Amount: $673,832.59 Completion Date: 03/12/2009
Letting Date: 02/21/2008 Final Est Sub:
20930(04) Contract: 090646 US-169 Residency: 08100 5.055 MI. US-169; WIDEN,RE-
SURFACE (ASPHALT), & BRIDGE.
SAP-30N(43)/SSP-30N(61)SS TULSA
BEGIN @ IS-244 AND EXTEND
Contractor: BECCO CONTRACTORS, INC. NORTH.
Engineer: Arnold, Bruce
Contract Amount: $16,358,949.00 Completion Date: 04/17/2012
Letting Date: 10/15/2009 Final Est Sub:
28593(04) Contract: 110454 US-75 Residency: 08001 0.00 MI. US-75/I-244/US-64/UNION
AVE. AT VARIOUS LOCATIONS IN
BRFY-NBIP(447)3B ENGR. SERV. & TESTING
DIVISION 8
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer: EST
Contract Amount: $562,805.00 Completion Date: 05/10/2012
Letting Date: 09/15/2011 Final Est Sub:
Construction Status Report Page 44
27634(04) Contract: 110319 US-75 Residency: 08400 0.00 MI. US-75: BRIDGE RE-
HABILITATION:OVER NICKLE CR. 1.9
SBR-172N(517)SB SAND SPRINGS
MI. N. OF SH-117 IN THE CITY OF
Contractor: PBX CORPORATION JENKS.
Engineer: Williams, Mark J.
Contract Amount: $531,675.75 Completion Date: 03/05/2012
Letting Date: 05/19/2011 Final Est Sub:
County: Wagoner Commissioner District: 1
Contracts Completed - Final Estimate Not Processed
21259(04) Contract: 100454 CORD Residency: 01002 0.179 MI. CO.RD.;BRIDGE &
APPROACHES:OVER SALT CR. TRI-
BRF-173C(093)CO TETRA TECH
BUTARY, 2.6 MI. S. OF THE
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)C/L.
ROGERS
Engineer: TETR
Contract Amount: $244,332.27 Completion Date: 03/09/2012
Letting Date: 07/22/2010 Final Est Sub:
22156(04) Contract: 100455 CORD Residency: 01002 0.227 MI. CO.RD./BRIDGE &
APPROACHES:OVER SPUNKY
CIRB-173D(101)RB TETRA TECH
CR.,1.0MI. EAST OF THE TULSA
Contractor: BELK BRIDGE, INC. C/L.
Engineer: TETR
Contract Amount: $855,704.43 Completion Date: 06/28/2012
Letting Date: 08/18/2011 Final Est Sub:
20290(04) Contract: 090407 I-44 Residency: 08300 0.722 MI. GRADE, DRAIN, SURFACE,
SIGNS, LIGHTING, SIGNAL & BRIDGE
IM-NHIY-0044-2(419)239HP CLAREMORE
I-44 AT 193RD E. AVE. (SH-167) IN
Contractor: BECCO CONTRACTORS, INC. THE CITY OF TULSA.
Engineer: Bray, Timothy
Contract Amount: $44,332,597.95 Completion Date: 12/13/2011
Letting Date: 04/21/2009 Final Est Sub:
19983(12) Contract: 090669 SH-412P Residency: 08300 0.00 MI. SH-412P: RIGHT-OF -WAY
CLEARANCE:BEGIN WEST OF 305TH
STPY-166A(245)RW CLAREMORE
E. AVE., EXTEND EAST.
Contractor: D T SPECIALIZED SERVICES, INC.
Engineer: Bray, Timothy
Contract Amount: $72,777.00 Completion Date: 11/09/2010
Letting Date: 12/17/2009 Final Est Sub:
10004(12) Contract: 100017 SH-51 Residency: 01100 0.492 MI. SH-51;BRIDGE &
APPROACHES:OVER BILLY CR.,
BRFY-173B(021) MUSKOGEE
11.9 MI. EAST OF THE SH- 72 JCT.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Ivy, Steve (Act.)
Contract Amount: $1,777,579.70 Completion Date: 08/24/2011
Letting Date: 01/28/2010 Final Est Sub:
10004(10) Contract: 090541 SH-51 Residency: 01100 2.040 MI. SH-51;BRIDGE &
APPROACHES: OVER THE
STPY-173B(019) MUSKOGEE
VERDIGRISRIVER, 7.5 MI. EAST OF
Contractor: JENSEN CONSTRUCTION COMPANY COWETA.
Engineer: Ivy, Steve (Act.)
Contract Amount: $8,762,873.67 Completion Date: 06/21/2011
Letting Date: 10/15/2009 Final Est Sub:
20914(04) Contract: 080223 SH-72 Residency: 01100 0.155 MI. GRADE, DRAIN, SURFACE,
BRIDGE & RAILROAD SH-72 OVER
BRFY-173B(083) MUSKOGEE
UNNAMED CRK. @ JCT. SH-51 IN
Contractor: M.J. LEE CONSTRUCTION COMPANY COWETA.
Engineer: Ivy, Steve (Act.)
Contract Amount: $7,973,218.60 Completion Date: 07/22/2010
Letting Date: 09/18/2008 Final Est Sub:
Construction Status Report Page 45
24757(04) Contract: 100261 SH-72 Residency: 01011 0.00 MI. SH-72;BRIDGE REHAB
-ILITATION;OVER CONCHARTY
STPY-173C(138) GARVER, LLC.
CR.,1.8 MI. N. OF THE MUSKOGEE
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC C/L.
Engineer: GARV
Contract Amount: $588,506.34 Completion Date: 11/23/2011
Letting Date: 07/22/2010 Final Est Sub:
County: Washita Commissioner District: 5
Contracts Completed - Final Estimate Not Processed
17126(08) Contract: 060288 US-183 Residency: 05100 2.867 MI. GRADE, DRAIN, SURFACE &
BRIDGE US-183 BEGIN S. OF SH-152
ACNHY-009N(082)GB CLINTON
& EXTEND NORTH.
Contractor: DOBSON BROTHERS CONSTRUCTION CO.
Engineer: Greer, Randy
Contract Amount: $11,893,891.64 Completion Date: 06/11/2009
Letting Date: 03/15/2007 Final Est Sub: 03/07/2012
County: Woods Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
24113(04) Contract: 100462 SH-50 Residency: 06100 0.190 MI. SH-50;BRIDGE &
APPROACHES;OVER HOUSTON CR.,
BRFY-176C(117) BUFFALO
0.10 MI. S. OF THE US-64
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
JUNCTION.
Engineer: Burke, David
Contract Amount: $1,304,200.77 Completion Date: 06/29/2012
Letting Date: 07/22/2010 Final Est Sub:
27433(04) Contract: 110157 SH-50 Residency: 06100 0.00 MI. SH-50:BRIDGE REHAB.
OVER THE CIMARRON RIVER, AT
SBR-176C(174)SB BUFFALO
WOODWARD C/L.
Contractor: LOGOS CONSTRUCTION CO., LLC
Engineer: Burke, David
Contract Amount: $327,802.00 Completion Date: 07/31/2012
Letting Date: 02/17/2011 Final Est Sub:
24634(04) Contract: 100410 US-64 Residency: 06100 *(181)/1.800 MI. US-64/PAVE -MENT
REHAB.(P.C. CONCRETE) FROM
SSR-176A(140)/MC-176A* BUFFALO
14TH ST.,EXTEND E. IN ALVA,FROM
Contractor: WITTWER CONSTRUCTION CO., INC. 7TH ST. IN ALVA.
Engineer: Burke, David
Contract Amount: $664,008.00 Completion Date: 01/06/2012
Letting Date: 06/17/2010 Final Est Sub: 08/10/2012
County: Woodward Commissioner District: 6
Contracts Completed - Final Estimate Not Processed
22895(04) Contract: 110020 CORD Residency: 06009 0.150 MI. CO.RD.:BRIDGE &
APPROACHES:OVER HACKBERRY
BRF-177C(072)CI CIRCUIT ENGR. DISTR. # 8
CR.,4.4 MI. EAST OF THE SH-34
Contractor: OBC, INC. JUNCTION.
Engineer: CED8
Contract Amount: $510,647.50 Completion Date: 08/24/2012
Letting Date: 01/20/2011 Final Est Sub:
Construction Status Report Page 46
20937(05) Contract: 110184 SH-50 Residency: 06100 0.00 MI. SH-50 OVER SAND CREEK, .8
MI. N OF US-183 AND OVER
BRFY-177C(120) BUFFALO
CANADIAN RIVER OVERFLOW, 5.3 MI.
Contractor: B & B CONSTRUCTION SERVICE J.T., INC. N OF US-183.
Engineer: Burke, David
Contract Amount: $51,266.00 Completion Date: 05/24/2012
Letting Date: 09/15/2011 Final Est Sub:
28591(04) Contract: 110458 SH8 Residency: 06001 0.00 MI. SH-8/SH-34: BRIDGE
PAINTING VARIOUS LOCATION IN
BRFY-NBIP(445)3B ENGR. SERV. & TESTING
DIV6.
Contractor: TARPON INDUSTRIAL, INC.
Engineer: EST
Contract Amount: $249,450.00 Completion Date: 05/01/2012
Letting Date: 10/20/2011 Final Est Sub:
27577(04) Contract: 120113 US-183 Residency: 06100 5.400 MI. US-183;RESURFACE
(UTWBC)FROM 8.3 MI. NORTH OF
NHY-017N(237)3P BUFFALO
SH-15, EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Burke, David
Contract Amount: $890,525.22 Completion Date: 07/16/2012
Letting Date: 02/16/2012 Final Est Sub:
17457(10) Contract: 050646 US-183 Residency: 06100 4.536 MI. SURFACING US-270/183
BEG. APPROX. 0.8 MI. S.E. OF SH-50
NHY-017N (053) BUFFALO
EXTEND N.W.
Contractor: DOBSON BROTHERS CONSTRUCTION CO.
Engineer: Burke, David
Contract Amount: $8,557,233.95 Completion Date: 12/12/2008
Letting Date: 01/19/2006 Final Est Sub:
27509(04) Contract: 110159 US-183 Residency: 06100 3.71 MI. US-183;RESURFACE
(ASPHALT)FROM THE SH-34 SOUTH
NHY-017N(240)3P BUFFALO
JUNCTION, EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Burke, David
Contract Amount: $697,824.00 Completion Date: 09/20/2011
Letting Date: 01/20/2011 Final Est Sub:
Construction Status Report Page 47
County: Adair Commissioner District: 1
Contracts Under Construction
29283(04) Contract: 120187 US-59 Residency: 01200 0.00 MI. US-59/US-64/US-69: STRIPING
HSIPG-268F(001)TR SALLISAW & PAVEMENT MARKING. VARIOUS
LOCATIONS IN DIV. 1.
Contractor: DIRECT TRAFFIC CONTROL INC.
Engineer: Edwards, Carl Adjusted:
Contract Amount: $774,999.80 ( $774,999.80)
Contract Time: 90 ( 90 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: 09/18/2012 Amount Paid: 0 %( 0 %)
Work Started: 08/28/2012 Time Passed: 0 %( 0 %)
25640(04) Contract: 110476 CORD Residency: 01200 0.237 MI. CO.RD. BRIDGE &
BRF-101C(081)CI SALLISAW APPROACHES;OVER ROCK BR. CR. 6.0
MI. E. OF SH-10 & 1.2 MI. S. OF THE
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC DELAWARE CL.
Engineer: Edwards, Carl Adjusted:
Contract Amount: $453,606.00 ( $453,606.00)
Contract Time: 90 ( 157 )
Letting Date: 11/17/2011
Contract Date: 12/15/2011
W/O Issued: 12/20/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 93 % ( 93 %)
Work Started: 03/05/2012 Time Passed: 171 % ( 98 %)
County: Alfalfa Commissioner District: 6
Contracts Under Construction
25910(04) Contract: 110411 CORD Residency: 06009 0.27 MI.CORD(EW-030)BRIDGE &
BRO-102D(136)CI CIRCUIT ENGR. DISTR. # 8 APPROACHES;OVER EAGLE CHIEF CREEK
1.0 MI. N OF SH-45 AND 5.7 MI. W OF
Contractor: SEWELL BROS., INC. SH-8,WEST OF CARMEN
Engineer: CED8 Adjusted:
Contract Amount: $875,761.90 ( $875,761.90)
Contract Time: 150 ( 156 )
Letting Date: 10/20/2011
Contract Date: 11/22/2011
W/O Issued: 11/29/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 86 %( 86 %)
Work Started: 01/23/2012 Time Passed: 93 % ( 90 %)
Construction Status Report Page 48
23272(04) Contract: 110477 SH8 Residency: 06100 0.85 MI. SH-8 BRIDGE & APPROACHS
BRFY-102C(093) BUFFALO OVER DRIFTWOOD CREEK 3.5 MINORTH
OF US-64/SH-11
Contractor: SEWELL BROS., INC.
Engineer: Burke, David Adjusted:
Contract Amount: $3,737,877.60 ( $3,737,877.60)
Contract Time: 200 ( 200 )
Letting Date: 10/20/2011
Contract Date: 11/22/2011
W/O Issued: 11/29/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 45 % ( 45 %)
Work Started: 03/05/2012 Time Passed: 80 % ( 80 %)
24071(04) Contract: 110051 US-64 Residency: 06100 1.18 MI. US-64:GRADE,DRAIN
SSP-102C(112)SS BUFFALO ,SURFACE & BRIDGE,FROM 5.0 MI.E. OF
WOODS C/L., EXTEND EAST.
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer: Burke, David Adjusted:
Contract Amount: $3,184,454.91 ( $3,275,837.60)
Contract Time: 250 ( 250 )
Letting Date: 02/17/2011
Contract Date: 03/22/2011
W/O Issued: 04/14/2011 Adjusted:
W/O Effective: 07/05/2011 Amount Paid: 98 % ( 96 %)
Work Started: 04/25/2011 Time Passed: 96 % ( 96 %)
24062(04) Contract: 120010 US-64 Residency: 06100 0.899 MI. US-64/SH-58 GRADE,
SSP-102C(100)SS BUFFALO DRAIN,SURFACE & BRIDGE;FROM 0.5
MI. W. OF SH-58,EXTEND EAST.FROM
Contractor: L & M CONTRACTORS, INC. 0.7 MI. SOUTH OF US-
Engineer: Burke, David Adjusted:
Contract Amount: $3,008,884.66 ( $3,008,884.66)
Contract Time: 180 ( 180 )
Letting Date: 02/16/2012
Contract Date: 03/19/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 14 %( 14 %)
Work Started: 07/02/2012 Time Passed: 25 %( 25 %)
64
23274(09) Contract: 120179 US-60 Residency: 06100 0.00 MI./US-60/US-64/US-281 :BRIDGE
SSP-202C(002)SS BUFFALO WATERPROOF SEAL. VARIOUS
LOCATIONS IN DIV. VI.
Contractor: GARY A. CRAIN, INC.
Engineer: Burke, David Adjusted:
Contract Amount: $106,422.75 ( $106,422.75)
Contract Time: 30 ( 30 )
Letting Date: 05/17/2012
Contract Date: 06/19/2012
W/O Issued: 06/21/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
County: Atoka Commissioner District: 2
Contracts Under Construction
Construction Status Report Page 49
27370(04) Contract: 120152 US-69 Residency: 02013 0.094 MI. US-69:BRIDGE &
ACBRF-103C(127)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES/OVER UNNAMED CREEK 1.0
MI. WEST OF THE US-69 JUNCTION.
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer: CED3 Adjusted:
Contract Amount: $434,146.30 ( $434,146.30)
Contract Time: 90 ( 90 )
Letting Date: 04/19/2012
Contract Date: 05/22/2012
W/O Issued: 05/29/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 18 % ( 18 %)
Work Started: Time Passed: 11 % ( 11 %)
28194(04) Contract: 110505 US-69 Residency: 02100 0.207 MI. US-69/BRIDGE REHAB. :OVER
SBR-103N(137)SB ANTLERS N. BOOGY RIVER, 5.87 MI.N. OF THE
SH-7 JCT.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Moy, Ryan Adjusted:
Contract Amount: $1,894,957.50 ( $1,901,657.10)
Contract Time: 150 ( 150 )
Letting Date: 11/17/2011
Contract Date: 12/20/2011
W/O Issued: 12/29/2011 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 95 % ( 95 %)
Work Started: 03/05/2012 Time Passed: 91 % ( 91 %)
29308(04) Contract: 120245 US-69 Residency: 02100 0.00 MI. US-69;STRIPING &
HSIPG-203F(008)TR ANTLERS PAVEMENT
MARKING/US-70/US-70B/US-271B:
Contractor: DIRECT TRAFFIC CONTROL INC. MULTIPLE LOCATIONS IN DIV. II.
Engineer: Moy, Ryan Adjusted:
Contract Amount: $297,000.00 ( $297,000.00)
Contract Time: 45 ( 45 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
20306(04) Contract: 090469 SH-3 Residency: 02100 5.07 MI. SH-3/GRADE,DRAIN, SURFACE
BRFY-103A(089)SS ANTLERS & BRIDGE.FROM THE PUSHMATAHA
C/L., EXTEND WEST.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Moy, Ryan Adjusted:
Contract Amount: $12,723,126.56 ( $13,392,420.56)
Contract Time: 420 ( 450 )
Letting Date: 08/18/2011
Contract Date: 09/20/2011
W/O Issued: 09/27/2011 Adjusted:
W/O Effective: 01/02/2012 Amount Paid: 25 %( 24 %)
Work Started: 01/16/2012 Time Passed: 31 %( 29 %)
Construction Status Report Page 50
25859(04) Contract: 120034 CORD Residency: 02013 0.227 MI. CO. RD.;BRIDGE &
BRO-103D(107)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES/OVER UNNAMED CR., 1.6
MI. E. & O.3 MI. N. OF THE
Contractor: C-GAWF CONSTRUCTION, INC. US-69/SH-131 JCT.
Engineer: CED3 Adjusted:
Contract Amount: $348,136.40 ( $348,136.40)
Contract Time: 90 ( 90 )
Letting Date: 01/19/2012
Contract Date: 02/24/2012
W/O Issued: 03/01/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 88 % ( 88 %)
Work Started: 04/09/2012 Time Passed: 104 % ( 104 %)
28128(45) Contract: 120058 US-69 Residency: 02400 44.24 MI. US-69;SAFETY IM-
BTOP-203N(001) MCALESTER PROVEMENTS(FIBER OPTIC CABLE) FROM
THE CITY OF ATOKA TO THE CITY OF
Contractor: B & H CONSTRUCTION, INC MCALESTER.
Engineer: Plymate, Larry Adjusted:
Contract Amount: $2,887,691.00 ( $4,194,630.75)
Contract Time: 125 ( 125 )
Letting Date: 01/19/2012
Contract Date: 02/13/2012
W/O Issued: 02/29/2012 Adjusted:
W/O Effective: 03/26/2012 Amount Paid: 126 % ( 87 %)
Work Started: 03/28/2012 Time Passed: 114 % ( 114 %)
28128(51) Contract: 120069 US-75 Residency: 02011 45.12 MI. US-75;SAFETY IM-
BTOP-203N(002) GARVER, LLC. PROVEMENTS(FIBER OPTIC CABLE)
SH-3/SH-99;FROM THE CITY OF ADA TO
Contractor: ROHL NETWORKS, LP THE CITY OF ATOKA.
Engineer: GARV Adjusted:
Contract Amount: $2,512,262.56 ( $2,695,297.56)
Contract Time: 140 ( 145 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 03/01/2012 Adjusted:
W/O Effective: 03/26/2012 Amount Paid: 107 %( 100 %)
Work Started: 03/29/2012 Time Passed: 92 %( 89 %)
County: Beaver Commissioner District: 6
Contracts Under Construction
26980(04) Contract: 120236 CORD Residency: 06200 0.298 MI. CO. RD. BRIDGE &
BRF-104C(068)CI GUYMON APPROACHES; OVER BEAVER RIVER 9.0
MI. EAST & 11.9 MI. N. OF ELMWOOD.
Contractor: L & M CONTRACTORS, INC.
Engineer: Michael, Charles Adjusted:
Contract Amount: $846,833.10 ( $846,833.10)
Contract Time: 150 ( 150 )
Letting Date: 05/17/2012
Contract Date: 07/03/2012
W/O Issued: 08/02/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 51
26981(04) Contract: 110412 CORD Residency: 06200 .26 MI.CORD(NS-133):BRIDGE &
BRF-104C(069)CI GUYMON APPROACHES OVER SOUTH FORK OF
CLEAR CREEK .9 MI. S OF SH-3, 6.0 MI.
Contractor: BEHNE CONSTRUCTION CO., INC. W OF ELMWOOD
Engineer: Michael, Charles Adjusted:
Contract Amount: $521,501.00 ( $528,397.00)
Contract Time: 120 ( 120 )
Letting Date: 10/20/2011
Contract Date: 11/22/2011
W/O Issued: 11/29/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 91 % ( 90 %)
Work Started: 01/03/2012 Time Passed: 100 % ( 100 %)
27476(04) Contract: 110031 SH-3 Residency: 06200 8.0 MI. SH-3:RESURFACE
NHY-017N(234)3P GUYMON (ASPHALT)FROM 6.0 MI. W. OF THE
TX/BEAVER C/L.,EXTEND EAST.
Contractor: J & R SAND COMPANY, INC.
Engineer: Michael, Charles Adjusted:
Contract Amount: $2,953,225.70 ( $3,113,972.77)
Contract Time: 160 ( 327 )
Letting Date: 02/17/2011
Contract Date: 03/18/2011
W/O Issued: 03/28/2011 Adjusted:
W/O Effective: 06/06/2011 Amount Paid: 104 % ( 99 %)
Work Started: 06/06/2011 Time Passed: 206 % ( 101 %)
27576(04) Contract: 120080 US-64 Residency: 06200 7.00 MI. US-64;RESURFACE
STPY-104B(073)3P GUYMON (ASPHALT)FROM 5.0 MI. EAST OF US-83,
EXTEND EAST.
Contractor: J & R SAND COMPANY, INC.
Engineer: Michael, Charles Adjusted:
Contract Amount: $1,363,940.80 ( $1,370,408.80)
Contract Time: 30 ( 30 )
Letting Date: 02/16/2012
Contract Date: 03/22/2012
W/O Issued: 03/26/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 99 %( 99 %)
Work Started: 05/14/2012 Time Passed: 73 %( 73 %)
28534(04) Contract: 110278 US-270 Residency: 06200 4.65 MI. US-270;RESURFACE
SSR-104C(081)SR GUYMON (ASPHALT)FROM US-64, EXTEND SOUTH.
Contractor: J & R SAND COMPANY, INC.
Engineer: Michael, Charles Adjusted:
Contract Amount: $581,138.00 ( $581,138.00)
Contract Time: 30 ( 30 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/24/2012 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 99 %( 99 %)
Work Started: 03/27/2012 Time Passed: 110 %( 110 %)
County: Beckham Commissioner District: 5
Contracts Under Construction
Construction Status Report Page 52
25822(04) Contract: 110396 US-283 Residency: 05200 0.309 MI. US-283 BRIDGE &
BRFY-105B(169) ALTUS APPROACHES:OVER TIMBER CR., 0.50
MI. SOUTH OF THE ROGER MILLS C/L.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Nedbalek, Will Adjusted:
Contract Amount: $1,367,072.99 ( $1,371,350.99)
Contract Time: 180 ( 224 )
Letting Date: 06/30/2011
Contract Date: 07/22/2011
W/O Issued: 07/29/2011 Adjusted:
W/O Effective: 09/01/2011 Amount Paid: 84 % ( 84 %)
Work Started: 11/01/2011 Time Passed: 136 % ( 109 %)
26656(04) Contract: 110055 CORD Residency: 05005 0.114 MI. CO.RD.;BRIDGE &
BRO-105D(179)CI CIRCUIT ENGR. DISTR. # 7 APPROACHES:OVER SHORT CR., 2.3MI.
W. OF THE IS-40 JCT.
Contractor: MUNOZ CONSTRUCTION CO., INC.
Engineer: CED7 Adjusted:
Contract Amount: $345,334.75 ( $348,334.75)
Contract Time: 120 ( 129 )
Letting Date: 02/17/2011
Contract Date: 03/16/2011
W/O Issued: 03/18/2011 Adjusted:
W/O Effective: 07/05/2011 Amount Paid: 97 % ( 96 %)
Work Started: 07/05/2011 Time Passed: 113 % ( 105 %)
26239(07) Contract: 110414 IS-40 Residency: 05200 4.31 MI. IS-40;RESURFACE
IMY-0040-1(075)006 ALTUS (ASPHALT)FROM MILE MARKER 3.50,
EXTEND EAST.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Nedbalek, Will Adjusted:
Contract Amount: $4,781,940.44 ( $4,789,253.36)
Contract Time: 125 ( 125 )
Letting Date: 02/16/2012
Contract Date: 03/22/2012
W/O Issued: 03/26/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 74 %( 74 %)
Work Started: 05/09/2012 Time Passed: 74 %( 74 %)
28132(04) Contract: 110506 SH-34 Residency: 05200 0.112 MI. SH-34;BRIDGE REHAB. OVER
SBR-105C(198)SB ALTUS INDIAN CR., 0.70 MI. N. OF THE SH-152
JCT.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: Nedbalek, Will Adjusted:
Contract Amount: $1,059,912.63 ( $1,061,308.91)
Contract Time: 85 ( 85 )
Letting Date: 11/17/2011
Contract Date: 12/13/2011
W/O Issued: 12/19/2011 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 93 %( 93 %)
Work Started: 04/16/2012 Time Passed: 108 %( 108 %)
Construction Status Report Page 53
29311(04) Contract: 120246 IS-40 Residency: 05100 0.00 MI. IS-40:STRIPING & PAVEMENT
HSIPG-205F(014)TR CLINTON MARKING/US-62/US-183/US-270/US-283/
SH-6/SH-3/ SH-33. MULTIPLE
Contractor: DIRECT TRAFFIC CONTROL INC. LOCATIONS IN D
Engineer: Greer, Randy Adjusted:
Contract Amount: $300,000.00 ( $300,000.00)
Contract Time: 45 ( 45 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 09/24/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
IV. V.
28902(04) Contract: 120194 I-40 Residency: 05002 0.00 MI. FARMRAIL R/R BR. /I-40.
BRFY-NBIP(451) TETRA TECH BRIDGE PAINTING:OVER I-40 AT MILE
MARKER 23.59.
Contractor: PACIFIC PAINTING COMPANY, INC.
Engineer: TETR Adjusted:
Contract Amount: $224,000.00 ( $224,000.00)
Contract Time: 60 ( 60 )
Letting Date: 05/17/2012
Contract Date: 06/19/2012
W/O Issued: 08/06/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
25909(05) Contract: 100551 IS-40 Residency: 05014 1.355 MI. IS-40;GRADE,DRAIN
SAP-105N(193) ,SURFACE & SITE
SAIC (AKA - THE BENHAM COMPANIES, LLC) PLANS;TRUCK WEIGH
STATION,1.75 MI. E. OF THE TX STATE
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCLINE.
Engineer: SAIC ( AKA - ZBCL) Adjusted:
Contract Amount: $8,714,997.47 ( $8,872,171.39)
Contract Time: 300 ( 327 )
Letting Date: 10/21/2010
Contract Date: 11/16/2010
W/O Issued: 11/23/2010 Adjusted:
W/O Effective: 03/07/2011 Amount Paid: 97 %( 95 %)
Work Started: 03/14/2011 Time Passed: 121 %( 111 %)
28031(04) Contract: 120237 CORD Residency: 05100 0.00 MI. CO.RD.:BRIDGE REPR. OVER
SAP-205N(013) CLINTON IS-40, 3.0 MI. EAST OF THE TEXAS
STATE LINE.
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer: Greer, Randy Adjusted:
Contract Amount: $23,550.00 ( $23,550.00)
Contract Time: 10 ( 10 )
Letting Date: 06/21/2012
Contract Date: 07/17/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
County: Blaine Commissioner District: 5
Contracts Under Construction
Construction Status Report Page 54
20237(04) Contract: 100549 US-270 Residency: 05100 2.215 MI. US-270;GRADE,DRAIN
NHY-010N(027) CLINTON ,SURFACE & BRIDGE;FROM 3.0 MI.S. OF
THE SH-33 JUNCTION, EX- TEND NORTH.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Greer, Randy Adjusted:
Contract Amount: $7,695,489.94 ( $7,783,472.23)
Contract Time: 360 ( 419 )
Letting Date: 09/16/2010
Contract Date: 10/11/2010
W/O Issued: 10/14/2010 Adjusted:
W/O Effective: 02/07/2011 Amount Paid: 101 % ( 100 %)
Work Started: 11/10/2010 Time Passed: 116 % ( 100 %)
21704(04) Contract: 120081 SH-58 Residency: 05100 0.462 MI. SH-58;BRIDGE &
SSP-106C(061)SS CLINTON APPROACHES;OVER NINE MI. & UN-NAME
CR., 8.6 & 9.2 MI. NORTH OF US-270.
Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer: Greer, Randy Adjusted:
Contract Amount: $2,836,769.65 ( $2,836,769.65)
Contract Time: 180 ( 180 )
Letting Date: 02/16/2012
Contract Date: 03/19/2012
W/O Issued: 04/09/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 41 % ( 41 %)
Work Started: 05/07/2012 Time Passed: 56 % ( 56 %)
24087(04) Contract: 110507 US-270 Residency: 05100 0.255 MI. US-270:BRIDGE &
BRFY-017N(203)SS CLINTON APPROACHES;OVER THE
N.CANADIANRIVER, 10.2 MI. EAST OF
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) THE DEWEY C/L.
Engineer: Greer, Randy Adjusted:
Contract Amount: $2,445,565.14 ( $2,445,565.14)
Contract Time: 220 ( 220 )
Letting Date: 11/17/2011
Contract Date: 12/13/2011
W/O Issued: 12/19/2011 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 68 %( 68 %)
Work Started: 04/02/2012 Time Passed: 55 %( 55 %)
20237(08) Contract: 110435 US-270 Residency: 05100 2.12 MI. US-270 FROM 5.2 MI. SOUTH OF
SSP-010N(032)SS CLINTON THE SH-33 JCT. EXTEND NORTH.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: Greer, Randy Adjusted:
Contract Amount: $2,087,949.25 ( $2,087,949.25)
Contract Time: 240 ( 240 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/17/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 63 %( 63 %)
Work Started: 01/02/2012 Time Passed: 82 %( 82 %)
Construction Status Report Page 55
26618(04) Contract: 120238 CORD Residency: 05005 0.217 MI. CO.RD.:BRIDGE &
BRO-106D(116)CI CIRCUIT ENGR. DISTR. # 7 APPROACHES/OVER SALT CREEK, 4.7
MI SOUTH OF SH-51.
Contractor: K & R BUILDERS, INC.
Engineer: CED7 Adjusted:
Contract Amount: $465,431.64 ( $465,431.64)
Contract Time: 120 ( 120 )
Letting Date: 06/21/2012
Contract Date: 07/20/2012
W/O Issued: 07/24/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Bryan Commissioner District: 2
Contracts Under Construction
21654(04) Contract: 120153 CO.RD. Residency: 02013 0.283 MI. CO.RD.:BRIDGE &
BRO-107D(087)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES/OVER J-N CREEK, 2.5MI.
NORTH OF US-70E.
Contractor: HUB CONSTRUCTION, INC.
Engineer: CED3 Adjusted:
Contract Amount: $580,850.90 ( $580,850.90)
Contract Time: 90 ( 90 )
Letting Date: 04/19/2012
Contract Date: 05/18/2012
W/O Issued: 05/23/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
26295(08) Contract: 120003 US-69 Residency: 02100 8.00 MI. US-69:PAVEMENT RE-
NHY-013N(148)3P ANTLERS HABILITATION (UTBWC)BEGIN 1.07
MI. NORTH OF SH-78, EXTEND NORTH
Contractor: THE CUMMINS CONSTRUCTION CO., INC. (SOUTHBOUND LANE)
Engineer: Moy, Ryan Adjusted:
Contract Amount: $4,152,484.83 ( $4,152,484.83)
Contract Time: 120 ( 120 )
Letting Date: 02/16/2012
Contract Date: 03/14/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 9 %( 9 %)
Work Started: 05/29/2012 Time Passed: 52 % ( 52 %)
23191(04) Contract: 120002 SH-199 Residency: 02300 1.280 MI. SH-199;BRIDGE &
SSP-107C(111)SS MADILL APPROACHES/FROM 4.0 MI. W. OF SH-
78, EXTEND W. OVER THE WASHITA
Contractor: L & N BRIDGE, LLC RIVER.
Engineer: Eldridge, Jerry Adjusted:
Contract Amount: $6,741,856.52 ( $6,741,856.52)
Contract Time: 240 ( 240 )
Letting Date: 01/19/2012
Contract Date: 04/19/2012
W/O Issued: 06/23/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 13 %( 13 %)
Work Started: 06/04/2012 Time Passed: 29 %( 29 %)
Construction Status Report Page 56
21732(04) Contract: 110413 US-70 Residency: 02300 .725 MI. US-70 OVER CADDO CREEK,
BRFY-022N(154)SS MADILL 10.5 MI. EAST OF US-69B JCT
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: Eldridge, Jerry Adjusted:
Contract Amount: $3,447,006.66 ( $3,447,006.66)
Contract Time: 150 ( 150 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/17/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 66 % ( 66 %)
Work Started: 02/06/2012 Time Passed: 124 % ( 124 %)
29079(04) Contract: 120196 US-69 Residency: 02300 13.109 MI. US-69:SAFETY
HSIPG-013N(156)(157)TR MADILL IMPROVEMENT(CABLE BARRIER & INT.
MODIFICATION)FROM JUST N. OF
Contractor: MIDSTATE TRAFFIC CONTROL, INC. COLBERT EXTEND N.
Engineer: Eldridge, Jerry Adjusted:
Contract Amount: $2,115,063.70 ( $2,115,063.70)
Contract Time: 180 ( 180 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
21733(04) Contract: 120247 US-70 Residency: 02300 0.738 MI. US-70/BRIDGE &
NHY-022N(157) MADILL APPROACHES:OVER BLUE RIVER 7.7MI.
EAST OF US-69B.
Contractor: L & N BRIDGE, LLC
Engineer: Eldridge, Jerry Adjusted:
Contract Amount: $4,555,100.82 ( $4,555,100.82)
Contract Time: 200 ( 200 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
26231(04) Contract: 120248 SH-69B Residency: 02300 0.15 MI. SH-69B:BRIDGE &
BRFY-107B(151) MADILL APPROACHES:OVER MINERAL BAYOU CR.
0.5 MI. SOUTH OF US-70.
Contractor: L & N BRIDGE, LLC
Engineer: Eldridge, Jerry Adjusted:
Contract Amount: $1,417,551.48 ( $1,417,551.48)
Contract Time: 150 ( 150 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 57
18847(15) Contract: 110348 US-70 Residency: 02300 4.502 MI. US-70;GRADE,DRAIN
NHY-022N(195)(207) MADILL ,SURFACE & SIGNALS/DURANT BY-
PASS:FROM THE US-JCT,EXTEND S.E. TO
Contractor: THE CUMMINS CONSTRUCTION CO., INC. THE SH-78 JCT.
Engineer: Eldridge, Jerry Adjusted:
Contract Amount: $18,574,116.09 ( $18,574,116.09)
Contract Time: 450 ( 450 )
Letting Date: 07/21/2011
Contract Date: 08/18/2011
W/O Issued: 08/24/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 28 % ( 28 %)
Work Started: 01/03/2012 Time Passed: 46 % ( 46 %)
28101(04) Contract: 110371 US-69 Residency: 02300 0.00 MI. US-69/SAFETY IMPROV. (CABLE
NHG-013N(144)(145)TR MADILL BARRIER/GUARDRAIL)FROM THE
OKLA./TEXAS S/L., EXTEND NORTH.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: Eldridge, Jerry Adjusted:
Contract Amount: $2,001,222.50 ( $2,001,222.50)
Contract Time: 160 ( 160 )
Letting Date: 08/18/2011
Contract Date: 09/26/2011
W/O Issued: 09/28/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 51 % ( 51 %)
Work Started: 12/06/2011 Time Passed: 123 % ( 123 %)
County: Caddo Commissioner District: 7
Contracts Under Construction
01817(04) Contract: 120127 SH-152 Residency: 07004 2.105 MI. SH-152;GRADE,DRAIN, &
STPY-008B(308)SS SURFACE;BEGIN 2.0 MI. E.OF SH-146,
JACOBS (AKA - CARTER-BURGESS)
EXTEND EAST.
Contractor: SCHWARZ PAVING CO., INC.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $6,558,995.07 ( $6,558,995.07)
Contract Time: 285 ( 285 )
Letting Date: 03/15/2012
Contract Date: 04/16/2012
W/O Issued: 04/20/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 3 %( 3 %)
Work Started: 08/08/2012 Time Passed: 4%( 4 %)
27439(04) Contract: 110280 US-281 Residency: 07300 7.65 MI. US-281;RESURFACE
SSR-108B(283)SR ANADARKO (ASPHALT)BEGIN 0.86 MI. N. OF US-62,
EXTEND NORTH.
Contractor: T & G CONSTRUCTION, INC.
Engineer: Knight, Reese Adjusted:
Contract Amount: $1,396,224.90 ( $1,396,224.90)
Contract Time: 30 ( 30 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/24/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 98 %( 98 %)
Work Started: 05/01/2012 Time Passed: 93 %( 93 %)
Construction Status Report Page 58
26488(04) Contract: 110508 IS-40 Residency: 05100 2.058 MI. IS-40RESURFACE
IMY-0040-4(430)102 CLINTON (ASPHALT)FROM MILE MARKER 102 .2
EXTEND EAST 2.06 MI.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Greer, Randy Adjusted:
Contract Amount: $4,682,467.35 ( $4,685,207.75)
Contract Time: 120 ( 120 )
Letting Date: 11/17/2011
Contract Date: 12/12/2011
W/O Issued: 12/15/2011 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 100 % ( 100 %)
Work Started: 02/06/2012 Time Passed: 100 % ( 100 %)
24512(04) Contract: 120302 US-281 Residency: 07300 0.000 MI. US-281/BRIDGE REPR. OVER
SBR-108B(178)SB ANADARKO SUGAR CR.,0.4 MI. E. OF THE
SH-8/SH-152 JCT IN THE CITY OF
Contractor: MERIDIAN CONTRACTING, INC. BINGER.
Engineer: Knight, Reese Adjusted:
Contract Amount: $1,056,897.00 ( $1,056,897.00)
Contract Time: 150 ( 150 )
Letting Date: 07/19/2012
Contract Date: 08/17/2012
W/O Issued: 08/22/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Canadian Commissioner District: 4
Contracts Under Construction
28313(04) Contract: 110189 I-40 Residency: 04010 .075 MI. I-40:BRIDGE
SBR-109N(181)SB ATKINS (AKA - PBS & J) REHABILITATION;OVER MAYBERRY RD
5.0 MI.WEST OF US-270
Contractor: C-P INTEGRATED SERVICES, INC.
Engineer: ATKINS (AKA - PBSJ) Adjusted:
Contract Amount: $1,207,042.00 ( $1,207,042.00)
Contract Time: 150 ( 150 )
Letting Date: 10/20/2011
Contract Date: 11/23/2011
W/O Issued: 12/07/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 36 %( 36 %)
Work Started: 03/05/2012 Time Passed: 104 % ( 104 %)
21008(04) Contract: 100511 I-40 Residency: 04200 *-40-4(433)139/ 2.037 MI.
SEC1702Y-109A(130)HP/IMY* EL RENO IS-40:GRADE,DRAIN,SURFACE, &
BRIDGE, AT MORGAN RD. INTER-
Contractor: ALLEN CONTRACTING, INC. CHANGE IN OKC.
Engineer: Vonfeldt, Cole Adjusted:
Contract Amount: $33,963,202.80 ( $34,075,771.00)
Contract Time: 640 ( 703 )
Letting Date: 09/16/2010
Contract Date: 10/15/2010
W/O Issued: 10/21/2010 Adjusted:
W/O Effective: 02/07/2011 Amount Paid: 92 %( 92 %)
Work Started: 02/14/2011 Time Passed: 85 %( 77 %)
Construction Status Report Page 59
26457(04) Contract: 120020 IS-40 Residency: 04003 0.00 MI. IS-40;PAVEMENT MARK -ING.
IMG-0040-4(431)000 COBB ENGINEERING CO., INC. AT VARIOUS LOCATIONS IN THE OKC
METRO AREA.
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: COBB Adjusted:
Contract Amount: $614,190.00 ( $614,190.00)
Contract Time: 90 ( 90 )
Letting Date: 01/19/2012
Contract Date: 02/22/2012
W/O Issued: 02/28/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 58 % ( 58 %)
Work Started: 06/04/2012 Time Passed: 76 % ( 76 %)
28012(04) Contract: 110374 IS-40 Residency: 04200 *-11N(88)TR/14.150 MI. IS- 40
IMG-40-4(434)120TR/NHG* EL RENO /SAFETY IMPROV.(CABLE
BARRIER)FROM 9.0 MI. W. OF THE
Contractor: JLT CONTRACTING, LLC US-81 JCT. EXTEND E.
Engineer: Vonfeldt, Cole Adjusted:
Contract Amount: $2,574,390.20 ( $2,605,906.00)
Contract Time: 160 ( 160 )
Letting Date: 08/18/2011
Contract Date: 10/03/2011
W/O Issued: 10/07/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 62 % ( 61 %)
Work Started: 12/05/2011 Time Passed: 101 % ( 101 %)
County: Carter Commissioner District: 7
Contracts Under Construction
20231(04) Contract: 100283 SH-199 Residency: 07200 3.45 MI.;SH-199;GRADE,DRAIN,
STPY-110B(108)SS ARDMORE SURFACE & BRIDGE;FROM 4.8 MI. W. OF
US-177, EXTEND EAST.
Contractor: OVERLAND CORPORATION
Engineer: Earp, Jay Adjusted:
Contract Amount: $11,231,158.14 ( $11,231,158.14)
Contract Time: 330 ( 654 )
Letting Date: 08/19/2010
Contract Date: 09/20/2010
W/O Issued: 09/27/2010 Adjusted:
W/O Effective: 01/03/2011 Amount Paid: 92 %( 92 %)
Work Started: 10/18/2010 Time Passed: 198 % ( 100 %)
09477(08) Contract: 110022 US-70 Residency: 07200 *(232)/CIRB-110C(204)RB/SSP
BRFY-110B(170)/STPY-110B* ARDMORE -110B(218)SS / 1.69 MI. US-70
;GRADE,DRAIN,SURFACE & BRIDGE
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. FROM MERIDAN RD. IN LONE GROVE
Engineer: Earp, Jay Adjusted:
Contract Amount: $6,498,225.78 ( $6,503,217.13)
Contract Time: 180 ( 180 )
Letting Date: 02/17/2011
Contract Date: 03/24/2011
W/O Issued: 03/30/2011 Adjusted:
W/O Effective: 05/09/2011 Amount Paid: 92 %( 92 %)
Work Started: 04/12/2011 Time Passed: 99 %( 99 %)
.
Construction Status Report Page 60
20231(07) Contract: 120128 SH-199 Residency: 07200 1.74 MI. SH-199:GRADE,DRAIN, &
STPY-110B(181)SS ARDMORE SURFACE/BEGIN 1.35 MI. W. OFUS-177
EXTEND EAST.
Contractor: OVERLAND CORPORATION
Engineer: Earp, Jay Adjusted:
Contract Amount: $6,196,358.20 ( $6,196,358.20)
Contract Time: 200 ( 200 )
Letting Date: 03/15/2012
Contract Date: 04/12/2012
W/O Issued: 04/20/2012 Adjusted:
W/O Effective: 05/23/2012 Amount Paid: 26 % ( 26 %)
Work Started: 05/23/2012 Time Passed: 42 % ( 42 %)
29176(04) Contract: 120154 I-35 Residency: 07200 0.00 MI. IS-35:BRIDGE RE-
SBR-210N(004)SB ARDMORE HABILITION:OVER SH-142 &
CO.RD(EW-189), 2.1 MI. & 7.2 MI.
Contractor: GIBSON & ASSOCIATES, INC. NORTH OF US-70
Engineer: Earp, Jay Adjusted:
Contract Amount: $526,159.58 ( $526,159.58)
Contract Time: 120 ( 120 )
Letting Date: 04/19/2012
Contract Date: 05/22/2012
W/O Issued: 06/19/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
28128(15) Contract: 110501 I-35 Residency: 07004 0.00 MI.
BTOP-116E(211) I-35/US-62/US-69/US-70/US-75/US-81 AT
JACOBS (AKA - CARTER-BURGESS)
VARIOUS LOCATIONS IN DIVISION 2 & 7.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $945,536.64 ( $945,536.64)
Contract Time: 150 ( 150 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 10/22/2011 Adjusted:
W/O Effective: 11/21/2011 Amount Paid: 86 %( 86 %)
Work Started: 03/12/2012 Time Passed: 118 %( 118 %)
28165(04) Contract: 120001 US-77 Residency: 07200 2.25 MI. US-77;RESURFACE
SSR-110A(235)SR ARDMORE (ASPHALT)BEGIN 1.0 MI. N. OF US-70,
EXTEND NORTH.
Contractor: OVERLAND CORPORATION
Engineer: Earp, Jay Adjusted:
Contract Amount: $1,958,640.16 ( $2,004,945.16)
Contract Time: 60 ( 60 )
Letting Date: 01/19/2012
Contract Date: 02/15/2012
W/O Issued: 03/01/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 86 %( 84 %)
Work Started: 05/07/2012 Time Passed: 122 %( 122 %)
Construction Status Report Page 61
24373(04) Contract: 120004 SH-53 Residency: 07200 0.576 MI. SH-53;GRADE,DRAIN &
STPY-110C(198)HP ARDMORE SURFACE/BEGIN 7.05 MI. E. OFIS-35 AT
THE W. ENTRANCE TO ARDMORE AIR
Contractor: OVERLAND CORPORATION PARK.
Engineer: Earp, Jay Adjusted:
Contract Amount: $1,916,259.49 ( $1,918,224.25)
Contract Time: 125 ( 125 )
Letting Date: 01/19/2012
Contract Date: 02/15/2012
W/O Issued: 02/22/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 24 % ( 23 %)
Work Started: 04/23/2012 Time Passed: 58 % ( 58 %)
28164(04) Contract: 110282 US-70 Residency: 07200 4.99 MI. US-70:RESURFACE
SSR-110B(234)SR ARDMORE (ASPHALT)FROM SH-76N, EXTEND EAST.
Contractor: OVERLAND CORPORATION
Engineer: Earp, Jay Adjusted:
Contract Amount: $1,698,223.30 ( $1,698,223.30)
Contract Time: 45 ( 45 )
Letting Date: 06/21/2012
Contract Date: 07/11/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
28128(49) Contract: 120064 IS-35 Residency: 07011 55.25 MI. IS-35/US-69/US-70 :SAFETY
BTOP-210N(001) GARVER, LLC. IMPROVEMENTS(FIBER OPTIC
CABLE)FROM THE CITY OF ARDMORE TO
Contractor: TELCO SUPPLY COMPANY THE CITY OF DURANT.
Engineer: GARV Adjusted:
Contract Amount: $3,087,621.74 ( $3,298,552.49)
Contract Time: 155 ( 155 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/23/2012 Adjusted:
W/O Effective: 03/19/2012 Amount Paid: 101 %( 94 %)
Work Started: 03/19/2012 Time Passed: 87 %( 87 %)
County: Cherokee Commissioner District: 1
Contracts Under Construction
10010(04) Contract: 080046 SH-82 Residency: 01200 6.719 KM WIDEN & RESURFACE SH-82
STPY-011C(341)SS SALLISAW BEGIN APPROX. 0.6 MI. N.W. OF SH-100
& EXTEND N.W.
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer: Edwards, Carl Adjusted:
Contract Amount: $9,279,334.90 ( $10,380,474.34)
Contract Time: 400 ( 1,427 )
Letting Date: 01/17/2008
Contract Date: 04/16/2008
W/O Issued: 04/25/2008 Adjusted:
W/O Effective: 08/04/2008 Amount Paid: 99 %( 89 %)
Work Started: 08/04/2008 Time Passed: 357 %( 100 %)
Construction Status Report Page 62
County: Choctaw Commissioner District: 2
Contracts Under Construction
21652(04) Contract: 120048 CORD Residency: 02013 0.32 MI. CO.RD.;BRIDGE &
BRO-112D(058)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES/OVER SALT CR. 2.3 MI. N.
& 0.7 MI. W. OF THE US-70/SH-93
Contractor: HUB CONSTRUCTION, INC. JCT.
Engineer: CED3 Adjusted:
Contract Amount: $764,239.75 ( $764,239.75)
Contract Time: 90 ( 104 )
Letting Date: 01/19/2012
Contract Date: 02/17/2012
W/O Issued: 02/23/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 56 %( 56 %)
Work Started: 05/21/2012 Time Passed: 108 %( 93 %)
18850(04) Contract: 100547 US-70 Residency: 02100 5.285 MI. US-70;GRADE,DRAIN,
NHY-022N(071) ANTLERS SURFACE, & BRIDGE;FROM THE SH-147
JUNCTION,EXTEND EAST.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Moy, Ryan Adjusted:
Contract Amount: $11,635,370.40 ( $11,635,370.40)
Contract Time: 360 ( 360 )
Letting Date: 09/16/2010
Contract Date: 10/21/2010
W/O Issued: 10/26/2010 Adjusted:
W/O Effective: 02/07/2011 Amount Paid: 86 % ( 86 %)
Work Started: 02/07/2011 Time Passed: 114 % ( 114 %)
County: Cimarron Commissioner District: 6
Contracts Under Construction
13337(05) Contract: 100614 US-287 Residency: 06200 3.139 MI. US-287;GRADE,DRAIN
NHY-017N(238) GUYMON ,SURFACE & BRIDGE;FROM 6.9 MI.N. OF
BOISE CITY, EXTEND NORTH.
Contractor: DOBSON BROTHERS CONSTRUCTION CO.
Engineer: Michael, Charles Adjusted:
Contract Amount: $8,619,401.99 ( $8,720,881.99)
Contract Time: 200 ( 452 )
Letting Date: 11/18/2010
Contract Date: 12/15/2010
W/O Issued: 12/27/2010 Adjusted:
W/O Effective: 04/04/2011 Amount Paid: 91 %( 90 %)
Work Started: 04/04/2011 Time Passed: 227 % ( 100 %)
Construction Status Report Page 63
13337(19) Contract: 100477 US-287 Residency: 06200 2.215 MI. US-287;SURFACE/ FROM 1.0
SEC1302Y-133N(050)HP GUYMON MI. S. OF THE SH-3/ US-64 JUNCTION.
Contractor: DOBSON BROTHERS CONSTRUCTION CO.
Engineer: Michael, Charles Adjusted:
Contract Amount: $5,610,381.67 ( $5,934,340.85)
Contract Time: 240 ( 243 )
Letting Date: 08/19/2010
Contract Date: 09/16/2010
W/O Issued: 09/21/2010 Adjusted:
W/O Effective: 01/03/2011 Amount Paid: 100 % ( 95 %)
Work Started: 10/25/2010 Time Passed: 101 % ( 100 %)
24823(04) Contract: 120200 CORD Residency: 06200 6.15 MI. CO.RD.:GRADE,DRAIN &
CIRB-113C(058)RB GUYMON SURFACE.FROM THE US-287/ TEXAS
STATE LINE JCT, EXTEND WEST.
Contractor: HIGHWAY CONTRACTORS, INC.
Engineer: Michael, Charles Adjusted:
Contract Amount: $3,382,570.79 ( $3,382,570.79)
Contract Time: 120 ( 120 )
Letting Date: 06/21/2012
Contract Date: 07/18/2012
W/O Issued: 07/20/2012 Adjusted:
W/O Effective: 08/13/2012 Amount Paid: 0%( 0 %)
Work Started: 08/09/2012 Time Passed: 0%( 0 %)
24612(04) Contract: 100465 CORD Residency: 06200 *-113D(56)CO/0.264 MI. CO. RD.;OVER
BRO-113D(55)CO/ACBRO* GUYMON LANE CANYON/GALLINAS CANYON CR.,
5.8 MI. & 4.25 MI. N. OF SH-325 JCT.
Contractor: KLAVER CONSTRUCTION COMPANY, INC.
Engineer: Michael, Charles Adjusted:
Contract Amount: $497,647.73 ( $497,647.73)
Contract Time: 120 ( 692 )
Letting Date: 07/22/2010
Contract Date: 08/24/2010
W/O Issued: 10/06/2010 Adjusted:
W/O Effective: 11/01/2010 Amount Paid: 93 %( 93 %)
Work Started: 11/01/2010 Time Passed: 533 %( 92 %)
County: Cleveland Commissioner District: 3
Contracts Under Construction
14392(04) Contract: 110324 CTST Residency: 03001 CT.ST.(60TH
STPY-014B(377)MS ENGR. SERV. & TESTING AVE):GRADE,DRAIN,SURFACE & BRIDGE
FROM N OF TECUMSEH RD EXTEND N, IN
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. THE CITY OF NORMAN
Engineer: EST Adjusted:
Contract Amount: $5,728,854.37 ( $5,728,854.37)
Contract Time: 210 ( 210 )
Letting Date: 10/20/2011
Contract Date: 11/23/2011
W/O Issued: 12/07/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 49 %( 49 %)
Work Started: 02/06/2012 Time Passed: 62 %( 62 %)
Construction Status Report Page 64
22670(04) Contract: 100042 CTST Residency: 03002 *STIM(504)HP/0.333 MI. CT.ST.
TCSP-OH68(007)TC/STP-* TETRA TECH ;GRADE,DRAIN,SURFACE &
BRIDGE;(ROBINSON ST.)DRAINAGE &
Contractor: MANHATTAN ROAD & BRIDGE COMPANY PUMP STATION AT THE BNSF R/R
Engineer: TETR Adjusted:
Contract Amount: $12,207,431.52 ( $13,834,681.54)
Contract Time: 465 ( 699 )
Letting Date: 02/18/2010
Contract Date: 03/09/2010
W/O Issued: 03/31/2010 Adjusted:
W/O Effective: 08/02/2010 Amount Paid: 100 % ( 89 %)
Work Started: 06/14/2010 Time Passed: 171 % ( 114 %)
21925(04) Contract: 120165 SH-9 Residency: 03001 0.00 MI. /SH-9/SH-37:BRIDGE
BRFY-NBIP(449) ENGR. SERV. & TESTING PAINTING, AT VARIOUS LOCATIONSIN
DIV. III.
Contractor: MONOKO, LLC
Engineer: EST Adjusted:
Contract Amount: $483,426.00 ( $483,426.00)
Contract Time: 120 ( 120 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 07/13/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
24282(04) Contract: 120009 CTST Residency: 03004 *-114A(243)TR/ 0.779 MI. CT.
STP-114A(197)AG/HSIPY* ST.:INTERSECTION MODIFICATION &
JACOBS (AKA - CARTER-BURGESS)
TRAFFIC SIGNALS. AT THE
Contractor: MARKWELL PAVING COMPANY, INC. INTERSECTION OF US-77H & ROBIN
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $1,982,395.61 ( $1,982,395.61)
Contract Time: 180 ( 180 )
Letting Date: 02/16/2012
Contract Date: 03/15/2012
W/O Issued: 03/22/2012 Adjusted:
W/O Effective: 06/19/2012 Amount Paid: 33 %( 33 %)
Work Started: 06/04/2012 Time Passed: 41 %( 41 %)
26840(04) Contract: 120084 CTST Residency: 03200 1.09 MI. CT.ST. WIDEN & RE-
STP-114B(256)AG PURCELL SURFACE(ASPHALT)ON PORTER AVE.IN
THE CITY OF NORMAN, FROM
Contractor: MARKWELL PAVING COMPANY, INC. WOODCREST DR., EXTEND NORTH.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $1,936,526.29 ( $1,936,526.29)
Contract Time: 220 ( 220 )
Letting Date: 02/16/2012
Contract Date: 03/15/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 12 %( 12 %)
Work Started: 06/04/2012 Time Passed: 26 %( 26 %)
Construction Status Report Page 65
26474(04) Contract: 110416 CTST Residency: 03200 .5 MI. CTST AT THE INTERSECTION OF
HSIPY-114A(242)TR PURCELL CLASSEN BLVD AND IMHOFF RD. IN THE
CITY OF NORMAN.
Contractor: SHELL CONSTRUCTION COMPANY INC.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $1,498,713.42 ( $1,498,713.42)
Contract Time: 120 ( 120 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 10/20/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 41 % ( 41 %)
Work Started: 02/06/2012 Time Passed: 143 % ( 143 %)
26803(04) Contract: 120130 CORD Residency: 04600 *(655)AG/ 1.97 MI. CO.RD.
STP-114B(249)AG/STP-155B* OKLAHOMA CITY GRADE,DRAIN & SURFACE(EASTERN
AVE.)BEGIN ONE MILE E. OF THE
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCIS-35/IS-240 JCT.
Engineer: Howell, Terry Adjusted:
Contract Amount: $4,793,449.19 ( $4,793,449.19)
Contract Time: 375 ( 375 )
Letting Date: 07/19/2012
Contract Date: 08/16/2012
W/O Issued: 08/20/2012 Adjusted:
W/O Effective: 09/24/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
27795(04) Contract: 120011 CTST Residency: 03010 1.46 MI. CT.ST.;LIGHTING;ON MAIN
STPG-114B(278)AG ATKINS (AKA - PBS & J) ST., FROM MERKLE DR., EX-TEND WEST
IN THE CITY OF NORMAN.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: ATKINS (AKA - PBSJ) Adjusted:
Contract Amount: $1,083,917.00 ( $1,083,917.00)
Contract Time: 60 ( 60 )
Letting Date: 02/16/2012
Contract Date: 03/20/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 07/19/2012 Amount Paid: 5 %( 5 %)
Work Started: 07/20/2012 Time Passed: 77 %( 77 %)
28080(05) Contract: 120085 SH-9 Residency: 03010 0.00 MI. SH-9; SAFETY IM-
STPG-114A(297)AG ATKINS (AKA - PBS & J) PROVEMENT(SIGNALS &
SIDEWALKS)FROM MCGEE DR., EXTEND
Contractor: MIDSTATE TRAFFIC CONTROL, INC. WEST IN THE CITY OF NORMAN.
Engineer: ATKINS (AKA - PBSJ) Adjusted:
Contract Amount: $363,490.00 ( $363,490.00)
Contract Time: 60 ( 60 )
Letting Date: 02/16/2012
Contract Date: 03/20/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 40 %( 40 %)
Work Started: 06/02/2012 Time Passed: 122 %( 122 %)
Construction Status Report Page 66
23766(04) Contract: 110512 CORD Residency: 03004 *(201)AG / 0.108 MI. CO.RD.: BRIDGE &
STP-114D(176)AG/STP-114C* APPROACHES:OVER BUCK-HEAD CR., 5.2
JACOBS (AKA - CARTER-BURGESS)
MI. E OF US- 77, OVER N. CANADIAN
Contractor: BRIDGECO CONTRACTORS, INC. RIVER.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $467,942.75 ( $504,320.12)
Contract Time: 80 ( 105 )
Letting Date: 11/17/2011
Contract Date: 12/07/2011
W/O Issued: 12/08/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 102 % ( 94 %)
Work Started: 12/19/2011 Time Passed: 144 % ( 110 %)
25922(04) Contract: 100002 CT.ST. Residency: 03200 0.706 MI. CT.ST., GRADE,
IM-0035-2(307)111MS PURCELL DRAIN,SURFACE & BRIDGE;FROM 36TH
AVE.,EXTEND E. IN THE CITY OF
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. NORMAN.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $4,989,217.88 ( $5,021,532.88)
Contract Time: 385 ( 630 )
Letting Date: 01/28/2010
Contract Date: 02/18/2010
W/O Issued: 02/25/2010 Adjusted:
W/O Effective: 06/07/2010 Amount Paid: 100 % ( 100 %)
Work Started: 06/08/2010 Time Passed: 172 % ( 105 %)
29011(04) Contract: 120250 CTST Residency: 03200 0.00 MI. CT.ST.:TRAFFIC
STPG-114F(303)AG PURCELL SIGNALS;MULTIPLE LOCATIONS IN THE
CITY OF NORMAN.
Contractor: TRAFFIC SIGNALS, INC.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $367,702.00 ( $367,702.00)
Contract Time: 90 ( 90 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 11/26/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
22140(04) Contract: 110235 CTST Residency: 03200 0.352 MI. CT.ST.;GRADE,DRAIN,
STP-114B(142)AG PURCELL SURFACE & TRAFFIC SIGNALS/
(LINDSEY ST.)FROM JENKINS
Contractor: SHELL CONSTRUCTION COMPANY INC. AVE.,EXTEND EAST IN NORMAN.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $2,211,002.78 ( $2,211,002.78)
Contract Time: 205 ( 205 )
Letting Date: 04/14/2011
Contract Date: 05/18/2011
W/O Issued: 05/26/2011 Adjusted:
W/O Effective: 07/11/2011 Amount Paid: 100 %( 100 %)
Work Started: 06/13/2011 Time Passed: 187 %( 187 %)
Construction Status Report Page 67
27785(04) Contract: 110325 CTST Residency: 03200 0.520 MI. CT.ST. PEDESTRAIN IMPROV.
STP-114B(276)AG PURCELL (12TH ST.)FROM SANTA FEAVE.,EXTEND
EAST TO JANEWAY AVE. IN THE CITY OF
Contractor: RUDY CONSTRUCTION CO. MOORE.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $158,341.50 ( $158,341.50)
Contract Time: 60 ( 60 )
Letting Date: 08/18/2011
Contract Date: 09/26/2011
W/O Issued: 09/29/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 100 % ( 100 %)
Work Started: 12/05/2011 Time Passed: 145 % ( 145 %)
09031(15) Contract: 120006 IS-35 Residency: 03003 0.00 MI. IS-35;SAFETY IMPROVE
IM-NHIY-0035-2(314)108 COBB ENGINEERING CO., INC. -MENT(SOUND BARRIER WALL)ALONGTHE
EAST SIDE OF IS-35 BE- TWEEN
Contractor: MANHATTAN ROAD & BRIDGE COMPANY LINDSEY ST. & MAIN ST.
Engineer: COBB Adjusted:
Contract Amount: $1,440,205.50 ( $1,486,426.37)
Contract Time: 100 ( 100 )
Letting Date: 01/19/2012
Contract Date: 02/22/2012
W/O Issued: 02/28/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 102 % ( 99 %)
Work Started: 04/05/2012 Time Passed: 92 % ( 92 %)
25648(04) Contract: 120201 CTST Residency: 03001 2.00 MI. CT.ST.;GRADE,DRAIN, SURFACE
STP-114B(222)AG ENGR. SERV. & TESTING & BRIDGE/CT.ST. (WESTERN
AVE.)FROM SW 164TH ST.,EXTEND N. IN
Contractor: ALLEN CONTRACTING, INC. OKC.
Engineer: EST Adjusted:
Contract Amount: $8,891,822.53 ( $8,891,822.53)
Contract Time: 320 ( 320 )
Letting Date: 06/21/2012
Contract Date: 07/13/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
24829(04) Contract: 110202 CORD Residency: 03200 5.983 MI. CO.RD.
CIRB-114C(210)RB PURCELL (EW-129):GRADE,DRAIN,&
SURFACE;ETOWAH RD FROM 48TH AVE
Contractor: MARKWELL PAVING COMPANY, INC. SW EXTEND EAST
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $5,483,149.88 ( $5,512,233.88)
Contract Time: 360 ( 360 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 11/22/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 31 %( 31 %)
Work Started: 03/05/2012 Time Passed: 44 %( 44 %)
Construction Status Report Page 68
24029(04) Contract: 120049 IS-35 Residency: 03002 *114C(292)AG /0.907 MI.IS-
ACSTP-114A(184)AG/STP-* TETRA TECH 35;GRADE,DRAIN & SURFACE/
FRONTAGE RD.(INTERSTATE DR.) I-35
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. NB RAMPS AT ROBINSON ST.
Engineer: TETR Adjusted:
Contract Amount: $2,730,900.00 ( $2,730,900.00)
Contract Time: ( )
Letting Date: 01/19/2012
Contract Date: 02/23/2012 Fixed Completion Date: 08/01/2012
W/O Issued: 02/29/2012 Adjusted:
W/O Effective: Amount Paid: 83 % ( 83 %)
Work Started: 04/02/2012 Time Passed: 125 % ( 81 %)
County: Coal Commissioner District: 3
Contracts Under Construction
28215(04) Contract: 120086 US-75 Residency: 03100 2.09 MI. US-75; RESURFACE
NHY-017N(239)3P ADA (ASPHALT)FROM 7.5 MI. NORTH OFTHE
ATOKA C/L, EXTEND NORTH.
Contractor: JOB CONSTRUCTION CO., INC.
Engineer: Russell, Julie Adjusted:
Contract Amount: $812,724.80 ( $812,724.80)
Contract Time: 45 ( 45 )
Letting Date: 02/16/2012
Contract Date: 03/14/2012
W/O Issued: 03/22/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 100 % ( 100 %)
Work Started: Time Passed: 118 % ( 118 %)
29036(04) Contract: 120087 SH-31 Residency: 03100 5.20 MI. SH-31:RESURFACE
STPY-215C(001)3P ADA (ASPHALT)FROM 8.5 MI. NORTH OFUS-75,
EXTEND NORTH.
Contractor: JOB CONSTRUCTION CO., INC.
Engineer: Russell, Julie Adjusted:
Contract Amount: $757,306.04 ( $757,306.04)
Contract Time: 35 ( 35 )
Letting Date: 02/16/2012
Contract Date: 03/14/2012
W/O Issued: 03/22/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 99 %( 99 %)
Work Started: 06/22/2012 Time Passed: 117 % ( 117 %)
20967(04) Contract: 110418 SH-48 Residency: 03100 .775 MI. SH-48 OVER CLEAR BOGGY
BRFY-115C(026) ADA CREEK, 9 MI. NORTH OF JOHNSTON
COUNTY LINE.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: Russell, Julie Adjusted:
Contract Amount: $4,077,515.62 ( $4,077,515.62)
Contract Time: 180 ( 215 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/19/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 95 %( 95 %)
Work Started: 11/15/2011 Time Passed: 133 %( 112 %)
Construction Status Report Page 69
County: Comanche Commissioner District: 7
Contracts Under Construction
21614(04) Contract: 120156 CORD Residency: 07100 5.356 MI. CO.RD.:GRADE,DRAIN &
STP-116C(110)CI DUNCAN SURFACE:FROM SH-115, EXTEND EAST.
Contractor: APAC-CENTRAL, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $5,233,521.39 ( $5,233,521.39)
Contract Time: 165 ( 165 )
Letting Date: 04/19/2012
Contract Date: 05/16/2012
W/O Issued: 05/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 11 %( 11 %)
Work Started: 07/09/2012 Time Passed: 23 %( 23 %)
20955(04) Contract: 110478 SH65 Residency: 07300 .570 MI. SH-65:GRADE,DRAIN,SURFACE
BRFY-116C(095) ANADARKO AND BRIDGE; OVER WHISKEY CREEK, 2.4
MI. SOUTH OF SH-17
Contractor: D. M. DOZERS, INC.
Engineer: Knight, Reese Adjusted:
Contract Amount: $2,393,655.43 ( $2,396,405.43)
Contract Time: 180 ( 180 )
Letting Date: 10/20/2011
Contract Date: 11/21/2011
W/O Issued: 11/28/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 51 % ( 51 %)
Work Started: 03/05/2012 Time Passed: 69 % ( 69 %)
20313(04) Contract: 090497 I-44 Residency: 07100 2.545 MI. GRADE, DRAIN, SURFACE &
IM-STIM(296) DUNCAN BRIDGE I-44 FROM 1.6 MI. N. OF SH-7
EXTEND NORTH.
Contractor: ALLEN CONTRACTING, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $15,797,093.11 ( $16,230,834.98)
Contract Time: 360 ( 888 )
Letting Date: 06/18/2009
Contract Date: 06/30/2009
W/O Issued: 07/22/2009 Adjusted:
W/O Effective: 08/24/2009 Amount Paid: 97 %( 95 %)
Work Started: 08/24/2009 Time Passed: 248 % ( 100 %)
20298(04) Contract: 090616 SH-7 Residency: 07100 3.26 MI. SH-7:GRADE,DRAIN,
SAP-021N(029) DUNCAN SURFACE. BEGIN 3.3 MI. EAST OFIS-44,
EXTEND EAST.
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $6,516,287.53 ( $6,701,884.15)
Contract Time: 200 ( 937 )
Letting Date: 10/15/2009
Contract Date: 11/13/2009
W/O Issued: 11/16/2009 Adjusted:
W/O Effective: 03/01/2010 Amount Paid: 100 %( 97 %)
Work Started: 01/19/2010 Time Passed: 264 %( 56 %)
Construction Status Report Page 70
28006(04) Contract: 120172 US-62 Residency: 07100 0.00 MI. US-62:BRIDGE REPAIR :OVER
SAP-216A(005) DUNCAN COUNTY RD. NS-247, 3.0 MI. EAST OF
SH-115.
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $79,568.20 ( $79,568.20)
Contract Time: 15 ( 15 )
Letting Date: 04/19/2012
Contract Date: 05/18/2012
W/O Issued: 05/23/2012 Adjusted:
W/O Effective: 06/18/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
21716(04) Contract: 120157 SH-115 Residency: 07300 1.283 MI. SH-115:GRADE,DRAIN,
SSP-116C(114)(195)SS ANADARKO SURFACE & BRIDGE:FROM EW-154,
EXTEND NORTH IN MEERS.
Contractor: T & G CONSTRUCTION, INC.
Engineer: Knight, Reese Adjusted:
Contract Amount: $2,839,916.88 ( $2,839,916.88)
Contract Time: 175 ( 175 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 05/29/2012 Adjusted:
W/O Effective: 08/16/2012 Amount Paid: 0%( 0 %)
Work Started: 08/16/2012 Time Passed: 0%( 0 %)
26850(04) Contract: 110513 CORD Residency: 07300 0.189 MI. CO.RD.;BRIDGE &
BRO-116D(182)CI ANADARKO APPROACHES:OVER WHISKEY CR., 1.8
MI. E. OF IS-44.
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer: Knight, Reese Adjusted:
Contract Amount: $358,418.20 ( $363,281.20)
Contract Time: 90 ( 90 )
Letting Date: 11/17/2011
Contract Date: 12/16/2011
W/O Issued: 12/20/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 101 %( 100 %)
Work Started: 02/07/2012 Time Passed: 98 %( 98 %)
21715(04) Contract: 110419 SH-17 Residency: 07300 .19 MI. SH-17 OVER COTTONWOOD
BRFY-116C(111) ANADARKO CREEK, .2 MI WEST OF GRADY CO.LINE.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: Knight, Reese Adjusted:
Contract Amount: $1,446,556.49 ( $1,449,616.49)
Contract Time: 210 ( 210 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/17/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 67 %( 67 %)
Work Started: 02/09/2012 Time Passed: 72 %( 72 %)
Construction Status Report Page 71
28128(42) Contract: 120175 IS-44 Residency: 07004 44.90 MI. IS-44/US-62/SH-7: US-62
BTOP-216N(001) FROM
JACOBS (AKA - CARTER-BURGESS) 9.0 MI. W. OF IS-44EXT E. TO
IS-44, S. TO SH-7, THEN E. TO DUNCAN.
Contractor: ROHL NETWORKS, LP
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $1,713,132.83 ( $1,713,132.83)
Contract Time: 95 ( 95 )
Letting Date: 03/15/2012
Contract Date: 04/10/2012
W/O Issued: 05/14/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 60 % ( 60 %)
Work Started: 06/11/2012 Time Passed: 77 % ( 77 %)
27330(04) Contract: 110007 SH-65 Residency: 07100 0.191 MI. SH-65:BRIDGE REHAB. OVER
SBR-116C(190)SB DUNCAN THE WEST FORK OF BEAVER CR., 4.2 MI.
N. OF N. OF THE SH-7 JUNCTION.
Contractor: PBX CORPORATION
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $749,504.60 ( $749,504.60)
Contract Time: 120 ( 247 )
Letting Date: 01/20/2011
Contract Date: 02/16/2011
W/O Issued: 02/22/2011 Adjusted:
W/O Effective: 06/06/2011 Amount Paid: 91 % ( 91 %)
Work Started: 07/08/2011 Time Passed: 200 % ( 97 %)
20298(07) Contract: 110237 SH-7 Residency: 07100 2.88 MI. SH-7:GRADE,DRAIN &
NHY-021N(051) DUNCAN SURFACE;FROM 2.88 MI. WEST OF THE
SH-65 JCT, EXTEND EAST.
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $5,893,347.18 ( $5,893,347.18)
Contract Time: 210 ( 210 )
Letting Date: 04/14/2011
Contract Date: 05/12/2011
W/O Issued: 05/19/2011 Adjusted:
W/O Effective: 09/06/2011 Amount Paid: 96 %( 96 %)
Work Started: 09/06/2011 Time Passed: 139 %( 139 %)
21717(08) Contract: 120180 US-277 Residency: 07300 0.00 MI. US-277:RIGHT-OF-WAY
STPY-216C(006)RW ANADARKO CLEARANCE:BEGIN 0.04 MI. EAST OF
US-62, EXTEND EAST.
Contractor: M & M WRECKING, INC.
Engineer: Knight, Reese Adjusted:
Contract Amount: $68,058.00 ( $68,058.00)
Contract Time: 180 ( 180 )
Letting Date: 05/17/2012
Contract Date: 06/19/2012
W/O Issued: 07/13/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 72
28964(04) Contract: 120131 US-62 Residency: 07100 25.00 MI. US-62:SIGNING;BEGIN AT THE
HSIPG-116A(210)TR DUNCAN KIOWA C/L, EXTEND EAST.
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $237,264.98 ( $237,264.98)
Contract Time: 90 ( 90 )
Letting Date: 03/15/2012
Contract Date: 04/13/2012
W/O Issued: 04/18/2012 Adjusted:
W/O Effective: 07/17/2012 Amount Paid: 0%( 0 %)
Work Started: 08/01/2012 Time Passed: 0%( 0 %)
27054(04) Contract: 100515 IS-44 Residency: 07100 2.547 MI. IS-44;PAVEMENT RE- HAB.
SSP-116N(187)SS DUNCAN (P.C. CONCRETE)FROM 1.0 MISOUTH OF
THE SH-7 EAST JCT, EXTEND NORTH.
Contractor: CHESTER BROSS CONSTRUCTION COMPANY/C.B. EQUIPMENT, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $4,736,418.47 ( $4,736,418.47)
Contract Time: 180 ( 180 )
Letting Date: 04/14/2011
Contract Date: 05/18/2011
W/O Issued: 05/31/2011 Adjusted:
W/O Effective: 09/06/2011 Amount Paid: 90 % ( 90 %)
Work Started: 07/20/2011 Time Passed: 134 % ( 134 %)
20956(04) Contract: 120013 SH-17 Residency: 07300 0.813 MI. SH-17;BRIDGE &
BRFY-116C(098) ANADARKO APPROACHES;OVER BEAVER CR. &
ATRIBUTARY OF BEAVER CR., 1.1 MI.
Contractor: T & G CONSTRUCTION, INC. E. OF SH-65 , STERLING
Engineer: Knight, Reese Adjusted:
Contract Amount: $3,898,376.63 ( $3,898,376.63)
Contract Time: 210 ( 210 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/27/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 19 %( 19 %)
Work Started: 05/31/2012 Time Passed: 34 %( 34 %)
27454(04) Contract: 100431 IS-44 Residency: 07100 0.00 MI. IS-44;SIGNING/FROM THE
IMG-44-1(116)030TR DUNCAN SH-36 JUNCTION, EXTEND NORTH.
Contractor: TIME STRIPING, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $381,248.95 ( $406,522.28)
Contract Time: 120 ( 311 )
Letting Date: 07/22/2010
Contract Date: 08/25/2010
W/O Issued: 10/19/2010 Adjusted:
W/O Effective: 01/17/2011 Amount Paid: 66 %( 62 %)
Work Started: 05/03/2011 Time Passed: 252 %( 97 %)
County: Cotton Commissioner District: 7
Contracts Under Construction
Construction Status Report Page 73
23229(04) Contract: 100552 SH-53 Residency: 07100 1.53 MI. SH-53/GRADE,DRAIN, SURFACE
BRFY-117B(046)SS DUNCAN & BRIDGE:OVER BEAVER CR.,
OVERFLOW & LITTLE BEAVER
Contractor: SEWELL BROS., INC. CR.,OVERFLOW,8.7 MI. & 9.1 MI.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $6,858,838.76 ( $6,858,838.76)
Contract Time: 360 ( 360 )
Letting Date: 08/18/2011
Contract Date: 09/26/2011
W/O Issued: 09/29/2011 Adjusted:
W/O Effective: 01/02/2012 Amount Paid: 75 % ( 75 %)
Work Started: 11/14/2011 Time Passed: 68 % ( 68 %)
EAST OF THE SH-5 JCT.
27486(04) Contract: 110465 CORD Residency: 07100 .134 MI. CORD (NS-157) OVER BIRD
BRO-117D(087)CI DUNCAN CREEK, 1.7 MI. SOUTH OF US-70 JCT.
Contractor: KLAVER CONSTRUCTION COMPANY, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $200,189.74 ( $200,189.74)
Contract Time: 90 ( 90 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 10/20/2011 Adjusted:
W/O Effective: 11/28/2011 Amount Paid: 84 % ( 84 %)
Work Started: 11/14/2011 Time Passed: 151 % ( 151 %)
County: Craig Commissioner District: 8
Contracts Under Construction
23910(04) Contract: 110266 CTST Residency: 08001 .372 MI. CTST:GRADE,DRAIN & SURFACE
STP-118C(074)UR ENGR. SERV. & TESTING EXCELSIOR AVE FROM US-60TO 4TH
STREET IN VINITA
Contractor: APAC-CENTRAL, INC.
Engineer: EST Adjusted:
Contract Amount: $755,297.46 ( $755,297.46)
Contract Time: 180 ( 180 )
Letting Date: 10/20/2011
Contract Date: 11/21/2011
W/O Issued: 02/17/2012 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 97 %( 97 %)
Work Started: 03/05/2012 Time Passed: 56 % ( 56 %)
24183(04) Contract: 110420 SH66 Residency: 08300 5.62 MI. SH-66:WIDEN AND RESURFACE;
STPY-118C(096)SS CLAREMORE 1.25 MI. E OF ROGERS CO.LINE EXTEND
NORTHEAST.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $7,425,911.85 ( $7,425,911.85)
Contract Time: 270 ( 270 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 02/03/2012 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 20 %( 20 %)
Work Started: 03/05/2012 Time Passed: 53 %( 53 %)
Construction Status Report Page 74
24220(04) Contract: 110421 US-60 Residency: 08300 .2 MI. US-60 OVER BIG CABIN CREEK,
BRFY-018N(050) CLAREMORE 3.7 MI. EAST OF SH-66 JCT
Contractor: B & B BRIDGE COMPANY, LLC
Engineer: Bray, Timothy Adjusted:
Contract Amount: $3,181,543.16 ( $3,230,885.09)
Contract Time: 180 ( 196 )
Letting Date: 09/15/2011
Contract Date: 10/14/2011
W/O Issued: 11/10/2011 Adjusted:
W/O Effective: 12/19/2011 Amount Paid: 76 % ( 75 %)
Work Started: 12/09/2011 Time Passed: 89 % ( 82 %)
29089(04) Contract: 120088 SH-25 Residency: 08300 *STPY-258C(002)3P/SH-25;RE-
STPY-218C(004)(005)3P* CLAREMORE SURFACE(ASPHALT)FROM SH-2 EX- TEND
EAST.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $2,371,387.22 ( $2,371,387.22)
Contract Time: 100 ( 100 )
Letting Date: 02/16/2012
Contract Date: 03/19/2012
W/O Issued: 06/06/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
29092(04) Contract: 120090 US-60 Residency: 08300 5.72 MI. US-60;RESURFACE
NHY-018N(068)3P CLAREMORE (ASPHALT)FROM 6.1 MI. EAST OF THE
NOWATA C/L, EXTEND EAST.
Contractor: APAC-CENTRAL, INC.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $961,840.42 ( $961,840.42)
Contract Time: 45 ( 45 )
Letting Date: 02/16/2012
Contract Date: 03/13/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 97 %( 97 %)
Work Started: 05/03/2012 Time Passed: 51 %( 51 %)
County: Creek Commissioner District: 8
Contracts Under Construction
25562(04) Contract: 100483 SH-66 Residency: 08400 1.471 MI. SH-66;BRIDGE &
BRFY-119C(176) SAND SPRINGS APPROACHES;OVER IS-44 (TURNER
TURNPIKE).
Contractor: BECCO CONTRACTORS, INC.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $8,215,224.30 ( $8,368,224.30)
Contract Time: 280 ( 549 )
Letting Date: 08/19/2010
Contract Date: 09/23/2010
W/O Issued: 11/03/2010 Adjusted:
W/O Effective: 01/03/2011 Amount Paid: 86 %( 85 %)
Work Started: 01/03/2011 Time Passed: 211 %( 108 %)
Construction Status Report Page 75
20890(04) Contract: 110377 SH-16 Residency: 08400 0.099 MI. SH-16/BRIDGE &
BRFY-119C(102) SAND SPRINGS APPROACHES/OVER ROCK CR., 2.2 MI.
EAST OF THE SH-48 JCT.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $955,789.64 ( $973,822.64)
Contract Time: 120 ( 127 )
Letting Date: 08/18/2011
Contract Date: 09/26/2011
W/O Issued: 09/28/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 94 % ( 93 %)
Work Started: 11/02/2011 Time Passed: 121 % ( 114 %)
29059(04) Contract: 120037 SH-33 Residency: 08400 1.78 MI. SH-33/SH-99B;PAVE -MENT
SSR-219B(002)SR SAND SPRINGS REHAB(AC & PC)BEGIN AT THE PAYNE
CL, EXTEND EAST. BEGIN AT
Contractor: BECCO CONTRACTORS, INC. SH-33,EXTEND NORTH.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $1,245,046.00 ( $1,248,113.68)
Contract Time: 90 ( 92 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/27/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 68 % ( 68 %)
Work Started: 06/04/2012 Time Passed: 80 % ( 78 %)
29093(04) Contract: 120091 SH-99 Residency: 08400 1.07 MI. SH-99;RESURFACE (P.C.
STPY-219B(004)3P SAND SPRINGS CONCRETE)FROM THE SH-99BJUNCTION,
EXTEND NORTH.
Contractor: DIAMOND SURFACE, INC.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $547,841.97 ( $547,841.97)
Contract Time: 30 ( 30 )
Letting Date: 02/16/2012
Contract Date: 03/15/2012
W/O Issued: 03/29/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
22750(04) Contract: 120181 CORD Residency: 08400 0.283 MI. CO.RD. BRIDGE &
BRO-119D(129)CO SAND SPRINGS APPROACHES:OVER LAGOON CR. 2.0MI.
N. & 1.0 MI. W. OF THE SH-51/SH-99
Contractor: BELK BRIDGE, INC. JCT.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $620,757.75 ( $620,757.75)
Contract Time: 120 ( 120 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 15 %( 15 %)
Work Started: 07/10/2012 Time Passed: 31 %( 31 %)
Construction Status Report Page 76
20891(04) Contract: 100432 SH-16 Residency: 08400 0.274 MI. SH-16;BRIDGE &
BRFY-119C(105) SAND SPRINGS APPROACHES;OVER TURKEY CR., 11.2
MI. EAST OF THE SH-48 JCT.
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $1,294,356.43 ( $1,294,356.43)
Contract Time: 120 ( 521 )
Letting Date: 07/22/2010
Contract Date: 08/17/2010
W/O Issued: 08/18/2010 Adjusted:
W/O Effective: 10/05/2010 Amount Paid: 97 % ( 97 %)
Work Started: 09/27/2010 Time Passed: 472 % ( 109 %)
County: Custer Commissioner District: 5
Contracts Under Construction
24426(04) Contract: 120158 SH-47 Residency: 05100 0.00 MI. SH-47;WATERPROOF
BRFY-220C(006) CLINTON SEAL/IS-40/SH-6/SH-34/SH-54/
SH-55/SH-152. AT VARIOUS
Contractor: GARY A. CRAIN, INC. LOCATIONS IN DIV. V
Engineer: Greer, Randy Adjusted:
Contract Amount: $68,343.25 ( $68,343.25)
Contract Time: 45 ( 45 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 05/24/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: 08/23/2012 Time Passed: 0%( 0 %)
20804(04) Contract: 100361 SH-54 Residency: 05100 1.062 MI. SH-54;BRIDGE &
BRFY-120C(086)(089) CLINTON APPROACHES;OVER DEER & HORSE CR.,
8.2 MI. & 6.8 MI. N. OF THE IS-40
Contractor: SEWELL BROS., INC. JUNCTION.
Engineer: Greer, Randy Adjusted:
Contract Amount: $4,275,740.07 ( $4,275,740.07)
Contract Time: 300 ( 429 )
Letting Date: 05/20/2010
Contract Date: 06/23/2010
W/O Issued: 07/01/2010 Adjusted:
W/O Effective: 10/04/2010 Amount Paid: 94 %( 94 %)
Work Started: 10/04/2010 Time Passed: 141 % ( 99 %)
28133(04) Contract: 110287 SH-33 Residency: 05100 9.36 MI. SH-33;RESURFACE
SSR-120B(194)(195)SR CLINTON (ASPHALT)BEGIN 4.5 MI. EAST OFTHE
US-183 JCT, EXTEND EAST.
Contractor: CASWELL CONTRACTING, INC.
Engineer: Greer, Randy Adjusted:
Contract Amount: $1,538,943.16 ( $1,538,943.16)
Contract Time: 75 ( 75 )
Letting Date: 01/19/2012
Contract Date: 02/22/2012
W/O Issued: 02/28/2012 Adjusted:
W/O Effective: 05/02/2012 Amount Paid: 100 %( 100 %)
Work Started: 06/13/2012 Time Passed: 92 %( 92 %)
Construction Status Report Page 77
09278(04) Contract: 120092 US-183 Residency: 05100 3.41 MI. US-183;GRADE,DRAIN, &
NHY-009N(019)SS CLINTON SURFACE;FROM THE WASHITA RIVER,
EXTEND NORTH.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Greer, Randy Adjusted:
Contract Amount: $7,762,288.72 ( $7,762,288.72)
Contract Time: 210 ( 210 )
Letting Date: 02/16/2012
Contract Date: 03/22/2012
W/O Issued: 03/26/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
29154(04) Contract: 120116 SH-34 Residency: 05100 6.00 MI. SH-34;RESURFACE
STPY-220B(004)3P CLINTON (ASPHALT)FROM 1.2 MI. NORTH OFSH-33,
EXTEND NORTH.
Contractor: CASWELL CONTRACTING, INC.
Engineer: Greer, Randy Adjusted:
Contract Amount: $1,369,086.65 ( $1,369,086.65)
Contract Time: 45 ( 45 )
Letting Date: 02/16/2012
Contract Date: 03/19/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 0%( 0 %)
Work Started: 08/20/2012 Time Passed: 0%( 0 %)
24670(04) Contract: 110466 CORD Residency: 05005 .199 MI. CO.RD. (EW-89) OVER DEER
BRO-120D(153)CI CIRCUIT ENGR. DISTR. # 7 CREEK, 3.2 MI. W OF SH-33 JCT.
Contractor: K & R BUILDERS, INC.
Engineer: CED7 Adjusted:
Contract Amount: $565,376.10 ( $565,376.10)
Contract Time: 120 ( 120 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/14/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 96 %( 96 %)
Work Started: 01/23/2012 Time Passed: 106 %( 106 %)
28904(04) Contract: 120206 I-40 Residency: 05100 0.00 MI. I-40:BRIDGE REPAIR/
BHFY-220N(012) CLINTON EASTBOUND OFF RAMP AT MILE POST
65 IN CLINTON.
Contractor: PBX CORPORATION
Engineer: Greer, Randy Adjusted:
Contract Amount: $253,807.50 ( $253,807.50)
Contract Time: 45 ( 45 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 78
28128(26) Contract: 120060 US-183 Residency: 05003 47.08 MI. US-183;SAFETY IM-
BTOP-220N(002) COBB ENGINEERING CO., INC. PROVEMENTS(FIBER OPTIC CABLE) FROM
THE CITY OF CLINTON TO THE CITY OF
Contractor: HENKELS & MCCOY, INC. SEILING.
Engineer: COBB Adjusted:
Contract Amount: $1,335,179.44 ( $1,335,179.44)
Contract Time: 135 ( 135 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/24/2012 Adjusted:
W/O Effective: 03/26/2012 Amount Paid: 100 % ( 100 %)
Work Started: 03/20/2012 Time Passed: 87 % ( 87 %)
County: Delaware Commissioner District: 8
Contracts Under Construction
28320(04) Contract: 120208 CORD Residency: 08001 2.42 MI. CO.RD.:RESURFACE
STP-121C(152)CO ENGR. SERV. & TESTING (ASPHALT)(OLD SH-33/E580)BE- GIN AT
US-412 EXTEND EAST.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: EST Adjusted:
Contract Amount: $498,118.77 ( $498,118.77)
Contract Time: ( )
Letting Date: 06/21/2012
Contract Date: 07/17/2012 Fixed Completion Date: 10/31/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
20622(05) Contract: 110515 CORD Residency: 08002 0.568 MI.CO.RD. BRIDGE &
CIRB-121C(109)RB TETRA TECH APPROACHES:OVER SPAVINAW CR., 4.6
MI. N. & 3.9 MI. W. OF COLCORD.
Contractor: A. M. COHRON & SON, INC.
Engineer: TETR Adjusted:
Contract Amount: $1,328,040.72 ( $1,328,040.72)
Contract Time: 210 ( 210 )
Letting Date: 11/17/2011
Contract Date: 12/15/2011
W/O Issued: 01/23/2012 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 79 %( 79 %)
Work Started: 03/05/2012 Time Passed: 74 % ( 74 %)
25901(04) Contract: 120251 CORD Residency: 08001 0.25 MI. CO.RD.;BRIDGE &
BRF-121C(122)CI ENGR. SERV. & TESTING APPROACHES/OVER CARR CR. 1.0 MI.N.
& 3.0 MI. E. OF SH-10 /SH-25 JCT.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: EST Adjusted:
Contract Amount: $565,597.19 ( $565,597.19)
Contract Time: 90 ( 90 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 79
County: Dewey Commissioner District: 5
Contracts Under Construction
28128(13) Contract: 110500 I-40 Residency: 04011 0.00 MI. I-35/I-40/US-60/US-270/US-412
BTOP-109E(191) GARVER, LLC. AT VARIOUS LOCATIONS IN DIVISION
4,5 & 6.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: GARV Adjusted:
Contract Amount: $967,763.44 ( $967,763.44)
Contract Time: 150 ( 150 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 10/22/2011 Adjusted:
W/O Effective: 11/21/2011 Amount Paid: 96 %( 96 %)
Work Started: 01/25/2012 Time Passed: 114 %( 114 %)
28128(36) Contract: 120061 US-270 Residency: 05003 35.20 MI. US-270;SAFETY IM-
BTOP-222N(001) COBB ENGINEERING CO., INC. PROVEMENTS(FIBER OPTIC CABLE) FROM
THE CITY OF WOODWARD TO THE CITY
Contractor: HENKELS & MCCOY, INC. OF SEILING.
Engineer: COBB Adjusted:
Contract Amount: $1,090,231.56 ( $1,090,231.56)
Contract Time: 95 ( 95 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/24/2012 Adjusted:
W/O Effective: 03/26/2012 Amount Paid: 100 % ( 100 %)
Work Started: 03/26/2012 Time Passed: 84 % ( 84 %)
County: Ellis Commissioner District: 6
Contracts Under Construction
26248(04) Contract: 110473 CORD Residency: 06009 4.50 MI. CO.RD. RESURFACE
STP-123C(069)CI CIRCUIT ENGR. DISTR. #8 (ASPHALT)FROM 5.0 MI. SOUTH
OFSH-15,EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: CED8 Adjusted:
Contract Amount: $1,318,680.02 ( $1,399,218.45)
Contract Time: ( )
Letting Date: 08/18/2011
Contract Date: 09/20/2011 Fixed Completion Date: 10/31/2011
W/O Issued: 09/22/2011 Adjusted:
W/O Effective: Amount Paid: 105 %( 99 %)
Work Started: 10/03/2011 Time Passed: 159 % ( 77 %)
Construction Status Report Page 80
20942(04) Contract: 090101 US-283 Residency: 06100 1.280 MI. US-283;BRIDGE &
SSP-123B(030)SS BUFFALO APPROACHES/ OVER WOLF CREEK,
NORTH OF SHATTUCK.
Contractor: SEWELL BROS., INC.
Engineer: Burke, David Adjusted:
Contract Amount: $6,597,222.13 ( $6,621,987.04)
Contract Time: 255 ( 499 )
Letting Date: 02/19/2009
Contract Date: 03/10/2009
W/O Issued: 03/12/2009 Adjusted:
W/O Effective: 07/06/2009 Amount Paid: 100 % ( 100 %)
Work Started: 04/24/2009 Time Passed: 206 % ( 105 %)
24850(04) Contract: 100517 US-60 Residency: 06100 0.00 MI. US-60;BRIDGE REPR. :OVER
SBR-123B(059)SB BUFFALO RED BLUFF CR.,2.7 MI. E.OF TH US-283
JUNCTION.
Contractor: PBX CORPORATION
Engineer: Burke, David Adjusted:
Contract Amount: $200,188.30 ( $200,188.30)
Contract Time: 45 ( 50 )
Letting Date: 09/16/2010
Contract Date: 10/27/2010
W/O Issued: 10/28/2010 Adjusted:
W/O Effective: 02/07/2011 Amount Paid: 100 % ( 100 %)
Work Started: 02/07/2011 Time Passed: 118 % ( 106 %)
24339(04) Contract: 110179 CORD Residency: 06009 0.207 MI. CO.RD.:BRIDGE &
BRF-123C(055)CI CIRCUIT ENGR. DISTR. # 8 APPROACHES/OVER A TRIBUTARY
OFLONG CREEK, 5.75 MI. W. OF THE
Contractor: SEWELL BROS., INC. US-283 JUNCTION.
Engineer: CED8 Adjusted:
Contract Amount: $508,780.11 ( $556,882.46)
Contract Time: 90 ( 142 )
Letting Date: 03/17/2011
Contract Date: 04/18/2011
W/O Issued: 04/27/2011 Adjusted:
W/O Effective: 07/05/2011 Amount Paid: 106 %( 96 %)
Work Started: 06/13/2011 Time Passed: 173 %( 110 %)
County: Garfield Commissioner District: 4
Contracts Under Construction
24867(04) Contract: 110423 CORD Residency: 04300 2.42 MI. CO.RD.;GRADE,DRAIN,
CIRB-124C(111)RB ENID SURFACE & BRIDGE;FROM 6.0 MI. N. OF
THE KINGFISHER C/L, EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $1,676,860.73 ( $1,676,860.73)
Contract Time: 135 ( 135 )
Letting Date: 11/17/2011
Contract Date: 12/20/2011
W/O Issued: 12/29/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 91 %( 91 %)
Work Started: 03/13/2012 Time Passed: 110 %( 110 %)
Construction Status Report Page 81
23300(04) Contract: 120132 US-60 Residency: 04300 0.435 MI. US-60;GRADE,DRAIN,
BRFY-124A(083) ENID SURFACE & BRIDGE. OVER SOUTH-
BOUND US-64, 3.8 MI. N. OF US-412.
Contractor: ALLEN CONTRACTING, INC.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $2,675,669.70 ( $2,675,669.70)
Contract Time: 150 ( 150 )
Letting Date: 03/15/2012
Contract Date: 04/16/2012
W/O Issued: 04/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 4%( 4 %)
Work Started: 08/06/2012 Time Passed: 7%( 7 %)
28221(04) Contract: 110289 US-81 Residency: 04300 0.92 MI. US-81;RESURFACE
SSR-124N(139)SR ENID (ASPHALT)FROM 1.0 MI. SOUTH
OFUS-412, EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $679,606.00 ( $679,606.00)
Contract Time: 75 ( 75 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/27/2012 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 88 % ( 88 %)
Work Started: 03/25/2012 Time Passed: 73 % ( 73 %)
24867(07) Contract: 120178 CORD Residency: 04300 4.97 MI. CO.RD.:GRADE,DRAIN
CIRB-124C(112)RB ENID SURFACE & BRIDGE:FROM 7.5 MI. SOUTH
OF US-64, EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $2,915,938.66 ( $2,915,938.66)
Contract Time: 90 ( 90 )
Letting Date: 04/19/2012
Contract Date: 05/16/2012
W/O Issued: 05/18/2012 Adjusted:
W/O Effective: 06/18/2012 Amount Paid: 42 %( 42 %)
Work Started: 07/17/2012 Time Passed: 66 %( 66 %)
29194(04) Contract: 120126 SH-74 Residency: 04300 9.34 MI. SH-74:RESURFACE
STPY-224C(003)(004)3P ENID (ASPHALT)FROM THE LOGAN C/L,
EXTEND NORTH.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $1,740,529.00 ( $1,740,529.00)
Contract Time: 60 ( 60 )
Letting Date: 02/16/2012
Contract Date: 03/19/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 91 %( 91 %)
Work Started: 06/05/2012 Time Passed: 80 %( 80 %)
Construction Status Report Page 82
28128(39) Contract: 120065 US-412 Residency: 04300 *(001)/ 65.80 MI. US-412; SAFETY
BTOP-224N(001)/BTOP-247N* ENID IMPROVEMENTS(FIBER OPTIC
CABLE)FROM THE CITY OF ORIENTA
Contractor: B & H CONSTRUCTION, INC EAST TO IS-35.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $1,643,186.00 ( $1,652,986.00)
Contract Time: 210 ( 210 )
Letting Date: 01/19/2012
Contract Date: 02/13/2012
W/O Issued: 02/15/2012 Adjusted:
W/O Effective: 03/12/2012 Amount Paid: 100 % ( 100 %)
Work Started: 03/12/2012 Time Passed: 68 % ( 68 %)
County: Garvin Commissioner District: 3
Contracts Under Construction
28175(04) Contract: 110331 SH-74 Residency: 03200 0.112 MI. SH-74;BRIDGE RE-
SBR-125C(197)SB PURCELL HAB.:OVER ROCK CREEK, 7.76 MI.NORTH
OF THE CARTER C/L.
Contractor: K & R BUILDERS, INC.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $585,584.77 ( $585,584.77)
Contract Time: 120 ( 120 )
Letting Date: 07/21/2011
Contract Date: 08/09/2011
W/O Issued: 08/18/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 100 % ( 100 %)
Work Started: 01/23/2012 Time Passed: 118 % ( 118 %)
26811(04) Contract: 110467 CORD Residency: 03200 .167 MI. CO. RD. (NS-318) OVER A
BRO-125D(173)CI PURCELL TRIBUTARY OF RUSH CREEK, 4.0 MI.
SOUTH OF SH-19 JCT.
Contractor: KLAVER CONSTRUCTION COMPANY, INC.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $282,307.33 ( $297,781.47)
Contract Time: 90 ( 90 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 10/20/2011 Adjusted:
W/O Effective: 01/02/2012 Amount Paid: 99 %( 94 %)
Work Started: 12/06/2011 Time Passed: 159 % ( 159 %)
10444(04) Contract: 110425 SH-74 Residency: 03200 .852 MI. SH-74 OVER RUSH CREEKAND
BRFY-025C(274) PURCELL LIGHTNING CREEK, 8.0 MI. NOF SH-29
JCT.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $4,396,629.34 ( $4,396,629.34)
Contract Time: 300 ( 300 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/19/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 46 %( 46 %)
Work Started: 02/06/2012 Time Passed: 60 %( 60 %)
Construction Status Report Page 83
27544(04) Contract: 110290 SH-19 Residency: 03200 2.63 MI. SH-19:RESURFACE
SSR-125C(188)SR PURCELL (ASPHALT)FROM 6.51 MI. EAST OFSH-74,
EXTEND EAST.
Contractor: MARKWELL PAVING COMPANY, INC.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $453,353.70 ( $453,353.70)
Contract Time: 21 ( 21 )
Letting Date: 06/21/2012
Contract Date: 07/18/2012
W/O Issued: 07/20/2012 Adjusted:
W/O Effective: 08/13/2012 Amount Paid: 0%( 0 %)
Work Started: 08/14/2012 Time Passed: 0%( 0 %)
27134(04) Contract: 100572 SH-74 Residency: 03200 0.00 MI. SH-74;BANK PROTEC
SSP-125C(180)SS PURCELL -TION/RIPRAP:OVER WASHITA RIVER,
1.25 MI. N. OF THE SH-19 JUNCTION.
Contractor: K & K CONTRACTING, INC.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $1,247,607.16 ( $1,433,721.96)
Contract Time: 90 ( 90 )
Letting Date: 11/18/2010
Contract Date: 12/28/2010
W/O Issued: 01/04/2011 Adjusted:
W/O Effective: 04/04/2011 Amount Paid: 112 % ( 97 %)
Work Started: 04/04/2011 Time Passed: 170 % ( 170 %)
25980(04) Contract: 120015 IS-35 Residency: 07200 3.33 MI. IS-35;RESURFACE(AS- PHALT)&
IMY-0035-2(323)055 3P ARDMORE BRIDGE RPR. BEGIN 6.56MI. N. OF THE
CARTER C/L, EXT.N. 3.3 MI.,& BRIDGE
Contractor: THE CUMMINS CONSTRUCTION CO., INC. REPR.
Engineer: Earp, Jay Adjusted:
Contract Amount: $3,095,260.14 ( $3,098,896.14)
Contract Time: 90 ( 90 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/24/2012 Adjusted:
W/O Effective: 03/26/2012 Amount Paid: 96 %( 96 %)
Work Started: 04/02/2012 Time Passed: 94 %( 94 %)
County: Grady Commissioner District: 7
Contracts Under Construction
20234(04) Contract: 090044 SH-37 Residency: 07004 2.58 MI. SH-37;GRADE,DRAIN &
STPY-126C(060) JACOBS (AKA - SURFACE;BEGIN 4.62 MI. E. OF
CARTER-BURGESS)
US-81,EXTEND E. TO GREGORY ST.
Contractor: OVERLAND CORPORATION
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $4,939,237.40 ( $4,967,149.54)
Contract Time: 300 ( 825 )
Letting Date: 04/23/2009
Contract Date: 05/13/2009
W/O Issued: 05/15/2009 Adjusted:
W/O Effective: 07/06/2009 Amount Paid: 97 %( 97 %)
Work Started: 07/06/2009 Time Passed: 272 %( 99 %)
Construction Status Report Page 84
26851(04) Contract: 120239 CORD Residency: 07300 0.34 MI. CO.RD.:BRIDGE &
BRO-126D(176)CI ANADARKO APPROACHES:OVER SALT CR., 1.7 MI.
NORTH & 2.0 MI. EAST OF POCASSET.
Contractor: D. M. DOZERS, INC.
Engineer: Knight, Reese Adjusted:
Contract Amount: $514,292.70 ( $514,292.70)
Contract Time: 90 ( 90 )
Letting Date: 06/21/2012
Contract Date: 07/17/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0%( 0 %)
Work Started: 08/07/2012 Time Passed: 0%( 0 %)
20960(04) Contract: 110241 SH-37 Residency: 07300 0.558 MI. SH-37/BRIDGE &
BRFY-126C(082) ANADARKO APPROACHES:OVER BUGGY CREEK, 0.6
MI. EAST OF US-81.
Contractor: SEWELL BROS., INC.
Engineer: Knight, Reese Adjusted:
Contract Amount: $2,403,359.07 ( $2,403,359.07)
Contract Time: 180 ( 180 )
Letting Date: 04/19/2012
Contract Date: 05/22/2012
W/O Issued: 05/25/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Grant Commissioner District: 4
Contracts Under Construction
26420(04) Contract: 110482 US60 Residency: 04300 .56 MI. US-60: GRADE,DRAIN,SURFACE
BRFY-127B(152)SS ENID AND BRIDGE; OVER SALT FORK OF THE
ARKANSAS RIVER, 1.0 MI. E OF US-81
Contractor: SEWELL BROS., INC.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $5,420,085.61 ( $5,420,085.61)
Contract Time: 300 ( 300 )
Letting Date: 10/20/2011
Contract Date: 11/22/2011
W/O Issued: 11/28/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 38 %( 38 %)
Work Started: 03/05/2012 Time Passed: 55 % ( 55 %)
29242(04) Contract: 120147 SH-132 Residency: 04300 12.760 MI. SH-132:RESURFACE
STPY-227C(003)(004)3P ENID (ASPHALT) BEGIN AT SH-11 EX- TEND
NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $1,759,330.00 ( $1,759,330.00)
Contract Time: ( )
Letting Date: 05/17/2012
Contract Date: 06/15/2012 Fixed Completion Date: 10/31/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 85
County: Greer Commissioner District: 5
Contracts Under Construction
28128(14) Contract: 110502 I-40 Residency: 05003 0.00 MI. I-40/SH-6/SH-9 AT VARIOUS
BTOP-120E(201) COBB ENGINEERING CO., INC. LOCATIONS IN DIVISION 5.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: COBB Adjusted:
Contract Amount: $961,786.64 ( $961,786.64)
Contract Time: 150 ( 150 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 10/22/2011 Adjusted:
W/O Effective: 11/21/2011 Amount Paid: 94 %( 94 %)
Work Started: 11/21/2011 Time Passed: 90 %( 90 %)
County: Harmon Commissioner District: 5
Contracts Under Construction
28020(04) Contract: 110516 CORD Residency: 05005 0.161 MI. CO.RD. BRIDGE &
BRO-129D(047)CI CIRCUIT ENGR. DISTR. # 7 APPROACHES;OVER TURKEY CR., 6.5
MI. N. OF THE US-62 JCT.
Contractor: K & R BUILDERS, INC.
Engineer: CED7 Adjusted:
Contract Amount: $279,104.42 ( $279,104.42)
Contract Time: 90 ( 120 )
Letting Date: 11/17/2011
Contract Date: 12/20/2011
W/O Issued: 12/29/2011 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 57 % ( 57 %)
Work Started: 04/02/2012 Time Passed: 134 % ( 101 %)
29153(04) Contract: 120121 US-62 Residency: 05200 5.24 MI. US-62/RESURFACE
NHY-020N(041)3P ALTUS (ASPHALT)FROM 9.0 MI. EAST OF SH-30,
EXTEND EAST.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Nedbalek, Will Adjusted:
Contract Amount: $946,654.34 ( $947,509.39)
Contract Time: 45 ( 45 )
Letting Date: 02/16/2012
Contract Date: 03/12/2012
W/O Issued: 03/13/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 100 %( 100 %)
Work Started: 03/20/2012 Time Passed: 40 % ( 40 %)
County: Harper Commissioner District: 6
Contracts Under Construction
Construction Status Report Page 86
27434(04) Contract: 120016 US-270 Residency: 06100 0.00 MI. US-270;BRIDGE RE-
SBR-130N(148)SB BUFFALO HABILITATION;OVER OTTER CR., 13.6
MI. EAST OF THE BEAVER CL.
Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer: Burke, David Adjusted:
Contract Amount: $192,397.20 ( $192,397.20)
Contract Time: 45 ( 45 )
Letting Date: 01/19/2012
Contract Date: 02/17/2012
W/O Issued: 03/20/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Haskell Commissioner District: 1
Contracts Under Construction
23102(04) Contract: 100603 SH-9 Residency: 01100 0.232 MI. SH-9;BRIDGE & AP-
BRFY-131B(067) MUSKOGEE PROACHES; OVER KINGS CR., 1.0 MI. E.
OF THE SH-2 JUNCTION.
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $1,759,826.88 ( $1,770,283.64)
Contract Time: 180 ( 180 )
Letting Date: 10/21/2010
Contract Date: 11/23/2010
W/O Issued: 11/24/2010 Adjusted:
W/O Effective: 03/07/2011 Amount Paid: 94 % ( 93 %)
Work Started: 04/12/2011 Time Passed: 116 % ( 116 %)
24965(04) Contract: 110270 CORD Residency: 01200 1.271 MI. CO.RD. BRIDGE &
CIRB-131C(085)RB SALLISAW APPROACHES:OVER SANS BOIS CR.,AT
THE KERR RESERVOIR, 2.5 MI. NORTH
Contractor: GLOVER & ASSOCIATES, INC. OF SH-9.
Engineer: Edwards, Carl Adjusted:
Contract Amount: $1,419,499.88 ( $1,419,499.88)
Contract Time: 150 ( 150 )
Letting Date: 05/19/2011
Contract Date: 06/14/2011
W/O Issued: 06/22/2011 Adjusted:
W/O Effective: 09/01/2011 Amount Paid: 95 %( 95 %)
Work Started: 09/01/2011 Time Passed: 89 % ( 89 %)
23101(04) Contract: 110242 SH-9 Residency: 01200 .709 MI. SH-9 OVER SNAKE CREEK, 5.5
BRFY-131B(064) SALLISAW MI. EAST OF SH-2 JCT.
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer: Edwards, Carl Adjusted:
Contract Amount: $2,719,722.44 ( $2,729,737.56)
Contract Time: 240 ( 240 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/19/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 30 %( 30 %)
Work Started: 02/06/2012 Time Passed: 49 %( 49 %)
Construction Status Report Page 87
County: Hughes Commissioner District: 3
Contracts Under Construction
20973(04) Contract: 110291 US-75 Residency: 03300 2.72 MI. US-75:GRADE,SURFACE &
STPY-132B(071) WEWOKA BRIDGE:FROM GRAND AVE. IN THE CITY
OF WETUMKA,EXTEND NORTHEAST.
Contractor: SEWELL BROS., INC.
Engineer: Moore, Archie (Act.) Adjusted:
Contract Amount: $8,521,068.29 ( $8,599,019.85)
Contract Time: 330 ( 330 )
Letting Date: 06/16/2011
Contract Date: 07/22/2011
W/O Issued: 07/29/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 89 %( 88 %)
Work Started: 08/15/2011 Time Passed: 91 %( 91 %)
28176(04) Contract: 110334 US-75 Residency: 03004 0.00 MI. US-75:BRIDGE REHAB. :OVER
SBR-132B(155)SB WEWOKA CREEK, 2.5 MI.
JACOBS (AKA - CARTER-BURGESS) SOUTH OF
THE SH-9 JCT/
Contractor: B & B BRIDGE COMPANY, LLC
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $1,054,622.03 ( $1,054,622.03)
Contract Time: 120 ( 129 )
Letting Date: 07/21/2011
Contract Date: 08/16/2011
W/O Issued: 08/29/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 91 % ( 91 %)
Work Started: 10/24/2011 Time Passed: 167 % ( 155 %)
County: Jackson Commissioner District: 5
Contracts Under Construction
27539(04) Contract: 110292 US-283 Residency: 05200 2.00 MI. US-283;RESURFACE
SSR-133B(120)SR ALTUS (ASPHALT)BEGIN 3.0 MI. SOUTH OF
US-62, EXTEND NORTH.
Contractor: APAC-CENTRAL, INC.
Engineer: Nedbalek, Will Adjusted:
Contract Amount: $506,074.28 ( $509,249.33)
Contract Time: 30 ( 30 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/27/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 101 %( 100 %)
Work Started: 04/11/2012 Time Passed: 33 % ( 33 %)
Construction Status Report Page 88
26627(04) Contract: 120240 CORD Residency: 05005 0.189 MI. CO.RD.:BRIDGE &
BRF-133C(105)CI CIRCUIT ENGR. DISTR. # 7 APPROACHES/OVER UNNAMED CR., 4.5
MI. EAST OF US-283.
Contractor: K & R BUILDERS, INC.
Engineer: CED7 Adjusted:
Contract Amount: $584,381.51 ( $584,381.51)
Contract Time: 120 ( 120 )
Letting Date: 06/21/2012
Contract Date: 07/20/2012
W/O Issued: 07/24/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Jefferson Commissioner District: 7
Contracts Under Construction
24971(04) Contract: 110203 CORD Residency: 07100 5.02 MI. CORD(NS-278):GRADE,DRAIN &
CIRB-134C(065)RB DUNCAN SURFACE; FROM US-70 EXTEND SOUTH
Contractor: OVERLAND CORPORATION
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $2,787,256.70 ( $2,787,256.70)
Contract Time: 150 ( 150 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 11/22/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 90 % ( 90 %)
Work Started: 02/06/2012 Time Passed: 98 % ( 98 %)
23125(09) Contract: 120159 IS-35 Residency: 07200 0.00 MI. IS-35;BRIDGEPROOF
BRFY-234C(005) ARDMORE SEAL;US-70/SH-76/SH-199. AT
MULTIPLE LOCATIONS IN DIV. VII.
Contractor: GARY A. CRAIN, INC.
Engineer: Earp, Jay Adjusted:
Contract Amount: $28,677.00 ( $28,677.00)
Contract Time: 30 ( 30 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 05/23/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 99 %( 99 %)
Work Started: 07/17/2012 Time Passed: 33 % ( 33 %)
27324(04) Contract: 100354 US-70 Residency: 07100 0.274 MI. US-70;BRIDGE RE-
SBR-134B(77)(78)SB DUNCAN HAB.:OVER WEST MUD CR.,6.21 MIEAST
OF THE US-81 JCT & OVER UNNAMED
Contractor: PBX CORPORATION CREEK.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $1,085,152.59 ( $1,085,152.59)
Contract Time: 120 ( 163 )
Letting Date: 05/20/2010
Contract Date: 06/23/2010
W/O Issued: 07/02/2010 Adjusted:
W/O Effective: 08/16/2010 Amount Paid: 92 %( 92 %)
Work Started: 10/18/2010 Time Passed: 164 %( 121 %)
Construction Status Report Page 89
25597(04) Contract: 100385 CORD Residency: 07100 0.1880 MI. CO.RD.;BRIDGE &
BRO-134D(072)CO DUNCAN APPROACHES;OVER A TRIBUTARY TO
RED CREEK, 5.4 MI. EAST OF THE
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
US-81 JCT.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $280,132.67 ( $280,132.67)
Contract Time: 90 ( 181 )
Letting Date: 06/17/2010
Contract Date: 07/28/2010
W/O Issued: 07/29/2010 Adjusted:
W/O Effective: 10/04/2010 Amount Paid: 87 % ( 87 %)
Work Started: 08/11/2010 Time Passed: 160 % ( 80 %)
28128(44) Contract: 120176 US-81 Residency: 07004 51.97 MI. US-81;SAFETY IM-
BTOP-234B(001) PROVEMENTS(FIBER OPTIC CABLE)
JACOBS (AKA - CARTER-BURGESS)
US-70;BEGIN 4.7 MI. N. OF
Contractor: ROHL NETWORKS, LP US-70,EXTEND S., THEN E. ON US
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $1,519,496.64 ( $1,519,496.64)
Contract Time: 140 ( 140 )
Letting Date: 03/15/2012
Contract Date: 04/12/2012
W/O Issued: 05/09/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 7%( 7 %)
Work Started: 07/11/2012 Time Passed: 52 % ( 52 %)
-70.
29220(04) Contract: 120304 US-81 Residency: 07002 0.00 MI. US-81:BRIDGE REHAB. :OVER
SBR-234N(007)SB TETRA TECH SQUIRREL CR. 3.5 MI. S. OF US-70.
Contractor: MERIDIAN CONTRACTING, INC.
Engineer: TETR Adjusted:
Contract Amount: $536,823.00 ( $536,823.00)
Contract Time: 120 ( 120 )
Letting Date: 07/19/2012
Contract Date: 08/17/2012
W/O Issued: 08/22/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
25598(04) Contract: 100485 CORD Residency: 07100 0.221 MI. CO.RD.;BRIDGE &
BRO-134D(073)CO DUNCAN APPROACHES/OVER CLEAR CR., 0.5MI.
EAST OF THE SH-89 JUNCTION.
Contractor: K & R BUILDERS, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $346,494.32 ( $346,494.32)
Contract Time: 90 ( 189 )
Letting Date: 08/19/2010
Contract Date: 09/20/2010
W/O Issued: 09/28/2010 Adjusted:
W/O Effective: 12/06/2010 Amount Paid: 95 %( 95 %)
Work Started: 12/06/2010 Time Passed: 216 %( 103 %)
Construction Status Report Page 90
29174(04) Contract: 120303 SH-32 Residency: 07002 0.00 MI. SH-32:BRIDGE REHAB. /OVER
SBR-234C(002)SB TETRA TECH RED CR., 8.1 MI. E. OF US-81.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: TETR Adjusted:
Contract Amount: $599,815.61 ( $599,815.61)
Contract Time: 100 ( 100 )
Letting Date: 07/19/2012
Contract Date: 08/16/2012
W/O Issued: 08/21/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Johnston Commissioner District: 3
Contracts Under Construction
28606(04) Contract: 110426 US-75 Residency: 03001 0.00 MI. US-75/SH-3E/SH-7/SH-22/CORD
BRFY-NBIP(448)3B ENGR. SERV. & TESTING AT VARIOUS LOCATIONS INDIVISION 3.
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer: EST Adjusted:
Contract Amount: $415,994.00 ( $415,994.00)
Contract Time: 75 ( 75 )
Letting Date: 09/15/2011
Contract Date: 10/18/2011
W/O Issued: 11/01/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 64 % ( 64 %)
Work Started: 02/06/2012 Time Passed: 45 % ( 45 %)
28218(04) Contract: 120095 SH-99 Residency: 03100 6.04 MI. SH-99:RESURFACE
STPY-135B(130)(131)3P ADA (ASPHALT)FROM THE MARSHALL C/L,
EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Russell, Julie Adjusted:
Contract Amount: $1,062,142.16 ( $1,062,142.16)
Contract Time: 45 ( 45 )
Letting Date: 02/16/2012
Contract Date: 03/14/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 86 %( 86 %)
Work Started: 05/09/2012 Time Passed: 120 % ( 120 %)
County: Kay Commissioner District: 4
Contracts Under Construction
Construction Status Report Page 91
25909(13) Contract: 100550 I-35 Residency: 04100 1.453 MI. IS-35;GRADE,DRAIN
ACIMY-0035-4(224)235MS PERRY ,SURFACE, & SITE PLAN:TRUCK WEIGH
STATION 2.0 MI. S. OF THE OK/KANSAS
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCSTATE LINE.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $7,489,962.67 ( $7,647,522.71)
Contract Time: 290 ( 544 )
Letting Date: 09/16/2010
Contract Date: 10/14/2010
W/O Issued: 11/09/2010 Adjusted:
W/O Effective: 01/10/2011 Amount Paid: 100 % ( 98 %)
Work Started: 12/07/2010 Time Passed: 187 % ( 100 %)
28315(04) Contract: 120140 US-60B Residency: 04100 0.06 MI. US-60B/BRIDGE RE-
SBR-136N(211)SB PERRY HABILITATION/US-177;OVER US- 60 IN
TONKAWA.
Contractor: K & R BUILDERS, INC.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $1,228,814.77 ( $1,228,814.77)
Contract Time: 90 ( 90 )
Letting Date: 03/15/2012
Contract Date: 04/13/2012
W/O Issued: 04/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 10 % ( 10 %)
Work Started: 08/06/2012 Time Passed: 10 % ( 10 %)
27594(04) Contract: 120305 US-60 Residency: 04100 0.070 MI. US-60:BRIDGE REHAB. OVER
SBR-136B(217)SB PERRY US-60B S.W. OF PONCA CITY
Contractor: A. M. COHRON & SON, INC.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $768,838.37 ( $768,838.37)
Contract Time: 90 ( 90 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
27063(04) Contract: 110483 I35 Residency: 04100 .359 MI. I-35:BRIDGE AND APPROACHES;
BRIY-0035-4(239)232 PERRY OVER US-177
Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer: Zachary, Ted Adjusted:
Contract Amount: $4,078,821.42 ( $4,078,821.42)
Contract Time: 240 ( 240 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 01/30/2012 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 64 %( 64 %)
Work Started: 02/20/2012 Time Passed: 69 %( 69 %)
Construction Status Report Page 92
27446(04) Contract: 120097 IS-35 Residency: 04100 3.98 MI. IS-35:RESURFACE
SSR-136N(198)SR PERRY (ASPHALT)FROM 3.98 MI. SOUTH OF THE
KANSAS STATE LINE, EXTEND NORTH.
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $2,369,970.00 ( $2,369,970.00)
Contract Time: ( )
Letting Date: 06/21/2012
Contract Date: 07/13/2012 Fixed Completion Date: 10/31/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
22953(04) Contract: 110380 CTST Residency: 04100 1.734 MI. CT.ST.:GRADE,DRAIN &
STP-136D(117)CI PERRY SURFACE/ON HUBBARD RD. IN PONCA
CITY, FROM WAVERLY RD. EXTEND
Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC. EAST.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $3,181,697.06 ( $3,230,473.32)
Contract Time: 200 ( 216 )
Letting Date: 08/18/2011
Contract Date: 09/20/2011
W/O Issued: 09/22/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 47 % ( 46 %)
Work Started: 02/21/2012 Time Passed: 84 % ( 78 %)
29310(04) Contract: 120254 I-35 Residency: 04100 0.00 MI. IS-35:STRIPING & PAVEMENT
HSIPG-236F(003)TR PERRY MARKING/US-60/US-77/
US-177/SH-51:MULTIPLE LO- CATIONS
Contractor: DIRECT TRAFFIC CONTROL INC. IN DIV. IV.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $157,250.00 ( $157,250.00)
Contract Time: 45 ( 45 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 09/17/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
County: Kingfisher Commissioner District: 4
Contracts Under Construction
24882(04) Contract: 110082 US-81 Residency: 04300 0.28 MI. US-81/BRIDGE REHAB. :OVER
SBR-137N(072)SB ENID THE CIMARRON RIVER, 6.8 MI. NORTH
OF THE SH-33 JUNC- TION.
Contractor: A. M. COHRON & SON, INC.
Engineer: Crowl, Kenny (Act.) Adjusted:
Contract Amount: $2,043,649.08 ( $2,060,875.16)
Contract Time: 180 ( 218 )
Letting Date: 07/21/2011
Contract Date: 08/12/2011
W/O Issued: 09/12/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 91 %( 90 %)
Work Started: 10/26/2011 Time Passed: 134 %( 111 %)
Construction Status Report Page 93
29085(04) Contract: 120255 US-81 Residency: 04011 0.177 MI. US-81:GRADE,DRAIN, &
SSP-237E(001)SS GARVER, LLC. SURFACE:FROM 2.6 MI. S. OF THE SH-33
JCT EXTEND NORTH.
Contractor: TOM HUDSON PAVING, INC.
Engineer: GARV Adjusted:
Contract Amount: $536,881.85 ( $536,881.85)
Contract Time: 90 ( 90 )
Letting Date: 07/19/2012
Contract Date: 08/16/2012
W/O Issued: 08/21/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Kiowa Commissioner District: 5
Contracts Under Construction
16063(45) Contract: 120160 US-183 Residency: 05200 3.04 MI./US-183/GRADE,DRAIN, &
NHY-009N(098) ALTUS SURFACE;FROM 1.5 MI. N. OF THE SH-9
WEST JUNCTION, EX- TEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Nedbalek, Will Adjusted:
Contract Amount: $7,121,528.84 ( $7,121,528.84)
Contract Time: 180 ( 180 )
Letting Date: 04/19/2012
Contract Date: 05/16/2012
W/O Issued: 05/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 4%( 4 %)
Work Started: 08/13/2012 Time Passed: 6%( 6 %)
26972(04) Contract: 110484 CORD Residency: 05005 .246 MI. CO.RD.(NS-225):BRIDGE AND
BRO-NBIL(174)CI CIRCUIT ENGR. DISTR. # 7 APPOACHES OVER OTTER CREEK 3.5 MI.
N OFUS-62 AND 1.0 MI. W OF US-183
Contractor: SEWELL BROS., INC.
Engineer: CED7 Adjusted:
Contract Amount: $383,549.36 ( $383,549.36)
Contract Time: 90 ( 102 )
Letting Date: 10/20/2011
Contract Date: 11/22/2011
W/O Issued: 11/29/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 94 %( 94 %)
Work Started: 02/27/2012 Time Passed: 126 % ( 111 %)
16063(44) Contract: 110295 US-183 Residency: 05200 2.268 MI. US-183/GRADE,DRAIN &
NHY-009N(097)SS ALTUS BRIDGE:FROM 1.8 MI. NORTH OF THE
SH-9 WEST JUNCTION, EXTEND NORTH.
Contractor: CORNELL CONSTRUCTION COMPANY, INC.
Engineer: Nedbalek, Will Adjusted:
Contract Amount: $1,081,602.56 ( $1,086,085.32)
Contract Time: 120 ( 121 )
Letting Date: 08/18/2011
Contract Date: 09/26/2011
W/O Issued: 09/29/2011 Adjusted:
W/O Effective: 01/02/2012 Amount Paid: 88 %( 87 %)
Work Started: 12/08/2011 Time Passed: 103 %( 102 %)
Construction Status Report Page 94
County: Latimer Commissioner District: 2
Contracts Under Construction
18843(04) Contract: 100387 US-270 Residency: 02400 1.402 MI. US-270;GRADE,DRAIN
CIP-139B(025)IP MCALESTER ,SURFACE & BRIDGE;FROM 6.5 MI.EAST
OF THE SH-2 JCT, EXTEND EAST.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Plymate, Larry Adjusted:
Contract Amount: $3,901,084.36 ( $4,020,957.62)
Contract Time: 360 ( 624 )
Letting Date: 06/17/2010
Contract Date: 07/26/2010
W/O Issued: 10/11/2010 Adjusted:
W/O Effective: 11/01/2010 Amount Paid: 94 %( 92 %)
Work Started: 11/30/2010 Time Passed: 182 %( 105 %)
28614(04) Contract: 120256 CORD Residency: 02013 0.311 MI. CO.RD.:GRADE,DRAIN,
STP-139C(120)CI CIRCUIT ENGR. DISTRICT # 3 SURFACE & BRIDGE(CRAVENS RD.) OVER
AN UNNAMED CR. 4.3 MI. E. & 1.3 MI. S.
Contractor: GLOVER & ASSOCIATES, INC. OF US-270.
Engineer: CED3 Adjusted:
Contract Amount: $531,458.49 ( $531,458.49)
Contract Time: 90 ( 90 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 09/17/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
00464(14) Contract: 120211 SH-82 Residency: 02200 0.616 MI. SH-82:GRADE,DRAIN &
STPY-139C(094) HEAVENER SURFACE:SLIDE REPR. FROM 64 MI.
NORTH OF US-270, EX- TEND NORTH.
Contractor: T. MCDONALD CONSTRUCTION, INC.
Engineer: Huddleston, David Adjusted:
Contract Amount: $2,917,533.98 ( $2,917,533.98)
Contract Time: 300 ( 300 )
Letting Date: 06/21/2012
Contract Date: 07/12/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0%( 0 %)
00464(16) Contract: 110257 SH-82 Residency: 02200 0.700 MI. SH-82;GRADE,DRAIN
ERSTP-139C(096)ER HEAVENER SURFACE & EROSION
CONTROL;LANDSLIDE REPR. FROM 4.8
Contractor: SHERWOOD CONSTRUCTION CO., INC. MI. NORTH OF US-270
Engineer: Huddleston, David Adjusted: JCT,EXT.NORTH.
Contract Amount: $4,322,783.60 ( $4,322,783.60)
Contract Time: 270 ( 270 )
Letting Date: 04/14/2011
Contract Date: 05/12/2011
W/O Issued: 05/26/2011 Adjusted:
W/O Effective: 07/11/2011 Amount Paid: 96 %( 96 %)
Work Started: 07/15/2011 Time Passed: 114 %( 114 %)
Construction Status Report Page 95
26298(04) Contract: 120050 CORD Residency: 02013 0.179 MI. CO.RD.;BRIDGE &
BRO-139D(101)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES:OVER CROOKED CR., 1.1
MI. S. OF SH-63 & 1.2 MI. W. OF THE
Contractor: C-GAWF CONSTRUCTION, INC. LEFLORE CL.
Engineer: CED3 Adjusted:
Contract Amount: $471,868.77 ( $471,868.77)
Contract Time: 120 ( 120 )
Letting Date: 01/19/2012
Contract Date: 02/24/2012
W/O Issued: 03/01/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 24 % ( 24 %)
Work Started: Time Passed: 66 % ( 66 %)
28128(47) Contract: 120066 US-270 Residency: 02200 41.79 MI. US-270/US-271; SAFETY
BTOP-239B(001) HEAVENER IMPROVEMENTS(FIBER OPTIC
CABLE)FROM THE CITY OF
Contractor: AMERICAN DIRECTIONAL BORING,INC. DBA ADB UTILITY CONTRACTORS
WILBURTON, IN POTEAU.
Engineer: Huddleston, David Adjusted:
Contract Amount: $1,906,450.18 ( $1,906,450.18)
Contract Time: 125 ( 125 )
Letting Date: 01/19/2012
Contract Date: 02/23/2012
W/O Issued: 03/06/2012 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 90 % ( 90 %)
Work Started: 04/02/2012 Time Passed: 97 % ( 97 %)
County: Le Flore Commissioner District: 2
Contracts Under Construction
28586(04) Contract: 110387 US-259 Residency: 02200 0.00 MI. US-259:BRIDGE PAINT
BRFY-NBIP(441)3B HEAVENER -ING/SH-3/SH-112:AT VARIOUS
LOCATIONS IN DIV. II.
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer: Huddleston, David Adjusted:
Contract Amount: $269,944.00 ( $269,944.00)
Contract Time: 75 ( 75 )
Letting Date: 08/18/2011
Contract Date: 09/28/2011
W/O Issued: 11/01/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 69 %( 69 %)
Work Started: 05/04/2012 Time Passed: 95 % ( 95 %)
28454(04) Contract: 120182 US-259 Residency: 02200 0.221 MI. US-259:SAFETYH IM-
STPG-140A(211)TR HEAVENER PROVEMENT(CONCRETE BARRIER
WALL)BEGIN 3.36 MI. S. OF SH-63,
Contractor: MANHATTAN ROAD & BRIDGE COMPANY EXTEND SOUTH.
Engineer: Huddleston, David Adjusted:
Contract Amount: $1,033,890.85 ( $1,033,890.85)
Contract Time: 150 ( 150 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 09/24/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 96
26904(04) Contract: 120148 CORD Residency: 02013 0.07 MI. CO. RD.:BRIDGE &
BRO-140D(189)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES/OVER TRIBUTARY OF
POTEAU RIVER 2.8 MI. S. & 0.5 MI. W.
Contractor: HUB CONSTRUCTION, INC. OF US-271/SH-9 JCT
Engineer: CED3 Adjusted:
Contract Amount: $214,245.60 ( $214,245.60)
Contract Time: 90 ( 90 )
Letting Date: 03/15/2012
Contract Date: 04/16/2012
W/O Issued: 04/18/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 65 % ( 65 %)
Work Started: Time Passed: 43 % ( 43 %)
25101(04) Contract: 110532 CORD Residency: 02013 0.246 MI. CO.RD./BRIDGE &
CIRB-140D(162)RB CIRCUIT ENGR. DISTRICT # 3 APPROACHES:OVER THE POTEAU
RIVER, 0.4 MI. SOUTH OF SH-128.
Contractor: HUB CONSTRUCTION, INC.
Engineer: CED3 Adjusted:
Contract Amount: $1,257,926.90 ( $1,257,926.90)
Contract Time: 150 ( 150 )
Letting Date: 11/17/2011
Contract Date: 12/15/2011
W/O Issued: 12/20/2011 Adjusted:
W/O Effective: 01/23/2012 Amount Paid: 49 % ( 49 %)
Work Started: 04/26/2012 Time Passed: 69 % ( 69 %)
28128(48) Contract: 120071 US-59 Residency: 02200 36.18 MI. US-59;SAFETY IM-
BTOP-240A(001) HEAVENER PROVEMENT(FIBER OPTIC CABLE) FROM
POTEAU EXTEND NORTH TO
Contractor: BEAR COMMUNICATIONS, LLC SALLISAW.
Engineer: Huddleston, David Adjusted:
Contract Amount: $1,242,465.04 ( $1,242,465.04)
Contract Time: 110 ( 110 )
Letting Date: 02/16/2012
Contract Date: 03/20/2012
W/O Issued: 04/10/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 54 %( 54 %)
Work Started: 05/15/2012 Time Passed: 92 %( 92 %)
23145(07) Contract: 120033 SH-31 Residency: 02200 0.00 MI. SH-31 BRIDGE PAIN- TING;
BRFY-NBIP(450) HEAVENER MULTIPLE LOCATIONS IN DIV. II.
Contractor: POSEIDON CONSTRUCTION, INC.
Engineer: Huddleston, David Adjusted:
Contract Amount: $722,922.00 ( $722,922.00)
Contract Time: 90 ( 90 )
Letting Date: 01/19/2012
Contract Date: 02/22/2012
W/O Issued: 05/31/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 0 %( 0 %)
Work Started: 08/14/2012 Time Passed: 0 %( 0 %)
Construction Status Report Page 97
26905(04) Contract: 120051 CORD Residency: 02013 0.08 MI. CO.RD.;BRIDGE &
BRO-140D(190)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES/OVER UNNAMED CR., 4.0
MI. SOUTH & 1,.7 MI. WEST OF
Contractor: C-GAWF CONSTRUCTION, INC. POCOLA.
Engineer: CED3 Adjusted:
Contract Amount: $235,577.04 ( $235,577.04)
Contract Time: 90 ( 90 )
Letting Date: 01/19/2012
Contract Date: 02/24/2012
W/O Issued: 02/29/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 85 % ( 85 %)
Work Started: 04/26/2012 Time Passed: 110 % ( 110 %)
County: Lincoln Commissioner District: 3
Contracts Under Construction
25087(04) Contract: 110153 CORD Residency: 03003 5.93 MI. CO.RD.(EW-87):SURFACELAKE
CIRB-141C(191)RB COBB ENGINEERING CO., INC. RD US-177 EXTEND EAST.
Contractor: THE QUAPAW COMPANY
Engineer: COBB Adjusted:
Contract Amount: $2,323,488.45 ( $2,546,230.37)
Contract Time: 90 ( 140 )
Letting Date: 10/20/2011
Contract Date: 11/21/2011
W/O Issued: 11/22/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 49 % ( 44 %)
Work Started: 03/05/2012 Time Passed: 152 % ( 98 %)
24180(08) Contract: 120018 US-177 Residency: 03300 0.715 MI. US-177;GRADE,DRAIN
BRFY-141B(206) WEWOKA ,SURFACE & BRIDGE/OVER SPRING CR.,
& DEEP FORK N.CANADIAN RIVER 0.24
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) & 0.53 MI. N. OF SH
Engineer: Moore, Archie (Act.) Adjusted:
Contract Amount: $4,046,554.18 ( $4,046,554.18)
Contract Time: 210 ( 210 )
Letting Date: 01/19/2012
Contract Date: 02/14/2012
W/O Issued: 04/05/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 46 %( 46 %)
Work Started: 05/16/2012 Time Passed: 44 % ( 44 %)
-66.
20995(04) Contract: 110244 US-75 Residency: 03100 0.00 MI. US-75:JOINT SEAL/
BRFY-141F(229) ADA REPAIR;SH-3/SH-66:AT MULTIPLE
LOCATIONS IN DIV. III.
Contractor: PBX CORPORATION
Engineer: Russell, Julie Adjusted:
Contract Amount: $381,844.50 ( $381,844.50)
Contract Time: 90 ( 120 )
Letting Date: 04/14/2011
Contract Date: 05/18/2011
W/O Issued: 05/25/2011 Adjusted:
W/O Effective: 09/01/2011 Amount Paid: 92 %( 92 %)
Work Started: 10/01/2011 Time Passed: 146 %( 109 %)
Construction Status Report Page 98
05859(10) Contract: 110462 SH-18 Residency: 03300 3.84 MI. SH-18 FROM 3.8 MI. SOUTH OF
STPY-063C(372) WEWOKA SH-62 IN MEEKER EXTEND NORTH.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Moore, Archie (Act.) Adjusted:
Contract Amount: $6,764,377.57 ( $7,049,790.97)
Contract Time: 325 ( 325 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/20/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 14 % ( 13 %)
Work Started: 12/27/2011 Time Passed: 58 % ( 58 %)
24679(04) Contract: 110300 SH-105 Residency: 03300 6.91 MI. SH-105:RESURFACE
SSR-141C(185)SR WEWOKA (ASPHALT)FROM THE LOGAN CL,
EXTEND EAST.
Contractor: ATLAS PAVING COMPANY
Engineer: Moore, Archie (Act.) Adjusted:
Contract Amount: $1,004,183.47 ( $1,004,183.47)
Contract Time: 40 ( 40 )
Letting Date: 06/21/2012
Contract Date: 07/11/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Logan Commissioner District: 4
Contracts Under Construction
24217(04) Contract: 110461 I-35 Residency: 04500 .709 MI. I-35:BRIDGE & APPROACHES
IMY-0035-4(215)151 STILLWATER OVER SEWARD RD 5.0 MI. N OF
OKLAHOMA COUNTY LINE
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer: Arps, Jonathan Adjusted:
Contract Amount: $7,119,614.24 ( $7,201,952.07)
Contract Time: 240 ( 240 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 11/22/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 63 %( 62 %)
Work Started: 03/05/2012 Time Passed: 62 % ( 62 %)
29196(04) Contract: 120124 US-77 Residency: 04500 5.29 MI. US-77;RESURFACE
STPY-242C(002)3P STILLWATER (ASPHALT)FROM 7.25 MI. N. OF SH-33,
EXTEND NORTH.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Arps, Jonathan Adjusted:
Contract Amount: $1,042,269.00 ( $1,042,269.00)
Contract Time: 45 ( 45 )
Letting Date: 04/19/2012
Contract Date: 05/16/2012
W/O Issued: 05/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 99
23018(04) Contract: 120134 CORD Residency: 04500 0.302 MI. CO.RD./BRIDGE &
STP-142C(119)AG STILLWATER APPROACHES:BROADWAY BLVD.OVER
COTTONWOOD CR., 0.5 MI. S. & 3.5
Contractor: BRIDGECO CONTRACTORS, INC. MI. W. OF IS-35/US-77 JC
Engineer: Arps, Jonathan Adjusted:
Contract Amount: $1,115,636.70 ( $1,122,681.50)
Contract Time: 180 ( 180 )
Letting Date: 03/15/2012
Contract Date: 04/12/2012
W/O Issued: 04/18/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 7%( 7 %)
Work Started: Time Passed: 13 % ( 13 %)
T
24381(04) Contract: 120019 SH-33 Residency: 04500 0.725 MI. SH-33;GRADE,DRAIN &
SSP-142C(146)SS STILLWATER SURFACE/FROM SH-74, EXTEND WEST.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Arps, Jonathan Adjusted:
Contract Amount: $1,288,459.25 ( $1,288,459.25)
Contract Time: 90 ( 90 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/27/2012 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 91 % ( 91 %)
Work Started: 04/02/2012 Time Passed: 102 % ( 102 %)
County: Love Commissioner District: 7
Contracts Under Construction
27166(04) Contract: 100604 IS-35 Residency: 07200 *-1(157)14/ 5.73 MI. IS-35
IMY-0035-1(156)11/IMY-35* ARDMORE ;GRADE,DRAIN,& SURFACE/FROM 11.75
MI. N. OF TX. STATE LINE, EXTEND
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCNORTH.
Engineer: Earp, Jay Adjusted:
Contract Amount: $13,041,382.34 ( $13,458,245.53)
Contract Time: 300 ( 648 )
Letting Date: 10/21/2010
Contract Date: 11/16/2010
W/O Issued: 11/17/2010 Adjusted:
W/O Effective: 03/07/2011 Amount Paid: 102 %( 99 %)
Work Started: 12/13/2010 Time Passed: 199 % ( 92 %)
27166(05) Contract: 110527 I-35 Residency: 07200 .265 MI. I-35: GRADE,DRAIN, SURGACE
BRIY-0035-1(151)015 ARDMORE AND BRIDGE; OVER SH-32
Contractor: MERIDIAN CONTRACTING, INC.
Engineer: Earp, Jay Adjusted:
Contract Amount: $5,141,923.65 ( $5,141,923.65)
Contract Time: 270 ( 270 )
Letting Date: 10/20/2011
Contract Date: 11/29/2011
W/O Issued: 12/08/2011 Adjusted:
W/O Effective: 01/09/2012 Amount Paid: 61 %( 61 %)
Work Started: 01/09/2012 Time Passed: 77 %( 77 %)
Construction Status Report Page 100
23123(04) Contract: 110433 US-77 Residency: 07200 .312 MI. US-77 OVER HICKORY CREEK
BRFY-143C(075)SS ARDMORE AND SOUTH BRANCH OF HICKORY CREEK
6.7 MI. N OR SH-32 JCT.
Contractor: EARTH BUILDERS, L.P.
Engineer: Earp, Jay Adjusted:
Contract Amount: $2,902,066.85 ( $2,923,527.74)
Contract Time: 180 ( 180 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 11/29/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 70 % ( 69 %)
Work Started: 02/06/2012 Time Passed: 98 % ( 98 %)
23124(04) Contract: 110434 SH-32 Residency: 07200 .151 MI. SH-32 OVER COFFEE POT
BRFY-143C(078) ARDMORE CREEK, 1.5 MI. WEST OF SH-76 JCT.
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Engineer: Earp, Jay Adjusted:
Contract Amount: $1,807,025.55 ( $1,807,025.55)
Contract Time: 180 ( 180 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/19/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 93 % ( 93 %)
Work Started: 12/12/2011 Time Passed: 99 % ( 99 %)
County: McClain Commissioner District: 3
Contracts Under Construction
22526(04) Contract: 110251 CORD Residency: 03200 .26 MI. CORD(EW-146):BRIDGE &
BRO-144D(095)CI PURCELL APPROACHES OVER FINN CREEK .9 MI E
OF SH-24 AND 1.0 MI. S OF SH-59.
Contractor: K & R BUILDERS, INC.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $835,867.08 ( $835,867.08)
Contract Time: 150 ( 150 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 11/22/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 49 %( 49 %)
Work Started: 03/05/2012 Time Passed: 59 % ( 59 %)
24142(04) Contract: 100611 SH-39 Residency: 03003 5.05 MI. SH-39;WIDEN,RESUR- FACE &
STPY-144C(121) COBB ENGINEERING CO., INC. BRIDGE;FROM 1.78 MI. E.OF THE SH-24
JUNCTION, EX- TEND EAST.
Contractor: MARKWELL PAVING COMPANY, INC.
Engineer: COBB Adjusted:
Contract Amount: $6,839,607.41 ( $7,371,223.59)
Contract Time: 365 ( 365 )
Letting Date: 11/18/2010
Contract Date: 12/22/2010
W/O Issued: 01/04/2011 Adjusted:
W/O Effective: 04/04/2011 Amount Paid: 103 %( 96 %)
Work Started: 04/04/2011 Time Passed: 113 %( 113 %)
Construction Status Report Page 101
28103(04) Contract: 110436 I-35 Residency: 03001 0.00 MI. I-35 FROM SH-59 OVERPASS
IMG-0035-2(312)086TR ENGR. SERV. & TESTING EXTEND NORTH.
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: EST Adjusted:
Contract Amount: $909,180.55 ( $909,180.55)
Contract Time: 90 ( 90 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 10/22/2011 Adjusted:
W/O Effective: 01/02/2012 Amount Paid: 53 % ( 53 %)
Work Started: 01/02/2012 Time Passed: 143 % ( 143 %)
28217(04) Contract: 120101 SH-59A Residency: 03100 *-162C(223)3P/ 5.270 MI. SH-
STPY-144C(163)3P/STPY* ADA 59A:RESURFACE(ASPHALT)FROM
US-177,EXTEND EAST.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Russell, Julie Adjusted:
Contract Amount: $934,707.70 ( $934,707.70)
Contract Time: 45 ( 45 )
Letting Date: 02/16/2012
Contract Date: 03/14/2012
W/O Issued: 03/21/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 88 % ( 88 %)
Work Started: 07/02/2012 Time Passed: 93 % ( 93 %)
28177(04) Contract: 110517 SH-59 Residency: 03004 0.00 MI. SH-59 BRIDGE REHAB. :OVER
SBR-144C(157)SB FINN
JACOBS (AKA - CARTER-BURGESS) CR., 2.8 MI. WEST OF THE SH-74
JCT.
Contractor: CIMARRON CONSTRUCTION COMPANY
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $964,159.55 ( $964,159.55)
Contract Time: 90 ( 90 )
Letting Date: 11/17/2011
Contract Date: 12/15/2011
W/O Issued: 12/21/2011 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 66 %( 66 %)
Work Started: 05/07/2012 Time Passed: 112 %( 112 %)
County: McCurtain Commissioner District: 2
Contracts Under Construction
24185(04) Contract: 110301 SH-3 Residency: 02100 5.77 MI. SH-3:GRADE,DRAIN, SURFACE
SEC1702Y-145B(153)SS ANTLERS & BRIDGE/FROM 4.5 MI. EAST OF THE
PUSHMATAHA C/L, EXTEND EAST.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Moy, Ryan Adjusted:
Contract Amount: $12,154,400.76 ( $12,154,400.76)
Contract Time: 360 ( 360 )
Letting Date: 06/16/2011
Contract Date: 07/26/2011
W/O Issued: 08/02/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 22 %( 22 %)
Work Started: 08/29/2011 Time Passed: 66 %( 66 %)
Construction Status Report Page 102
29031(04) Contract: 120183 US-259 Residency: 02100 12.00 MI. US-259:RESURFACE
SSR-245A(001)(002)SR ANTLERS (ASPHALT)BEGIN 9.656 NORTH OF THE
END OF CONCRETE PAV' IN BROKEN
Contractor: THE CUMMINS CONSTRUCTION CO., INC. BOW(6TH ST.)& EXTEND N.
Engineer: Moy, Ryan Adjusted:
Contract Amount: $2,685,984.80 ( $2,685,984.80)
Contract Time: 75 ( 75 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/21/2012 Adjusted:
W/O Effective: 07/16/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: McIntosh Commissioner District: 1
Contracts Under Construction
20584(04) Contract: 120161 CORD Residency: 01003 0.226 MI. CO.RD.:BRIDGE &
BRF-146C(054)CI COBB ENGINEERING CO., INC. APPROACHES/OVER MILL CREEK, 4.0
MI. SOUTH OF SH-9.
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer: COBB Adjusted:
Contract Amount: $448,077.30 ( $448,077.30)
Contract Time: 75 ( 75 )
Letting Date: 04/19/2012
Contract Date: 05/22/2012
W/O Issued: 05/25/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 57 % ( 57 %)
Work Started: 07/02/2012 Time Passed: 60 % ( 60 %)
23511(04) Contract: 110382 CORD Residency: 01200 0.331 MI. CO.RD.:BRIDGE RE- HAB &
CIRB-146C(085)RB SALLISAW APPROACHES:OVER DUCHESS CR., 3.0
MI. W. OF THE MUSKOGEE C/L AT
Contractor: JENSEN CONSTRUCTION COMPANY LAKE EUFAULA.
Engineer: Edwards, Carl Adjusted:
Contract Amount: $3,480,844.47 ( $3,480,844.47)
Contract Time: 270 ( 270 )
Letting Date: 08/18/2011
Contract Date: 09/28/2011
W/O Issued: 10/03/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 71 %( 71 %)
Work Started: 10/31/2011 Time Passed: 81 % ( 81 %)
08156(04) Contract: 100238 US-69 Residency: 01100 0.429 MI.;US-69/BRIDGE RE-
BHFY-013N(020) MUSKOGEE HAB.,OVER THE NORTH CANADIAN
RIVER, 7.9 MI. NORTH OF THE
Contractor: JENSEN CONSTRUCTION COMPANY PITTSBURG C/L.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $11,498,787.17 ( $11,944,862.33)
Contract Time: 635 ( 770 )
Letting Date: 07/22/2010
Contract Date: 09/10/2010
W/O Issued: 09/16/2010 Adjusted:
W/O Effective: 12/06/2010 Amount Paid: 87 %( 84 %)
Work Started: 11/01/2010 Time Passed: 103 %( 85 %)
Construction Status Report Page 103
24003(04) Contract: 110173 CORD Residency: 01100 1.671 MI. CO.RD.;GRADE,DRAIN , &
SEC1702-146C(088)HP MUSKOGEE SURFACE:(TEXANNA RD.)FROM THE
US-69 JCT NEAR LAKE
Contractor: GLOVER & ASSOCIATES, INC. EUFAULA,EXTEND EAST.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $1,153,615.03 ( $1,157,559.54)
Contract Time: 90 ( 129 )
Letting Date: 04/14/2011
Contract Date: 07/27/2011
W/O Issued: 08/04/2011 Adjusted:
W/O Effective: 08/29/2011 Amount Paid: 82 % ( 82 %)
Work Started: 09/12/2011 Time Passed: 143 % ( 100 %)
20884(06) Contract: 100605 IS-40 Residency: 01100 4.987 MI. IS-40;PAVEMENT RE
IMY-0040-6(369)265 MUSKOGEE -HAB(P.C. CONCRETE)FROM THE US-69
BUSINESS RD. IN CHECOTAH , EXTEND
Contractor: DOBSON BROTHERS CONSTRUCTION CO. EAST.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $15,987,937.22 ( $16,080,499.91)
Contract Time: 400 ( 527 )
Letting Date: 10/21/2010
Contract Date: 11/17/2010
W/O Issued: 11/19/2010 Adjusted:
W/O Effective: 03/07/2011 Amount Paid: 89 % ( 88 %)
Work Started: 02/01/2011 Time Passed: 122 % ( 92 %)
County: Major Commissioner District: 6
Contracts Under Construction
17360(18) Contract: 100528 US-412 Residency: 06100 6.640 MI.;US-412/GRADE,DRAIN
NHY-147N(075)IP BUFFALO ,SURFACE & BRIDGE;FROM 8.4 MI.E. OF
THE US-281 JUNCTION, EXTEND EAST.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Burke, David Adjusted:
Contract Amount: $9,815,494.00 ( $10,531,136.39)
Contract Time: 310 ( 561 )
Letting Date: 10/21/2010
Contract Date: 11/24/2010
W/O Issued: 12/02/2010 Adjusted:
W/O Effective: 01/24/2011 Amount Paid: 96 %( 90 %)
Work Started: 01/24/2011 Time Passed: 169 % ( 93 %)
25104(04) Contract: 120055 CORD Residency: 06004 8.90 MI. CO.RD.;RESURFACE
CIRB-147C(135)(167)RB JACOBS (AKA - (ASPHALT)BEGIN AT SH-58, EX- TEND
CARTER-BURGESS)
EAST.
Contractor: J & R SAND COMPANY, INC.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $3,894,981.34 ( $3,894,981.34)
Contract Time: 90 ( 90 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/28/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 88 %( 88 %)
Work Started: 06/05/2012 Time Passed: 80 %( 80 %)
Construction Status Report Page 104
24615(04) Contract: 110518 CORD Residency: 06009 0.151 MI. CO.RD.;BRIDGE &
BRF-147C(127)CI CIRCUIT ENGR. DISTR. # 8 APPROACHES/OVER WEST BRANCH
BARNEY CR., 8.3 MI. EAST OF US-281.
Contractor: BRIDGECO CONTRACTORS, INC.
Engineer: CED8 Adjusted:
Contract Amount: $385,007.89 ( $401,188.60)
Contract Time: 120 ( 127 )
Letting Date: 11/17/2011
Contract Date: 12/16/2011
W/O Issued: 12/20/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 95 % ( 91 %)
Work Started: 03/05/2012 Time Passed: 98 % ( 93 %)
25831(04) Contract: 110337 CORD Residency: 06009 0.321 MI. CO.RD.:BRIDGE &
BRO-147D(145)CI CIRCUIT ENGR. DISTR. # 8 APPROACHES/OVER EAGLE CHIEF
CREEK, 3.5 MI. NORTH OF THE US-60
Contractor: K & R BUILDERS, INC. JUNCTION
Engineer: CED8 Adjusted:
Contract Amount: $592,169.50 ( $592,169.50)
Contract Time: 120 ( 129 )
Letting Date: 07/21/2011
Contract Date: 08/09/2011
W/O Issued: 08/18/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 94 % ( 94 %)
Work Started: 09/14/2011 Time Passed: 100 % ( 93 %)
23274(08) Contract: 110333 US-64 Residency: 06200 0.00 MI. US-64;BRIDGE WATER PROOF
BRFY-147C(170) GUYMON SEAL/US-283/US-287/SH-8 /SH-58:AT
VARIOUS LOCATIONS IN DIV. VI.
Contractor: GARY A. CRAIN, INC.
Engineer: Michael, Charles Adjusted:
Contract Amount: $58,818.00 ( $58,818.00)
Contract Time: 30 ( 30 )
Letting Date: 08/18/2011
Contract Date: 09/28/2011
W/O Issued: 10/04/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 86 %( 86 %)
Work Started: 04/10/2012 Time Passed: 63 %( 63 %)
24068(04) Contract: 100091 US-281 Residency: 06100 0.491 MI. US-281;BRIDGE &
STP-STIM(519) BUFFALO APPROACHES,OVER GRIEVER CR., 5.0
MI. NORTH OF US-60E.
Contractor: SEWELL BROS., INC.
Engineer: Burke, David Adjusted:
Contract Amount: $3,035,684.32 ( $3,038,474.32)
Contract Time: 275 ( 483 )
Letting Date: 03/18/2010
Contract Date: 04/26/2010
W/O Issued: 05/03/2010 Adjusted:
W/O Effective: 08/02/2010 Amount Paid: 88 %( 88 %)
Work Started: 06/25/2010 Time Passed: 180 %( 102 %)
Construction Status Report Page 105
24230(04) Contract: 120213 SH-58 Residency: 06100 0.632 MI. SH-58;BRIDGE &
BRFY-147C(121) BUFFALO APPROACHES/OVER INDIAN CR. 4.0MI.
N. & 3.0 MI. EAST OF SH-8/SH-58 JCT.
Contractor: UNITED CONTRACTORS, INC.
Engineer: Burke, David Adjusted:
Contract Amount: $3,892,474.05 ( $3,892,474.05)
Contract Time: 160 ( 160 )
Letting Date: 05/17/2012
Contract Date: 06/14/2012
W/O Issued: 07/13/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Marshall Commissioner District: 2
Contracts Under Construction
21097(04) Contract: 120135 CORD Residency: 02013 0.275 MI. CO.RD.:BRIDGE &
BRO-148D(041)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES:OVER CANEY CR. 1.7 MI. S.
& 0.4 MI. W. OF US- 70/SH-32 JCT.
Contractor: L & N BRIDGE, LLC
Engineer: CED3 Adjusted:
Contract Amount: $854,852.70 ( $854,852.70)
Contract Time: 150 ( 150 )
Letting Date: 03/15/2012
Contract Date: 04/19/2012
W/O Issued: 04/23/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 26 % ( 26 %)
Work Started: 07/02/2012 Time Passed: 30 % ( 30 %)
County: Mayes Commissioner District: 8
Contracts Under Construction
20893(05) Contract: 120267 US-69 Residency: 08300 0.00 MI. US-69:BRIDGE REHAB. OVER
SBR-249N(004)SB CLAREMORE CHOUTEAU CR., 9.4 MI. N. OF THE
WAGONER C/L.
Contractor: SCR CONSTRUCTION CO., INC.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $668,821.90 ( $668,821.90)
Contract Time: 80 ( 80 )
Letting Date: 06/21/2012
Contract Date: 07/18/2012
W/O Issued: 07/20/2012 Adjusted:
W/O Effective: 08/13/2012 Amount Paid: 0 %( 0 %)
Work Started: 08/24/2012 Time Passed: 0%( 0 %)
Construction Status Report Page 106
25417(04) Contract: 110440 CORD Residency: 08004 2.03 MI. CO.RD. CHIMNEY ROCK RD
STP-149D(124)CI (EW-50) FROM SH-28 EXTEND EAST.
JACOBS (AKA - CARTER-BURGESS)
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $2,881,866.71 ( $2,881,866.71)
Contract Time: 190 ( 190 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/19/2011 Adjusted:
W/O Effective: 01/02/2012 Amount Paid: 41 % ( 41 %)
Work Started: 02/23/2012 Time Passed: 96 % ( 96 %)
28497(04) Contract: 120136 CORD Residency: 08012 0.052 MI. CO.RD.;BRIDGE REHA-
BHO-149D(148)CI PSA-DEWBERRY BILITATION/OVER UNION PACIFIC R/R
0.30 MI. WEST OF US-69
Contractor: PBX CORPORATION
Engineer: PSAD Adjusted:
Contract Amount: $492,418.00 ( $492,418.00)
Contract Time: 60 ( 60 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
28965(04) Contract: 120137 US-412 Residency: 08012 *-266A(004)TR/ 26.50 MI. US
HSIPG-149A(150)TR/HSIPG* PSA-DEWBERRY -412(SIGNING) BEGIN AT IS-44 EXTEND
EAST.
Contractor: ADVANCED WORKZONE SERVICES, LLC
Engineer: PSAD Adjusted:
Contract Amount: $284,490.36 ( $284,490.36)
Contract Time: 150 ( 150 )
Letting Date: 03/15/2012
Contract Date: 04/19/2012
W/O Issued: 04/23/2012 Adjusted:
W/O Effective: 07/22/2012 Amount Paid: 17 %( 17 %)
Work Started: 06/18/2012 Time Passed: 30 %( 30 %)
06549(04) Contract: 120184 CORD Residency: 08012 2.032 MI. CO.RD./GRADE,DRAIN, &
CIRB-049C(286)RB PSA-DEWBERRY SURFACE(ELLIOT ST.)FROM SH- 69A,
EXTEND NORTH.
Contractor: BECCO CONTRACTORS, INC.
Engineer: PSAD Adjusted:
Contract Amount: $2,787,246.48 ( $2,787,246.48)
Contract Time: 150 ( 150 )
Letting Date: 05/17/2012
Contract Date: 06/14/2012
W/O Issued: 06/18/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 107
23169(07) Contract: 120022 US-69 Residency: 08300 6.79 MI. US-69;PAVEMENT RE- HAB.
SSR-149N(146)SR CLAREMORE (P.C.CONCRETE)FROM THE WAGONER
COUNTY LINE,EXTEND NORTH.
Contractor: CHESTER BROSS CONSTRUCTION COMPANY/C.B. EQUIPMENT, INC.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $1,880,427.62 ( $1,880,427.62)
Contract Time: 180 ( 180 )
Letting Date: 01/19/2012
Contract Date: 02/15/2012
W/O Issued: 03/20/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 55 % ( 55 %)
Work Started: 04/23/2012 Time Passed: 57 % ( 57 %)
21910(04) Contract: 110338 SH28 Residency: 08004 1.11 MI. SH-28:BRIDGE AND
BRFY-149C(079) APPROACHES OVER BIG CABIN CREEK,
JACOBS (AKA - CARTER-BURGESS)
7.5 MI. E OF US-69
Contractor: UNITED CONTRACTORS, INC.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $7,829,965.12 ( $7,829,965.12)
Contract Time: 330 ( 330 )
Letting Date: 10/20/2011
Contract Date: 11/21/2011
W/O Issued: 01/11/2012 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 47 % ( 47 %)
Work Started: 02/06/2012 Time Passed: 58 % ( 58 %)
County: Murray Commissioner District: 7
Contracts Under Construction
26241(04) Contract: 110191 US177 Residency: 07003 .99 MI. US-177:GRADE,DRAIN, AND
SSP-150B(079)SS COBB ENGINEERING CO., INC. SURFACE;CHICKASAW TURNPIKE, 2.0 MI.
N OF SH-7
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer: COBB Adjusted:
Contract Amount: $2,756,145.50 ( $2,763,531.58)
Contract Time: 160 ( 183 )
Letting Date: 10/20/2011
Contract Date: 11/23/2011
W/O Issued: 12/07/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 75 %( 75 %)
Work Started: 03/05/2012 Time Passed: 93 % ( 81 %)
20303(04) Contract: 110475 SH-77D Residency: 07200 1.907 MI. SH-77D;GRADE,DRAIN &
STPY-150C(090) ARDMORE SURFACE/FROM THE US-77 JCT, EXT.
SOUTHEAST.
Contractor: MERIDIAN CONTRACTING, INC.
Engineer: Earp, Jay Adjusted:
Contract Amount: $4,513,391.00 ( $4,513,391.00)
Contract Time: 180 ( 180 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0 %( 0 %)
Work Started: 08/06/2012 Time Passed: 0 %( 0 %)
Construction Status Report Page 108
20328(05) Contract: 120214 I-35 Residency: 07001 0.00 MI. I-35/US-77:BRIDGE
BRFY-NBIP(452) ENGR. SERV. & TESTING PAINTING: AT MULTIPLE LO- CATIONS
IN DIV. VII.
Contractor: PACIFIC PAINTING COMPANY, INC.
Engineer: EST Adjusted:
Contract Amount: $581,000.00 ( $581,000.00)
Contract Time: 140 ( 140 )
Letting Date: 05/17/2012
Contract Date: 06/19/2012
W/O Issued: 06/22/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 50 % ( 50 %)
Work Started: 07/09/2012 Time Passed: 26 % ( 26 %)
20328(08) Contract: 120215 I-35 Residency: 07001 0.00 MI. I-35/US-77:JOINT
BRFY-250N(002) ENGR. SERV. & TESTING SEAL/REPAIR: AT MULTIPLE LO-
CATIONS IN DIV. VII.
Contractor: PBX CORPORATION
Engineer: EST Adjusted:
Contract Amount: $373,819.00 ( $373,819.00)
Contract Time: 60 ( 60 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Muskogee Commissioner District: 1
Contracts Under Construction
23105(09) Contract: 120162 IS-40 Residency: 01100 0.00 MI. IS-40/BRIDGE WATER- PROOF
BRFY-251C(004) MUSKOGEE SEAL/SH-2/SH-16/SH-51: AT MULTIPLE
LOCATIONS IN DIV. I.
Contractor: GARY A. CRAIN, INC.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $61,220.00 ( $61,220.00)
Contract Time: 30 ( 30 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 05/24/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 82 %( 82 %)
Work Started: 07/31/2012 Time Passed: 53 % ( 53 %)
29022(04) Contract: 120106 US-69 Residency: 01100 2.85 MI. US-69:RESURFACE
NHY-013N(154)3P MUSKOGEE (ASPHALT)FROM JUST NORTH OF US-62
EAST, EXTEND NORTH.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $1,042,275.00 ( $1,042,275.00)
Contract Time: 60 ( 60 )
Letting Date: 02/16/2012
Contract Date: 03/14/2012
W/O Issued: 03/22/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 8 %( 8 %)
Work Started: 08/14/2012 Time Passed: 17 %( 17 %)
Construction Status Report Page 109
29187(04) Contract: 120216 I-40 Residency: 01200 8.500 MI. IS-40:SAFETY IM-
HSIPIG-0040-6(379)282TR SALLISAW PROVEMENT(CABLE BARRIER)FROM
MILE MARKER 282, EXTEND EAST.
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: Edwards, Carl Adjusted:
Contract Amount: $876,720.10 ( $876,720.10)
Contract Time: 180 ( 180 )
Letting Date: 05/17/2012
Contract Date: 06/21/2012
W/O Issued: 06/28/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Noble Commissioner District: 4
Contracts Under Construction
26181(04) Contract: 110489 I35 Residency: 04100 7.04 MI. I-35: CABLE BARRIER FROM MM
IMG-0035-4(231)190TR PERRY 190 TO MM 198
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $1,013,113.67 ( $1,013,113.67)
Contract Time: 120 ( 120 )
Letting Date: 10/20/2011
Contract Date: 11/21/2011
W/O Issued: 11/28/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 78 % ( 78 %)
Work Started: 03/01/2012 Time Passed: 100 % ( 100 %)
27909(04) Contract: 110490 I-35 Residency: 04100 .74 MI. I-35:BRIDGE,APPROACHES,&
IMY-0035-4(244)186/SBR-* PERRY CABLE BARRIER;OVER US-64(FIR ST)1.0
MI. N OF US-77 IN PERRY, OVER BNSF
Contractor: MANHATTAN ROAD & BRIDGE COMPANY RAILROAD.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $6,254,011.33 ( $6,424,547.38)
Contract Time: 300 ( 330 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 12/07/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 49 %( 48 %)
Work Started: 02/06/2012 Time Passed: 58 % ( 53 %)
*152N(191)SB
29190(04) Contract: 120262 IS-35 Residency: 04500 5.70 MI. IS-35:SAFETY IMPROV. (CABLE
HSIPIG-0035-4(246)170 STILLWATER BARRIER)IN PAYNE CO. FROM MM170
EXTEND N. 4.0 MI. IN NOBLE CO.
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: Arps, Jonathan Adjusted:
Contract Amount: $658,048.73 ( $658,048.73)
Contract Time: 140 ( 140 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 09/17/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 110
20311(04) Contract: 110247 US-64 Residency: 04100 6.523 MI. US-64;GRADE,DRAIN &
STPY-152B(105) PERRY BRIDGE;FROM BOUNDARY ST. IN PERRY,
EXTEND EAST.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Zachary, Ted Adjusted:
Contract Amount: $6,812,122.07 ( $6,812,122.07)
Contract Time: 360 ( 412 )
Letting Date: 04/14/2011
Contract Date: 05/12/2011
W/O Issued: 05/18/2011 Adjusted:
W/O Effective: 09/06/2011 Amount Paid: 40 % ( 40 %)
Work Started: 09/07/2011 Time Passed: 96 % ( 84 %)
23306(09) Contract: 120185 I-35 Residency: 04500 0.00 MI. I-35/I-40/US-64/
BRFY-252F(004) STILLWATER US-77/US-177/SH-15/SH-33/SH-86SH-156
:VARIOUS LOCATIONS IN DIV. IV.
Contractor: GARY A. CRAIN, INC.
Engineer: Arps, Jonathan Adjusted:
Contract Amount: $659,148.75 ( $659,148.75)
Contract Time: 100 ( 100 )
Letting Date: 05/17/2012
Contract Date: 06/19/2012
W/O Issued: 06/21/2012 Adjusted:
W/O Effective: 07/16/2012 Amount Paid: 37 % ( 37 %)
Work Started: Time Passed: 29 % ( 29 %)
21861(04) Contract: 120023 US-77 Residency: 04100 0.139 MI. US-77;BRIDGE &
BRFY-152C(068) PERRY APPROACHES/OVER BLACK BEAR CR.4.2
MI. NORTH OF THE US- 64 JCT.
Contractor: K & R BUILDERS, INC.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $1,386,675.28 ( $1,392,203.32)
Contract Time: 90 ( 90 )
Letting Date: 01/19/2012
Contract Date: 02/23/2012
W/O Issued: 03/12/2012 Adjusted:
W/O Effective: 04/16/2012 Amount Paid: 98 %( 97 %)
Work Started: 04/16/2012 Time Passed: 91 %( 91 %)
27600(04) Contract: 120234 US-77 Residency: 04100 5.3600 MI. US-77/ RESURFACE
SSR-152C(190)SR PERRY (ASPHALT) FROM SH-164, EXTEND EAST.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Zachary, Ted Adjusted:
Contract Amount: $1,764,920.00 ( $1,764,920.00)
Contract Time: ( )
Letting Date: 05/17/2012
Contract Date: 06/14/2012 Fixed Completion Date: 10/31/2012
W/O Issued: 06/18/2012 Adjusted:
W/O Effective: Amount Paid: 0 %( 0 %)
Work Started: 07/27/2012 Time Passed: 5 %( 4 %)
County: Nowata Commissioner District: 8
Contracts Under Construction
Construction Status Report Page 111
23129(04) Contract: 110441 US-169 Residency: 08300 .275 MI. US-169 OVER CALIFORNIA
BRFY-153N(147) CLAREMORE CREEK, 3.5 MI. N OF US-60 JCT.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $3,277,995.45 ( $3,277,995.45)
Contract Time: 180 ( 180 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/25/2011 Adjusted:
W/O Effective: 11/28/2011 Amount Paid: 51 % ( 51 %)
Work Started: 11/30/2011 Time Passed: 105 % ( 105 %)
County: Okfuskee Commissioner District: 3
Contracts Under Construction
28198(04) Contract: 110304 US-62 Residency: 03300 3.670 MI. US-62;RESURFACE
SSR-154C(167)SR WEWOKA (ASPHALT)FROM SH-27, EXTEND WEST.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Moore, Archie (Act.) Adjusted:
Contract Amount: $641,355.00 ( $641,355.00)
Contract Time: 35 ( 35 )
Letting Date: 06/21/2012
Contract Date: 07/18/2012
W/O Issued: 07/20/2012 Adjusted:
W/O Effective: 08/13/2012 Amount Paid: 0%( 0 %)
Work Started: 08/20/2012 Time Passed: 0%( 0 %)
23958(04) Contract: 120056 CORD Residency: 03300 0.189 MI. CO.RD.;BRIDGE &
BRF-154C(100)CI WEWOKA APPROACHES/OVER HILLIBY
TRIBU-TARY, 2.1 MI. N. & 2.6 MI. EAST
Contractor: BELK BRIDGE, INC. OF PADEN.
Engineer: Moore, Archie (Act.) Adjusted:
Contract Amount: $302,781.75 ( $302,781.75)
Contract Time: 90 ( 97 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/28/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 93 %( 93 %)
Work Started: 04/05/2012 Time Passed: 99 % ( 92 %)
County: Oklahoma Commissioner District: 4
Contracts Under Construction
Construction Status Report Page 112
17428(81) Contract: 120024 IS-40 Residency: 04400 0.382 MI. IS-40;GRADE,DRAIN, SURFACE
IMY-XTWN(074) EDMOND & BRIDGE. WEST CONNEC-TION FROM
EAST OF AGNEW AVE. TO
Contractor: MANHATTAN ROAD & BRIDGE COMPANY PENNSYLVANIA AVE.
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $9,162,185.05 ( $9,162,185.05)
Contract Time: 240 ( 240 )
Letting Date: 01/19/2012
Contract Date: 02/22/2012
W/O Issued: 03/06/2012 Adjusted:
W/O Effective: 04/09/2012 Amount Paid: 61 % ( 61 %)
Work Started: 04/09/2012 Time Passed: 51 % ( 51 %)
27589(04) Contract: 110276 IS-44 Residency: 04400 0.07 MI. IS-44;BRIDGE IMPRO-
SBR-155A(875)SB EDMOND VEMENTS. CT.ST.(LINCOLN BLVD)
SOUTHBOUND LINCOLN BLVD. OVER
Contractor: SCR CONSTRUCTION CO., INC. IS-44.
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $465,034.95 ( $465,034.95)
Contract Time: 60 ( 60 )
Letting Date: 01/19/2012
Contract Date: 02/23/2012
W/O Issued: 03/01/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 76 % ( 76 %)
Work Started: 06/04/2012 Time Passed: 122 % ( 122 %)
17428(28) Contract: 100503 IS-40 Residency: 04400 *(12)TI/SEC115-155N(807)SG; 2.2 MI.
OKCY-XTWN(009)/OKCY-XTWN* EDMOND IS-40;SURFACING & TRAFFIC
CONTROL/FROM W. OF MAY
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCAVE.,EXTEND E. IN OKC.
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $29,346,556.72 ( $31,566,323.54)
Contract Time: 370 ( 526 )
Letting Date: 08/19/2010
Contract Date: 09/20/2010
W/O Issued: 09/27/2010 Adjusted:
W/O Effective: 11/08/2010 Amount Paid: 104 %( 97 %)
Work Started: 10/20/2010 Time Passed: 121 %( 85 %)
28588(04) Contract: 110480 I240 Residency: 04002 0.00 MI. I-240/SH-152: BRIDGE
BRFY-NBIP(443)3B TETRA TECH PAINTING VARIOUS LOCATION IN DIV. 4.
Contractor: SEMINOLE EQUIPMENT, INC.
Engineer: TETR Adjusted:
Contract Amount: $411,000.00 ( $411,000.00)
Contract Time: 60 ( 60 )
Letting Date: 10/20/2011
Contract Date: 11/21/2011
W/O Issued: 03/02/2012 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 85 %( 85 %)
Work Started: 03/21/2012 Time Passed: 182 %( 182 %)
Construction Status Report Page 113
09033(40) Contract: 100615 IS-235 Residency: 04400 2.19 MI. IS-235:GRADE,DRAIN, SURFACE
IMY-0235-1(103)005IP EDMOND & BRIDGE/ON THE SOUTH-BOUND TO
WESTBOUND OFF RAMPS, AT THE IS-44
Contractor: HASKELL LEMON CONSTRUCTION CO. INTERCHANGE.
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $18,135,376.41 ( $18,746,715.78)
Contract Time: 400 ( 424 )
Letting Date: 01/20/2011
Contract Date: 02/25/2011
W/O Issued: 04/26/2011 Adjusted:
W/O Effective: 06/06/2011 Amount Paid: 103 % ( 100 %)
Work Started: 06/20/2011 Time Passed: 109 % ( 103 %)
27834(04) Contract: 120163 CTST Residency: 04600 0.370 MI. CT.ST.:INTERSEC- TION
STP-155B(800)AG OKLAHOMA CITY MODIFICATION/AT N.E. 10THST. IN THE
CITY OF NICOMA PARK.
Contractor: SCHIRALLI CONSTRUCTION CORP.
Engineer: Howell, Terry Adjusted:
Contract Amount: $923,530.70 ( $923,530.70)
Contract Time: 75 ( 75 )
Letting Date: 04/19/2012
Contract Date: 05/18/2012
W/O Issued: 05/23/2012 Adjusted:
W/O Effective: 06/24/2012 Amount Paid: 48 % ( 48 %)
Work Started: 06/18/2012 Time Passed: 75 % ( 75 %)
29266(04) Contract: 120170 CTST Residency: 04600 0.52 MI. CT.ST.(LINCOLN
CMC-255A(062) OKLAHOMA CITY BLVD.)RESURFACE (ASPHALT)FROM JUST
S. OF 14TH ST., EXTEND NORTH IN OKC.
Contractor: HASKELL LEMON CONSTRUCTION CO.
Engineer: Howell, Terry Adjusted:
Contract Amount: $360,375.00 ( $360,375.00)
Contract Time: 45 ( 45 )
Letting Date: 04/19/2012
Contract Date: 05/16/2012
W/O Issued: 05/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 22 %( 22 %)
Work Started: 07/10/2012 Time Passed: 7 %( 7 %)
21043(04) Contract: 110012 CTST Residency: 04004 0.63 MI. CT.ST.:GRADE,DRAIN &
STP-155B(412)AG SURFACE:(15TH ST.)FROM
JACOBS (AKA - CARTER-BURGESS) VICKIE
DRIVE, EXTEND EAST IN DEL CITY.
Contractor: SCHWARZ PAVING CO., INC.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $2,576,116.82 ( $2,636,975.56)
Contract Time: 240 ( 352 )
Letting Date: 06/16/2011
Contract Date: 07/26/2011
W/O Issued: 08/01/2011 Adjusted:
W/O Effective: 10/03/2011 Amount Paid: 94 %( 91 %)
Work Started: 10/10/2011 Time Passed: 130 %( 89 %)
Construction Status Report Page 114
24041(05) Contract: 110491 CTST Residency: 04400 2.62 MI. CTST: GRADE,DRAIN AND
STP-155C(651)(852)AG EDMOND SURFACE; KELLY AVE FROM N OF 192ND
ST EXT N, AND COVELL RD FROM E OF
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCSANTE FE EXT E IN ED
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $14,769,759.12 ( $14,788,266.78)
Contract Time: 325 ( 325 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 11/22/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 54 % ( 54 %)
Work Started: 01/16/2012 Time Passed: 66 % ( 66 %)
MOND.
28588(05) Contract: 110496 I240 Residency: 04002 0.00 MI. I-240/SH-152: JOINT
BRFY-155A(877)3B TETRA TECH SEAL/REPAIR; VARIOUS LOCATIONS IN
DIVISION 4.
Contractor: PBX CORPORATION
Engineer: TETR Adjusted:
Contract Amount: $44,218.00 ( $44,218.00)
Contract Time: 60 ( 60 )
Letting Date: 10/20/2011
Contract Date: 11/22/2011
W/O Issued: 11/29/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
28541(04) Contract: 110519 CT.ST. Residency: 04400 1.723 MI. CT.ST.;RESURFACE
STP-155A(870)AG EDMOND (ASPHALT)(MEMORIAL RD.)FROM
WESTERN AVE., EXTEND EAST IN OKC.
Contractor: ATLAS PAVING COMPANY
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $1,048,923.35 ( $1,048,923.35)
Contract Time: 45 ( 45 )
Letting Date: 11/17/2011
Contract Date: 12/12/2011
W/O Issued: 12/19/2011 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 91 %( 91 %)
Work Started: 05/07/2012 Time Passed: 96 %( 96 %)
29188(04) Contract: 120232 I-240 Residency: 04600 2.97 MI. I-240;SAFETY IMPROV. (CABLE
HSIPIG-0240-1(357)008TR OKLAHOMA CITY BARRIER)FROM MILE MARKER8,
EXTEND EAST.
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: Howell, Terry Adjusted:
Contract Amount: $653,775.36 ( $653,775.36)
Contract Time: 60 ( 60 )
Letting Date: 05/17/2012
Contract Date: 06/21/2012
W/O Issued: 06/28/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0 %( 0 %)
Work Started: 08/20/2012 Time Passed: 0 %( 0 %)
Construction Status Report Page 115
28128(30) Contract: 120072 IS-40 Residency: 04600 22.900 MI. IS-40;SAFETY IM-
BTOP-255N(002) OKLAHOMA CITY PROVEMENTS(FIBER OPTIC CABLE) FROM
THE EDUCATIONAL TELE- VISIONS
Contractor: EWING SIGNAL CONSTRUCTION NETWORK BLDG.IN OKC.
Engineer: Howell, Terry Adjusted:
Contract Amount: $999,031.60 ( $999,031.60)
Contract Time: 70 ( 70 )
Letting Date: 03/15/2012
Contract Date: 04/10/2012
W/O Issued: 05/16/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 90 % ( 90 %)
Work Started: 06/04/2012 Time Passed: 101 % ( 101 %)
28014(04) Contract: 110255 I-240 Residency: 04600 4.53 MI. I-240 FROM DOUGLAS BLVD.
IMG-0240-1(355)011TR OKLAHOMA CITY EXTEND EAST.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: Howell, Terry Adjusted:
Contract Amount: $1,150,500.14 ( $1,150,500.14)
Contract Time: 120 ( 120 )
Letting Date: 09/15/2011
Contract Date: 10/14/2011
W/O Issued: 10/20/2011 Adjusted:
W/O Effective: 01/02/2012 Amount Paid: 70 % ( 70 %)
Work Started: 01/02/2012 Time Passed: 116 % ( 116 %)
17428(58) Contract: 110504 IS-40 Residency: 04400 0.089 MI., IS-40/AGNEW AVE.
OKCY-XTWN(046) EDMOND ;GRADE,DRAIN,SURFACE & BRIDGE
FROM W. OF MAY AVE,EXTEND EAST
Contractor: ALLEN CONTRACTING, INC. IN OKC, AGNEW AVE.
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $17,699,647.18 ( $17,702,096.18)
Contract Time: 300 ( 300 )
Letting Date: 11/17/2011
Contract Date: 12/16/2011
W/O Issued: 12/20/2011 Adjusted:
W/O Effective: 02/15/2011 Amount Paid: 49 %( 49 %)
Work Started: 02/27/2012 Time Passed: 57 %( 57 %)
17428(77) Contract: 110530 IS-40 Residency: 04200 1.591 MI. IS-40;BRIDGE &
ACIMY-XTWN(067) EL RENO APPROACHES(REMOVAL) DECONS-
TRUCTION OF BRIDGE FROM
Contractor: SHERWOOD CONSTRUCTION CO., INC. WESTERN AVE. TO JUST EAST.
Engineer: Vonfeldt, Cole Adjusted:
Contract Amount: $9,660,191.37 ( $9,660,191.37)
Contract Time: 270 ( 270 )
Letting Date: 11/17/2011
Contract Date: 12/12/2011
W/O Issued: 03/27/2012 Adjusted:
W/O Effective: 04/26/2012 Amount Paid: 84 %( 84 %)
Work Started: 04/26/2012 Time Passed: 41 %( 41 %)
Construction Status Report Page 116
21978(04) Contract: 100392 CTST Residency: 04003 0.871 MI. CT.ST.,GRADE,DRAIN
STP-STIM(517)AG COBB ENGINEERING CO., INC. ,SURFACE & BRIDGE;(POST RD.) FROM
SE 15TH ST.,EXTEND NORTH TO
Contractor: MARKWELL PAVING COMPANY, INC. MIDWEST CITY.
Engineer: COBB Adjusted:
Contract Amount: $3,206,824.41 ( $3,254,108.41)
Contract Time: 280 ( 528 )
Letting Date: 06/17/2010
Contract Date: 07/15/2010
W/O Issued: 07/16/2010 Adjusted:
W/O Effective: 10/04/2010 Amount Paid: 99 % ( 98 %)
Work Started: 10/04/2010 Time Passed: 195 % ( 103 %)
26273(04) Contract: 110341 IS-35 Residency: 04600 2.67 MI. IS-35;SAFETY IMPROV
IMG-0035-3(298)129TR OKLAHOMA CITY -MENT(CABLE BARRIER)FROM 0.40 MI.
NO. OF THE US-62 JCT, IN OKC, EXTEND
Contractor: ACTION SAFETY SUPPLY CO. NORTH.
Engineer: Howell, Terry Adjusted:
Contract Amount: $841,662.63 ( $841,662.63)
Contract Time: 90 ( 90 )
Letting Date: 07/21/2011
Contract Date: 08/16/2011
W/O Issued: 08/19/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 74 % ( 74 %)
Work Started: 01/03/2012 Time Passed: 109 % ( 109 %)
21133(04) Contract: 120217 CTST Residency: 04600 0.00 MI. CT.ST.;SAFETY IM-
STPG-155F(424)AG OKLAHOMA CITY PROVEMENTS(SCHOOL ZONES)
MULTIPLE LOCATIONS IN THE OKLA.
Contractor: MIDSTATE TRAFFIC CONTROL, INC. CITY METRO.
Engineer: Howell, Terry Adjusted:
Contract Amount: $475,930.20 ( $475,930.20)
Contract Time: 180 ( 180 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 11/26/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
24107(04) Contract: 120258 CORD Residency: 04400 14.91 MI. CO.RD.:STRIPING (COVELL
STPG-155F(605)AG EDMOND RD./EDMOND RD./MACAR- THUR BLVD.)
MULTIPLE LO- CATIONS IN OKLA.
Contractor: ACTION SAFETY SUPPLY CO. COUNTY.
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $109,271.30 ( $109,271.30)
Contract Time: 30 ( 30 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 09/17/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 117
17428(22) Contract: 090501 I-40 Residency: 04200 1.072 MI. GRADE, DRAIN, SURFACE,
OKCY-XTWN(003)TI EL RENO BRIDGE & RAILROAD I-40 FROM EAST OF
WESTERN AVE. EXTEND EAST.
Contractor: ALLEN CONTR., INC./SHERWOOD CONST. CO, INC./MANHATTAN RD. &
Engineer: Vonfeldt, Cole Adjusted:
Contract Amount: $63,211,594.70 ( $66,216,867.56)
Contract Time: 520 ( 843 )
Letting Date: 07/23/2009
Contract Date: 08/10/2009
W/O Issued: 08/11/2009 Adjusted:
W/O Effective: 09/14/2009 Amount Paid: 105 % ( 100 %)
Work Started: 09/08/2009 Time Passed: 192 % ( 118 %)
26119(04) Contract: 110248 CT.ST. Residency: 04011 0.026 MI. CT.ST. BRIDGE &
STP-155A(691)AG GARVER, LLC. APPROACHES/(RENO AVE.)OVER
CROOKED OAK CR., AT BRYANT AVE.
Contractor: C-P INTEGRATED SERVICES, INC. IN DEL CITY.
Engineer: GARV Adjusted:
Contract Amount: $641,907.69 ( $675,037.69)
Contract Time: 90 ( 190 )
Letting Date: 04/14/2011
Contract Date: 05/18/2011
W/O Issued: 05/25/2011 Adjusted:
W/O Effective: 08/01/2011 Amount Paid: 90 % ( 86 %)
Work Started: 08/01/2011 Time Passed: 387 % ( 183 %)
28510(04) Contract: 110358 IS-35 Residency: 08100 *-172F(530)IT/ 0.00 MI. IS -35:SAFETY
HSIPG-155F(865)IT/HSIPG* TULSA IMPROVEMENT:AT VA- RIOUS
LOCATIONS IN OKC METRO AREA.ALSO
Contractor: MIDSTATE TRAFFIC CONTROL, INC. IN THE TULSA AREA.
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $1,822,347.10 ( $1,829,690.22)
Contract Time: ( )
Letting Date: 07/21/2011
Contract Date: 08/16/2011 Fixed Completion Date: 04/25/2012
W/O Issued: 08/22/2011 Adjusted:
W/O Effective: Amount Paid: 50 %( 50 %)
Work Started: 01/09/2012 Time Passed: 174 %( 70 %)
17428(23) Contract: 110197 IS-40 Residency: 04200 *-XTWN(73)TE/SEC115-155N(826) SG
OKCY-XTWN(004)TI/ACOKCY* EL RENO /1.442 MI. IS-40;SURFACING,BRIDGE
FOUNDATION & SAFETY
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCIMPROVEMENT(ITS)
Engineer: Vonfeldt, Cole Adjusted:
Contract Amount: $25,544,186.10 ( $26,836,620.29)
Contract Time: 260 ( 260 )
Letting Date: 07/21/2011
Contract Date: 08/12/2011
W/O Issued: 08/15/2011 Adjusted:
W/O Effective: 08/29/2011 Amount Paid: 104 %( 99 %)
Work Started: 08/29/2011 Time Passed: 85 %( 85 %)
Construction Status Report Page 118
28308(04) Contract: 110273 I-40 Residency: 04400 0.173 MI. IS-40/BRIDGE RE-
SBR-155N(837)SB EDMOND HAB.:OVER IS-44, 5.4 MI. EAST OF THE
CANADIAN C/L.
Contractor: PBX CORPORATION
Engineer: Hubbard, Tom Adjusted:
Contract Amount: $1,384,147.70 ( $1,384,147.70)
Contract Time: 100 ( 100 )
Letting Date: 07/21/2011
Contract Date: 08/09/2011
W/O Issued: 08/25/2011 Adjusted:
W/O Effective: 10/03/2011 Amount Paid: 100 % ( 100 %)
Work Started: 10/03/2011 Time Passed: 292 % ( 292 %)
17428(32) Contract: 100313 I-40 Residency: 04600 *XTWN(15)TI/SEC115-155N(806)
IMY-40-4(432)152SS/OKCY-* OKLAHOMA CITY SG/1.024 MI.
IS-40:GRADE,DRAIN,SURFACE &
Contractor: ALLEN CONTRACTING, INC. BRIDGE/CT. STREETS W.RENO,
Engineer: Howell, Terry Adjusted: S.LINCOLN BLVD. INT.
Contract Amount: $28,127,553.86 ( $29,862,654.75)
Contract Time: ( )
Letting Date: 07/22/2010
Contract Date: 08/27/2010 Fixed Completion Date: 12/27/2012
W/O Issued: 09/14/2010 Adjusted:
W/O Effective: Amount Paid: 87 % ( 82 %)
Work Started: 10/11/2010 Time Passed: 672 % ( 80 %)
29332(04) Contract: 120259 CT.ST. Residency: 04600 0.00 MI. CT.ST.:RESURFACE
CMC-255E(091) OKLAHOMA CITY (ASPHALT)PARKING LOT:BEGIN @ THE
SW QUADRANT OF THE INTER- SECTION
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. OF LINCOLN & NE 18TH.
Engineer: Howell, Terry Adjusted:
Contract Amount: $160,294.00 ( $160,294.00)
Contract Time: ( )
Letting Date: 07/19/2012
Contract Date: 08/16/2012 Fixed Completion Date: 10/15/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
County: Okmulgee Commissioner District: 1
Contracts Under Construction
27592(04) Contract: 120039 US-75 Residency: 01100 *(174)(181)SR/ 9.26 MI. US-
SSR-14N(85)SR/SSR-156N* MUSKOGEE 75;RESURFACE (ASPHALT)BEGIN JUST
NORTH OF US-62E, EXTEND NORTH.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $2,800,836.17 ( $2,800,836.17)
Contract Time: 150 ( 150 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 02/28/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 0 %( 0 %)
Work Started: 08/29/2012 Time Passed: 0 %( 0 %)
Construction Status Report Page 119
15205(04) Contract: 120164 CORD Residency: 01010 0.196 MI. CO.RD./BRIDGE &
BRF-056C(253)CI ATKINS (AKA - PBS & J) APPROACHES;OVER MONTEZUMA CR.
2.75 MI. N. OF I-40.
Contractor: SEWELL BROS., INC.
Engineer: ATKINS (AKA - PBSJ) Adjusted:
Contract Amount: $598,213.90 ( $598,213.90)
Contract Time: 120 ( 120 )
Letting Date: 04/19/2012
Contract Date: 05/22/2012
W/O Issued: 05/29/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: 08/06/2012 Time Passed: 0%( 0 %)
20908(05) Contract: 110492 I-40 Residency: 01100 6.34 MI. I-40: PAVEMENT
IMY-0040-6(370)233/IMY-* MUSKOGEE REHABILITATION AND BRIDGE
PAINTING; FROM US-75 EXTEND EAST.
Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $24,494,383.94 ( $24,656,790.59)
Contract Time: 620 ( 620 )
Letting Date: 10/20/2011
Contract Date: 11/17/2011
W/O Issued: 11/28/2011 Adjusted:
W/O Effective: 01/09/2012 Amount Paid: 47 % ( 46 %)
Work Started: 01/09/2012 Time Passed: 31 % ( 31 %)
*0040-5(386)207/BRFY-NBIP(422)
22181(04) Contract: 120260 CORD Residency: 01100 *-156D(105)RB/ 0.233 MI. CO.
CIRB-156C(104)RB/CIRB* MUSKOGEE RD.:BRIDGE & APPROACHES:OVER
NEGRO CR. 3.1 MI. N. & 1.1 MI.W. OF
Contractor: MANHATTAN ROAD & BRIDGE COMPANY US-75/SH-56 JCT.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $781,201.21 ( $781,201.21)
Contract Time: 90 ( 90 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
28289(04) Contract: 120307 SH-56 Residency: 01100 0.00 MI. SH-56:BRIDGE REHAB. OVER
SBR-156C(175)SB MUSKOGEE DEEP FORK RIVER,13.8 MI. E. OF THE
OKFUSKEE C/L.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $1,432,819.90 ( $1,432,819.90)
Contract Time: 180 ( 180 )
Letting Date: 07/19/2012
Contract Date: 08/16/2012
W/O Issued: 08/21/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 120
28128(35) Contract: 120073 IS-40 Residency: 01010 46.50 MI. IS-40;SAFETY IM-
BTOP-256N(001) ATKINS (AKA - PBS & J) PROVEMENT(FIBER OPTIC CABLE)
BEGIN AT HENRYETTA, EXTEND EAST
Contractor: ROHL NETWORKS, LP TO WEBBER FALLS.
Engineer: ATKINS (AKA - PBSJ) Adjusted:
Contract Amount: $1,255,674.00 ( $1,255,674.00)
Contract Time: 160 ( 160 )
Letting Date: 03/15/2012
Contract Date: 04/10/2012
W/O Issued: 05/09/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 48 % ( 48 %)
Work Started: 05/29/2012 Time Passed: 30 % ( 30 %)
28128(16) Contract: 110503 I-40 Residency: 01010 0.00 MI. I-40/US-59/SH-99/INDIAN
BTOP-167E(194) ATKINS (AKA - PBS & J) NATION TURNPIKE AT VARIOUS
LOCATIONS IN DIVISION 1 & 3.
Contractor: TELCO SUPPLY COMPANY
Engineer: ATKINS (AKA - PBSJ) Adjusted:
Contract Amount: $965,532.92 ( $1,055,408.71)
Contract Time: 150 ( 161 )
Letting Date: 09/15/2011
Contract Date: 10/17/2011
W/O Issued: 10/22/2011 Adjusted:
W/O Effective: 11/21/2011 Amount Paid: 108 % ( 99 %)
Work Started: 12/27/2011 Time Passed: 107 % ( 100 %)
County: Osage Commissioner District: 8
Contracts Under Construction
28262(04) Contract: 120301 SH-11 Residency: 08400 0.022 MI. SH-11:BRIDGE &
E-SAP-257B(011) SAND SPRINGS APPROACHES:OVER RED EAGLE
BRANCH CR., 9.2 MI. EAST OF JCT
Contractor: MANHATTAN ROAD & BRIDGE COMPANY SH-99.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $684,792.80 ( $684,792.80)
Contract Time: 60 ( 60 )
Letting Date: 06/21/2012
Contract Date: 07/05/2012
W/O Issued: 07/06/2012 Adjusted:
W/O Effective: 07/07/2012 Amount Paid: 94 %( 94 %)
Work Started: 07/07/2012 Time Passed: 67 % ( 67 %)
22146(07) Contract: 110015 PK WY. Residency: 08007 2.17 MI. PK.WY.;GRADE,DRAIN, &
STP-157A(143)IG CRAIG & KEITHLINE, INC. SURFACE.FROM 41ST AVE., EX- TEND
EAST IN TULSA.
Contractor: BECCO CONTRACTORS, INC.
Engineer: C&KI Adjusted:
Contract Amount: $7,781,953.52 ( $7,781,953.52)
Contract Time: 245 ( 294 )
Letting Date: 02/17/2011
Contract Date: 03/17/2011
W/O Issued: 03/22/2011 Adjusted:
W/O Effective: 07/05/2011 Amount Paid: 63 %( 63 %)
Work Started: 07/06/2011 Time Passed: 167 %( 139 %)
Construction Status Report Page 121
22146(04) Contract: 090662 CT.ST. Residency: 08007 0.749 MI. CT.ST.;(GILCREASE
STP-157A(66)(67)IG CRAIG & KEITHLINE, INC. EXPRESSWAY) GRADE,DRAIN,SUR-
FACE,BRIDGE & TRAFFIC SIGNALS.
Contractor: PLAINS BRIDGE CONTR./TREAS CONST./UNITED GENERAL CONTR.,INC.
Engineer: C&KI Adjusted:
Contract Amount: $13,091,185.87 ( $13,225,868.69)
Contract Time: 420 ( 873 )
Letting Date: 12/17/2009
Contract Date: 01/22/2010
W/O Issued: 02/02/2010 Adjusted:
W/O Effective: 03/01/2010 Amount Paid: 100 % ( 99 %)
Work Started: 03/01/2010 Time Passed: 210 % ( 101 %)
23130(04) Contract: 090665 US-60 Residency: 08400 3.048 MI. US-60;GRADE,DRAIN,
NHY-018N(045)TI SAND SPRINGS SURFACE & BRIDGE/ BEGIN 3.2
MINORTH OF SH-11, EXTEND EAST.
Contractor: PLAINS BRIDGE CONTR./TREAS CONST./UNITED GENERAL CONTR.,INC.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $10,049,793.43 ( $10,334,331.60)
Contract Time: 475 ( 899 )
Letting Date: 12/17/2009
Contract Date: 01/22/2010
W/O Issued: 02/02/2010 Adjusted:
W/O Effective: 04/05/2010 Amount Paid: 94 % ( 91 %)
Work Started: 03/08/2010 Time Passed: 185 % ( 98 %)
23480(04) Contract: 110016 CO.RD. Residency: 08400 2.065 MI. CO.RD.;BRIDGE &
CIRB-157C(083)RB SAND SPRINGS APPROACHES(E.STREET)OVER THE
ARKANSAS RIVER, AT THE
Contractor: MANHATTAN ROAD & BRIDGE COMPANY OSAGE/PAWNEE COUNTY LINE.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $6,197,488.90 ( $6,248,752.90)
Contract Time: 240 ( 240 )
Letting Date: 04/14/2011
Contract Date: 05/18/2011
W/O Issued: 05/25/2011 Adjusted:
W/O Effective: 10/03/2011 Amount Paid: 57 %( 56 %)
Work Started: 10/10/2011 Time Passed: 93 %( 93 %)
21913(04) Contract: 120219 SH-18 Residency: 08400 0.037 MI.SH-18:BRIDGE &
HSIPY-157C(061) SAND SPRINGS APPROACHES:OVER LOST MAN CR., 2.0
MI. NORTH OF SH-60.
Contractor: APAC-CENTRAL, INC.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $813,914.87 ( $813,914.87)
Contract Time: 90 ( 90 )
Letting Date: 06/21/2012
Contract Date: 07/11/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
County: Ottawa Commissioner District: 8
Contracts Under Construction
Construction Status Report Page 122
27812(04) Contract: 120017 CT.ST. Residency: 08004 0.238 MI. CT.ST.;BRIDGE &
STP-158B(182)UR APPROACHES(EAST CENTRAL AVE.) OVER
JACOBS (AKA - CARTER-BURGESS)
TAR CREEK 0.25 MI. W. OF ELM ST. IN
Contractor: B & B BRIDGE COMPANY, LLC MIAMI.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $1,745,041.78 ( $1,745,041.78)
Contract Time: 120 ( 120 )
Letting Date: 04/19/2012
Contract Date: 05/18/2012
W/O Issued: 05/31/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 16 % ( 16 %)
Work Started: 07/23/2012 Time Passed: 20 % ( 20 %)
08932(04) Contract: 100395 SH-10 Residency: 08300 *STPY-58C(240)/3.566 MI. SH-
BRFY-058C(235)(237)/* CLAREMORE 10/GRADE,DRAIN,SURFACE,BRIDGE
;FROM THE IS-44 INTERCHANGE,
Contractor: BECCO CONTRACTORS, INC. EXTEND EAST.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $19,695,764.93 ( $19,698,389.93)
Contract Time: 650 ( 701 )
Letting Date: 11/18/2010
Contract Date: 12/22/2010
W/O Issued: 01/04/2011 Adjusted:
W/O Effective: 04/04/2011 Amount Paid: 86 % ( 86 %)
Work Started: 04/04/2011 Time Passed: 77 % ( 71 %)
28476(04) Contract: 120222 CORD Residency: 08001 7.60 MI. CO.RD.:RESURFACE
STP-158D(193)CO ENGR. SERV. & TESTING (ASPHALT)FROM SH-137,EXTEND EAST
THEN SOUTH TO IS-44.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: EST Adjusted:
Contract Amount: $1,044,665.10 ( $1,044,665.10)
Contract Time: 45 ( 45 )
Letting Date: 06/21/2012
Contract Date: 07/17/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0 %( 0 %)
Work Started: 08/06/2012 Time Passed: 0 %( 0 %)
County: Payne Commissioner District: 4
Contracts Under Construction
20331(06) Contract: 110177 SH-33 Residency: 04500 7.20 MI. SH-33/GRADE,DRAIN, SURFACE
STPY-160B(166)(171) STILLWATER & BRIDGE;FROM THE NEW ALIGNMENT
OVER THE CIMARRON RIVER, EXTEND
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCEAST.
Engineer: Arps, Jonathan Adjusted:
Contract Amount: $9,829,479.48 ( $10,927,662.59)
Contract Time: 300 ( 431 )
Letting Date: 03/17/2011
Contract Date: 04/18/2011
W/O Issued: 04/27/2011 Adjusted:
W/O Effective: 06/06/2011 Amount Paid: 109 %( 98 %)
Work Started: 06/06/2011 Time Passed: 141 %( 98 %)
Construction Status Report Page 123
28225(04) Contract: 120241 US-177 Residency: 04500 0.950 MI. US-177:RESURFACE
SSR-160A(206)SR STILLWATER (ASPHALT)FROM PERKINGS RD. IN
STILLWATER, EXTEND WEST.
Contractor: THE QUAPAW COMPANY
Engineer: Arps, Jonathan Adjusted:
Contract Amount: $267,995.00 ( $267,995.00)
Contract Time: 30 ( 30 )
Letting Date: 06/21/2012
Contract Date: 07/17/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 45 % ( 45 %)
Work Started: 08/13/2012 Time Passed: 33 % ( 33 %)
County: Pittsburg Commissioner District: 2
Contracts Under Construction
23145(05) Contract: 120032 SH-31 Residency: 02200 0.00 MI. JOINT SEAL/REPR. MULTIPLE
BRFY-261C(004) HEAVENER LOCATIONS IN DIV. II.
Contractor: B & B CONSTRUCTION SERVICE J.T., INC.
Engineer: Huddleston, David Adjusted:
Contract Amount: $398,823.53 ( $398,823.53)
Contract Time: 120 ( 120 )
Letting Date: 01/19/2012
Contract Date: 02/24/2012
W/O Issued: 04/20/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 27 % ( 27 %)
Work Started: 06/18/2012 Time Passed: 9%( 9 %)
28128(46) Contract: 120074 US-270 Residency: 02400 28.920 MI. US-270/SAFETY IM-
BTOP-261B(002) MCALESTER PROVEMENT(FIBER OPTIC CABLE) FROM
MCALESTER, EXTEND EAST TO
Contractor: BEAR COMMUNICATIONS, LLC WILBURTON.
Engineer: Plymate, Larry Adjusted:
Contract Amount: $952,036.39 ( $952,036.39)
Contract Time: 95 ( 95 )
Letting Date: 02/16/2012
Contract Date: 03/20/2012
W/O Issued: 04/23/2012 Adjusted:
W/O Effective: 05/21/2012 Amount Paid: 16 %( 16 %)
Work Started: 06/12/2012 Time Passed: 43 % ( 43 %)
29436(04) Contract: 120310 SH-31 Residency: 02400 3.00 MI. SH-31:RESURFACE
SSR-261C(008)SR MCALESTER (ASPHALT)BEGIN AT THE SH-31A JCT,
EXTEND EAST.
Contractor: GLOVER & ASSOCIATES, INC.
Engineer: Plymate, Larry Adjusted:
Contract Amount: $1,944,746.00 ( $1,944,746.00)
Contract Time: ( )
Letting Date: 07/19/2012
Contract Date: 08/21/2012 Fixed Completion Date: 10/31/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 124
28195(04) Contract: 120226 SH-113 Residency: 02400 *(247)SB / 0.00 MI. SH-113; BRIDGE
SBR-161C(246)SB/SBR-161B* MCALESTER REHAB.OVER ROCK CR., 11.2 MI. N. OF
US-69.SH-9A, OVER GAINES CR.,0.92
Contractor: C-GAWF CONSTRUCTION, INC. MI. E.
Engineer: Plymate, Larry Adjusted:
Contract Amount: $2,376,239.74 ( $2,376,239.74)
Contract Time: 240 ( 240 )
Letting Date: 06/21/2012
Contract Date: 07/17/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
21746(04) Contract: 110359 US-270 Residency: 02400 0.616 MI. US-270:BRIDGE &
BRFY-161B(141) MCALESTER APPROACHES/OVER COAL CREEK, 13.2
MI. EAST OF THE HUGHES C/L.
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer: Plymate, Larry Adjusted:
Contract Amount: $2,747,402.53 ( $2,809,285.77)
Contract Time: 180 ( 180 )
Letting Date: 07/21/2011
Contract Date: 08/09/2011
W/O Issued: 08/18/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 101 % ( 99 %)
Work Started: 09/15/2011 Time Passed: 187 % ( 187 %)
County: Pontotoc Commissioner District: 3
Contracts Under Construction
21842(04) Contract: 100610 SH-99 Residency: 03100 0.254 MI. SH-99,GRADE,DRAIN
BRFY-162B(118) ADA ,SURFACE & BRIDGE.OVER CLEAR
BOGGY CR., 1.54 MI. S. OF THE SH-3
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV)
JUNCTION.
Engineer: Russell, Julie Adjusted:
Contract Amount: $1,634,999.97 ( $1,637,749.97)
Contract Time: 180 ( 188 )
Letting Date: 10/21/2010
Contract Date: 11/23/2010
W/O Issued: 11/29/2010 Adjusted:
W/O Effective: 03/07/2011 Amount Paid: 99 %( 98 %)
Work Started: 03/01/2011 Time Passed: 126 % ( 121 %)
21843(04) Contract: 110310 SH-99 Residency: 03100 0.056 MI. SH-99:BRIDGE &
BRFY-162B(121) ADA APPROACHES:OVER BOIS D' ARC CR.,
4.57 MI. SOUTH OF THE SH-3
Contractor: MANHATTAN ROAD & BRIDGE COMPANY JUNCTION
Engineer: Russell, Julie Adjusted:
Contract Amount: $1,020,063.41 ( $1,045,283.41)
Contract Time: 90 ( 117 )
Letting Date: 06/16/2011
Contract Date: 07/22/2011
W/O Issued: 07/29/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 99 %( 97 %)
Work Started: 11/07/2011 Time Passed: 182 %( 140 %)
Construction Status Report Page 125
22973(10) Contract: 120167 SH-48 Residency: 03200 0.00 MI. SH-48/IS-35/SH-9/
SSP-162C(226)SS PURCELL SH-76/SH-4;BRIDGE WATERPROOF
SEAL. MULTIPLE LOCATIONS IN DIV. III.
Contractor: GARY A. CRAIN, INC.
Engineer: Riemer, Caleb Adjusted:
Contract Amount: $106,709.17 ( $106,709.17)
Contract Time: 80 ( 80 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 05/24/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
21926(04) Contract: 120166 SH-3 Residency: 03100 0.00 MI.:SH-3:JOINT SEAL/
BRFY-162C(225) ADA REPAIR:US-270/SH-18:AT MUL- TIPLE
LOCATIONS IN DIV. III.
Contractor: C-P INTEGRATED SERVICES, INC.
Engineer: Russell, Julie Adjusted:
Contract Amount: $261,403.96 ( $261,403.96)
Contract Time: 120 ( 120 )
Letting Date: 04/19/2012
Contract Date: 05/18/2012
W/O Issued: 05/23/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
28174(04) Contract: 110522 SH-1 Residency: 03100 0.00 MI. SH-1;BRIDGE REHAB. /OVER
SBR-162A(219)SB ADA 18TH ST., JUST SOUTH OF ADA.
Contractor: SCR CONSTRUCTION CO., INC.
Engineer: Russell, Julie Adjusted:
Contract Amount: $1,340,399.50 ( $1,359,689.10)
Contract Time: 210 ( 210 )
Letting Date: 11/17/2011
Contract Date: 12/20/2011
W/O Issued: 01/27/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 93 %( 92 %)
Work Started: 02/20/2012 Time Passed: 74 %( 74 %)
County: Pottawatomie Commissioner District: 3
Contracts Under Construction
28128(31) Contract: 120075 IS-40 Residency: 03003 26.500 MI. IS-40;SAFETY IM-
BTOP-263N(001) COBB ENGINEERING CO., INC. PROVEMENTS(FIBER OPTIC CABLE)
BEGIN AT THE OKLA. C/L, EXTEND
Contractor: ROHL NETWORKS, LP EAST TO US-377.
Engineer: COBB Adjusted:
Contract Amount: $865,555.90 ( $865,555.90)
Contract Time: 70 ( 70 )
Letting Date: 03/15/2012
Contract Date: 04/10/2012
W/O Issued: 05/09/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 78 %( 78 %)
Work Started: Time Passed: 104 %( 104 %)
Construction Status Report Page 126
29318(04) Contract: 120263 US-177 Residency: 03300 0.00 MI. US-177:TRAFFIC
HSIP-263B(005)TR WEWOKA SIGNALS:AT ACME RD. IN SHAWNEE3.5
MI. S. & 4.0 MI. E. OF THE I-40 JCT.
Contractor: TRAFFIC SIGNALS, INC.
Engineer: Moore, Archie (Act.) Adjusted:
Contract Amount: $132,014.34 ( $132,014.34)
Contract Time: 120 ( 120 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Pushmataha Commissioner District: 2
Contracts Under Construction
26233(04) Contract: 110447 US-271 Residency: 02200 .164 MI. US-271 OVER HARDY CREEK, 1.0
BRFY-164B(146)SS HEAVENER MI. N OF SH-144 JCT.
Contractor: C-GAWF CONSTRUCTION, INC.
Engineer: Huddleston, David Adjusted:
Contract Amount: $1,425,016.88 ( $1,425,016.88)
Contract Time: 180 ( 180 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/19/2011 Adjusted:
W/O Effective: 05/21/2012 Amount Paid: 18 % ( 18 %)
Work Started: 06/11/2012 Time Passed: 46 % ( 46 %)
26232(04) Contract: 120264 US-271 Residency: 02200 0.325 MI. US-271:BRIDGE &
BRFY-164B(143) HEAVENER APPROACHES/OVER HURD CREEK 2.4MI.
SOUTH OF SH-2.
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer: Huddleston, David Adjusted:
Contract Amount: $1,809,840.70 ( $1,809,840.70)
Contract Time: 180 ( 180 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 12/03/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0%( 0 %)
17045(04) Contract: 120057 CORD Residency: 02013 0.38 MI. CO.RD.:BRIDGE &
BRF-164C(012)CI CIRCUIT ENGR. DISTRICT # 3 APPROACHES;OVER TENMILE CR., 1.8
MI. NORTH OF JUMBO.
Contractor: K & R BUILDERS, INC.
Engineer: CED3 Adjusted:
Contract Amount: $809,066.74 ( $809,066.74)
Contract Time: 150 ( 150 )
Letting Date: 01/19/2012
Contract Date: 02/23/2012
W/O Issued: 02/29/2012 Adjusted:
W/O Effective: 05/07/2012 Amount Paid: 31 %( 31 %)
Work Started: Time Passed: 65 %( 65 %)
Construction Status Report Page 127
27877(04) Contract: 120225 US-271 Residency: 02100 0.00 MI. US-271 BRIDGE REHAB. :OVER
SBR-164B(162)(163)SB ANTLERS UNNAMED CR., 11.3 MI. N.E. OF
SH-3.US-271 OVER GAY CR.,13.0 MI N.E.
Contractor: LOGOS CONSTRUCTION CO., LLC OF SH-3.
Engineer: Moy, Ryan Adjusted:
Contract Amount: $1,318,797.56 ( $1,318,797.56)
Contract Time: 150 ( 150 )
Letting Date: 06/21/2012
Contract Date: 07/13/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Roger Mills Commissioner District: 5
Contracts Under Construction
28590(05) Contract: 110391 IS-40 Residency: 05100 0.00 MI. IS-40/JOINT SEAL/
BRFY-165C(122)3B CLINTON REPAIR:SH-47/ AT VARIOUS
LOCATIONS IN DIV. V.
Contractor: PBX CORPORATION
Engineer: Greer, Randy Adjusted:
Contract Amount: $292,921.00 ( $292,921.00)
Contract Time: 70 ( 117 )
Letting Date: 08/18/2011
Contract Date: 09/28/2011
W/O Issued: 10/04/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 89 % ( 89 %)
Work Started: 03/19/2012 Time Passed: 131 % ( 79 %)
21702(04) Contract: 110528 SH33 Residency: 05100 .25 MI. SH-33: BRIDGE AND
BRFY-165C(059) CLINTON APPROACHES; OVER NINE MILE CREEK
11.4 MI. EAST OF US-283.
Contractor: REECE CONSTRUCTION CO., INC.
Engineer: Greer, Randy Adjusted:
Contract Amount: $1,556,466.14 ( $1,621,672.09)
Contract Time: 180 ( 193 )
Letting Date: 10/20/2011
Contract Date: 11/21/2011
W/O Issued: 12/28/2011 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 98 %( 94 %)
Work Started: 01/09/2012 Time Passed: 106 % ( 98 %)
County: Rogers Commissioner District: 8
Contracts Under Construction
Construction Status Report Page 128
09488(04) Contract: 090566 US-169 Residency: 08300 5.24 MI. US-169;GRADE,DRAIN
NHY-030N(011) CLAREMORE ,SURFACE & BRIDGE;FROM
TALALA,EXTEND NORTH TO THE NOWATA
Contractor: DONDLINGER & SONS CONSTRUCTION CO., INC. COUNTY LINE.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $12,216,022.60 ( $12,768,123.89)
Contract Time: 345 ( 802 )
Letting Date: 10/15/2009
Contract Date: 11/13/2009
W/O Issued: 01/19/2010 Adjusted:
W/O Effective: 02/01/2010 Amount Paid: 98 % ( 94 %)
Work Started: 03/03/2010 Time Passed: 273 % ( 118 %)
25744(04) Contract: 120142 CORD Residency: 08010 0.235 MI. CO.RD.;BRIDGE &
BRF-166C(219)CI ATKINS (AKA - PBS & J) APPROACHES/OVER DOG CREEK 1.9 MI.
EAST OF SH-66.
Contractor: BELK BRIDGE, INC.
Engineer: ATKINS (AKA - PBSJ) Adjusted:
Contract Amount: $1,261,116.57 ( $1,261,116.57)
Contract Time: 120 ( 120 )
Letting Date: 03/15/2012
Contract Date: 04/12/2012
W/O Issued: 04/18/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 64 % ( 64 %)
Work Started: 05/14/2012 Time Passed: 64 % ( 64 %)
28261(04) Contract: 120043 SH-266 Residency: 08300 0.26 MI. SH-266;BRIDGE RE-
SBR-166C(254)SB CLAREMORE HABILITATION;OVER VERDIGRIS
RIVER, 5.6 MI. EAST OF TULSA C/L.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Bray, Timothy Adjusted:
Contract Amount: $1,775,741.30 ( $1,775,741.30)
Contract Time: 180 ( 180 )
Letting Date: 01/19/2012
Contract Date: 02/15/2012
W/O Issued: 02/22/2012 Adjusted:
W/O Effective: 03/19/2012 Amount Paid: 69 %( 69 %)
Work Started: 03/19/2012 Time Passed: 74 %( 74 %)
29061(04) Contract: 120308 I-44 Residency: 08300 *(003)SB/ 0.00 MI. IS-44/SH- 66.
SBR-266A(002)SB/SBR-266A* CLAREMORE BRIDGE REHAB.;OVER SH-66 0.6 MI. E.
OF TULSA C.L. & SH-66 OVER
Contractor: PBX CORPORATION ABANDONDED TURNPIKE
Engineer: Bray, Timothy Adjusted:
Contract Amount: $326,856.50 ( $326,856.50)
Contract Time: 60 ( 60 )
Letting Date: 07/19/2012
Contract Date: 08/17/2012
W/O Issued: 08/22/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
County: Seminole Commissioner District: 3
Contracts Under Construction
Construction Status Report Page 129
28128(32) Contract: 120076 SH-99 Residency: 03003 11.30 MI. SH-99;SAFETY IM-
BTOP-267N(001) COBB ENGINEERING CO., INC. PROVEMENTS(FIBER OPTIC CABLE)
US-270 FROM SEMINOLE STATE
Contractor: BEAR COMMUNICATIONS, LLC COLLEGE IN SEMINOLE E.TO SH-99
Engineer: COBB Adjusted:
Contract Amount: $576,938.70 ( $576,938.70)
Contract Time: 35 ( 35 )
Letting Date: 03/15/2012
Contract Date: 04/10/2012
W/O Issued: 04/23/2012 Adjusted:
W/O Effective: 05/21/2012 Amount Paid: 9%( 9 %)
Work Started: 05/28/2012 Time Passed: 54 % ( 54 %)
28128(33) Contract: 120077 SH-99 Residency: 03003 36.800 MI. SH-99;SAFETY IM-
BTOP-167N(002) COBB ENGINEERING CO., INC. PROVEMENTS(FIBER OPTIC CABLE)
BEGIN S. OF ADA, EXTEND N. TO
Contractor: ROHL NETWORKS, LP SEMINOLE STATE COLLEGE.
Engineer: COBB Adjusted:
Contract Amount: $1,279,367.24 ( $1,279,367.24)
Contract Time: 95 ( 95 )
Letting Date: 03/15/2012
Contract Date: 04/10/2012
W/O Issued: 05/09/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 46 % ( 46 %)
Work Started: 06/11/2012 Time Passed: 74 % ( 74 %)
28128(34) Contract: 120078 IS-40 Residency: 03010 40.50 MI. IS-40/SAFETY IM-
BTOP-267N(003) ATKINS (AKA - PBS & J) PROVEMENTS(FIBER OPTIC CABLE)
BEGIN AT THE SH-99 INTER- CHANGE,
Contractor: ROHL NETWORKS, LP EXTEND E.TO HENRYETTA.
Engineer: ATKINS (AKA - PBSJ) Adjusted:
Contract Amount: $1,286,282.96 ( $1,286,282.96)
Contract Time: 140 ( 140 )
Letting Date: 03/15/2012
Contract Date: 04/12/2012
W/O Issued: 05/09/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 59 %( 59 %)
Work Started: 06/18/2012 Time Passed: 52 %( 52 %)
T
County: Sequoyah Commissioner District: 1
Contracts Under Construction
20910(04) Contract: 100306 I-40 Residency: 01200 5.86 MI. IS-40:RESURFACE ( P.C.
IMY-0040-6(346)(367)325 SALLISAW CONCRETE)CABLE BARRIER &
BRIDGE;FROM MILE MARKER 325. 06,
Contractor: JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INCEXTEND E. TO MILE MARKER
Engineer: Edwards, Carl Adjusted:
Contract Amount: $17,611,219.09 ( $17,809,649.04)
Contract Time: 500 ( 729 )
Letting Date: 05/20/2010
Contract Date: 06/16/2010
W/O Issued: 06/22/2010 Adjusted:
W/O Effective: 10/04/2010 Amount Paid: 91 %( 90 %)
Work Started: 08/30/2010 Time Passed: 140 %( 96 %)
Construction Status Report Page 130
28730(04) Contract: 120150 PKRD Residency: 01200 5.80 MI. PK.RD.(SEQUOYAH
PLHD-168E(225)DC SALLISAW WILDLIFE)RESURFACE(ASPHALT) FROM
THE IS-40/SH-10 JCT, EXTEND S.
Contractor: GLOVER & ASSOCIATES, INC. FROM THE IS-40/SH-82
Engineer: Edwards, Carl Adjusted:
Contract Amount: $707,425.77 ( $843,625.77)
Contract Time: 30 ( 30 )
Letting Date: 03/15/2012
Contract Date: 04/16/2012
W/O Issued: 04/18/2012 Adjusted:
W/O Effective: 07/02/2012 Amount Paid: 114 % ( 96 %)
Work Started: 06/28/2012 Time Passed: 60 % ( 60 %)
29078(04) Contract: 120186 I-40 Residency: 01200 2.32 MI. I-40;SAFETY IMPROV. (CABLE
HSIPIG-0040-6(377)308TR SALLISAW BARRIER) FROM US-59 EXTEND EAST.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: Edwards, Carl Adjusted:
Contract Amount: $479,114.50 ( $479,114.50)
Contract Time: 60 ( 60 )
Letting Date: 05/17/2012
Contract Date: 06/14/2012
W/O Issued: 06/18/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Stephens Commissioner District: 7
Contracts Under Construction
26847(04) Contract: 110228 CORD Residency: 07100 0.283 MI. CO.RD.;BRIDGE &
BRO-169D(169)CI DUNCAN APPROACHES/OVER A TRIBUTARY
OFLITTLE BEAVER CR., 0.30 MI. S. OF
Contractor: PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) GRADY C/L.
THE
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $528,883.38 ( $528,883.38)
Contract Time: 90 ( 90 )
Letting Date: 03/17/2011
Contract Date: 04/18/2011
W/O Issued: 04/27/2011 Adjusted:
W/O Effective: 07/05/2011 Amount Paid: 90 %( 90 %)
Work Started: 07/05/2011 Time Passed: 103 % ( 103 %)
20952(05) Contract: 110312 US-70 Residency: 07001 0.00 MI. US-70/US-281/SH-7 :BRIDGE
BRFY-169C(190) ENGR. SERV. & TESTING JOINT SEAL/REPAIR.AT MULTIPLE
LOCATIONS IN DIV. VII.
Contractor: PBX CORPORATION
Engineer: EST Adjusted:
Contract Amount: $327,455.00 ( $327,455.00)
Contract Time: 130 ( 130 )
Letting Date: 06/16/2011
Contract Date: 07/26/2011
W/O Issued: 08/04/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 84 %( 84 %)
Work Started: 01/16/2012 Time Passed: 114 %( 114 %)
Construction Status Report Page 131
23125(07) Contract: 100308 I-35 Residency: 07100 0.00 MI. I-35/I-44/US-62/US
BRFY-169C(173) DUNCAN -77/US-177/SH-5/SH-7/SH-32/SH
-53;MULTIPLE LOCATIONS IN DIV. VII.
Contractor: INTERSTATE IMPROVEMENT, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $150,771.50 ( $150,771.50)
Contract Time: 125 ( 142 )
Letting Date: 04/15/2010
Contract Date: 05/19/2010
W/O Issued: 07/09/2010 Adjusted:
W/O Effective: 09/07/2010 Amount Paid: 97 % ( 97 %)
Work Started: 09/10/2010 Time Passed: 37 % ( 32 %)
28155(04) Contract: 110213 SH-7 Residency: 07100 *(91)3P / 6.90 MI. SH-7/
NHY-21N(53)3P/NHY-11N* DUNCAN RESURFACE(ASPHALT)FROM THE
COMANCHE C/L, EXTEND EAST. US-81
Contractor: T & G CONSTRUCTION, INC. FROM THE SH-7W.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $3,199,135.24 ( $3,460,151.44)
Contract Time: 75 ( 75 )
Letting Date: 02/17/2011
Contract Date: 03/22/2011
W/O Issued: 03/31/2011 Adjusted:
W/O Effective: 07/05/2011 Amount Paid: 104 % ( 96 %)
Work Started: 06/20/2011 Time Passed: 89 % ( 89 %)
26846(04) Contract: 110524 CORD Residency: 07100 0.284 MI. CO.RD.;BRIDGE &
BRO-169D(168)CI DUNCAN APPROACHES/OVER STAGESTAND CR.,
6.3 MI. SOUTH OF SH-7.
Contractor: K & R BUILDERS, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $574,732.10 ( $574,732.10)
Contract Time: 150 ( 150 )
Letting Date: 11/17/2011
Contract Date: 12/20/2011
W/O Issued: 12/29/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 78 %( 78 %)
Work Started: 02/23/2012 Time Passed: 100 %( 100 %)
28128(43) Contract: 120177 US-81 Residency: 07004 20.94 MI. US-81:SAFETY IM-
BTOP-269N(001) PROVEMENTS(FIBER OPTIC CABLE)
JACOBS (AKA - CARTER-BURGESS)
BEGIN 4.7 MI. N. OF US-70, EXTEND N.
Contractor: ROHL NETWORKS, LP TO SH-7.
Engineer: JACOBS (AKA - C-B) Adjusted:
Contract Amount: $801,221.37 ( $801,221.37)
Contract Time: 75 ( 75 )
Letting Date: 03/15/2012
Contract Date: 04/10/2012
W/O Issued: 05/09/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 97 %( 97 %)
Work Started: 05/30/2012 Time Passed: 104 %( 104 %)
Construction Status Report Page 132
28570(04) Contract: 120243 US-81 Residency: 07100 2.13 MI. US-81:RESURFACE
MC-269N(005) DUNCAN (ASPHALT)FROM BEECH AVE. IN
DUNCAN, EXTEND NORTH.
Contractor: T & G CONSTRUCTION, INC.
Engineer: Harwell, Jerry M. Adjusted:
Contract Amount: $727,313.95 ( $727,313.95)
Contract Time: 45 ( 45 )
Letting Date: 06/21/2012
Contract Date: 07/17/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Texas Commissioner District: 6
Contracts Under Construction
14971(13) Contract: 100588 US-54 Residency: 06200 5.28 MI. US-54;GRADE,DRAIN &
NHY-008N(019) GUYMON SURFACE/FROM 5.5 MI. S.W. OFTHE
SH-94 JUNCTION, EXTEND NORTHEAST.
Contractor: DOBSON BROTHERS CONSTRUCTION CO.
Engineer: Michael, Charles Adjusted:
Contract Amount: $9,958,921.28 ( $10,393,772.96)
Contract Time: 245 ( 460 )
Letting Date: 10/21/2010
Contract Date: 11/17/2010
W/O Issued: 12/07/2010 Adjusted:
W/O Effective: 03/07/2011 Amount Paid: 96 % ( 92 %)
Work Started: 03/07/2011 Time Passed: 209 % ( 112 %)
25483(04) Contract: 120227 CORD Residency: 06200 5.30 MI. CO.RD.:GRADE,DRAIN &
CIRB-170C(140)RB GUYMON SURFACE:FROM 5.0 MI. N. OF US-64,
EXTEND NORTH.
Contractor: J & R SAND COMPANY, INC.
Engineer: Michael, Charles Adjusted:
Contract Amount: $3,308,800.95 ( $3,308,800.95)
Contract Time: 120 ( 120 )
Letting Date: 06/21/2012
Contract Date: 07/17/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Tillman Commissioner District: 5
Contracts Under Construction
Construction Status Report Page 133
23236(04) Contract: 120188 CORD Residency: 05005 0.199 MI. CO.RD. BRIDGE &
BRO-171D(094)CI CIRCUIT ENGR. DISTR. # 7 APPROACHES:OVER BLUE CR. 3.1 MI. S.
& 2.0 MI. EAST OF US- 70/SH-36 JCT IN
Contractor: SEWELL BROS., INC. GRANDFIELD.
Engineer: CED7 Adjusted:
Contract Amount: $399,223.65 ( $399,223.65)
Contract Time: 100 ( 100 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Tulsa Commissioner District: 8
Contracts Under Construction
22150(04) Contract: 110409 CTST Residency: 08002 0.508 MI. CT.ST.:GRADE,DRAIN &
STP-172C(278)IG TETRA TECH SURFACE (91ST ST.) FROM ELM ST.,
EXTEND EAST IN THE CITY OF JENKS.
Contractor: PARAGON CONTRACTORS, LLC
Engineer: TETR Adjusted:
Contract Amount: $972,972.00 ( $985,097.00)
Contract Time: 150 ( 150 )
Letting Date: 08/18/2011
Contract Date: 09/26/2011
W/O Issued: 09/30/2011 Adjusted:
W/O Effective: 01/16/2012 Amount Paid: 100 % ( 99 %)
Work Started: 01/16/2012 Time Passed: 97 % ( 97 %)
27401(04) Contract: 100197 CT.ST. Residency: 08002 1.855 MI. CT.ST.;RESURFACE
STP-STIM(512)(513)IG TETRA TECH (ASPHALT)CITY ST.(E FLORENCE
ST.,FROM OLIVE AVE. EXTEND EAST ON
Contractor: PARAGON CONTRACTORS, LLC 23RD ST.,FROM JASPER.
Engineer: TETR Adjusted:
Contract Amount: $604,067.00 ( $604,067.00)
Contract Time: 90 ( 269 )
Letting Date: 03/18/2010
Contract Date: 04/29/2010
W/O Issued: 05/06/2010 Adjusted:
W/O Effective: 07/05/2010 Amount Paid: 92 %( 92 %)
Work Started: 07/05/2010 Time Passed: 266 % ( 89 %)
06374(44) Contract: 100617 IS-44 Residency: 08100 1.215 MI. IS-44;GRADE,DRAIN, SURFACE
IMY-0044-2(396)225 TULSA & BRIDGE;FROM RIVER- SIDE DR. TO E.
OF PEORIA AVE. IN TULSA.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $32,439,488.87 ( $33,000,066.25)
Contract Time: 720 ( 772 )
Letting Date: 11/18/2010
Contract Date: 12/22/2010
W/O Issued: 01/05/2011 Adjusted:
W/O Effective: 03/01/2011 Amount Paid: 96 %( 94 %)
Work Started: 03/01/2011 Time Passed: 72 %( 67 %)
Construction Status Report Page 134
27382(04) Contract: 100311 CTST Residency: 08002 0.259 MI. CT.ST.; RESURFACE
STP-STIM(506)IG TETRA TECH (ASPHALT)(MAIN ST.) BEGIN AT 4TH ST.,
EXTEND W. IN THE CITY OF JENKS.
Contractor: BECCO CONTRACTORS, INC.
Engineer: TETR Adjusted:
Contract Amount: $163,450.00 ( $163,450.00)
Contract Time: 90 ( 244 )
Letting Date: 04/15/2010
Contract Date: 05/12/2010
W/O Issued: 06/24/2010 Adjusted:
W/O Effective: 08/02/2010 Amount Paid: 79 % ( 79 %)
Work Started: 08/02/2010 Time Passed: 234 % ( 86 %)
26604(04) Contract: 110205 IS-244 Residency: 08100 0.968 MI. IS-244:BRIDGE &
IM-TIGR(497)SS TULSA APPROACHES.OVER THE ARKANSAS
RIVER, IN TULSA.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $63,637,567.76 ( $63,637,567.76)
Contract Time: 740 ( 740 )
Letting Date: 02/17/2011
Contract Date: 03/16/2011
W/O Issued: 03/18/2011 Adjusted:
W/O Effective: 06/15/2011 Amount Paid: 78 % ( 78 %)
Work Started: 05/13/2011 Time Passed: 57 % ( 57 %)
06374(83) Contract: 090677 SH-51 Residency: 08100 0.00 MI.;SH-51;US-75:IS-44; IS-244
IMY-0044-2(492)225NI TULSA /SART WORK ZONE;AT VARIOUS
LOCATIONS IN DIV. VIII.
Contractor: ACTION SAFETY SUPPLY CO.
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $1,310,320.25 ( $1,310,320.25)
Contract Time: ( )
Letting Date: 11/19/2009
Contract Date: 12/07/2009 Fixed Completion Date: 01/31/2013
W/O Issued: 12/08/2009 Adjusted:
W/O Effective: Amount Paid: 77 %( 77 %)
Work Started: 12/16/2009 Time Passed: 959 %( 83 %)
27929(04) Contract: 120168 1-244 Residency: 08100 0.260 MI. I-244:BRIDGE RE-
SBR-272N(020)SB TULSA HABILITATION (E-S RAMP)OVER I-444
IN TULSA.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $1,298,863.10 ( $1,298,863.10)
Contract Time: 150 ( 150 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 06/01/2012 Adjusted:
W/O Effective: 07/09/2012 Amount Paid: 4 %( 4 %)
Work Started: 07/30/2012 Time Passed: 1 %( 1 %)
Construction Status Report Page 135
29191(04) Contract: 120230 I-244 Residency: 08100 0.00 MI. I-244/SH-11:SAFETY
HSIPIG-0244-1(009)000TR TULSA IMPROVEMENT(CABLE BARRIER)BE- GIN
AT MILE MARKER 0, EX- TEND N. FROM
Contractor: ACTION SAFETY SUPPLY CO. HARVARD AVE.
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $1,124,670.55 ( $1,124,670.55)
Contract Time: 140 ( 140 )
Letting Date: 07/19/2012
Contract Date: 08/21/2012
W/O Issued: 08/24/2012 Adjusted:
W/O Effective: 01/07/2013 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
23185(09) Contract: 120144 US-75 Residency: 08100 0.00 MI. BRIDGE WATER PROOF
SSP-272C(017)SS TULSA SEAL/VARIOUS LOCATIONS IN DIV.VIII.
/US-75.
Contractor: JLT CONTRACTING, LLC
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $334,119.40 ( $334,119.40)
Contract Time: 60 ( 60 )
Letting Date: 03/15/2012
Contract Date: 04/13/2012
W/O Issued: 04/18/2012 Adjusted:
W/O Effective: 05/14/2012 Amount Paid: 90 % ( 90 %)
Work Started: 05/14/2012 Time Passed: 67 % ( 67 %)
24037(04) Contract: 110525 CT.ST. Residency: 08001 *172A(396)IG / 1.634 MI. CT.
STP-172A(346)IG/STPG-* ENGR. SERV. & TESTING ST.;GRADE,DRAIN,SURFACE &
BRIDGE;(86TH ST.)FROM MEMORIALDR.,
Contractor: BECCO CONTRACTORS, INC. EXTEND E. TO MAIN ST.
Engineer: EST Adjusted:
Contract Amount: $6,953,717.61 ( $6,953,717.61)
Contract Time: 275 ( 275 )
Letting Date: 11/17/2011
Contract Date: 12/12/2011
W/O Issued: 12/15/2011 Adjusted:
W/O Effective: 04/02/2012 Amount Paid: 28 %( 28 %)
Work Started: 04/02/2012 Time Passed: 49 %( 49 %)
27146(04) Contract: 110453 I-244 Residency: 08003 4.33 MI. I-244 FROM 73RD ST. EXTEND E
IMY-244-2(499)011/IMY-* COBB ENGINEERING CO., INC. TO I-44 INTERCHANGE INCITY OF TULSA.
Contractor: SHERWOOD CONSTRUCTION CO., INC.
Engineer: COBB Adjusted:
Contract Amount: $35,057,955.07 ( $35,057,955.07)
Contract Time: 420 ( 420 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/20/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 43 %( 43 %)
Work Started: 02/06/2012 Time Passed: 42 %( 42 %)
*244-2(500)14
Construction Status Report Page 136
28263(04) Contract: 120309 I-244 Residency: 08100 0.066 MI. I-244:BRIDGE REHAB. OVER
SBR-172N(518)SB TULSA 33RD W. AVE., 0.8 MI. N. OF I-44.
Contractor: BECCO CONTRACTORS, INC.
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $1,517,217.00 ( $1,517,217.00)
Contract Time: 180 ( 180 )
Letting Date: 07/19/2012
Contract Date: 08/16/2012
W/O Issued: 08/21/2012 Adjusted:
W/O Effective: 01/07/2013 Amount Paid: 0%( 0 %)
Work Started: Time Passed: 0%( 0 %)
27921(04) Contract: 110207 SH-20 Residency: 08001 0.634 MI. SH-20;GRADE,DRAIN, &
SAP-172A(511) ENGR. SERV. & TESTING SURFACE/NEW ALIGNMENT FROM 22ND
ST, EXTEND E. TO 14TH ST., IN
Contractor: PARAGON CONTRACTORS, LLC COLLINSVILLE.
Engineer: EST Adjusted:
Contract Amount: $2,080,217.59 ( $2,302,841.46)
Contract Time: 180 ( 226 )
Letting Date: 03/17/2011
Contract Date: 04/15/2011
W/O Issued: 04/22/2011 Adjusted:
W/O Effective: 05/31/2011 Amount Paid: 109 % ( 98 %)
Work Started: 05/31/2011 Time Passed: 134 % ( 107 %)
21901(04) Contract: 110204 IS-244 Residency: 08002 0.00 MI. IS-244/BRIDGE PAINT -ING &
IMY-NBIP(436) TETRA TECH REHAB./AT MULTIPLE LOCATIONS IN
THE CITY OF TULSA.
Contractor: V. H. P. ENTERPRISES, INC.
Engineer: TETR Adjusted:
Contract Amount: $8,940,379.50 ( $9,560,431.85)
Contract Time: 240 ( 254 )
Letting Date: 03/17/2011
Contract Date: 05/12/2011
W/O Issued: 06/10/2011 Adjusted:
W/O Effective: 08/01/2011 Amount Paid: 94 %( 88 %)
Work Started: 08/01/2011 Time Passed: 151 %( 143 %)
23171(04) Contract: 120143 IS-244 Residency: 08100 0.00 MI. IS-244:BRIDGE REHAB
BRIY-0244-1(006)101 TULSA -ILITATION:I-244 EB RAMP OVER I-244
W-N RAMP, APPROX. 5.39 MI. E. OF JCT
Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC I-244/I-444.
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $492,453.50 ( $492,453.50)
Contract Time: 90 ( 90 )
Letting Date: 03/15/2012
Contract Date: 04/10/2012
W/O Issued: 04/12/2012 Adjusted:
W/O Effective: 09/06/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 137
27633(04) Contract: 110526 SH-51 Residency: 08100 *(005)SB/ 0.05 MI. SH-51; BRIDGE
SBR-172A(515)SB/SBR-272A* TULSA REHAB./OVER PITTSBURG AVE. 0.5 MI.
E. OF HARVARD AVE.,& OVER MK&T
Contractor: BECCO CONTRACTORS, INC. R/R.
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $2,680,788.96 ( $2,680,788.96)
Contract Time: 240 ( 240 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 03/22/2012 Adjusted:
W/O Effective: 04/23/2012 Amount Paid: 40 % ( 40 %)
Work Started: 04/23/2012 Time Passed: 42 % ( 42 %)
21923(04) Contract: 110451 US-75 Residency: 08007 .107 MI. US-75 OVER MIDDLE DUCK
BRFY-172N(272) CRAIG & KEITHLINE, INC. CREEK, .9 MI. N OF OKMULGEE COUNTY
LINE.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: C&KI Adjusted:
Contract Amount: $2,471,973.36 ( $2,471,973.36)
Contract Time: 250 ( 250 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/20/2011 Adjusted:
W/O Effective: 11/28/2011 Amount Paid: 95 % ( 95 %)
Work Started: 11/28/2011 Time Passed: 84 % ( 84 %)
28593(05) Contract: 110455 US-75 Residency: 08001 0.00 MI. US-75/I-244/US-64/UNION AVE
BRFY-172A(531)3B ENGR. SERV. & TESTING AT VARIOUS LOCATIONS INDIVISION 8.
Contractor: PBX CORPORATION
Engineer: EST Adjusted:
Contract Amount: $700,136.30 ( $700,136.30)
Contract Time: 90 ( 90 )
Letting Date: 09/15/2011
Contract Date: 10/12/2011
W/O Issued: 10/20/2011 Adjusted:
W/O Effective: 11/28/2011 Amount Paid: 99 %( 99 %)
Work Started: 02/16/2012 Time Passed: 97 %( 97 %)
06374(47) Contract: 120228 IS-44 Residency: 08100 0.828 MI. IS-44:GRADE,DRAIN
IMY-0044-2(399)226 TULSA ,SURFACE & BRIDGE/AT LEWIS AVEIN
THE CITY OF TULSA.
Contractor: MANHATTAN ROAD & BRIDGE CO. / ALLEN CONTRACTING, INC. (JV)
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $37,992,362.93 ( $37,992,362.93)
Contract Time: 600 ( 600 )
Letting Date: 06/21/2012
Contract Date: 07/17/2012
W/O Issued: 08/21/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
Construction Status Report Page 138
17387(04) Contract: 090587 US-75 Residency: 08007 2.738 MI. GRADE, DRAIN, SURFACE &
NHY-014N(019)SS CRAIG & KEITHLINE, INC. BRIDGE US-75 AT THE 111TH STREET
JUNCTION IN THE CITY OF JENKS.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: C&KI Adjusted:
Contract Amount: $11,243,505.70 ( $11,646,841.52)
Contract Time: 365 ( 1,073 )
Letting Date: 09/17/2009
Contract Date: 10/20/2009
W/O Issued: 10/23/2009 Adjusted:
W/O Effective: 03/01/2010 Amount Paid: 103 % ( 100 %)
Work Started: 11/10/2009 Time Passed: 256 % ( 87 %)
23185(08) Contract: 110254 IS-244 Residency: 08100 0.00 MI. BRIDGE WATER PROOF
BRFY-172B(523) TULSA SEAL/VARIOUS LOCATIONS IN CREEK
& TULSA COUNTY.
Contractor: GARY A. CRAIN, INC.
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $258,181.60 ( $258,181.60)
Contract Time: 60 ( 60 )
Letting Date: 04/14/2011
Contract Date: 05/12/2011
W/O Issued: 05/18/2011 Adjusted:
W/O Effective: 09/06/2011 Amount Paid: 100 % ( 100 %)
Work Started: 04/25/2012 Time Passed: 62 % ( 62 %)
20925(04) Contract: 120229 US-64 Residency: 08400 0.074 MI. US-64:BRIDGE REPR. OVER
SSP-172N(355)SS SAND SPRINGS EUCHEE CR.,6.4 MI. S.E. OF THE OSAGE
C/L.
Contractor: MANHATTAN ROAD & BRIDGE COMPANY
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $1,100,714.80 ( $1,100,714.80)
Contract Time: 90 ( 90 )
Letting Date: 06/21/2012
Contract Date: 07/11/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
26362(05) Contract: 090329 I-244 Residency: 08100 5.805 MI. PAVEMENT REHAB, BRIDGE,
IM-STIM(048)(49)(50)(47) TULSA TRAFFIC LIGHTING & TRAFFIC SIGNS
I-244 AT VARIOUS LOCATIONS IN
Contractor: MANHATTAN ROAD & BRIDGE CO. & SHERWOOD CONSTRUCTION CO, INC. 8.
DIVISION
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $67,659,720.06 ( $69,905,475.59)
Contract Time: 580 ( 1,004 )
Letting Date: 04/23/2009
Contract Date: 05/13/2009
W/O Issued: 06/01/2009 Adjusted:
W/O Effective: 06/08/2009 Amount Paid: 102 %( 99 %)
Work Started: 06/08/2009 Time Passed: 172 %( 99 %)
Construction Status Report Page 139
24796(04) Contract: 100569 CTST Residency: 08100 *(392)(491)SB/ 0.097 MI. CT. ST.;
SBR-172N(389)SB/SBR-172A* TULSA BRIDGE REHAB. SH-51;OVER UTICA AVE.
& OVER ST.LOUIS ST. ON 12TH
Contractor: MANHATTAN ROAD & BRIDGE COMPANY ST.OVER IS-444 IN
Engineer: Arnold, Bruce Adjusted:
Contract Amount: $2,291,528.04 ( $2,451,528.04)
Contract Time: 130 ( 461 )
Letting Date: 10/21/2010
Contract Date: 11/15/2010
W/O Issued: 11/19/2010 Adjusted:
W/O Effective: 01/04/2011 Amount Paid: 96 % ( 90 %)
Work Started: 01/04/2011 Time Passed: 314 % ( 89 %)
TULSA.
County: Wagoner Commissioner District: 1
Contracts Under Construction
28100(04) Contract: 110394 US-69 Residency: 01001 0.00 MI. US-69;SAFETY IMPROV. (CABLE
NHG-013N(143)TR ENGR. SERV. & TESTING BARRIER)FROM 3.6 MI. S.OF THE MAYES
C/L., EXTEND NORTH.
Contractor: MIDSTATE TRAFFIC CONTROL, INC.
Engineer: EST Adjusted:
Contract Amount: $538,478.00 ( $538,478.00)
Contract Time: 120 ( 120 )
Letting Date: 08/18/2011
Contract Date: 09/26/2011
W/O Issued: 09/29/2011 Adjusted:
W/O Effective: 12/05/2011 Amount Paid: 32 % ( 32 %)
Work Started: 12/05/2011 Time Passed: 143 % ( 143 %)
10006(07) Contract: 120174 SH-51 Residency: 01100 0.776 MI. SH-51:GRADE & DRAIN
STPY-173B(009) MUSKOGEE (CAUSEWAY AT GRAND RIVER
BRIDGE)FROM 7.8 MI. E. OF US- 69,
Contractor: MANHATTAN ROAD & BRIDGE COMPANY EXTEND EAST.
Engineer: Ivy, Steve (Act.) Adjusted:
Contract Amount: $9,218,517.50 ( $9,218,517.50)
Contract Time: 300 ( 300 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 05/31/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 15 %( 15 %)
Work Started: 07/11/2012 Time Passed: 12 % ( 12 %)
County: Washington Commissioner District: 8
Contracts Under Construction
Construction Status Report Page 140
26948(04) Contract: 110303 CORD Residency: 08400 0.293 MI. CO.RD./BRIDGE &
BRO-174D(075)CO SAND SPRINGS APPROACHES;OVER KEELER CR. 7.0MI.
S. & 2.8 MI. W. OF US -60/US-75 JCT.
Contractor: K & R BUILDERS, INC.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $576,535.91 ( $576,535.91)
Contract Time: 90 ( 107 )
Letting Date: 11/17/2011
Contract Date: 01/24/2012
W/O Issued: 01/26/2012 Adjusted:
W/O Effective: 03/05/2012 Amount Paid: 67 % ( 67 %)
Work Started: 04/09/2012 Time Passed: 143 % ( 121 %)
23170(05) Contract: 120189 US-60 Residency: 08400 0.174 MI. US-60/SH-123 SAFETY
SSP-274B(001)SS SAND SPRINGS IMPROVEMENT (INTERSECTION
MODIFICATION)AT THE SH-123
Contractor: APAC-CENTRAL, INC. JUNCTION.
Engineer: Williams, Mark J. Adjusted:
Contract Amount: $834,070.86 ( $834,070.86)
Contract Time: 90 ( 90 )
Letting Date: 05/17/2012
Contract Date: 06/14/2012
W/O Issued: 06/18/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 0%( 0 %)
Work Started: 08/22/2012 Time Passed: 0%( 0 %)
County: Washita Commissioner District: 5
Contracts Under Construction
28113(04) Contract: 120231 SH-44 Residency: 05100 0.00 MI. SH-44:BRIDGE REHAB. OVER
SBR-175C(125)SB CLINTON STEEL DUST CR., 0.7 MI. NORTH OF THE
KIOWA C/L.
Contractor: K & R BUILDERS, INC.
Engineer: Greer, Randy Adjusted:
Contract Amount: $643,945.48 ( $643,945.48)
Contract Time: 60 ( 60 )
Letting Date: 06/21/2012
Contract Date: 07/20/2012
W/O Issued: 07/24/2012 Adjusted:
W/O Effective: 11/05/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0%( 0 %)
County: Woods Commissioner District: 6
Contracts Under Construction
Construction Status Report Page 141
24318(04) Contract: 120169 US-64 Residency: 06100 0.227 MI. US-64/BRIDGE &
STPY-176B(128) BUFFALO APPROACHES:OVER UNNAMED CR., 3.1
MI. E. OF SH-14.
Contractor: REECE CONSTRUCTION CO., INC.
Engineer: Burke, David Adjusted:
Contract Amount: $1,464,780.94 ( $1,464,780.94)
Contract Time: 120 ( 120 )
Letting Date: 04/19/2012
Contract Date: 05/21/2012
W/O Issued: 08/07/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0%( 0 %)
Work Started: 08/27/2012 Time Passed: 0%( 0 %)
24243(04) Contract: 120190 US-64 Residency: 06100 0.982 MI. US-64:BRIDGE &
BRFY-176B(125) BUFFALO APPROACHES;OVER WHITE HORSE CR.
9.0 MI. EAST OF SH-50.
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING
Engineer: Burke, David Adjusted:
Contract Amount: $5,222,031.23 ( $5,222,031.23)
Contract Time: 310 ( 310 )
Letting Date: 05/17/2012
Contract Date: 06/19/2012
W/O Issued: 07/13/2012 Adjusted:
W/O Effective: 10/01/2012 Amount Paid: 3%( 3 %)
Work Started: 07/30/2012 Time Passed: 5%( 5 %)
27753(04) Contract: 110158 SH-14 Residency: 06002 0.00 MI. SH-14:BRIDGE REHAB
SBR-176C(182)(183)(184)SB TETRA TECH -ILITATION/OVER EAGLE CHIEF CR., 5.0
MI. SOUTH OF THE US-64 JUNCTION
Contractor: REECE CONSTRUCTION CO., INC.
Engineer: TETR Adjusted:
Contract Amount: $1,045,246.69 ( $1,054,117.21)
Contract Time: 120 ( 120 )
Letting Date: 07/21/2011
Contract Date: 08/18/2011
W/O Issued: 08/30/2011 Adjusted:
W/O Effective: 09/26/2011 Amount Paid: 95 %( 94 %)
Work Started: 09/26/2011 Time Passed: 94 %( 94 %)
20271(04) Contract: 100409 US-281 Residency: 06100 2.071 MI. US-281;BRIDGE &
BRFY-176B(061)SS BUFFALO APPROACHES;OVER A SALT FORK OFTHE
ARKANSAS RIVER/OVER A R/R
Contractor: VENTURE CORPORATION DBA V. C. O. PAVING BRIDGE JUST N. OF ALVA.
Engineer: Burke, David Adjusted:
Contract Amount: $11,597,233.63 ( $12,153,757.23)
Contract Time: 380 ( 572 )
Letting Date: 07/22/2010
Contract Date: 08/24/2010
W/O Issued: 09/16/2010 Adjusted:
W/O Effective: 11/01/2010 Amount Paid: 102 %( 97 %)
Work Started: 09/21/2010 Time Passed: 151 %( 100 %)
Construction Status Report Page 142
27560(04) Contract: 120233 US-281 Residency: 06100 6.00 MI. US-281:RSURFACE
SSR-176B(178)SR BUFFALO (ASPHALT)BEGIN 2.4 MI. NORTH OF
US-64, EXTEND NORTH.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Burke, David Adjusted:
Contract Amount: $899,680.00 ( $899,680.00)
Contract Time: 35 ( 35 )
Letting Date: 06/21/2012
Contract Date: 07/12/2012
W/O Issued: 07/18/2012 Adjusted:
W/O Effective: 08/06/2012 Amount Paid: 0%( 0 %)
Work Started: 08/06/2012 Time Passed: 0%( 0 %)
23046(04) Contract: 110456 CORD Residency: 06009 .198 MI. CO.RD.(EW-021): BRIDGE AND
BRO-176D(088)CI CIRCUIT ENGR. DISTR. # 8 APPROACHES; OVER LITTLE EAGLE CHIEF
CREEK .8 MI. E OF US-281 AND 6.0 MI. S
Contractor: SEWELL BROS., INC. OF US-64.
Engineer: CED8 Adjusted:
Contract Amount: $400,735.96 ( $400,735.96)
Contract Time: 90 ( 96 )
Letting Date: 10/20/2011
Contract Date: 11/22/2011
W/O Issued: 11/29/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 92 % ( 92 %)
Work Started: 12/27/2011 Time Passed: 104 % ( 98 %)
24196(04) Contract: 110322 CORD Residency: 06009 .18 MI. CO.RD.(NS-237):BRIDGE AND
BRF-176C(121)CI CIRCUIT ENGR. DISTR. # 8 APPROACHES; OVER UNNAMED CREEK,
7.0 MI. W AND 6.5 MI. S OF THE
Contractor: SEWELL BROS., INC. US-64/US-281 JCT.
Engineer: CED8 Adjusted:
Contract Amount: $410,082.80 ( $432,464.13)
Contract Time: 105 ( 111 )
Letting Date: 10/20/2011
Contract Date: 11/22/2011
W/O Issued: 11/29/2011 Adjusted:
W/O Effective: 02/06/2012 Amount Paid: 101 %( 96 %)
Work Started: 12/29/2011 Time Passed: 110 %( 104 %)
County: Woodward Commissioner District: 6
Contracts Under Construction
17457(14) Contract: 110316 SH-3 Residency: 06100 1.723 MI. SH-3:GRADE,DRAIN
NHY-017N(057) BUFFALO ,SURFACE & BRIDGE:FROM 3.0 MI.SOUTH
OF THE SH-50 JUNCTION, EXTEND
Contractor: OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV) SOUTHEAST.
Engineer: Burke, David Adjusted:
Contract Amount: $5,801,858.98 ( $6,227,770.23)
Contract Time: 210 ( 300 )
Letting Date: 06/16/2011
Contract Date: 07/26/2011
W/O Issued: 08/01/2011 Adjusted:
W/O Effective: 11/07/2011 Amount Paid: 98 %( 91 %)
Work Started: 11/04/2011 Time Passed: 134 %( 94 %)
Construction Status Report Page 143
28140(04) Contract: 120114 US-183 Residency: 06100 1.38 MI. US-183;PAVEMENT RE
NHY-177N(118)3P BUFFALO -HABILITATION(P.C. CONCRETE) FROM
10TH ST. IN WOODWARD, EXTEND
Contractor: DIAMOND SURFACE, INC. WEST.
Engineer: Burke, David Adjusted:
Contract Amount: $854,186.73 ( $854,186.73)
Contract Time: 90 ( 90 )
Letting Date: 02/16/2012
Contract Date: 03/15/2012
W/O Issued: 03/29/2012 Adjusted:
W/O Effective: 06/04/2012 Amount Paid: 100 % ( 100 %)
Work Started: 06/04/2012 Time Passed: 81 % ( 81 %)
17457(12) Contract: 100412 US-183 Residency: 06100 3.183 MI. US-183/US-270/SH-
NHY-017N(055) BUFFALO 3;GRADE,DRAIN & SURFACE;FROM THE
SH-50 JUNCTION,EXTEND SOUTHEAST.
Contractor: THE CUMMINS CONSTRUCTION CO., INC.
Engineer: Burke, David Adjusted:
Contract Amount: $9,179,854.29 ( $9,524,294.02)
Contract Time: 300 ( 602 )
Letting Date: 06/17/2010
Contract Date: 07/15/2010
W/O Issued: 07/20/2010 Adjusted:
W/O Effective: 11/01/2010 Amount Paid: 99 % ( 96 %)
Work Started: 10/11/2010 Time Passed: 210 % ( 104 %)
25700(04) Contract: 120191 CORD Residency: 06009 0.208 MI. CO.RD. BRIDGE &
BRO-177D(098)CI CIRCUIT ENGR. DISTR. # 8 APPROACHES:OVER DEEP CREEK 0.3MI.
N. & 1.7 MI. W. OF THE US-183/US-270
Contractor: SEWELL BROS., INC. JCT NW OF SEILIN
Engineer: CED8 Adjusted:
Contract Amount: $677,094.40 ( $677,094.40)
Contract Time: 120 ( 120 )
Letting Date: 05/17/2012
Contract Date: 06/15/2012
W/O Issued: 06/20/2012 Adjusted:
W/O Effective: 09/04/2012 Amount Paid: 0 %( 0 %)
Work Started: Time Passed: 0 %( 0 %)
G
28128(37) Contract: 120063 US-412 Residency: 06003 54.30 MI. US-412;SAFETY IM-
BTOP-277N(001) COBB ENGINEERING CO., INC. PROVEMENTS(FIBER OPTIC CABLE) FROM
THE CITY OF WOODWARD TO THE
Contractor: ROHL NETWORKS, LP CITY OF ORIENTA.
Engineer: COBB Adjusted:
Contract Amount: $1,698,546.26 ( $1,698,546.26)
Contract Time: 160 ( 160 )
Letting Date: 01/19/2012
Contract Date: 02/21/2012
W/O Issued: 03/01/2012 Adjusted:
W/O Effective: 03/26/2012 Amount Paid: 100 %( 100 %)
Work Started: 03/26/2012 Time Passed: 41 %( 41 %)
Construction Status Report Page 144
County: Alfalfa Commissioner District: 6
Contracts Awarded - NTP Not Processed
26958(04) Contract: 120268 CORD BRO-102D(162)CI
Contractor: BELK BRIDGE, INC. 0.237 MI. CO.RD.:BRIDGE &
Contract Amount: $747,976.88 APPROACHES:OVER LITTLE MULE CR., 4.2
Residency: 06009
MI. N. OF SH-11.
Letting Date: 08/16/2012 CIRCUIT ENGR. DISTR. # 8
County: Atoka Commissioner District: 2
Contracts Awarded - NTP Not Processed
28755(04) Contract: 120373 PKRD SAP-103D(141)
Contractor: HUB CONSTRUCTION, INC. 0.010 MI. PK.RD.;GRADE & RE-
Contract Amount: $67,660.00 SURFACE(ASPHALT)AT MCGEE CREEKSTATE
Residency: 02100
PK., ON MCGEE CR. LAKE ROAD.
Letting Date: 08/16/2012 ANTLERS
County: Beckham Commissioner District: 5
Contracts Awarded - NTP Not Processed
28131(04) Contract: 120193 SH-34 SBR-105C(197)SB
Contractor: REECE CONSTRUCTION CO., INC. 0.00 MI. SH-34:BRIDGE RE-
Contract Amount: $552,243.09 HABILITATION/OVER FLAT CR., 4.3 MI.
Residency: 05200
SOUTH OF SH-152.
Letting Date: 06/21/2012 ALTUS
County: Bryan Commissioner District: 2
Contracts Awarded - NTP Not Processed
27889(04) Contract: 120284 CORD STP-107C(170)CI
Contractor: OVERLAND CORPORATION 2.023 MI. CO.RD.:GRADE,DRAIN SURFACE &
Contract Amount: $2,166,935.18 BRIDGE/FROM 6.0 MI. S. OF US-70, EXTEND
Residency: 02013
SOUTH.
Letting Date: 08/16/2012 CIRCUIT ENGR. DISTRICT # 3
County: Carter Commissioner District: 7
Contracts Awarded - NTP Not Processed
26849(04) Contract: 120249 CORD BRF-NBIL(223)CI
Contractor: REECE CONSTRUCTION CO., INC. 0.340 MI. CO.RD./BRIDGE &
Contract Amount: $604,283.25 APPROACHES:OVER TRIBUTARY OF WALNUT
Residency: 07200
BAYOU CR. 4.0 MI. SO. & 4.6 MI. E. OF
Letting Date: 07/19/2012 ARDMORE US-70.
28754(04) Contract: 120374 PKRD SAP-110D(241)
Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. 0.22 MI. PK.RD.:RESURFACE (ASPHALT)AT
Contract Amount: $136,900.00 MURRAY STATE PK, ON THE ENTRANCE RD.
Residency: 07200
IN FRONT OF THE PRO SHOP.
Letting Date: 08/16/2012 ARDMORE
County: Cimarron Commissioner District: 6
Contracts Awarded - NTP Not Processed
Construction Status Report Page 145
28322(04) Contract: 120314 CORD ACSTP-113C(087)CI
Contractor: HIGHWAY CONTRACTORS, INC. 2.860 MI. CO.RD.;RESURFACE
Contract Amount: $1,210,577.38 (ASPHALT)FROM EW-23, EXTEND NORTH TO
Residency: 06200
US-56.
Letting Date: 08/16/2012 GUYMON
County: Cleveland Commissioner District: 3
Contracts Awarded - NTP Not Processed
24112(11) Contract: 120286 SH-39 STPY-214B(012)RW
Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC 0.00 MI. SH-39:RIGHT-OF- WAY
Contract Amount: $28,333.00 CLEARANCE:FROM 2.0 MI. E. OF US-77,
Residency: 03200
EXTEND EAST.
Letting Date: 08/16/2012 PURCELL
20997(17) Contract: 120285 US-77 STPY-214C(013)RW
Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC 0.00 MI. US-77:RIGHT-OF- WAY
Contract Amount: $32,188.00 CLEARANCE:FROM 4.05 MI. N.OF
Residency: 03200
SH-39,EXTEND NORTH THROUGH
Letting Date: 08/16/2012 PURCELL SLAUGHTERVILLE.
County: Creek Commissioner District: 8
Contracts Awarded - NTP Not Processed
28932(04) Contract: 120269 US-75 BRFY-219C(005)
Contractor: PBX CORPORATION 0.00 MI. US-75/SH-11/SH-18 /SH-99:AT
Contract Amount: $1,683,521.80 MULTIPLE LOCATIONS IN DIV. VIII.
Residency: 08002
Letting Date: 08/16/2012 TETRA TECH
County: Custer Commissioner District: 5
Contracts Awarded - NTP Not Processed
28473(04) Contract: 120271 CORD STP-120C(197)CI
Contractor: CASWELL CONTRACTING, INC. 1.523 MI. CO.RD.;GRADE,DRAIN &
Contract Amount: $775,444.37 SURFACE;FROM AIRPORT RD. IN
Residency: 05005
WEATHERFORD EXTEND E. ON EW- 101 THEN
Letting Date: 08/16/2012 CIRCUIT ENGR. DISTR. # 7 N. ON NS-244.
24133(04) Contract: 120270 SH-33 SSP-120B(124)SS/SBR-120B*
Contractor: *(178)SB/SBR-220B(007)SB/
OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Contract Amount: $2,561,056.22 SH-33:BRIDGE & APPROACHES/ BRIDGE
Residency: 05100
REHAB./OVER DEER CR., DRY CR.,&
Letting Date: 08/16/2012 CLINTON LITTLE DEER CR.
County: Delaware Commissioner District: 8
Contracts Awarded - NTP Not Processed
10441(04) Contract: 110422 SH-10 BRFY-021C(256)
Contractor: JENSEN CONSTRUCTION COMPANY 0.892 MI. SH-10;BRIDGE &
Contract Amount: $15,741,148.27 APPROACHES/OVER ELK RIVER, 1.35 MI. S.
Residency: 08011
OF THE OTTAWA C/L.
Letting Date: 08/16/2012 GARVER, LLC.
County: Grant Commissioner District: 4
Contracts Awarded - NTP Not Processed
Construction Status Report Page 146
27281(04) Contract: 120252 CORD BRO-127D(171)CI
Contractor: KING CONSTRUCTION CO., INC. & SUBSIDIARIES 0.275 MI. CO.RD.:BRIDGE &
Contract Amount: $679,607.00 APPROACHES/OVER TRIBUTARY TO SAND
Residency: 04009
CR. 2.0 MI.N.& 0.4 MI. E. OF THE
Letting Date: 07/19/2012 CIRCUIT ENGR. DISTR. # 8 SH-11/SH-132 JCT.
County: Harmon Commissioner District: 5
Contracts Awarded - NTP Not Processed
24949(04) Contract: 120253 CORD CIRB-129C(039)RB
Contractor: EARTH BUILDERS, L.P. 0.937 MI. CO.RD.:BRIDGE &
Contract Amount: $7,176,530.30 APPROACHES:OVER THE RED RIVER 8.0 MI.
Residency: 05005
S. & 3.0 MI. W. OF HOLLIS.
Letting Date: 07/19/2012 CIRCUIT ENGR. DISTR. # 7
County: Haskell Commissioner District: 1
Contracts Awarded - NTP Not Processed
27386(04) Contract: 120287 CORD BRF-131C(103)CI
Contractor: HUB CONSTRUCTION, INC. 0.128 MI. CO.RD.:BRIDGE &
Contract Amount: $588,716.00 APPROACHES:OVER ELM CR., 0.2 MI. WEST
Residency: 01200
OF SH-2
Letting Date: 08/16/2012 SALLISAW
County: Jefferson Commissioner District: 7
Contracts Awarded - NTP Not Processed
27474(04) Contract: 120288 CORD BRO-134D(079)CI
Contractor: 0.376 MI. CO.RD.:BRIDGE &
OBC, INC./PLAINS BRIDGE CONTRACTING OF OKLAHOMA, LLC (JV)
Contract Amount: $1,049,375.54 APPROACHES:OVER MUD & COTTON- WOOD
Residency: 07100
CR., 0.7 MI. W. OF SH- 89.
Letting Date: 08/16/2012 DUNCAN
County: Latimer Commissioner District: 2
Contracts Awarded - NTP Not Processed
21735(08) Contract: 120375 SH-1 MC-239C(006)
Contractor: B & B CONSTRUCTION SERVICE J.T., INC. 0.08 MI. SH-1:BRIDGE REHAB . OVER ROCK
Contract Amount: $356,081.00 CR., 0.16 MI. W. OF THE LEFLORE COUNTY
Residency: 02200
LINE.
Letting Date: 08/16/2012 HEAVENER
County: Logan Commissioner District: 4
Contracts Awarded - NTP Not Processed
23017(04) Contract: 120289 CORD BRF-142C(118)CI
Contractor: BELK BRIDGE, INC. 0.251 MI. CO.RD.:BRIDGE &
Contract Amount: $734,485.00 APPROACHES:OVER OTTER CR. 3.0 MI. S. &
Residency: 04500
1.4 MI. EAST OF THE SH-51/SH-74 JCT.
Letting Date: 08/16/2012 STILLWATER
27729(04) Contract: 120274 SH-000 STPY-242C(001)
Contractor: RUDY CONSTRUCTION CO. 1.55 MI. SH-00:RESURFACE (ASPHALT) &
Contract Amount: $587,140.00 PEDESTRIAN IMPROV./ THRU COYLE, FROM
Residency: 04500
THE NEW SH-33,EXTEND EAST THEN
Letting Date: 08/16/2012 STILLWATER NORTH.
Construction Status Report Page 147
County: Love Commissioner District: 7
Contracts Awarded - NTP Not Processed
28584(04) Contract: 120257 IS-35 IMY-0035-1(161)003
Contractor: 1.50 CO., INC JV
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION MI. IS-35;GRADE,DRAIN, &
Contract Amount: $3,526,292.41 SURFACE;INTERCHANGE @ ROGERSRD. 3.24
Residency: 07200
N. OF THE TX STATE LINE (SOUTH HALF)
Letting Date: 08/16/2012 ARDMORE
County: McClain Commissioner District: 3
Contracts Awarded - NTP Not Processed
20212(04) Contract: 120290 CORD BRF-144C(059)CI
Contractor: REECE CONSTRUCTION CO., INC. 0.192 MI. CO.RD.:BRIDGE &
Contract Amount: $365,646.68 APPROACHES:OVER TRIBUTARY OF
Residency: 03006
COLBERT CR., 6.0 MI. & 5.7 MI. W. OF THE
Letting Date: 08/16/2012 OLLAR & OLLAR ENGINEERINGSH-39/SH-59 JCT
County: McIntosh Commissioner District: 1
Contracts Awarded - NTP Not Processed
29151(04) Contract: 120306 US-69 SBR-246N(001)SB
Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES 0.00 MI. US-69:BRIDGE REHAB. :OVER
Contract Amount: $1,421,032.80 LOCUST ST. IN EUFAULA, 4.71 MI. N. OF THE
Residency: 01100
PITTSBURG C/L.
Letting Date: 07/19/2012 MUSKOGEE
County: Murray Commissioner District: 7
Contracts Awarded - NTP Not Processed
29273(04) Contract: 120299 SH-7 HSIPG-250A(001)TR
Contractor: MIDSTATE TRAFFIC CONTROL, INC. 0.00 MI. SH-7;SAFETY IM- PROVEMENT AT
Contract Amount: $158,280.00 THE IS-35 INTERCHANGE.
Residency: 07200
Letting Date: 08/16/2012 ARDMORE
County: Noble Commissioner District: 4
Contracts Awarded - NTP Not Processed
20311(07) Contract: 120275 US-64 STPY-152B(173)/BRFY-152B*
Contractor: DONDLINGER & SONS CONSTRUCTION CO., INC. *(74) 4.63 MI. US-64, GRADE,DRAIN &
Contract Amount: $3,278,241.33 BRIDGE FROM 7.0 MI.E. OF BOUNDARY ST.
Residency: 04100
IN PERRY, EXT EAST. OVER MULE CR., 7.8
Letting Date: 08/16/2012 PERRY MI.
23316(04) Contract: 120277 US-77 BRFY-NBIP(360)
Contractor: V. H. P. ENTERPRISES, INC. 0.00 MI. US-77/SH-74/BRIDGE PAINTING @
Contract Amount: $325,000.00 MULTIPLE LOCATIONS IN DIV. IV.
Residency: 04001
Letting Date: 08/16/2012 ENGR. SERV. & TESTING
23316(05) Contract: 120278 US-77 BRFY-252C(007)
Contractor: B & B CONSTRUCTION SERVICE J.T., INC. 0.00 MI. US-77/SH-74;JOINT
Contract Amount: $134,285.00 SEAL/REPAIR:AT MULTIPLE LOCA- TIONS IN
Residency: 04001
DIV. IV.
Letting Date: 08/16/2012 ENGR. SERV. & TESTING
Construction Status Report Page 148
County: Oklahoma Commissioner District: 4
Contracts Awarded - NTP Not Processed
29274(04) Contract: 120171 I-44 SBR-255A(063)SB
Contractor: GIBSON & ASSOCIATES, INC. 0.00 MI. IS-44:BRIDGE REPR. :OVER THE
Contract Amount: $785,150.40 OKLA. RIVER IN OKC.
Residency: 04200
Letting Date: 07/19/2012 EL RENO
27591(04) Contract: 120149 IS-44 SBR-155N(876)SB
Contractor: SCR CONSTRUCTION CO., INC. 0.050 MI. IS-44:BRIDGE REHAB /OVER
Contract Amount: $657,392.00 RENO AVE. IN OKC.
Residency: 04004
Letting Date: 08/16/2012 JACOBS (AKA - CARTER-BURGESS)
09033(45) Contract: 120291 IS-44 IMY-0044-1(122)127RW
Contractor: K & M DIRT SERVICES, LLC DBA K & M WRECKING 0.00 MI. IS-44:RIGHT-OF-WAY
Contract Amount: $29,500.00 CLEARANCE/WESTBOUND TO NORTH- BOUND
Residency: 04400
RAMPS AT THE IS-44/ I-235 JCT.
Letting Date: 08/16/2012 EDMOND
County: Osage Commissioner District: 8
Contracts Awarded - NTP Not Processed
29232(04) Contract: 120220 SH-123 SBR-257C(006)(007)SB
Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES 0.111 MI. SH-123:BRIDGE RE-
Contract Amount: $1,556,260.97 HABILITATION/OVER SAND CR., 1.5 MI. S.
Residency: 08400
OF US-60. OVER ELIZA CR., 0.6 MI. S. OF
Letting Date: 08/16/2012 SAND SPRINGS US-60
29313(04) Contract: 120280 SH-99 SSR-257C(008)SR
Contractor: PARAGON CONTRACTORS, LLC 0.203 MI. SH-99 & SH-20 / INTERSECTION
Contract Amount: $120,582.66 MODIFICATION SH- 20: INTERSECTION AT
Residency: 08400
SH-99 IN HOMINY.
Letting Date: 08/16/2012 SAND SPRINGS
28932(05) Contract: 120261 SH-99 BRFY-NBIP(454)
Contractor: POSEIDON CONSTRUCTION, INC. 0.00 MI. SH-99;BRIDGE PAINT- ING;OVER
Contract Amount: $112,251.00 PENN CR. 0.3 MI. N. OF SH-20.
Residency: 08002
Letting Date: 07/19/2012 TETRA TECH
County: Pawnee Commissioner District: 8
Contracts Awarded - NTP Not Processed
28934(04) Contract: 120283 SH-18 BRFY-NBIP(455)
Contractor: POSEIDON CONSTRUCTION, INC. 0.00 MI. SH-18:BRIDGE PAIN- TING;OVER
Contract Amount: $47,845.00 COAL CR., 7.5 MI. N.OF 64.
Residency: 08001
Letting Date: 08/16/2012 ENGR. SERV. & TESTING
County: Pittsburg Commissioner District: 2
Contracts Awarded - NTP Not Processed
23482(11) Contract: 120298 CORD CIRB-261C(007)RB
Contractor: MANHATTAN ROAD & BRIDGE COMPANY 0.417 MI. CO.RD.;GRADE, DRAIN &
Contract Amount: $2,318,698.35 SSURFACE(CROWDER BLOCKER RD.)FROM
Residency: 02013
CAUSEWAY OVER LAKE EUFAULA 2.0 MI.
Letting Date: 08/16/2012 CIRCUIT ENGR. DISTRICT # 3
Construction Status Report Page 149
28756(04) Contract: 120378 PKRD SAP-161D(251)
Contractor: JOB CONSTRUCTION CO., INC. 0.380 MI. PK.RD.:RESURFACE (ASPHALT)AT
Contract Amount: $108,180.75 ARROWHEAD STATE PKON MAIN PK.RD. &
Residency: 02400
GOLF COURSE DRIVEWAY.
Letting Date: 08/16/2012 MCALESTER
County: Pottawatomie Commissioner District: 3
Contracts Awarded - NTP Not Processed
22090(04) Contract: 120295 CORD BRO-163D(337)CI
Contractor: K & R BUILDERS, INC. 0.126 MI. CO.RD./BRIDGE &
Contract Amount: $673,401.24 APPROACHES:OVER TRIBUTARY TO SALT
Residency: 03100
CR., 0.2 MI. W. OF US -177.
Letting Date: 08/16/2012 ADA
County: Sequoyah Commissioner District: 1
Contracts Awarded - NTP Not Processed
26251(04) Contract: 120296 CORD ACSTP-168C(196)CO
Contractor: JOB CONSTRUCTION CO., INC. 4.26 MI. CO.RD.:RESURFACE (ASPHALT)
Contract Amount: $549,350.16 (NS-471)FROM US-64, EXTEND SOUTH.
Residency: 01200
Letting Date: 08/16/2012 SALLISAW
County: Texas Commissioner District: 6
Contracts Awarded - NTP Not Processed
29384(04) Contract: 120297 SH-95 MC-270C(003)
Contractor: BEHNE CONSTRUCTION CO., INC. 0.020 MI. SH-95:RESURFACE (PC
Contract Amount: $118,310.00 CONCRETE INTERSECTION) AT 3RD ST. IN
Residency: 06200
THE TOWN OF TEXHOMA.
Letting Date: 08/16/2012 GUYMON
County: Tulsa Commissioner District: 8
Contracts Awarded - NTP Not Processed
15860(04) Contract: 120265 CORD BRO-172D(598)CO
Contractor: B & B BRIDGE COMPANY, LLC 0.099 MI. CO.RD.;BRIDGE &
Contract Amount: $325,782.00 APPROACHES(HARVARD AVE.)OVER BIRD
Residency: 08014
CR. TRIB. 2.8 MI. S. & 1.0 MI. W. OF
Letting Date: 07/19/2012 SAIC (AKA - THE BENHAM COMPANIES, LLC)
US-75.
County: Wagoner Commissioner District: 1
Contracts Awarded - NTP Not Processed
16233(08) Contract: 120300 US-69 BRFY-NBIP(464)
Contractor: POSEIDON CONSTRUCTION, INC. 0.00 MI. US-69/BRIDGE PAIN- TING;OVER
Contract Amount: $163,327.00 UNION PACIFIC R/R, 0.7 MI. & 1.5 MI. N. OF
Residency: 01002
SH-51
Letting Date: 08/16/2012 TETRA TECH
Construction Status Report Page 150
Resident Directory
Residency: 0X001 - ENGR. SERV. & TESTING NORMAN, OK 73072 3201 S. BERRY ROAD
Engineer: EST Ph: (405)307-8378 Fx: (405)329-1914
Residency: 0X002 - TETRA TECH OKLAHOMA CITY, OK 73102 119 N. ROBINSON AVE. - SUITE
(405)608-8601 700
Engineer: TETR Ph: (405)606-8600 Fx:
Residency: 0X003 - COBB ENGINEERING CO., INC. OKLAHOMA CITY, OK 73122 4516 NW 36TH STREET
Engineer: COBB Ph: (405)415-9400 Fx: (405)415-9410
Residency: 0X004 - JACOBS (AKA - CARTER-BURGESS) OKLAHOMA CITY, OK 73114 10001 N. BROADWAY EXTENSION
Engineer: JACOBS (AKA - C-B) Ph: (405) 810-8254 Fx: (405) 810-2980
Residency: 0X005 - CIRCUIT ENGR. DISTR. # 7 CLINTON, OK 73601 PO BOX 337 - 1779 MARSHALL
RD.
Engineer: CED7 Ph: (580)323-8685 Fx:
Residency: 0X006 - OLLAR & OLLAR ENGINEERING NORMAN, OK 73070 PO BOX 5997
Engineer: O&OE Ph: 405-364-0281 Fx:
Residency: 0X007 - CRAIG & KEITHLINE, INC. TULSA, OK 74105 214 E. SKELLY DRIVE, SUITE 100
Engineer: C&KI Ph: (918)743-6611 Fx: (918)743-6680
Residency: 0X008 - BRAWLEY ENGINEERING CORP. MCALESTER, OK 74501 521 S SECOND STREET
Engineer: BEC Ph: (918)420-5500 Fx:
Residency: 0X009 - CIRCUIT ENGR. DISTR. # 8 ALVA, OK 73717 909 WEST LAKES DRIVE
Engineer: CED8 Ph: (580)430-5078 Fx:
Residency: 0X010 - ATKINS (AKA - PBS & J) NORMAN, OK 73072 350 DAVID L. BOREN
BOULEVARD, SUITE 1510
Engineer: ATKINS (AKA - PBSJ) Ph: (405)321-2480 Fx:
Residency: 0X011 - GARVER, LLC. TULSA, OK 74146 10015 E 51ST STREET
Engineer: GARV Ph: (919)250-5922 Fx:
Residency: 0X012 - PSA-DEWBERRY TULSA, OK 74119 1350 SOUTH BOULDER, STE 600
Engineer: PSAD Ph: (918)587-7283 Fx:
Residency: 0X013 - CIRCUIT ENGR. DISTRICT # 3 HUGO, OK 74743 203 PEPSI COLA AVE
Engineer: CED3 Ph: (580)326-9191 Fx:
Residency: 0X014 - SAIC (AKA - THE BENHAM COMPANIES, LLC) OKLAHOMA CITY, OK 73114 9400 NORTH BROADWAY, SUITE
300
Engineer: SAIC ( AKA - ZBCL) Ph: (405)478-5353 Fx:
Residency: 01100 - MUSKOGEE MUSKOGEE, OK 74401 2800 S. 32ND - US-69 3 MI. S OF
(918) 682-2597 sivy@odot.org US-62
Engineer: Ivy, Steve (Act.) Ph: (918) 682-9471 Fx:
Residency: 01200 - SALLISAW SALLISAW, OK 74955 P.O. BOX 449 - 113 MCGEE DRIVE
Engineer: Edwards, Carl Ph: (918) 775-2751 Fx: (918) 776-0285 cedwards@odot.org
Residency: 01700 - DIV. 1 BRIDGE MUSKOGEE, OK 74401 2800 S. 32ND - US-69 3 MI. S
(918) 682-2597 dobrien@odot.org US-62
Engineer: Obrien, Dan Ph: (918) 682-9471 Fx:
Construction Status Report Page 151
Residency: 02100 - ANTLERS ANTLERS, OK 74523 P. O. BOX DRAWER 628 - US-271
(580) 298-6152 rmoy@odot.org 2 MI. S. TOWN
Engineer: Moy, Ryan Ph: (580) 298-3081 Fx:
Residency: 02200 - HEAVENER HEAVENER, OK 74937 P.O. BOX 835 - N. HIGHWAY 59
Engineer: Huddleston, David Ph: (918) 653-7896 Fx: (918) 653-4532 dhuddleston@odot.org
Residency: 02300 - MADILL MADILL, OK 73446 P. O. BOX 297 - HWY. BLDG. S.
(580) 795-7461 jeldridge@odot.org MADILL
Engineer: Eldridge, Jerry Ph: (580) 795-3675 Fx:
Residency: 02400 - MCALESTER MCALESTER, OK 74502 P.O. BOX 3269 - US-270 E.
(918) 429-0807 lplymate@odot.org MCALESTER
Engineer: Plymate, Larry Ph: (918) 423-5443 Fx:
Residency: 02700 - DIV. 2 BRIDGE ANTLERS, OK 74523 P.O. BOX DRAWER 628 - US-271 2
(580) 298-6152 mnabors@odot.org MI. S TOWN
Engineer: Nabors, Monte Ph: (580) 298-3371 Fx:
Residency: 03100 - ADA ADA, OK 74820 P.O. BOX 157 - 3 MI. NW ADA ON
(580) 332-2566 jrussell@odot.org SH-3W
Engineer: Russell, Julie Ph: (580) 332-2094 Fx:
Residency: 03200 - PURCELL PURCELL, OK 73080 P.O. BOX 468 - SH-74 2 MI. SW
(405) 527-6576 criemer@odot.org OF PURCELL
Engineer: Riemer, Caleb Ph: (405) 527-5569 Fx:
Residency: 03300 - WEWOKA WEWOKA, OK 74884 P.O. BOX 918 - 1.5 MI. N.
(405) 257-5003 amoore@odot.org WEWOKA ON SH-56
Engineer: Moore, Archie (Act.) Ph: (405) 257-3325 Fx:
Residency: 03700 - DIV. 3 BRIDGE ADA, OK 74820 P.O. BOX 549 - 3 MI. N.W. OF ADA
(580) 332-0261 slwilliams@odot.org ON SH-3W
Engineer: Williams, Shelly Ph: (580) 332-1526 Fx:
Residency: 04100 - PERRY PERRY, OK 73077 P.O. BOX 548 - US-77 1/4 M. E. OF
(580) 336-7373 tzachary@odot.org I-35
Engineer: Zachary, Ted Ph: (580) 336-7374 Fx:
Residency: 04200 - EL RENO Yukon, OK 73099 15100 NW 36th St,
Engineer: Vonfeldt, Cole Ph: (405) 350-2331 Fx: (405) 350-2199 cvonfeldt@odot.org
Residency: 04300 - ENID ENID, OK 73701 410 KREMLIN
Engineer: Crowl, Kenny (Act.) Ph: (580) 234-3223 Fx: (580) 237-3328 kcrowl@odot.org
Residency: 04400 - EDMOND EDMOND, OK 73013 4105 E. MEMORIAL RD.
Engineer: Hubbard, Tom Ph: (405) 475-2860 Fx: (405) 478-1126 thubbard@odot.org
Residency: 04500 - STILLWATER STILLWATER, OK 74076 P.O. BOX 1928 - 3613 N.
(405) 377-8321 jarps@odot.org HUSBAND
Engineer: Arps, Jonathan Ph: (405) 372-5644 Fx:
Residency: 04600 - OKLAHOMA CITY OKLAHOMA CITY, OK 73129 1021 S.E. 59TH
Engineer: Howell, Terry Ph: (405) 636-4044 Fx: (405) 632-9921 thowell@odot.org
Residency: 04700 - DIV. 4 BRIDGE PERRY, OK 73077 P.O. BOX 471 - US-77 1/4 MI. E
(580) 336-7350 charlin@odot.org I-35
Engineer: Harlan, Chris Ph: (580) 336-7340 Fx:
Residency: 05100 - CLINTON CLINTON, OK 73601 P.O. BOX 818 - US-183 1 MI S. OF
(580) 323-3551 rgreer@odot.org I-40
Engineer: Greer, Randy Ph: (580) 323-0702 Fx:
Residency: 05200 - ALTUS ALTUS, OK 73521 608 S. JACKSON ST
Engineer: Nedbalek, Will Ph: (580) 482-3191 Fx: (580) 482-0792 wnedbalek@odot.org
Construction Status Report Page 152
Residency: 05700 - DIV. 5 BRIDGE CLINTON, OK 73601 P.O. BOX 1449 - US-183 1 MI. S.
(580) 323-1430 mclanton@odot.org I-40
Engineer: Clanton, Mike Ph: (580) 323-1431 Fx:
Residency: 06100 - BUFFALO BUFFALO, OK 73834 P. O. BOX 190 - US-64 1 MI. W
(580) 735-2024 dburke@odot.org US-183
Engineer: Burke, David Ph: (580) 735-2537 Fx:
Residency: 06200 - GUYMON GUYMON, OK 73942 P.O. BOX 348 - 504 S. CRUMLEY
Engineer: Michael, Charles Ph: (580) 338-3545 Fx: (580) 338-5685 cmichael@odot.org
Residency: 06700 - DIV. 6 BRIDGE BUFFALO, OK 73834 P.O. BOX 190 - US-64 1 MI. W
(580) 735-2248 wroesner@odot.org US-183
Engineer: Roesner, Wayne Ph: (580) 735-2561 Fx:
Residency: 07100 - DUNCAN DUNCAN, OK 73534 P.O. BOX 1107 - 2205 S. US-81
(580) 252-6178 jharwell@odot.org BYPASS
Engineer: Harwell, Jerry M. Ph: (580) 255-7609 Fx:
Residency: 07200 - ARDMORE ARDMORE, OK 73402 P. O. BOX 1826 - 525 INTERSTATE
(580) 226-8146 jearp@odot.org DR.
Engineer: Earp, Jay Ph: (580) 223-1351 Fx:
Residency: 07300 - ANADARKO ANADARKO, OK 73005 P.O. BOX 220 - 211 W MAIN ST.
Engineer: Knight, Reese Ph: (405) 247-2462 Fx: (405) 247-2057 rknight@odot.org
Residency: 07700 - DIV. 7 BRIDGE DUNCAN, OK 73533 P.O. BOX 460 - 2205 S. US-81
(580) 255-5064 terrrill@odot.org BYPASS
Engineer: Terrill, Tracy Ph: (580) 255-7586 Fx:
Residency: 08100 - TULSA TULSA, OK 74116 4002 N. MINGO VAL. EXPWY.
Engineer: Arnold, Bruce Ph: (918) 836-7116 Fx: (918) 832-0383 barnold@odot.org
Residency: 08300 - CLAREMORE CLAREMORE, OK 74018 25825-B S. HWY. 66 - 729 S.
(918) 343-1203 tbray@odot.org MORETZ
Engineer: Bray, Timothy Ph: (918) 266-1160 Fx:
Residency: 08400 - SAND SPRINGS SAND SPRINGS, OK 74063 110 E. 41ST (PRATTVILLE)
Engineer: Williams, Mark J. Ph: (918) 245-9531 Fx: (918) 245-0953 mwilliams@odot.org
Residency: 08700 - DIV. 8 BRIDGE TULSA, OK 74101 P.O. BOX 660 - 4002 N. MINGO
(918) 832-9074 dbutler@odot.org VAL. EXPWY.
Engineer: Butler, David Ph: (918) 838-9933 Fx:
Construction Status Report Page 153
Get documents about "