					                                                                    UAE Energy Efficiency
                                                                    Standardization & Labeling
                                                                    Phase 1
                                                                    Non-ducted Room Air-conditioners
                                                                    I.   Program Launching
                                                                    II.  Regulation
                                                                          • Objective
                                                                          • Scope
                                                                    III. Technical Requirements
                                                                          • Applicable Standards
                                                                          • Sampling & Testing
                                                                          • Calculation
                                                                          • Star Rating
                                                                    IV. Compliance Process
                                                                          • Registration
                                                                          • Label Request
                                                                          • Fees
                                                                    V. Market Surveillance
                                                                    VI. Future Plans

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                             November 22, 2011
         UAE Energy Efficiency Standardization & Labeling (EESL)
                           Program Launching

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners   November 22, 2011
              National Energy Efficiency and
              Conservation Program launching




     http://gulfnews.com/news/gulf/uae/environment/energy-efficiency-scheme-launched-in-uae-1.798304


    Dr. Rashid Ahmad Bin Fahd, Minister of Environment and Water, Chairman of
    the Emirates Authority for Standardization and Metrology and Eng. Mohamed
    Saleh Badri, Acting Director General of ESMA at the launch of the national
    energy efficiency and conservation program in 23/4/2011.

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                                      November 22, 2011
              Major Manufacturers
              Consultative Meeting


   June 13, 2011 – ESMA Office Dubai




  A meeting was held by ESMA to consult major manufacturers & industry players of
  the planned regulation and implementation process of the EESL program.



EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners      November 22, 2011
      UAE Energy Efficiency Standardization & Labeling (EESL)
                            Regulation

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners   November 22, 2011
              UAE.S 5010:2011
              UAE Energy Efficiency Regulation




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners   November 22, 2011
              OBJECTIVE
              UAE Energy Efficiency Regulation


   Objective:

          Ensure that all non-ducted air-conditioners (room air-conditioners) may be
          placed on the market or put into service only if:

           It does not endanger the safety of persons, domestic animals or
            property when properly installed and maintained and used in
            applications for which it was made;

           It complies with the Minimum Energy Efficiency Performance limits
            identified in the UAE.S 5010:2011

           It bears the registered Energy Efficiency Label as defined in the UAE.S
            5010:2011

           Having been constructed in accordance with good engineering practices
            in safety matters prevailing in the international community;

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners             November 22, 2011
              SCOPE
              UAE Energy Efficiency Regulation


   Scope:

          Single-phase household window-type and split-type non-ducted room air-
          conditioners using air and water-cooled condensers for residential use.




               window type                                          split type



EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                November 22, 2011
              APPLICABLE STANDARDS
              UAE Energy Efficiency Regulation




            - UAE.S 5010:2011
                  - Labeling – Energy Efficiency Label for
                       Electrical Appliances – Part 1: Household Air-
                       conditioners


            - UAE.S ISO 5151:2011
                  - Non-ducted air-conditioners and heat pumps
                       – testing and rating for performance




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners   November 22, 2011
      UAE Energy Efficiency Standardization & Labeling (EESL)
                      Technical Requirements

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners   November 22, 2011
              TESTING REQUIREMENTS
              Technical Requirements


                                                        Fully comply with the          electrical      safety
                                                         requirements of ECAS;

                                                        meet, at the least, the minimum energy
                                                         efficiency rating as stated in the UAE.S
                                                         5010:2011 - EER ≥ 5.90 (Btu-h)/W at T3;

                                                        Cooling capacity tests shall be done under T3
                                                         conditions as specified in the UAE.S ISO
                                                         5151:2011;

                                                        The value of EER (Btu-h)/W shall be rounded
                                                         and recorded to three (3) significant figures;

                                                        Test voltage shall be 230Va.c. (volts);

                                                        Frequency shall be 50Hz;

                                                        1 watt – 3.41214 Btu/h.
EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                                  November 22, 2011
              CALCULATION / FORMULA
              Technical Requirements



   Energy Efficiency Ratio (EER):

                                                              Total Cooling Capacity (in Btu-h)
                    EER (Btu-h)/W =
                                                                    Effective Power Input (in W)



   Annual Energy Consumption (EER):


               AEC (KW-h)/Year = (Total Input Power, in KW) X (1,000 Hours/Year)




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                                  November 22, 2011
              STAR RATING
              Technical Requirements




                        Star Rating                                    EER Limits
                                                                     (Btu-h)/W at T3
                                   5                                   EER ≥ 7.11
                                   4                                7.10 ≥ EER ≥ 6.81
                                   3                                6.80 ≥ EER ≥ 6.51
                                   2                                6.50 ≥ EER ≥ 6.31
                                   1                                6.30 ≥ EER ≥ 5.90

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                      November 22, 2011
      UAE Energy Efficiency Standardization & Labeling (EESL)
                        Compliance Process

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners   November 22, 2011
                REGISTRATION PROCESS
                Compliance Process

            1                                            #                       Process
                  Application
                                                         1 Client submits required documents for
                                                               EESL registration including Performance
            2     Review TR                                    test reports based on UAE standards.
                                                         2 Submitted application and test reports are
                                                               verified for compliance to minimum
        Y           Product                                    requirements.
                    Complies                  3
                       ?                                 3 Decision: Compliance to standards.

                            N
                                                         4 Reject product registration due to non-
                                                               compliance.
                     Reject
            4
                     Product                             5 If product meets minimum requirements,
                                                               EER is evaluated and the equivalent star
                  Assign Star                                  rating is assigned.
                                         5
                    Rating                               6 Findings of the review are recorded such
                                                               as, product details, star rating and annual
                    Record               6                     energy consumption in ESMA Data Bank
                    Findings
EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                                   November 22, 2011
              LABEL REQUEST PROCESS
              Compliance Process


        1
                 Request Serial                       #                         Process
                   Numbers
                                                      1 Once the model is registered, serial numbers
                                                            for each label should be requested.
        2       Review Request                        2 Application for the serial numbers is reviewed
                                                            to verify correctness of star ratings.
                                                      3 Serial numbers will then be awarded.
        3
                   Assign Serial                      4 Payment shall be done for no. of Units
                    Numbers


        4
                  Pay the Fees




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                                    November 22, 2011
              LABEL PLACEMENT
              Compliance Process

                          Window AC             Split AC (Outdoor)




                      Split AC (Indoor)          Carton Marking




EESL: Consultative Meeting – AC Manufacturers                        June 13, 2011
      UAE Energy Efficiency Standardization & Labeling (EESL)
                         Market Monitoring

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners   November 22, 2011
              MARKET INSPECTION/SURVEILLANCE
              Market Monitoring




                                                           The UAE market will be
                                                           monitored and sampling/testing
                                                           will be done making sure that
                                                           regulated products complies with
                                                           the existing UAE regulation.



EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                         November 22, 2011
              CHALLENGE TESTING
              Market Monitoring


                                                                    Challenge Testing Scheme
                                                                    allows the participation of
                                                                    manufacturers and traders in
                                                                    the market monitoring practice
                                                                    in the UAE.

                                                                    Mediated by ESMA, this paves
                                                                    the way for a sustainable
                                                                    market monitoring where the
                                                                    market monitors itself making
                                                                    sure that products available in
                                                                    the market presents proven
                                                                    values in terms of efficiency
                                                                    and safety.




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                          November 22, 2011
              CHALLENGE TESTING
              Market Monitoring




                 Challenger                                    ESMA       Brand Owner




                                                          3rd Party Lab




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                  November 22, 2011
              CHALLENGE TESTING
              Market Monitoring

          1
                         Lodge
                        Challenge

                         Evaluate
                        Challenger

                         Submit
                       Internal TR


                                                  N
                         Findings                              Notify         END
                          Valid?                             Challenger

                            Y

                      Notify Brand                     2
                        Owner                                       *Challenger details are kept 
                                                                    confidential.

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                                   November 22, 2011
              CHALLENGE TESTING
              Market Monitoring



                      ESMA & Brand Owner Collect
          2
                         Sample from Market




                             ESMA Arrange
                      Shipping/Transport of sample
                             to 3rd Party Lab



                       3rd Party Lab Proceeds with
                           Testing & Evaluation



                      3rd Party Lab Submits Formal
                                                                    3
                        report of findings to ESMA




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners       November 22, 2011
              CHALLENGE TESTING
              Market Monitoring

                      ESMA reviews & evaluates 3rd
          3
                          Party Lab Report




                                Challenger                  N        Challenger Pays Challenge
                                 Findings                                      Fees
                                                                                                     END
                                 Correct?

                                   Y

                                                                    Brand Owner Pays Challenge
                                                                              Fees


                        Notify Brand Owner of 3rd                       Brand Owner will be
                                                                                                      END
                              Party Findings                            penalized as per law


                                                                    Brand Owner Proceeds with
                                                                         Corrective Action

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                                November 22, 2011
              CHALLENGE FEES
              Market Monitoring


  Challenge Fees:

  - Sample Selection from the market (ESMA)
  - Sample Shipment (ESMA)
  - 3rd Party Testing Fees (ESMA)

  *Outcome of the result will be charged to either challenger or brand owner.




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners               November 22, 2011
              CORRECTIVE ACTIONS
              Market Monitoring


        Corrective Actions (challenger or brand owner):

        For Products still within MEP requirement:

        -    Re-assigning of star rating;
        -    Purchasing of the correct star rating serial numbers;
        -    Re-printing of correct labels and placement in the market as needed.
        -    Impose penalties as per Federal Law No. 28

        For Products failing to meet MEP requirement:

        - Recall products from the market.
        - Impose Penalties as per Federal Law No. 28




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners               November 22, 2011
      UAE Energy Efficiency Standardization & Labeling (EESL)
                           Future Plans


EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners   November 22, 2011
              FUTURE PLANS
              UAE’s Energy Efficiency Program




                                                                      2011
                                                                     Room Air-conditioners
                                                                     Non-ducted
                                                                     Window & Split




                                                             2012 2013
                                                           Lamps                  Air-conditioners
                                                           Washing Machines       Chillers & Ducted
                                                           Refrigerating          Types
                                                           Appliances

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                            November 22, 2011
              FUTURE PLANS
              AC Chillers & Ducted Types:




     Formulate                                     Agree on                         Approve       Allow 6 
                              Draft 
      National                                    Verification      Inform WTO     from UAE       month 
                            Regulation
     Committee                                     Program                          Cabinet     adjustment




   1st Q, 2012                                                                   4th Q, 2012

EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                              November 22, 2011
                                                      For more information:
                                                      Please contact:

                                                      Conformity Affairs Department
                                                      Emirates Authority for Standardization & Metrology

                                                      Eng. Marco Intalan
                                                      Tel:   04-2084360
                                                      Fax:   04-2951898
                                                      Email: marco.intalan@esma.ae
                                                             conformity@esma.ae



                                                                             Stand No.: Concourse 530




EESL Industry Meeting: Phase 1 – Non-ducted Room Air-conditioners                                 November 22, 2011

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:31
posted:9/25/2012
language:English
pages:30